CN102031775A - Construction technology of drilled pile in hard oblique rocks by medium hole blasting - Google Patents

Construction technology of drilled pile in hard oblique rocks by medium hole blasting Download PDF

Info

Publication number
CN102031775A
CN102031775A CN2010101990941A CN201010199094A CN102031775A CN 102031775 A CN102031775 A CN 102031775A CN 2010101990941 A CN2010101990941 A CN 2010101990941A CN 201010199094 A CN201010199094 A CN 201010199094A CN 102031775 A CN102031775 A CN 102031775A
Authority
CN
China
Prior art keywords
hole
big gun
plastic bushing
boring
construction technology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010101990941A
Other languages
Chinese (zh)
Other versions
CN102031775B (en
Inventor
江拔其
胡伟
郑先奇
徐华轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CN201010199094.1A priority Critical patent/CN102031775B/en
Publication of CN102031775A publication Critical patent/CN102031775A/en
Application granted granted Critical
Publication of CN102031775B publication Critical patent/CN102031775B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to a construction technology of a drilled pile in hard oblique rocks by medium hole blasting. In the construction technology, the technologies of drilling a hole, charging, injecting water, backfilling and constructing the drilled pile are utilized, and the invention is characterized in that the construction technology of the drilled pile in the hard oblique rocks by medium hole blasting is as follows: using a geological drill to drill a blast hole at the center of the pile; charging explosive in the blast hole; injecting water, backfilling, and blasting; and constructing the drilled pile. The construction technology can be used in the construction of the drilled pile in the hard oblique rocks, the construction speed is fast, the operation is simple, and the cost is low.

Description

Hard tiltedly rock mesopore blasting boreholes pile construction technology
Technical field
The invention belongs to field of civil engineering, particularly relate to a kind of novel hard tiltedly rock mesopore blasting boreholes pile construction technology, adopt the center of geological prospecting rig in stake, boring (Ф=110mm) as the big gun hole, put into the blasting charge and carry out explosion, country rock around the broken big gun hole is easy to drilled pile construction.
Background technology
Karst is to be subjected to the chemical corrosion of water for a long time and to be formed by solubility rocks such as limestone.Karst strata exists solution cavity, lapies, fluid bowl, especially solution cavity top (end) plate interlocking, and height differs greatly.Limestone is subjected to the chemolysis of water for a long time, and the rock stratum exists uneven or half rock, half native, half rock, the half molten and slope rock of soft or hard.It is the difficult point technology of karst pile foundation boring that karst is grown the rock drilled pile inclined hole correction of slope, stratum by force.And the conventional job practices of the drilled pile of in the past taking, the not only time-consuming material that takes, and also construction speed is very slow, and the hard tiltedly rock mesopore blasting boreholes pile construction technology of invention facts have proved that this invention speed of application is fast, and expense is low, easy operating.
Summary of the invention
Adopt the geological prospecting rig in the center of stake, Ф=110mm is as the big gun hole in boring, and blast hole depth lacks 50~80cm than the design hole depth, is not subjected to the destruction of explosion and influences bearing capacity of pile tip to guarantee stake end rock stratum.Because grow the bad ground area by force at karst and carry out drilling construction, solution cavity causes being difficult to pore-forming often.The geological prospecting rig can be taked corresponding technical measures according to non-filler and solution cavity filler situation are arranged in the solution cavity when boring runs into solution cavity: during non-filler, can adopt steel sleeve follow-up guard aperture drilling and forming hole in running into solution cavity; When in running into solution cavity, filler being arranged, can utilize geological prospecting rig pressure injection cement paste according to solution cavity filler situation, at the fixed solution cavity filler of certain limit drilling and forming hole.After boring reaches the requirement hole depth, residue and the interior silt particle of mud in the cleaning hole, utilize rig to carry out hole clearly, silt boring up to prevent that silt particle from refluxing.
Drilled pile deep hole hydraulic pressure demolition, its cartridge bag belongs to the internal action cartridge bag.What design principles of control cartridge bag amount is that its cartridge bag amount causes the crack of big gun hole rock crusher or generation to be controlled in a stake footpath scope and gets final product with interior.At present, the computational methods that the author takes promptly need broken volume to multiply by the total charge that the unit administration amount is exactly the big gun hole as the deep hole hydraulic pressure demolition.For example 333# pier 1# stake, stake footpath 1m, the dark 17m in rock stratum (the dark 34m of stake), then fragmentation volume V=(1/2) 2π * 17=13.35m 2, unit with π dose q through trying the quick-fried 1.6kg/m3 that is defined as at last, big gun hole total charge Q=q * V=21.36kg, reality has been adorned 21.6kg.
The present invention compares with open-air deep hole hydraulic pressure demolition, open-air conventional deep hole blasting, chamber blasting and Tunnel Blasting has following advantage: simple to operate, each root has the stake of rock stratum only to design a big gun hole, stake with the big gun hole do not have and get in touch, detonate separately, the design in each big gun hole does not involve parameters such as borehole spacing, array pitch, bench height.
Description of drawings
Fig. 1 electric initiating charge constitution schematic diagram;
Fig. 2 fuse arming test experiment initiation charge constitution schematic diagram.
The specific embodiment
Drilled pile deep hole hydraulic pressure demolition is divided into processes such as boring, powder charge water filling, backfill obstruction and percussive drilling by the construction succession.
1, adopt geology to be drilled in pile center's axial location by big gun hole of stake deep drilling.In boring procedure, owing to soil layer is arranged, may also have solution cavity,, must outside the geology drill bit, put into steel sleeve for preventing to promote the geology drill bit hole of outside the big gun hole, collapsing.Occur the hole of collapsing outside the big gun hole again for preventing that steel sleeve from extracting, must in steel sleeve, reinstall plastic bushing.After treating that plastic bushing is inserted in, just can extract steel sleeve outside the big gun hole, and plastic bushing is still motionless in situ.
2, a reinforcing bar that is tied with a plurality of cartridge bags is put into the big gun hole along plastic bushing, water filling in the plastic bushing then treats that water rises to when the 3m left and right sides, big gun aperture, stops up with the stemming backfill.For preventing that stemming from sneaking in the water, between water and the stemming spacer is arranged, it is just passable as spacer in fact to twist into group with grass.
3, after the explosion, can hole with Churn drill immediately.

