CN105178290B - Steel tube pile with blast expanding device - Google Patents

Steel tube pile with blast expanding device Download PDF

Info

Publication number
CN105178290B
CN105178290B CN201510497328.3A CN201510497328A CN105178290B CN 105178290 B CN105178290 B CN 105178290B CN 201510497328 A CN201510497328 A CN 201510497328A CN 105178290 B CN105178290 B CN 105178290B
Authority
CN
China
Prior art keywords
quick
steel
explosive expansion
explosive
swollen cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510497328.3A
Other languages
Chinese (zh)
Other versions
CN105178290A (en
Inventor
杜湧
许书强
王泽平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan University of Technology
Original Assignee
Taiyuan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan University of Technology filed Critical Taiyuan University of Technology
Priority to CN201510497328.3A priority Critical patent/CN105178290B/en
Publication of CN105178290A publication Critical patent/CN105178290A/en
Application granted granted Critical
Publication of CN105178290B publication Critical patent/CN105178290B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to steel tube piles applied to foundation piles, in particular to a steel tube pile with a blast expanding device. The steel tube pile comprises a main steel tube 1, a blast expanding cylinder 2 and a front cone 3. The main steel tube 1 is connected to the blast expanding cylinder 2 through a steel pin 13. The front cone 3 is mounted to the blast expanding cylinder 2 through four screws or a threaded structure. The blast expanding device is located in the blast expanding cylinder 2 and mainly comprises a bottom lamination structure and an upper lamination structure, wherein the bottom lamination structure is composed of a double-layer structure or a multi-layer structure; the upper lamination structure is composed of a double-layer structure or a multi-layer structure. A blasting system is composed of blast expanding materials (explosives), a blast expanding bin, a detonating cord and a blasting machine. Since the blast expanding device is mounted or connected into the steel tube pile and a lantern-shaped local expanding part is formed through blast expanding, the anti-pressing, anti-pulling and anti-lateral comprehensive bearing capacity of the pile is effectively improved.

Description

Steel-pipe pile with explosive expansion device
Technical field
The present invention relates to construction project field, specially a kind of steel-pipe pile for being applied to ground operation, by steel-pipe pile Middle installation couples explosive expansion device, and the local for forming a lantern-shaped by explosive expansion expands part to effectively improve the anti-of stake Pressure, resistance to plucking anti-side to and comprehensive load capacity.
Background technology
At present, foundation pile plays a role mainly by pile side resistance and end resistance in traditional mode;When there is building Load is especially big, needs the larger bearing capacity of stake offer or in the similar engineering such as side slope consolidation projects and ocean engineering, right When breakout capacity requires very high, also it is difficult to reach high-bearing capacity only by the method for changing stake size and high withdrawal resistance need to Ask.Therefore need to redesign a kind of new steel-pipe pile to solve the above problems.
The content of the invention
The present invention is to solve when the bearing capacity or breakout capacity to steel-pipe pile requires very high, ordinary skill steel-pipe pile Only it is difficult to reach high-bearing capacity and high withdrawal resistance demand by changing size, there is provided a kind of new steel pipe with explosive expansion device Stake.
The present invention adopts the following technical scheme that realization:
A kind of steel-pipe pile with explosive expansion device, as shown in figure 1, including quick-fried swollen cylinder, the top connection master of the quick-fried swollen cylinder Steel pipe, its bottom connection precentrum.
As shown in figure 1, the quick-fried swollen cylinder inner bottom part and top are fixedly installed respectively laminated construction, lamination knot in quick-fried swollen cylinder Explosive expansion warehouse is installed, around cavity is formed, the cavity is formed the outer surface of the explosive expansion warehouse with quick-fried swollen cylinder inwall between structure Cross section closing explosive expansion storehouse in a ring, in the explosive expansion storehouse explosive is provided with;Axle is offered at the axis of the explosive expansion warehouse Xiang Kong, the axial hole bottom is with some radial holes being opened in the middle part of explosive expansion warehouse while UNICOM;Install in the axial hole There is exploding wire, the exploding wire is placed through the laminated construction at the top of quick-fried swollen cylinder and is connected with trigger.
When explosive explosive expansion, it can produce very big pressure.By the type of the selected explosive of control, weight and shape, The integrality of quick-fried swollen cylinder can be kept(It is quick-fried and break and control expand shape).As shown in figure 3, forming a lantern by explosive expansion The local of shape expand part effectively improve resistance to compression, resistance to plucking and the anti-side of stake to comprehensive load capacity.
After explosive explosive expansion, in general, to avoid the steel pin for connecting main steel pipe and quick-fried swollen cylinder from suffering damage.And precentrum It is impaired.Main steel pipe, quick-fried swollen cylinder and precentrum need to adopt to be had higher stake yield strength, ultimate strength, is particularly high ductility Material, can generally adopt structural steel, stainless steel, copper or copper alloy, aluminum or aluminum alloy.In order to be able to bear huge pressure, no The size and tube wall for requiring nothing more than quick-fried swollen cylinder should be greater than critical thickness, and laminated construction must also have and substantially reduce shock strength Ability.
When shock wave is constituted through interconnected materials by visibly different acoustic impedance or by fibre reinforced composites During laminated construction, it will disperse quickly.Dispersion, the ability for slackening shock wave depend primarily on the phase of acoustic impedance between materials at two layers The opposite sex.In order to prevent steel pin and precentrum undermined, it is provided with bottom laminated construction and top laminate structure to weaken shock wave Impact to other parts pile body and coupling part.Shock wave will be decayed rapidly during by laminated construction.When logical The pressure of previous Shockwave will greatly reduce when crossing laminated construction.High pressure explosive expansion gas will be discharged by radial hole and axial hole Come.Some laminated materials for being welded to quick-fried swollen cylinder inwall will be partially separated under the immense pressure of explosive, but still some To be intact.So in this way, the integrality of polycrystalline substance still can retain, and steel pin will not be damaged Or it is broken.
In the presence of explosive, quick-fried swollen cylinder will be expanded rapidly outwardly.The high pressure of quick-fried swollen cylinder periphery makes the soil pressure outside pipe contract, Substantially increase the packing and intensity of soil.In turn, the soil pressure that pipe appearance is subject to also will be greatly improved.In high strain-rate (>103/s)In the case of, the yield stress of quick-fried swollen bobbin body material will further be increased.Judging explosive and quick-fried swollen During the interaction of cylinder, it is necessary to take into account this factor.In addition, temperature is also a factor for needing to consider.
When shock wave travels to soil from quick-fried swollen cylinder, shock wave will reflect, incide in soil.According to shock theory thing Reason, back wave is a kind of rare ripple, and incidence wave is a kind of compressional wave, increases can soil density, so as to intensity increase.
Beneficial effects of the present invention are as follows:
In traditional mode, foundation pile affords the effect of frictional force, and frictional force is P*m, and wherein P is the malleation of soil Power, m are soil and pile body surface coefficient of friction.However, using in above-mentioned pattern, what foundation pile was born does not only have frictional force, There is the normal pressure for being far longer than frictional force.In fact in the present invention, even if frictional force is also greater than traditional mode, because surrounding Squeeze pressure P of the soil body in explosive expansion is bigger than in traditional mode, therefore, steel-pipe pile can bear bigger load.So of the invention There is significant advantage.Under identical bearing capacity, it is possible to use smaller size of pipe, and same support effect is reached, can be big It is big to reduce construction costs, with larger promotional value.
Description of the drawings
Fig. 1 represents steel-pipe pile generalized section before explosive expansion.
Fig. 2 represents the A-A sectional views of Fig. 1.
Fig. 3 represents steel-pipe pile generalized section after explosive expansion.
In figure, the main steel pipes of 1-, the quick-fried swollen cylinders of 2-, 3- precentrums, 4- laminated construction, 5- explosive expansion warehouses, 6- explosive expansions storehouse, 7- fries Medicine, 8- axial holes, 9- radial holes, 10- exploding wires, 11- initiators, 12- reinforcing rings, 13- steel pins, 14- bolts, 15- screws.
Specific embodiment
The specific embodiment of the present invention is described in detail below in conjunction with the accompanying drawings.
A kind of steel-pipe pile with explosive expansion device, is made up of main steel pipe 1, quick-fried swollen cylinder 2 with precentrum 3.Main steel pipe 1 passes through one Individual steel pin 13 is connected to the top of quick-fried swollen cylinder 2.Precentrum 3 is to be installed to quick-fried swollen cylinder 2 by four screws or helicitic texture Bottom.Explosive expansion device is installed in quick-fried swollen cylinder 2, is mainly included:One bottom laminated construction, by one group of double-deck or sandwich construction group Into;One top set structure, is made up of one group of bilayer or sandwich construction.One blasting system, by explosive expansion thing(Explosive 7)、 Explosive expansion warehouse 5, exploding wire 10, initiator 11 are constituted.
Concrete structure in quick-fried swollen cylinder is as follows:
As shown in figure 1, the quick-fried inner bottom part of swollen cylinder 2 and top are fixedly installed respectively laminated construction 4, laminated construction can be by two Layering or sandwich construction composition, but must be at what two kinds of different materials made.For the laminated construction of a double layerings, The acoustic impedance of wherein layer of material have to be lower than another layer material.The definition of acoustic impedance is that Cr, wherein C and r represent respectively sound The speed of sound and the density of material.And for the laminated construction of multilayer, the acoustic impedance of layers of material also must be inequality.Each layer Material can be using metal or nonmetallic materials(Fibre reinforced composites).Upper and lower laminated construction may have identical The number of plies and same layer material, it is also possible to different layer number and layer material.This depends entirely on individual actual conditions.It is located at First layer material of the laminated material in quick-fried swollen cylinder must be welded onto on quick-fried swollen cylinder, make the structure more powerful with this, Steel pin is allowed from infringement.But the laminated construction of bottom need not be welded to quick-fried swollen cylinder in quick-fried swollen cylinder, but be installed using bolt To on explosive expansion warehouse.
As shown in figure 1, explosive expansion warehouse 5, the outer surface of the explosive expansion warehouse 5 are provided with quick-fried swollen cylinder 2 between laminated construction 4 Around cavity is formed, the cavity forms cross section closing explosive expansion storehouse 6 in a ring with the quick-fried inwall of swollen cylinder 2, peace in the explosive expansion storehouse 6 Equipped with explosive 7, explosive 7 can also be replaced by solid propellant.The effect in explosive expansion storehouse is constraint explosive expansion, by changing shape, length Degree, diameter, can be with the pipe shape of formation after controlled blasting, so that it can bear peak power.Generally, after explosive expansion, quick-fried swollen cylinder Overall diameter will be enlarged by as original minimum twice.The area of its section also will be increased to few 4 times.
As shown in Figure 1, 2, offer axial hole 8 at the axis of the explosive expansion warehouse 5, the bottom of the axial hole 8 with open up Some radial holes 9 in the middle part of explosive expansion warehouse 5 are while UNICOM;Exploding wire 10, the exploding wire 10 are installed in the axial hole 8 The laminated construction 4 for being placed through the top of quick-fried swollen cylinder 2 is connected with initiator 11, initiator must with exploding wire 10 be closely contacted with Just can successfully ignite.Initiator is explosive initiation point.Explosive expansion ripple is propagated along an axial hole 8 and some radial holes 9.This A little radial holes(At least 8 holes)It is evenly distributed on the same cross section of explosive expansion warehouse 5, by radial hole, explosive expansion ripple can be smooth Ground, equably propagate in explosive expansion storehouse 6 and ignite and expand medicine 7.
As shown in figure 1, outer being located above and below explosive expansion storehouse 6 of the quick-fried swollen cylinder 2 is installed with respectively reinforcing ring 12, use To reduce the unnecessary expansion of pile pipe, reinforcing ring 12 is using metal material or fibre reinforced composites.
As shown in figure 3, the local for forming a lantern-shaped by explosive expansion expands part to effectively improve the resistance to compression of stake, resist Pull out with anti-side to comprehensive load capacity.
It is any technical scheme to be modified or equivalent, without departure from technical scheme Spirit and scope, it all should cover in the claims of the present invention.

Claims (10)

1. a kind of steel-pipe pile with explosive expansion device, including quick-fried swollen cylinder(2), the quick-fried swollen cylinder(2)Top connect main steel pipe (1), its bottom connection precentrum(3);
It is characterized in that:The quick-fried swollen cylinder(2)Inner bottom part and top are fixedly installed respectively laminated construction(4), quick-fried swollen cylinder(2)It is interior Laminated construction(4)Between explosive expansion warehouse is installed(5), the explosive expansion warehouse(5)Outer surface around forming cavity, the cavity with Quick-fried swollen cylinder(2)Inwall forms cross section closing explosive expansion storehouse in a ring(6), the explosive expansion storehouse(6)Explosive is inside installed(7);Institute State explosive expansion warehouse(5)Axis at offer axial hole(8), the axial hole(8)Bottom be opened in explosive expansion warehouse(5)Middle part Some radial holes(9)While UNICOM;The axial hole(8)Exploding wire is inside installed(10), the exploding wire(10)Through position In quick-fried swollen cylinder(2)The laminated construction at top(4)With initiator(11)Connection.
2. the steel-pipe pile with explosive expansion device according to claim 1, it is characterised in that:The quick-fried swollen cylinder(2)It is located at outward Explosive expansion storehouse(6)Above and below be installed with reinforcing ring respectively(12).
3. the steel-pipe pile with explosive expansion device according to claim 1 and 2, it is characterised in that:The laminated construction(4)By Two layerings or sandwich construction composition, the acoustic impedance of layers of material is inequality.
4. the steel-pipe pile with explosive expansion device according to claim 3, it is characterised in that:The laminated construction(4)It is each Layer material is using metal material or fibre reinforced composites.
5. the steel-pipe pile with explosive expansion device according to claim 4, it is characterised in that:Positioned at quick-fried swollen cylinder(2)Inner top Laminated construction(4)Ground floor and quick-fried swollen cylinder(2)Welding;Positioned at quick-fried swollen cylinder(2)The laminated construction of inner bottom part(4)By bolt (14)With explosive expansion warehouse(5)Connection.
6. the steel-pipe pile with explosive expansion device according to claim 1, it is characterised in that:The main steel pipe(1)It is swollen with quick-fried Cylinder(2)By steel pin(13)Connection;The quick-fried swollen cylinder(2)And precentrum(3)By screw(15)Or helicitic texture connection.
7. the steel-pipe pile with explosive expansion device according to claim 6, it is characterised in that:The main steel pipe(1), quick-fried swollen cylinder (2)And precentrum(3)Made using structural steel, stainless steel, copper or copper alloy or aluminum or aluminum alloy.
8. the steel-pipe pile with explosive expansion device according to claim 7, it is characterised in that:The radial hole(9)Uniform position In same cross section, quantity at least 8.
9. the steel-pipe pile with explosive expansion device according to claim 8, it is characterised in that:The explosive(7)Pushed away by solid Enter agent replacement.
10. the steel-pipe pile with explosive expansion device according to claim 2, it is characterised in that:The reinforcing ring(12)Using Metal material or fibre reinforced composites.
CN201510497328.3A 2015-08-14 2015-08-14 Steel tube pile with blast expanding device Expired - Fee Related CN105178290B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510497328.3A CN105178290B (en) 2015-08-14 2015-08-14 Steel tube pile with blast expanding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510497328.3A CN105178290B (en) 2015-08-14 2015-08-14 Steel tube pile with blast expanding device

Publications (2)

Publication Number Publication Date
CN105178290A CN105178290A (en) 2015-12-23
CN105178290B true CN105178290B (en) 2017-05-10

Family

ID=54900680

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510497328.3A Expired - Fee Related CN105178290B (en) 2015-08-14 2015-08-14 Steel tube pile with blast expanding device

Country Status (1)

Country Link
CN (1) CN105178290B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120720B (en) * 2016-07-02 2018-02-13 南通大学 A kind of construction foundation working equipment and construction method
CN106013096B (en) * 2016-07-02 2017-11-10 南通长城建设集团有限公司 A kind of construction foundation working method
CN107356487B (en) * 2017-08-22 2023-05-02 中国工程物理研究院化工材料研究所 High overload loading device based on stress wave multiple reflection under action of high explosive
CN114319331B (en) * 2022-03-08 2022-06-21 中国长江三峡集团有限公司 Construction method of underwater pipe pile type foundation and underwater pipe pile type foundation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001348867A (en) * 2001-04-13 2001-12-21 Nkk Corp Screwed type steel pipe and its work execution method
CN101126237A (en) * 2007-09-29 2008-02-20 周亚萍 Blasting pile-forming method for three-stage bottom-enlarging prefabricated and cast-in-situ steel concrete combination pile body
CN101235639A (en) * 2008-02-18 2008-08-06 翟宇思 Exploding expanding device for concrete filling pore bottom exploding expanding pile and pile forming method
CN101942831A (en) * 2010-09-16 2011-01-12 关洪军 Method for blasting and enlarging jet grouting pile
CN102031775A (en) * 2010-06-12 2011-04-27 中铁十六局集团有限公司 Construction technology of drilled pile in hard oblique rocks by medium hole blasting

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001348867A (en) * 2001-04-13 2001-12-21 Nkk Corp Screwed type steel pipe and its work execution method
CN101126237A (en) * 2007-09-29 2008-02-20 周亚萍 Blasting pile-forming method for three-stage bottom-enlarging prefabricated and cast-in-situ steel concrete combination pile body
CN101235639A (en) * 2008-02-18 2008-08-06 翟宇思 Exploding expanding device for concrete filling pore bottom exploding expanding pile and pile forming method
CN102031775A (en) * 2010-06-12 2011-04-27 中铁十六局集团有限公司 Construction technology of drilled pile in hard oblique rocks by medium hole blasting
CN101942831A (en) * 2010-09-16 2011-01-12 关洪军 Method for blasting and enlarging jet grouting pile

Also Published As

Publication number Publication date
CN105178290A (en) 2015-12-23

Similar Documents

Publication Publication Date Title
CN105178290B (en) Steel tube pile with blast expanding device
Teng et al. Behavior of hybrid FRP-concrete-steel double-skin tubular columns
CN107675800A (en) (SMA) self-resetting deformation coordinates floor node structure
NO317755B1 (en) Method of expanding a stable rudder and well with such a rudder
CN105102722A (en) Vertical pneumatic fender
CN207032556U (en) Buckling restrained brace and building containing yi word pattern dissipative cell
CN110374085B (en) Double-layer threaded steel pipe pile for coral sand foundation and construction method
CN105840223A (en) Large-deformation self-repairing anti-rockburst anchor rod
CN105928428A (en) Closed spherical anti-explosion container filled with hollow balls
CN107178336A (en) A kind of outburst prevention device of packing element
CN107476459A (en) Buckling restrained brace, building and assemble method containing yi word pattern dissipative cell
CN1280537A (en) Device for mutual support of two construction members
CN110259495A (en) A kind of compound support method based on erosion control decompression anchor cable
CN105113501B (en) Formula large diameter cylinder suction anchor is extended out with explosive expansion device
CN113445670A (en) Prefabricated and assembled composite steel pipe concrete lattice column and construction method
US9851043B2 (en) Crack arrestor
CN105155532B (en) Double expansion formula large diameter cylinder suction anchors with explosive expansion device
CN116241301A (en) Super-structure grouting anchor rod device with pull-up self-reinforcement function
RU2560125C2 (en) High-pressure cylinder
CN101059068B (en) Self-adapting bulging head expanding tube reinforcement device
CN201093131Y (en) Glass fibre reinforced plastic pressure tube
CN211970493U (en) Large-scale antiknock container of lightweight with pressure release function
US7409988B2 (en) Blowout preventer packing element with non-metallic composite inserts
CN208816120U (en) A kind of steel gas fracturing pipe
CN207332905U (en) Utilize the big stroke rod-type damper of performance behind material peak

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Du Yong

Inventor after: Xu Shuqiang

Inventor after: Wang Zeping

Inventor before: Du Yong

Inventor before: Wang Zeping

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170510

Termination date: 20170814

CF01 Termination of patent right due to non-payment of annual fee