CN207030751U - Boom hoisting - Google Patents
Boom hoisting Download PDFInfo
- Publication number
- CN207030751U CN207030751U CN201720774499.0U CN201720774499U CN207030751U CN 207030751 U CN207030751 U CN 207030751U CN 201720774499 U CN201720774499 U CN 201720774499U CN 207030751 U CN207030751 U CN 207030751U
- Authority
- CN
- China
- Prior art keywords
- suspension hook
- installed part
- connecting portion
- plane
- boom hoisting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
A kind of boom hoisting, including suspension bracket are the utility model is related to, is arranged with a plurality of walking track in parallel;And movable hanger, including two or more, each movable hanger includes installed part, the first suspension hook and drive mechanism, installed part is movably arranged on suspension bracket along the walking track, drive mechanism is arranged on installed part, first suspension hook is rotatablely arranged on installed part, and can be rotated and in the rotation with surface intersected with axis around an axis opposite mount under the driving of drive mechanism;Wherein, being lifted on the prefabricated components on movable hanger and in the first plane can stagger under the rotation of the first suspension hook, and be run to installed part in the second plane.In the utility model boom hoisting in two or more movable hangers, the prefabricated components being lifted on the first suspension hook can rotate in the presence of the first suspension hook, and it can also be realized with installed part by the first plane conversion to the second plane, multimember synchronous lifting and storage are realized, improves production efficiency.
Description
Technical field
Engineering machinery field is the utility model is related to, more particularly to a kind of boom hoisting for being used to lift.
Background technology
In flat-type preform production factory, polylith building panel pouring molding on a steel table top, after the demoulding,
Sling prefabricated panel and prefabricated panel is transferred to storeroom by being fixed on boom hoisting hook in crane and deposited.
However, conventional hoist is low so that dragging slow whole piece flowing water using the single lifting storage of suspender, efficiency after the prefabricated components demoulding
Production line activity time.
Utility model content
Based on this, it is necessary to which providing a kind of can lift multiple prefabricated components simultaneously to improve the boom hoisting of production efficiency.
A kind of boom hoisting, for hoisting prefabricated component, it includes:
Suspension bracket, it is arranged with a plurality of walking track in parallel;And
Movable hanger, including two or more, each movable hanger includes installed part, the first suspension hook and drive
Motivation structure, the installed part are movably arranged on the suspension bracket along the walking track, and the drive mechanism is arranged at institute
State on installed part, first suspension hook is rotatablely arranged on the installed part, and can be under the driving of the drive mechanism
Rotated around an axis relative to the installed part and in the rotation with surface intersected with axis;
Wherein, the prefabricated components on described two or two or more movable hanger and in the first plane are lifted on
It can stagger under the rotation of first suspension hook, and with the installed part along a plurality of walking track travel to described first
In the second intersecting plane of plane.
In one of the embodiments, first plane is parallel with the extending direction of a plurality of walking track, described
Second plane is vertical with the extending direction of a plurality of walking track.
In one of the embodiments, the boom hoisting includes fixed suspension hook, and the fixed suspension hook is fixedly installed on institute
State at least one of a plurality of walking track, be lifted on the prefabricated components on the fixed suspension hook in first plane
It is same with being located in second plane with the prefabricated components being lifted on described two or two or more movable hanger
In plane.
In one of the embodiments, the suspension bracket includes girder and is connected with the girder and formed with the walking rail
Three track girders in road, three track girders are arranged at intervals on the girder and at least both are common in three track girders
Formed with two walking tracks, the movable hanger includes two, and two movable hangers may move correspondingly
Ground is arranged on two walking tracks, and the fixed suspension hook is fixedly installed in another one in three track girders.
In one of the embodiments, first suspension hook includes first connecting portion and the first lifting portion, and described first connects
One end of socket part is axially rotatably installed in the installed part around itself and is connected with the drive mechanism, and described first hangs
Dress portion is arranged at the one end of the first connecting portion away from the installed part.
In one of the embodiments, the drive mechanism includes suspender actuator and driving member, the suspender actuator
It is installed on the installed part, described driving member one end is connected to the suspender actuator, and the driving member other end is sheathed on
The first connecting portion of first suspension hook.
In one of the embodiments, the suspender actuator is hydraulic jack, and the movable hanger is walked including suspender
Component, the suspender walking component includes road wheel and suspender hoofing part part, the road wheel are arranged on the installed part,
The suspender hoofing part part is installed on the installed part and is connected with the road wheel.
In one of the embodiments, the movable hanger also includes the second suspension hook, and the drive mechanism also includes synchronous
Component, second suspension hook includes second connecting portion and the second lifting portion, the second connecting portion can turn around own axes direction
The installed part is installed on dynamicly, the second lifting portion is connected to the one end of the second connecting portion away from the installed part,
The Synchronization Component connects the first connecting portion of first suspension hook and the second connecting portion of second suspension hook.
In one of the embodiments, the Synchronization Component includes connecting rod and is rotationally connected with the connecting rod two end respectively
The first oscillating rod and the second oscillating rod, the described one end of first oscillating rod away from the connecting rod is connected to first suspension hook
The first connecting portion, the described one end of second oscillating rod away from the connecting rod are connected to second company of second suspension hook
Socket part.
In one of the embodiments, the first lifting portion of first suspension hook connects the first connecting portion one certainly
The direction for being laterally away from the installed part tilts extension, to be in certain angle with the central axis of the first connecting portion, and
The angle is obtuse angle.
In the utility model boom hoisting, two or more movable hangers are provided with, and are lifted on the first suspension hook
Prefabricated components can be rotated in the presence of the first suspension hook, and can also with installed part along the walking track travel on suspension bracket, it is real
Now by the first plane conversion to the second plane, realizing multimember synchronous lifting and storage, production efficiency is improved.
Brief description of the drawings
Fig. 1 is the side view of the boom hoisting of an embodiment;
Fig. 2 is the structural representation of suspension bracket in boom hoisting shown in Fig. 1;
Fig. 3 is the structural representation of movable hanger in boom hoisting shown in Fig. 1;
Fig. 4 is the structural representation of the first suspension hook in movable hanger shown in Fig. 3.
Embodiment
For the ease of understanding the utility model, the utility model is more fully retouched below with reference to relevant drawings
State.Preferred embodiment of the present utility model is given in accompanying drawing.But the utility model can come in many different forms
Realize, however it is not limited to embodiment described herein.On the contrary, the purpose for providing these embodiments is made to of the present utility model
The understanding of disclosure more thorough and comprehensive.
It should be noted that when element is referred to as " being fixed on " another element, it can be directly on another element
Or there may also be element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to
To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ",
" right side " and similar statement are for illustrative purposes only.
Unless otherwise defined, all of technologies and scientific terms used here by the article is led with belonging to technology of the present utility model
The implication that the technical staff in domain is generally understood that is identical.It is simply in term used in the description of the present utility model herein
The purpose of description specific embodiment, it is not intended that in limitation the utility model.Term as used herein " and/or " include
The arbitrary and all combination of one or more related Listed Items.
As shown in figure 1, prefabricated components are carried out by the boom hoisting 100 of the preferred embodiment of the utility model for realizing
Lifting and transhipment.Boom hoisting 100 includes suspension bracket 10 and movable hanger 30, and suspension bracket 10 can in the effect of lifting mechanism (not shown)
Set up and down, movable hanger 30 includes two or more, and two or more movable hangers 30 are movably disposed
In on suspension bracket 10.
Fig. 2 and Fig. 3 are refer to, the surface of suspension bracket 10 towards movable hanger 30 is arranged with a plurality of walking track in parallel and (schemed not
Show), movable hanger 30 includes installed part 31, the first suspension hook 32 and drive mechanism 33, and installed part 31, which is movably arranged at, to be hung
On frame 10, drive mechanism 33 is arranged on installed part 31, and the first suspension hook 32 is rotatablely arranged on installed part 31, and can driven
Rotated under the driving of motivation structure 33 around an axis relative to the installed part 31 and in the rotation with surface intersected with axis.
The pivot center of the above-mentioned opposite mount 31 of first suspension hook 32 for the connection mounting 31 of the first suspension hook 32 one end around
The pivot axis, to ensure that first one end of suspension hook 32 away from installed part 31 can be in the Plane Rotation of hoisting prefabricated component.
Wherein, it is lifted on two or more movable hangers 30 and the prefabricated components in the first plane can be the
Stagger under the rotation of one suspension hook 32, and the second plane extremely intersected with installed part 31 along a plurality of walking track travel with the first plane
It is interior.In this specific embodiment, the first plane is parallel with the extending direction of a plurality of walking track, the second plane and a plurality of walking rail
The extending direction in road is vertical, i.e. the first plane and the second plane are orthogonal two planes.
Further, each movable hanger 30 includes suspender walking component 34, and suspender walking component 34 includes road wheel 340
And suspender hoofing part part 342.Road wheel 340 is arranged on installed part 31, and suspender hoofing part part 342 is installed on installed part 31
Above and with road wheel 340 it is connected, to drive road wheel 340 to drive the relative suspension bracket 10 of whole movable hanger 30 along preset direction row
Walk.
In this specific embodiment, suspender walking component 34 includes two groups of road wheels 340, and two groups of road wheels 340 distinguish position
In the both ends of the length direction of installed part 31, suspender hoofing part part 342 is the deceleration for providing power for two groups of road wheels 340
Motor.
Further, boom hoisting 100 includes fixed suspension hook 20, and fixed suspension hook 20 is fixedly installed in a plurality of walking track
At least one on, be lifted on the prefabricated components on fixed suspension hook 20 in the first plane and the second plane with being lifted on two
Or in the prefabricated components on two or more movable hanger 30 are generally aligned in the same plane.That is, each movable hanger 30 can be along each
From walking track move back and forth to the direction closer or far from fixed suspension hook 20, and the be arranged on each movable hanger 30
One suspension hook 32 can also rotate under the driving of drive mechanism 33 to the direction closer or far from fixed suspension hook 20;So that it is lifted on two
The prefabricated components that the prefabricated components of individual or more than two movable hangers 30 can be lifted on fixed suspension hook 20 are that reference point exists
Common arrangements be located in the first plane when initial, and Common arrangements are in vertical with the first plane the after being moved along track of walking
In two planes, orientation of the prefabricated components in two intersecting planes is so realized, in order to follow-up storage and lifting.
Suspension bracket 10 includes girder 11 and three track girders 13 being connected with girder 11, three track girders 13 are arranged at intervals at master
On beam 11, and in three track girders 13 at least both altogether formed with two walking tracks.Every walking track is along every track girder
13 longitudinally is set, for providing walking track for suspender walking component 34.Movable hanger 30 is in this specific embodiment
Including two, two movable hangers 30 are movably arranged on two walking tracks correspondingly, in three track girders 13
Fixed suspension hook 20 is fixedly installed in another one.
In this specific embodiment, three track girders 13 are I-steel, adjacent two sides in adjacent two I-steel
Form a walking track, i.e. in three track girders 13 in both a track girder and the track girder of centre one of side phase
Two adjacent sides form a walking track;Accordingly, edge is set perpendicular to the direction of track girder 13 on each movable hanger 30
Two groups of suspender walking components 34 are equipped with, two groups of suspender walking components 34 are assemblied on two walking tracks correspondingly so that
Crossbearer is between two I-steel and a middle I-steel of both sides correspondingly for two movable hangers 30, fixed suspension hook 20
It is fixedly installed on the centre one of three track girders 13 and among two movable hangers 30.
, can be single on the every track girder 13 that is connected with each movable hanger 30 it is to be appreciated that in its some embodiment
Solely set walking track, i.e., each movable hanger 30 can independent ambulation on corresponding every track girder 13 also can, herein
It is not construed as limiting, it is only necessary to which implementing each movable hanger 30 can move along the first direction.Meanwhile in some other embodiment
In, the position of fixed suspension hook 20 and movable hanger 30 quantitative relation between the two and setting can as needed depending on, and
The position of the quantity and setting of girder 11 and track girder 13 is alternatively other, according to demand depending on.In addition, track girder 13 can also be adopted
With other structures, it is not limited thereto.
Meanwhile in this specific embodiment, boom hoisting 100 is applied to be used for pouring and being stripped in steel table top in factory building
Prefabricated panel afterwards is lifted, and accordingly the first in-plane is longitudinal direction, and the second in-plane is to be hung down with the first in-plane
Straight transverse direction.It is to be appreciated that in some other embodiment, boom hoisting 100 is equally applicable for other fields for needing to lift
Institute, for example, goods transport with storage etc., be not limited thereto.
Fig. 4 is refer to, the first suspension hook 32 includes the lifting portion 322 of first connecting portion 320 and first, first connecting portion 320
One end is axially rotatably installed in installed part 31 around itself and is connected with drive mechanism 33, and the first lifting portion 322 is arranged at
The one end of first connecting portion 320 away from installed part 31.Preferably, the first lifting portion 322 of the first suspension hook 32 connects from connection first
The direction that socket part 320 1 is laterally away from installed part 31 tilts extension to be in certain folder with the central axis of first connecting portion 320
Angle, and the angle is obtuse angle (i.e.) in Fig. 4 relative to the central axis of first connecting portion 320 counterclockwise, so as to facilitate coagulation
The native isostructural installation of prefabricated board.Meanwhile first suspension hook 32 away from the one end of first connecting portion 320 offer hole for hoist 3221.Such as
This, the structures such as concrete prefabricated board can be lifted on the first suspension hook 32 by operator by hole for hoist 3221.It is appreciated that first
Structure not limited to this of the lifting portion 322 away from the one end of first connecting portion 320, can be arranged as required to, such as hanger, not make herein
Limit.
Referring again to Fig. 3, drive mechanism 33 includes suspender actuator 331 and driving member 332, and suspender actuator 331 is installed
In on installed part 31, the one end of driving member 332 is connected to suspender actuator 331, and the other end is sheathed on the first company of the first suspension hook 32
Socket part 320.In this way, suspender actuator 331 can drive the first suspension hook 32 to rotate by driving member 332, so as to complete to lift direction
Change.
Preferably, suspender actuator 331 is hydraulic jack, hydraulic jack be provided with can straight reciprocating motion piston rod, pass
The one end of moving part 332 is rotatably connected at the piston rod of hydraulic jack, and the other end is sheathed on the first connecting portion of the first suspension hook 32
320.In this way, driving member 332 can be when piston rod carries out straight reciprocating motion using the central axis of first connecting portion 320 as rotation
Axle drives the opposite mount 31 of the first suspension hook 32 to rotate, so as to change the lifting direction of the first suspension hook 32.
Further, movable hanger 30 also includes the second suspension hook 35, the structure of the second suspension hook 35 and the knot of the first suspension hook 32
Structure is identical and can coordinate with the first suspension hook 32 with common hoisting prefabricated component 200.Drive mechanism 33 also includes Synchronization Component 334,
Second suspension hook 35 includes the lifting portion 352 of second connecting portion 350 and second, and second connecting portion 350 is rotatable around own axes direction
Ground is installed on bottom plate 4301, and the second lifting portion 352 is connected to the one end of second connecting portion 350 away from installed part 31, Synchronization Component
The second connecting portion 350 of the suspension hook 35 of first connecting portion 320 and second of 334 the first suspension hooks 32 of connection so that the second suspension hook 35 and
First suspension hook 32 synchronizes under the driving of suspender actuator 331 to be rotate in same direction, and direction is lifted with synchronous change.
Synchronization Component 334 includes connecting rod 3340 and is rotationally connected with first oscillating rod 3342 at the both ends of connecting rod 3340 respectively
With the second oscillating rod 3344.First one end of oscillating rod 3342 away from connecting rod 3340 is connected to the first connecting portion of the first suspension hook 32
320, and the synchronous axial system of first connecting portion 320 can be followed.Second one end of oscillating rod 3344 away from connecting rod 3340 is connected to second
The second connecting portion 350 of suspension hook 35, and the synchronous axial system of second connecting portion 350 can be driven.In this way, the driving of suspender actuator 331 the
The first connecting portion 320 of one suspension hook 32 rotates, and then drives the first oscillating rod 3342 to rotate, the first oscillating rod 3342 and then drive
Connecting rod 3340 is swung, and drives the second suspension hook 35 to rotate eventually through the second oscillating rod 3344.In the present embodiment, the first oscillating rod
3342 are set in the first connecting portion 320 of the first suspension hook 32 with the stacking of driving member 332.In another embodiment, first swing
Bar 3342 is integrally formed setting with driving member 332.
Fig. 1 and Fig. 3 are refer to, below so that prefabricated components 200 are three pieces of prefabricated panels as an example, to lifting of the present utility model
The operation principle of device 100 is described in detail.
In original state, three pieces of prefabricated panels are placed horizontally on steel chassis;In hoisting process, boom hoisting is controlled
100 are moved to station turning, and make middle fixed suspension hook 20 (fixed suspension centre) corresponding with middle one piece of prefabricated panel, two movements
Suspender 30 is corresponding with two pieces of prefabricated panels of the left and right sides respectively.
Suspender actuator 331 on each movable hanger 30 is controlled to drive Synchronization Component 334 to drive the first suspension hook 32 and second
Suspension hook 35 (mobile suspension centre) rotation is located at same straight line to fixed suspension hook 20, by shackle and steel wire rope by three pieces of prefabricated panels
Connected respectively with corresponding fixed suspension hook 20 and movable hanger 30;Treat that three pieces of prefabricated panels are completed to move from the demoulding of steel trolley surface
Dynamic suspender 30 hangs three pieces of prefabricated panels, controls suspender actuator 331 to drive Synchronization Component 334 to drive the He of the first suspension hook 32 again
Second suspension hook 35 turns an angle, so make originally 3 pieces of PC plates in same level spatially stagger certain distance
And the plane of itself place track girder 13 of movable hanger 30 is turned to, then control both sides movable hanger 30 simultaneously along respective track girder
13 walk to the direction mutually drawn close, until three pieces of prefabricated panels are vertically arranged in a second direction, and same end face is (i.e. real
The change of existing three pieces of prefabricated panel orientations), three pieces of prefabricated panels are put into whole by the entirety of last operation hanging device 100 simultaneously
Body pallet pile is deposited.
Two or more movable hangers 30 are provided with the utility model boom hoisting 100, so as to realize while enter
The lifting of row polylith prefabricated panel;In addition, first suspension hook 32 can turn under the driving of drive mechanism 33 on each movable hanger 30
It is dynamic, and along the walking track travel on suspension bracket 10, can also realized with installed part 31 by the first plane conversion to the second plane,
Multimember synchronous lifting and storage are realized, improves production efficiency.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality
Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses several embodiments of the present utility model, and its description is more specific and detailed,
But therefore it can not be interpreted as the limitation to utility model patent scope.It should be pointed out that the common skill for this area
For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to
The scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (10)
- A kind of 1. boom hoisting, for hoisting prefabricated component, it is characterised in that including:Suspension bracket, including a plurality of walking track be arrangeding in parallel;AndMovable hanger, including two or more, each movable hanger includes installed part, the first suspension hook and driving machine Structure, the installed part are movably arranged on the suspension bracket along the walking track, and the drive mechanism is arranged at the peace In piece installing, first suspension hook is rotatablely arranged on the installed part, and can be under the driving of the drive mechanism around one Axis rotates relative to the installed part and in the rotation with surface intersected with the axis;Wherein, it is lifted on described two or two or more movable hanger and the prefabricated components in the first plane can be Stagger under the rotation of first suspension hook, and with the installed part along it is described it is a plurality of walking track travel to first plane In the second intersecting plane.
- 2. boom hoisting according to claim 1, it is characterised in that first plane and a plurality of walking track Extending direction is parallel, and second plane is vertical with the extending direction of a plurality of walking track.
- 3. boom hoisting according to claim 1 or 2, it is characterised in that the boom hoisting includes fixed suspension hook, described Fixed suspension hook is fixedly installed at least one of described a plurality of walking track, is lifted on described pre- on the fixed suspension hook Component processed is in first plane and second plane with being lifted on described two or two or more movable hanger In the prefabricated components are generally aligned in the same plane.
- 4. boom hoisting according to claim 3, it is characterised in that the suspension bracket includes girder and is connected with the girder Three track girders, three track girders are arranged at intervals on the girder and at least both are conformal in three track girders Into there is two walking tracks, the movable hanger includes two, and two movable hangers are correspondingly movably It is arranged on two walking tracks, the fixed suspension hook is fixedly installed in another one in three track girders.
- 5. boom hoisting according to claim 1, it is characterised in that first suspension hook includes first connecting portion and first Lifting portion, one end of the first connecting portion be axially rotatably installed on around itself in the installed part and with the driving machine Structure connects, and the first lifting portion is arranged at the one end of the first connecting portion away from the installed part.
- 6. boom hoisting according to claim 5, it is characterised in that the drive mechanism includes suspender actuator and transmission Part, the suspender actuator are installed on the installed part, and described driving member one end is connected to the suspender actuator, the biography The moving part other end is sheathed on the first connecting portion of first suspension hook.
- 7. boom hoisting according to claim 6, it is characterised in that the movable hanger includes suspender walking component, institute Stating suspender walking component includes road wheel and suspender hoofing part part, and the road wheel is arranged on the installed part, described to hang Tool hoofing part part is installed on the installed part and is connected with the road wheel.
- 8. boom hoisting according to claim 5, it is characterised in that the movable hanger also includes the second suspension hook, described Drive mechanism also includes Synchronization Component, and second suspension hook includes second connecting portion and the second lifting portion, the second connecting portion The installed part is rotatably installed on around own axes direction, it is remote that the second lifting portion is connected to the second connecting portion One end of the installed part, the Synchronization Component connect the first connecting portion of first suspension hook and second suspension hook The second connecting portion.
- 9. boom hoisting according to claim 8, it is characterised in that the Synchronization Component includes connecting rod and difference is rotatable The first oscillating rod and the second oscillating rod of the connecting rod two end are connected to, the one end of first oscillating rod away from the connecting rod connects The first connecting portion of first suspension hook is connected to, the described one end of second oscillating rod away from the connecting rod is connected to described The second connecting portion of two suspension hooks.
- 10. boom hoisting according to claim 5, it is characterised in that the first lifting portion of first suspension hook is certainly The direction inclination extension that the first connecting portion one is laterally away from the installed part is connected, with the center with the first connecting portion Axis is in certain angle, and the angle is obtuse angle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720774499.0U CN207030751U (en) | 2017-06-29 | 2017-06-29 | Boom hoisting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720774499.0U CN207030751U (en) | 2017-06-29 | 2017-06-29 | Boom hoisting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207030751U true CN207030751U (en) | 2018-02-23 |
Family
ID=61466306
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720774499.0U Withdrawn - After Issue CN207030751U (en) | 2017-06-29 | 2017-06-29 | Boom hoisting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207030751U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107140528A (en) * | 2017-06-29 | 2017-09-08 | 岳阳远大住宅工业有限公司 | Boom hoisting |
-
2017
- 2017-06-29 CN CN201720774499.0U patent/CN207030751U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107140528A (en) * | 2017-06-29 | 2017-09-08 | 岳阳远大住宅工业有限公司 | Boom hoisting |
CN107140528B (en) * | 2017-06-29 | 2018-05-11 | 岳阳远大住宅工业有限公司 | Boom hoisting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107445065B (en) | Hanging device | |
CN203045200U (en) | Sucking disc hoist device and plate tailor-welding logistics conveying system | |
CN103111778A (en) | Sucking disc hoist device and plate tailor-welding logistics conveying system | |
CN211594267U (en) | PC coincide floor stacking machine | |
CN207030751U (en) | Boom hoisting | |
CN207030788U (en) | Hanging device | |
CN107140528B (en) | Boom hoisting | |
CN207258990U (en) | Offset hook gear | |
CN103832921B (en) | Longeron on-line hanger before a kind of automobile | |
CN202658902U (en) | Hoisting and distributing dual-purpose concrete distributing machine | |
CN105084224B (en) | A kind of arm-type lifting machine | |
CN208200188U (en) | A kind of unmanned overhead traveling crane applied to concrete prefabricated element stockyard | |
CN212559190U (en) | Gantry crane for construction of assembled underpass tunnel segment | |
CN203624832U (en) | Grab bucket convenient to move | |
CN203833510U (en) | Multiple lifting point door type electromagnetic lifting device with steering function | |
JPH03192093A (en) | Suspension attitude control for curved plate and suspending tool for curved plate | |
CN107687132B (en) | The method that equidistant double width bridge uses Segmental assembling bridge-erecting machine synchronous construction | |
CN107653783B (en) | Double width bridge tail portion feeding beam hanging method | |
CN109368513A (en) | Tunnel form transfer car(buggy) | |
CN207030742U (en) | Mobile hanging apparatus | |
CN205114887U (en) | Hand propelled removes portal frame | |
CN110258356B (en) | Cast-in-place box girder template hoist | |
CN209193385U (en) | Tunnel gantry crane | |
CN103058059A (en) | Double-flat-arm tower crane and trolley synchronous control device thereof | |
CN203602284U (en) | Pulley bracket and rotary drilling rig |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20180223 Effective date of abandoning: 20180511 |
|
AV01 | Patent right actively abandoned |