CN105155781A - Reinforced connecting structure and method between precast reinforced concrete components - Google Patents

Reinforced connecting structure and method between precast reinforced concrete components Download PDF

Info

Publication number
CN105155781A
CN105155781A CN201510570717.4A CN201510570717A CN105155781A CN 105155781 A CN105155781 A CN 105155781A CN 201510570717 A CN201510570717 A CN 201510570717A CN 105155781 A CN105155781 A CN 105155781A
Authority
CN
China
Prior art keywords
bolt
hole
connector
sleeve
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510570717.4A
Other languages
Chinese (zh)
Inventor
祝磊
高振华
顾辰
张其宁
张迎霞
孙海林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Langfang Yuzeli Building Material Technology Co Ltd
Beijing University of Civil Engineering and Architecture
Original Assignee
Langfang Yuzeli Building Material Technology Co Ltd
Beijing University of Civil Engineering and Architecture
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Langfang Yuzeli Building Material Technology Co Ltd, Beijing University of Civil Engineering and Architecture filed Critical Langfang Yuzeli Building Material Technology Co Ltd
Priority to CN201510570717.4A priority Critical patent/CN105155781A/en
Publication of CN105155781A publication Critical patent/CN105155781A/en
Pending legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention belongs to the technical field of building connecting structures and in particular relates to a reinforced connecting structure and method between precast reinforced concrete components. The reinforced connecting structure between the precast reinforced concrete components comprises a connecting piece, butt-jointed reinforcements, a bolt, a sleeve and a nut, wherein the connecting piece is hollow in the middle; a first threaded through hole is formed in one end of the connecting piece; a second through hole is formed in the other end of the connecting piece. Before the precast components are connected, first, the first threaded through hole of the connecting piece is connected with one butt-jointed reinforcement through threads, the other butt-jointed reinforcement is connected with the bolt through a sleeve thread, the bolt penetrates into the second through hole of the connecting piece while the precast components are in place, the length of the bolt being fastened into the sleeve is adjusted so that the bolt is closely connected with the connecting piece through the nut in the connecting piece, and the sleeve and the nut are tightened by using a torque wrench; therefore, whether an enough torque is reached or not is convenient to check. According to the reinforced connecting structure and method between the precast reinforced concrete components, provided by the invention, an error problem in the actual engineering abut-jointing process of the precast concrete components is solved; the loading performance and the seismic resistance of the reinforced connecting structure are high; the wet construction amount can be reduced; the assembling ratio is increased; the construction process is simplified; and the engineering cost is reduced.

Description

Steel bar connecting structure between a kind of precast reinforced concrete structure and mode thereof
Technical field
The invention belongs to building syndeton technical field, particularly relate to the steel bar connecting structure between a kind of precast reinforced concrete structure and mode thereof.
Background technology
As everyone knows, assembly concrete building have superior in quality, the duration is shorter, energy conservation, consumption reduce, produce many advantages such as clean.This adopts precast reinforced concrete structure mainly due to prefabricated concrete structure building more, uses industrialization technology to build and forms.Precast reinforced concrete structure is produced by prefabrication, is connected to become entirety at building-site by some connected modes.Therefore the bar connecting of prefabricated concrete structure is the key affecting structural safety, and the construction technology of bar connecting also has larger impact to construction quality and installation effectiveness.
Assembly concrete building is often higher to the positioning requirements of precast reinforced concrete structure docking reinforcing bar, and allowable deviation is generally 2 ~ 3mm.In practice of construction process, after the reason such as appearance and size of prefabricated units can cause prefabricated units in place, there is larger deviation in its docking reinforcing bar, cause the connection of reinforcing bar to occur a difficult problem on axis direction or abutting direction.For solving this difficult problem, the method generally adopted in the world is at present sleeve grouting connected mode.The existing national sector standard of China " prefabricated concrete structure tecnical regulations " JGJ1-2014 has carried out pertinent regulations to this connecting method for reinforcing bars adopted in prefabricated structural element.But sleeve grouting connected mode also has the shortcoming of self, is first that joint area concreting is more difficult, concrete is closely knit not.Secondly the casting technique quality requirement of sleeve is high, and cutwork amount is large, and complex procedures, processing cost is high.These problems all can limit application and the technical development of China's assembling frame structure.
Summary of the invention
In order to avoid the grouting of above-mentioned sleeve connect existing for weak point, the present invention proposes steel bar connecting structure between a kind of precast reinforced concrete structure and mode thereof.
Syndeton comprises: connector, docking reinforcing bar, bolt, sleeve, nut; Be empty in the middle of described connector, one end has the first tapped through hole, and the other end has the second through hole, and the first tapped through hole internal diameter matches with the major diameter of thread of docking reinforcing bar, and the internal diameter of the second through hole is greater than the first tapped through hole internal diameter and is less than sleeve outer diameter;
Connector is docked screw thread steel by the first tapped through hole be connected with one; Another root docking reinforcing bar is connected by bush whorl with bolt; The bolt part be exposed at outside sleeve penetrates the second through hole of connector, and sleeve is stuck in outside the second through hole of connector, fastening nut on bolt.
Described connector is high-strength steel material, and bolt is high-strength bolt, and nut is high-strength nut.
The shape of described connector 1 is any one in rectangle, circle, trapezoidal, ellipse.
Described connector 1 is frame construction or loop configuration.
Connected mode comprises:
Before prefabricated units connect, first the first tapped through hole of connector is docked screw thread steel be connected with one; Another root docking reinforcing bar is connected by bush whorl with bolt; While prefabricated units are in place, bolt penetrates the second through hole of connector, and adjustment bolt screws in the length of sleeve, make connector inner by bolt and connector by nut compact siro spinning technology, sleeve and nut torque wrench are tightened, and whether convenient inspection reaches enough moments of torsion.
Beneficial effect of the present invention is: the connecting method for reinforcing bars adopting special connector and high-strength bolt, solves the offset issue of precast unit in Practical Project docking; Connect effect firm, can ensure that building structure possesses sufficient supporting capacity, anti-seismic performance.Convenient construction transport and the requirement realizing suitability for industrialized production fast can be met, and wet trade quantity can be reduced, improve assembling ratio, simplify construction technology, reduce construction costs.
Accompanying drawing explanation
Fig. 1 is the steel bar connecting structure figure between a kind of precast reinforced concrete structure.
Fig. 2 is the prefabricated connector processed.
Connector is connected with docking screw thread steel by Fig. 3.
High-strength bolt is docked reinforcing bar with another to pass through sleeve connection by Fig. 4.
Fig. 5 be concrete prefabricated element in place while, high-strength bolt is through another through hole of connector.
Fig. 6 is the syndeton in tensile loads experiment.
Fig. 7 is the syndeton after tensile loads experiment.
Fig. 8 is tensile loads experimental data figure.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiment is elaborated.
Steel bar connecting structure between a kind of precast reinforced concrete structure and mode thereof.
As shown in Figure 1, syndeton comprises: connector 1, docking reinforcing bar 2, bolt 3, sleeve 4, nut 5; As shown in Figure 2, be empty in the middle of connector 1, one end has the first tapped through hole, and the other end has the second through hole, and the first tapped through hole internal diameter matches with the major diameter of thread of docking reinforcing bar, and the internal diameter of the second through hole is greater than the first tapped through hole internal diameter and is less than sleeve outer diameter;
Connector 1 is docked screw thread steel by the first tapped through hole be connected with one; Another root docking reinforcing bar is threaded by sleeve 4 with bolt 3; Bolt 3 part be exposed at outside sleeve 4 penetrates the second through hole of connector 1, and sleeve 4 is stuck in outside the second through hole of connector 1, fastening nut 5 on bolt 3.
Described connector 1 is high-strength steel material, and bolt 3 is high-strength bolt, and nut is high-strength nut.
The shape of described connector 1 is any one in rectangle, circle, trapezoidal, ellipse.
Described connector 1 is frame construction or loop configuration.
Connected mode comprises:
Before prefabricated units connect, as shown in Figure 3, first the first tapped through hole of connector 1 is docked screw thread steel be connected with one; As shown in Figure 4, another root docking reinforcing bar is threaded by sleeve 4 with bolt 3; While prefabricated units are in place, as shown in Figure 5, bolt 3 penetrates the second through hole of connector 1, adjustment bolt screws in the length of sleeve, make connector inner by bolt and connector by nut 5 compact siro spinning technology, as shown in Figure 1, sleeve and nut torque wrench are tightened, and whether convenient inspection reaches enough moments of torsion.
As shown in Figure 6, the reliability adopting the metal tensile test at room temperature of this kind of bar connecting mode to demonstrate this kind of bar connecting mode by two groups.Test Loading Control is carried out according to the regulation of " mechanical connection technique of reinforcement code ".As shown in Figure 7, the result display of test, there is obvious constriction in the rear lengths of rebar of test specimen surrender and coupling part stands intact.Thus illustrate that this kind of connected mode can ensure bar connecting very well, and the requirement of I level bar splice in can reaching " mechanical connection technique of reinforcement code ".Fig. 8 gives specific experiment data.
This embodiment is only the present invention's preferably detailed description of the invention; but protection scope of the present invention is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses, the change that can expect easily or replacement, all should be encompassed within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection domain of claim.

Claims (5)

1. the steel bar connecting structure between precast reinforced concrete structure, is characterized in that, comprising:
Connector, docking reinforcing bar, bolt, sleeve, nut; Be empty in the middle of described connector, one end has the first tapped through hole, and the other end has the second through hole, and the first tapped through hole internal diameter matches with the major diameter of thread of docking reinforcing bar, and the internal diameter of the second through hole is greater than the first tapped through hole internal diameter and is less than sleeve outer diameter;
Connector is docked screw thread steel by the first tapped through hole be connected with one; Another root docking reinforcing bar is connected by bush whorl with bolt; The bolt part be exposed at outside sleeve penetrates the second through hole of connector, and sleeve is stuck in outside the second through hole of connector, fastening nut on bolt.
2. steel bar connecting structure according to claim 1, it is characterized in that, described connector is high-strength steel material, and bolt is high-strength bolt, and nut is high-strength nut.
3. steel bar connecting structure according to claim 1, is characterized in that, the shape of described connector is any one in rectangle, circle, trapezoidal, ellipse.
4. steel bar connecting structure according to claim 1, it is characterized in that, described connector is frame construction or loop configuration.
5., based on a bar connecting mode for steel bar connecting structure described in claim 1, it is characterized in that, comprising:
Before prefabricated units connect, first the first tapped through hole of connector is docked screw thread steel be connected with one; Another root docking reinforcing bar is connected by bush whorl with bolt; While prefabricated units are in place, bolt penetrates the second through hole of connector, and adjustment bolt screws in the length of sleeve, make connector inner by bolt and connector by nut compact siro spinning technology, sleeve and nut torque wrench are tightened, and whether convenient inspection reaches enough moments of torsion.
CN201510570717.4A 2015-09-09 2015-09-09 Reinforced connecting structure and method between precast reinforced concrete components Pending CN105155781A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510570717.4A CN105155781A (en) 2015-09-09 2015-09-09 Reinforced connecting structure and method between precast reinforced concrete components

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510570717.4A CN105155781A (en) 2015-09-09 2015-09-09 Reinforced connecting structure and method between precast reinforced concrete components

Publications (1)

Publication Number Publication Date
CN105155781A true CN105155781A (en) 2015-12-16

Family

ID=54796791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510570717.4A Pending CN105155781A (en) 2015-09-09 2015-09-09 Reinforced connecting structure and method between precast reinforced concrete components

Country Status (1)

Country Link
CN (1) CN105155781A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638981A (en) * 2016-11-22 2017-05-10 湖南远大工程设计有限公司 Steel bar connection structure of prefabricated parts
CN107254912A (en) * 2017-07-11 2017-10-17 应义淼 A kind of prefabricated concrete structure connection method
CN107338911A (en) * 2016-11-22 2017-11-10 湖南远大工程设计有限公司 Precast shear wall steel bar connecting joints
CN107419809A (en) * 2017-08-17 2017-12-01 山东远博建筑科技有限公司 A kind of assembled architecture connector
CN108360755A (en) * 2018-04-10 2018-08-03 四川林彬彬装配式建筑科技有限公司 A kind of reinforced concrete column joint reinforcing bar connection structure
CN109267701A (en) * 2018-10-12 2019-01-25 天津城建大学 A kind of new reinforcing steel bar connection structure convenient for reinforcing bar connection
CN110238963A (en) * 2019-06-13 2019-09-17 天津城建大学 Double-tube type steel bar connecting structure and its construction method between precast concrete
CN112268044A (en) * 2020-10-14 2021-01-26 上海外高桥造船有限公司 Connector of steel pull rod
CN112609903A (en) * 2020-12-17 2021-04-06 上海宝冶集团有限公司 Steel bar connecting assembly and method for building by utilizing PC (polycarbonate) component

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110134352A (en) * 2011-11-04 2011-12-14 (주)대흥이엔지 Coupler
KR20130056134A (en) * 2011-11-21 2013-05-29 동아이엔지(주) Iron reinforcing rod coupler and precast assembly using the same
CN103132656A (en) * 2013-02-19 2013-06-05 东南大学 Connecting structure for vertical reinforcement bars of prefabricated wall parts
CN203320813U (en) * 2013-06-03 2013-12-04 徐曼 Reinforcement connecting piece for prefabricated concrete component
CN103835441A (en) * 2014-01-23 2014-06-04 王睿敏 Rebar mechanical joint element used for precast reinforced concrete member and installing method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110134352A (en) * 2011-11-04 2011-12-14 (주)대흥이엔지 Coupler
KR20130056134A (en) * 2011-11-21 2013-05-29 동아이엔지(주) Iron reinforcing rod coupler and precast assembly using the same
CN103132656A (en) * 2013-02-19 2013-06-05 东南大学 Connecting structure for vertical reinforcement bars of prefabricated wall parts
CN203320813U (en) * 2013-06-03 2013-12-04 徐曼 Reinforcement connecting piece for prefabricated concrete component
CN103835441A (en) * 2014-01-23 2014-06-04 王睿敏 Rebar mechanical joint element used for precast reinforced concrete member and installing method thereof

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638981A (en) * 2016-11-22 2017-05-10 湖南远大工程设计有限公司 Steel bar connection structure of prefabricated parts
CN107338911A (en) * 2016-11-22 2017-11-10 湖南远大工程设计有限公司 Precast shear wall steel bar connecting joints
CN107254912A (en) * 2017-07-11 2017-10-17 应义淼 A kind of prefabricated concrete structure connection method
CN107419809A (en) * 2017-08-17 2017-12-01 山东远博建筑科技有限公司 A kind of assembled architecture connector
CN108360755A (en) * 2018-04-10 2018-08-03 四川林彬彬装配式建筑科技有限公司 A kind of reinforced concrete column joint reinforcing bar connection structure
CN109267701A (en) * 2018-10-12 2019-01-25 天津城建大学 A kind of new reinforcing steel bar connection structure convenient for reinforcing bar connection
CN110238963A (en) * 2019-06-13 2019-09-17 天津城建大学 Double-tube type steel bar connecting structure and its construction method between precast concrete
CN112268044A (en) * 2020-10-14 2021-01-26 上海外高桥造船有限公司 Connector of steel pull rod
CN112609903A (en) * 2020-12-17 2021-04-06 上海宝冶集团有限公司 Steel bar connecting assembly and method for building by utilizing PC (polycarbonate) component

Similar Documents

Publication Publication Date Title
CN105155781A (en) Reinforced connecting structure and method between precast reinforced concrete components
CN105442760A (en) Steel bar connection mode used for connection among prefabricated reinforced concrete members
CN204753843U (en) PC primary and secondary roof beam bolted connection node
CN203213282U (en) Fabricated reinforced concrete frame structure system
CN102493602B (en) Ductile concrete column capable of delaying local buckling of steel bars and manufacturing method thereof
CN103195170A (en) Prefabricated reinforced concrete frame structure system
CN102852244B (en) Detachable self-resetting type energy-dissipation coupling beam
CN100593065C (en) Double layer sleeve barrel steel bar connector and its reinforcing steel bar connection construction method
CN204370701U (en) For the steel concrete supporting device in assembly concrete building structure
CN103015735A (en) Construction method for planting wall lacing bars after pre-burying of sleeve assemblies
CN105317168A (en) Split-type steel bar sleeve full-grouting joint
CN210086553U (en) Dry-type connected precast concrete wall and foundation connection node
CN205153145U (en) Adopt precast concrete coincide floor of bolt and connection structure of H shaped steel roof beam
CN203559526U (en) Connecting sleeve for steel bars of assembly type building members with reinforced concrete members
CN103911952A (en) Positioning construction method of prestressed steel corrugated pipe
CN201309797Y (en) Reinforced structure of steel crane girder
CN203462654U (en) Machinery anchoring structure for reinforcing steel bar
CN202611223U (en) Recyclable bolt type scaffold wall connection piece
CN110616855A (en) Steel bar mechanical connection structure and connection method for prefabricated concrete structure
CN106592872A (en) Steel bar mechanical connecting structure and installation method
CN202990111U (en) Embedded sleeve component
CN211172720U (en) Mechanical connection structure of steel bars for prefabricated concrete structure
CN109797984A (en) A kind of multi-purpose transfer of the external prestressing steels of variable curvature
CN109339226A (en) A kind of prefabricated assembling type reinforced concrete beam-column connection structure
CN201635185U (en) Oblique steel support device between beam and column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151216