CN105129620A - Four-machine hoisting mounting method - Google Patents
Four-machine hoisting mounting method Download PDFInfo
- Publication number
- CN105129620A CN105129620A CN201510478786.2A CN201510478786A CN105129620A CN 105129620 A CN105129620 A CN 105129620A CN 201510478786 A CN201510478786 A CN 201510478786A CN 105129620 A CN105129620 A CN 105129620A
- Authority
- CN
- China
- Prior art keywords
- hanging beam
- driving
- equipment
- hoisting
- hanging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The invention discloses a four-machine hoisting mounting method. The four-machine hoisting mounting method comprises the following steps that the lower portions of every two of four travelling cranes are connected with an auxiliary hanging beam, the lower portions of the two auxiliary hanging beams are connected with a main hanging beam, and the main hanging beam is provided with a plurality of hanging points; the hanging points on the main hanging beam are selected according to the weight of equipment to be hoisted, and lifting lugs on the equipment to be hoisted are connected with the hanging points on the main hanging beam through a plurality of steel wire ropes; and the four travelling cranes are controlled to conduct coupling at the same time, the equipment to be hoisted is made to slowly leave the ground, and after the equipment is hoisted to a mounting position, the equipment slowly falls back, and other equipment is assembled. According to the four-machine hoisting mounting method, a plurality of sets of overweight equipment can be hoisted through four-machine hoisting, the process of hoisting large equipment is simple and convenient, the technologies of previously adopting large-tonnage automobile crane hoisting and hydraulic lifting hoisting are changed, and the beneficial effects of being convenient to operate and high in safety are achieved; and the mounting period can be greatly shortened, and meanwhile the hoisting cost is reduced to a large degree.
Description
Technical field
The present invention relates to equipment installation Technology field, particularly relate to a kind of four machines and lift installation method.
Background technology
The stretch processing line of certain factory's line configuration is configured with 2 stretcher equipment.Wherein, the gross weight of 30MN stretcher is the gross weight of 775t, 100MN stretcher is 2567.5t, and wherein the 30MN stretcher headstock, tailstock are the single piece assembled, and single-piece is heavily respectively 133.9t and 134.69t; The 100MN stretcher headstock is divided into the heavy 148.4t of the every part of upper and lower two parts, and tailstock is divided into the heavy 147t of the every part of upper and lower two parts, and in employing workshop, existing driving cannot unit or two-shipper lifting.
But, due to by on-the-spot place and factory building roof limitation in height, adopt large hydraulic to hang and cannot directly lift, and machine cost is higher; In addition, super large number of packages amount many (having 6), its installation site is different, repeatedly need repeat displacement according to hydraulic lifting apparatus, build, very flexible, waste of manpower, material resources.
Summary of the invention
Main purpose of the present invention is to provide a kind of four machines to lift installation method, is intended to conveniently lift heavy wares.
For achieving the above object, the invention provides a kind of four machines and lift installation method, comprise the following steps:
Every two driving belows in driving a vehicle four connect a secondary hanging beam, and connect a main hanging beam below two secondary hanging beams, and described main hanging beam is provided with multiple suspension centre;
According to treating that the weight of hanging device selects the suspension centre on described main hanging beam, being connected by many steel ropes and treating the hanger on hanging device and the suspension centre on main hanging beam;
Control four drivings to hook up simultaneously, make to treat that hanging device slowly leaves ground, after being lifted into installation position, slow dropping place carries out the assembling of miscellaneous equipment again.
Preferably, every two the driving belows in driving a vehicle four connect a secondary hanging beam, and also comprise connect the step of a main hanging beam below two secondary hanging beams before:
Four adjacent anticollision devices in driving two ends are removed and drawn close multiple described driving, connects adjacent driving with shaped steel, make four drivings be linked to be an entirety.
Preferably, when control four driving hooks up simultaneously, the same signal channel of remote controller furnishing of every two drivings is operated two remote controllers with realization and controls four drivings.
Preferably, described secondary hanging beam and driving between and all adopt pinned connection between main hanging beam and secondary hanging beam.
Four machines that the present invention proposes lift installation method, adopt four machines to lift and can complete the lifting of many cover overweight equipments, the process of hoisting large-size equipment is simple and convenient, change techniques such as in the past adopting the lifting of large-tonnage wheel crane, hydraulic pressure lift lifting, there is easy to operate, that safety is high advantage, not only significantly can shorten installation period, reduce lifting cost simultaneously to a great extent and use.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet that the present invention four machine lifts installation method preferred embodiment;
Fig. 2 is the structural representation that the present invention four machine lifts the suspender that installation method uses when lifting the stretcher headstock;
Fig. 3 is the structural representation that the present invention four machine lifts the suspender that installation method uses when lifting stretcher tailstock.
In figure, 1-drives a vehicle, the secondary hanging beam of 2-, the main hanging beam of 3-, 4-suspension centre, the 5-stretcher headstock, 6-stretcher tailstock.
The realization of the object of the invention, functional characteristics and advantage will in conjunction with the embodiments, are described further with reference to accompanying drawing.
Detailed description of the invention
Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
Referring to figs. 1 through Fig. 3, in this preferred embodiment, a kind of four machines lift installation method, comprise the following steps:
Step S10, connects a secondary hanging beam 2 by below every two drivings 1 in four drivings 1, and connect a main hanging beam 3 below two secondary hanging beam 2, described main hanging beam 3 is provided with multiple suspension centre 4;
Step S20, according to treating that the weight of hanging device selects the suspension centre 4 on described main hanging beam 3, being connected by many steel ropes and treating the hanger on hanging device and the suspension centre 4 on main hanging beam 3;
Step S30, control four drivings 1 and hook up simultaneously, make to treat that hanging device slowly leaves ground, after being lifted into installation position, slow dropping place carries out the assembling of miscellaneous equipment again.
Particularly, secondary hanging beam 2 and driving 1 between and all adopt pinned connection between main hanging beam 3 and secondary hanging beam 2.When treating hanging device and unloading, first should reconnoitre and enter route, note installation site and the installation direction of equipment, guarantee in installation across being no longer shifted, turning to, to realize shortest distance lifting.
Further, with reference to Fig. 1, also comprised before step S10:
Four adjacent anticollision devices in driving 1 two ends are removed and draw close multiple described driving 1, connecting adjacent driving 1 with shaped steel by step S01, make four drivings 1 be linked to be an entirety.
Four drivings 1 are linked to be an entirety, thus ensure that the synchronism of four drivings 1.
Further, when control four driving 1 hooks up simultaneously, the same signal channel of remote controller furnishing of every two drivings 1 is operated two remote controllers with realization and controls four drivings 1.
The detailed process of lifting appliance is as follows:
(1) lifting of large of 30MN stretcher
1) adopt bearing pin to be connected to by suspender in driving 1, use the hanger on four steel rope connecting devices and the suspension centre 4 on main hanging beam 3.
2) control four that uses a teleswitch driving 1 hooks up simultaneously, makes equipment slowly leave ground, and when distance ground 200mm height, stop hoisting, four drivings 1 run simultaneously, and by equipment hoisting to installation position, slow dropping place, assembles with road wheel.
3) according to weight of equipment and the driving 1 hoisting capacity difference of each lifting, in hoisting process, different suspension centres 4 is selected.
4) diameter phi 75 steel rope that steel rope adopts 6 × 37 is lifted, 2 of long 2.8m, 2 of long 8.5m, 2 of long 6.5m.
5) head, tail frame carries out tensile beam lifting and other equipment hoistings, assembling after having lifted.
(2) lifting of large of 100MN stretcher
1) adopt bearing pin to be connected to by suspender in driving 1, use the hanger on four steel rope connecting devices and the suspension centre 4(on main hanging beam 3 as shown in Figure 2).
2) control four that uses a teleswitch driving 1 hooks up simultaneously, makes equipment slowly leave ground, and when distance ground 200mm height, stop hoisting, four drivings 1 run simultaneously, and by equipment hoisting to installation position, slow dropping place, assembles with stretcher road wheel.
3) different according to the weight of equipment of each lifting, and driving 1 hoisting capacity is different, selects different suspension centre 4(as shown in Figure 3 in hoisting process).The upper and lower of the stretcher headstock 5, stretcher tailstock 6 is measure-alike, and lifting mode is identical.
4) when the bottom lifting of the 100MN stretcher headstock 5, stretcher tailstock 6 puts in place, lift the dividing plate drawn high in beam and head, tail frame after assembling with road wheel, then lift the 100MN stretcher headstock 5, tailstock top.
5) diameter phi 80 steel rope 2 2.8m that steel rope adopts 6 × 37 are lifted, diameter phi 80 steel rope 2 3.2m of 6 × 37, diameter phi 80 steel rope 2 3.3m of 6 × 37.
6) head, tail frame carries out after having lifted drawing high beam lifting and other equipment hoistings, assembling.
Four machines that the present invention proposes lift installation method, adopt four machines to lift and can complete the lifting of many cover overweight equipments, the process of hoisting large-size equipment is simple and convenient, change techniques such as in the past adopting the lifting of large-tonnage wheel crane, hydraulic pressure lift lifting, there is easy to operate, that safety is high advantage, not only significantly can shorten installation period, reduce lifting cost simultaneously to a great extent and use.
These are only the preferred embodiments of the present invention; not thereby the scope of the claims of the present invention is limited; every equivalent structure transformation utilizing specification sheets of the present invention and accompanying drawing content to do, or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present invention.
Claims (4)
1. four machines lift an installation method, it is characterized in that, comprise the following steps:
Every two driving belows in driving a vehicle four connect a secondary hanging beam, and connect a main hanging beam below two secondary hanging beams, and described main hanging beam is provided with multiple suspension centre;
According to treating that the weight of hanging device selects the suspension centre on described main hanging beam, being connected by many steel ropes and treating the hanger on hanging device and the suspension centre on main hanging beam;
Control four drivings to hook up simultaneously, make to treat that hanging device slowly leaves ground, after being lifted into installation position, slow dropping place is to carry out the assembling of miscellaneous equipment.
2. four machines as claimed in claim 1 lift installation method, it is characterized in that, every two the driving belows in driving a vehicle four connect a secondary hanging beam, and also comprise connect the step of a main hanging beam below two secondary hanging beams before:
Four adjacent anticollision devices in driving two ends are removed and drawn close multiple described driving, connects adjacent driving with shaped steel, make four drivings be linked to be an entirety.
3. four machines as claimed in claim 1 lift installation method, it is characterized in that, when control four driving hooks up simultaneously, the same signal channel of remote controller furnishing of every two drivings is operated two remote controllers with realization and controls four drivings.
4., as four machines in claims 1 to 3 as described in any one lift installation method, it is characterized in that, described secondary hanging beam and driving between and all adopt pinned connection between main hanging beam and secondary hanging beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510478786.2A CN105129620A (en) | 2015-08-07 | 2015-08-07 | Four-machine hoisting mounting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510478786.2A CN105129620A (en) | 2015-08-07 | 2015-08-07 | Four-machine hoisting mounting method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105129620A true CN105129620A (en) | 2015-12-09 |
Family
ID=54715285
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510478786.2A Pending CN105129620A (en) | 2015-08-07 | 2015-08-07 | Four-machine hoisting mounting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105129620A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110550549A (en) * | 2019-09-29 | 2019-12-10 | 广船国际有限公司 | Hoisting method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2598741B2 (en) * | 1993-01-12 | 1997-04-09 | 日揮株式会社 | Lifting work beam device |
JP2000177976A (en) * | 1998-12-11 | 2000-06-27 | Mitsubishi Heavy Ind Ltd | Suspension device |
CN201301176Y (en) * | 2008-10-22 | 2009-09-02 | 天津二十冶建设有限公司 | Machines and tools for hoisting large-scale rolling-mill housings |
CN201385980Y (en) * | 2009-03-24 | 2010-01-20 | 上海外高桥造船有限公司 | Lifting bent of combined crane for gantry grate |
CN201619942U (en) * | 2010-01-04 | 2010-11-03 | 山东高速青岛公路有限公司 | Special hoisting tool for hoisting super large block of steel box girder |
CN201809030U (en) * | 2010-09-27 | 2011-04-27 | 中国葛洲坝集团机械船舶有限公司 | Lifting appliance of double gantry cranes for lifting large-scale workpieces |
CN202400718U (en) * | 2011-12-27 | 2012-08-29 | 山东丰汇设备技术有限公司 | Multiple-hoisting-point and double-layer rotatable lifting beam |
CN203728439U (en) * | 2014-01-28 | 2014-07-23 | 徐工集团工程机械股份有限公司 | Walking gantry crane |
-
2015
- 2015-08-07 CN CN201510478786.2A patent/CN105129620A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2598741B2 (en) * | 1993-01-12 | 1997-04-09 | 日揮株式会社 | Lifting work beam device |
JP2000177976A (en) * | 1998-12-11 | 2000-06-27 | Mitsubishi Heavy Ind Ltd | Suspension device |
CN201301176Y (en) * | 2008-10-22 | 2009-09-02 | 天津二十冶建设有限公司 | Machines and tools for hoisting large-scale rolling-mill housings |
CN201385980Y (en) * | 2009-03-24 | 2010-01-20 | 上海外高桥造船有限公司 | Lifting bent of combined crane for gantry grate |
CN201619942U (en) * | 2010-01-04 | 2010-11-03 | 山东高速青岛公路有限公司 | Special hoisting tool for hoisting super large block of steel box girder |
CN201809030U (en) * | 2010-09-27 | 2011-04-27 | 中国葛洲坝集团机械船舶有限公司 | Lifting appliance of double gantry cranes for lifting large-scale workpieces |
CN202400718U (en) * | 2011-12-27 | 2012-08-29 | 山东丰汇设备技术有限公司 | Multiple-hoisting-point and double-layer rotatable lifting beam |
CN203728439U (en) * | 2014-01-28 | 2014-07-23 | 徐工集团工程机械股份有限公司 | Walking gantry crane |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110550549A (en) * | 2019-09-29 | 2019-12-10 | 广船国际有限公司 | Hoisting method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106081926A (en) | Harbour Radix Saposhnikoviae crane with mechanical arm gripping device | |
CN204454235U (en) | A kind of novel many suspension centres equalizing bar device | |
CN105129620A (en) | Four-machine hoisting mounting method | |
CN202046793U (en) | Special strut for ultra-long flexible steel plate | |
CN202390116U (en) | High-intensity small-tonnage hoist | |
CN208454272U (en) | A kind of lifting device for generator stator | |
CN104098018A (en) | Reusable multistage balance beam combination system | |
CN106044573A (en) | Four-crane hoisting installation method | |
CN103569842A (en) | Lifting appliance for gantry crane | |
CN204569150U (en) | A kind of tyre crane driver's cab hoisting fixture | |
CN203845661U (en) | Recyclable multi-stage balance beam combination system | |
CN204162315U (en) | A kind of dicycly hoisting crane | |
CN203113305U (en) | Hydraulic balancing device of ship lift cable wire with mechanical locking function | |
CN202414964U (en) | Travelling crane hoisting auxiliary device | |
CN207243262U (en) | The hanging apparatus of generating set electricity generator stator | |
CN207030751U (en) | Boom hoisting | |
CN205170188U (en) | Hoist is lifted by crane in removal | |
CN201713227U (en) | Gantry crane for turning of steel structures | |
CN201161868Y (en) | Multifunctional lifted crane | |
CN102642772B (en) | Lifting appliance mounting base | |
CN203033635U (en) | Lifting sling with three traveling cranes with unequal weight | |
CN204038883U (en) | A kind of shoulder pole girder with swivel hook | |
CN102241368A (en) | Columnar hoisting frame | |
CN102275830A (en) | Pillar type hoisting method | |
CN107140528A (en) | Boom hoisting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151209 |
|
RJ01 | Rejection of invention patent application after publication |