Claims (1)

1. hard tiltedly rock mesopore blasting boreholes pile construction technology comprises boring, powder charge water filling, backfill obstruction and percussive drilling, uses the boring of geological prospecting rig, carries out the deep hole hydraulic pressure demolition, and reduction boring rock stratum hardness is accelerated boring drilling depth, correction correction inclined hole.
Described bore process adopts:
Geology is drilled in pile center's axial location by big gun hole of stake deep drilling, and the geology drill bit is put into steel sleeve outward, the plastic bushing of in steel sleeve, packing into, treat that plastic bushing is inserted in after, just can extract steel sleeve outside the big gun hole, and plastic bushing is still motionless in situ.
Process using is stopped up in described powder charge water filling and backfill:
A reinforcing bar that is tied with a plurality of cartridge bags is put into the big gun hole along plastic bushing, and water filling in the plastic bushing then treats that water rises to when the 3m left and right sides, big gun aperture, stops up with the stemming backfill, between water and the stemming spacer is arranged, and available grass twists into group as spacer.
CN201010199094.1A 2010-06-12 2010-06-12 Construction technology of drilled pile in hard oblique rocks by medium hole blasting Active CN102031775B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010199094.1A CN102031775B (en) 2010-06-12 2010-06-12 Construction technology of drilled pile in hard oblique rocks by medium hole blasting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010199094.1A CN102031775B (en) 2010-06-12 2010-06-12 Construction technology of drilled pile in hard oblique rocks by medium hole blasting

Publications (2)

Publication Number Publication Date
CN102031775A true CN102031775A (en) 2011-04-27
CN102031775B CN102031775B (en) 2015-04-29

Family

ID=43885177

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010199094.1A Active CN102031775B (en) 2010-06-12 2010-06-12 Construction technology of drilled pile in hard oblique rocks by medium hole blasting

Country Status (1)

Country Link
CN (1) CN102031775B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102913132A (en) * 2012-09-29 2013-02-06 中铁十九局集团有限公司 Method for processing inclined rock of drilled pile near existing line karst area
CN103015407A (en) * 2012-12-01 2013-04-03 李尚喜 High-rise building foundation sister hole blasting building and construction method on mountain stone
CN103422494A (en) * 2013-03-12 2013-12-04 中国建筑第四工程局有限公司 In-situ position exploding hole forming method and device for multi-layer rock in cast-in-place pile
CN103967001A (en) * 2013-01-25 2014-08-06 深圳市勘察测绘院有限公司 Hole-forming construction method for punching pile
CN105113501A (en) * 2015-08-14 2015-12-02 太原理工大学 External expansion type large-diameter cylinder suction pile provided with explosive enlargement device
CN105155532A (en) * 2015-08-14 2015-12-16 太原理工大学 Double-expansion type large-diameter cylinder suction pile with explosion expanding device
CN105178290A (en) * 2015-08-14 2015-12-23 太原理工大学 Steel tube pile with blast expanding device
CN108589704A (en) * 2018-04-11 2018-09-28 广东梁亮建筑工程有限公司 Concrete pouring of punched hole piles method
CN110779405A (en) * 2019-10-21 2020-02-11 中建五局土木工程有限公司 Weak disturbance controlled blasting construction system and construction method for foundation pit

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001200551A (en) * 2000-01-18 2001-07-27 Chem Grouting Co Ltd Trench excavation method and its device
CN1397783A (en) * 2002-07-18 2003-02-19 许祖岳 Explosion method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001200551A (en) * 2000-01-18 2001-07-27 Chem Grouting Co Ltd Trench excavation method and its device
CN1397783A (en) * 2002-07-18 2003-02-19 许祖岳 Explosion method

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102913132A (en) * 2012-09-29 2013-02-06 中铁十九局集团有限公司 Method for processing inclined rock of drilled pile near existing line karst area
CN102913132B (en) * 2012-09-29 2016-06-01 中铁十九局集团有限公司 Method for processing inclined rock of drilled pile near existing line karst area
CN103015407A (en) * 2012-12-01 2013-04-03 李尚喜 High-rise building foundation sister hole blasting building and construction method on mountain stone
CN103967001A (en) * 2013-01-25 2014-08-06 深圳市勘察测绘院有限公司 Hole-forming construction method for punching pile
CN103422494B (en) * 2013-03-12 2015-09-23 中国建筑第四工程局有限公司 Multi-layer rock original position drilling by blasting method and device in castinplace pile
CN103422494A (en) * 2013-03-12 2013-12-04 中国建筑第四工程局有限公司 In-situ position exploding hole forming method and device for multi-layer rock in cast-in-place pile
CN105113501A (en) * 2015-08-14 2015-12-02 太原理工大学 External expansion type large-diameter cylinder suction pile provided with explosive enlargement device
CN105155532A (en) * 2015-08-14 2015-12-16 太原理工大学 Double-expansion type large-diameter cylinder suction pile with explosion expanding device
CN105178290A (en) * 2015-08-14 2015-12-23 太原理工大学 Steel tube pile with blast expanding device
CN105178290B (en) * 2015-08-14 2017-05-10 太原理工大学 Steel tube pile with blast expanding device
CN105113501B (en) * 2015-08-14 2017-05-31 太原理工大学 Formula large diameter cylinder suction anchor is extended out with explosive expansion device
CN105155532B (en) * 2015-08-14 2017-06-16 太原理工大学 Double expansion formula large diameter cylinder suction anchors with explosive expansion device
CN108589704A (en) * 2018-04-11 2018-09-28 广东梁亮建筑工程有限公司 Concrete pouring of punched hole piles method
CN108589704B (en) * 2018-04-11 2020-10-27 广东梁亮建筑工程有限公司 Construction method of punching cast-in-place pile
CN110779405A (en) * 2019-10-21 2020-02-11 中建五局土木工程有限公司 Weak disturbance controlled blasting construction system and construction method for foundation pit
CN110779405B (en) * 2019-10-21 2022-02-11 中建五局土木工程有限公司 Weak disturbance controlled blasting construction system and construction method for foundation pit

Also Published As

Publication number Publication date
CN102031775B (en) 2015-04-29

Similar Documents

Publication Publication Date Title
CN102031775B (en) Construction technology of drilled pile in hard oblique rocks by medium hole blasting
CN103758524B (en) A kind of segment blast driving shaft construction method
CN104533467B (en) A kind of high artesian, the method for protecting support in fault disruption zone tunnel
CN103244180B (en) Gob-side entry driving surrounding rock control method using remaining small pillars
CN107120137B (en) A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method
CN102278130A (en) Process method for reinforcing and grouting of high-pressure water-rich solution cavity of tunnel
CN102505687B (en) Pre-explosion drilling, grouting and anchoring integrated anchor rod and construction method thereof
CN105466292A (en) Medium-length hole blasting technology used in semi-coal-rock roadway
CN106437711A (en) Coal seam impact type mine earthquake prevention and control method
CN107816366A (en) A kind of multilayer goaf filling well is into well engineering method
CN202416312U (en) Pre-blastable anchor rod with integration of drilling, injecting and anchoring
CN115749713A (en) Rock stratum frequency conversion pulse fracture network fracturing method and equipment
CN102383813A (en) Construction method for ultralong loess accumulative roc tunnel
CN110656947A (en) Method for tunneling raised section of seabed bedrock
CN104074184B (en) Pile base post-grouted expanded-base bored pile
CN105545315A (en) Normal pressure tool replacing method for reinforcing excavation face soil layer in shield tunnel construction
CN103132515A (en) Calabash type anchor rod
CN209961089U (en) Well stroke ization shale geology is bored to explode and is buried medicine structure
CN103774654A (en) Olive-shaped anti-slip key grouted anchoring supporting blasting tube type anchor rod
CN108843327B (en) Tunnel excavation method based on soundless cracking agent
CN113700016B (en) Ground water plugging method for extremely strong flowing water passing channel of underground mine
CN105626100A (en) Method for improving strength of coal and rock mass by carrying out grouting and drilling on coal walls of three soft coal seams
CN208472721U (en) A kind of anchor pole constructed in loose media stratum using hand air drill
CN107726935B (en) Pile foundation construction method for large-angle inclined plane hard rock stratum
CN111594183A (en) Coal seam deep hole blasting pressure relief method for improving blasting effect by using original pressure relief holes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant