CN105114028B - It is not take up well head and intersects cementing method - Google Patents

It is not take up well head and intersects cementing method Download PDF

Info

Publication number
CN105114028B
CN105114028B CN201510505683.0A CN201510505683A CN105114028B CN 105114028 B CN105114028 B CN 105114028B CN 201510505683 A CN201510505683 A CN 201510505683A CN 105114028 B CN105114028 B CN 105114028B
Authority
CN
China
Prior art keywords
well
well head
take
surface pipe
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510505683.0A
Other languages
Chinese (zh)
Other versions
CN105114028A (en
Inventor
李中
黄熠
邓诚
李炎军
罗东辉
肖伟
张万栋
汪俊锋
朱新华
林四元
张可
刘国栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Zhanjiang Branch
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Zhanjiang Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC China Ltd Zhanjiang Branch filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201510505683.0A priority Critical patent/CN105114028B/en
Publication of CN105114028A publication Critical patent/CN105114028A/en
Application granted granted Critical
Publication of CN105114028B publication Critical patent/CN105114028B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

Well head is not take up the invention discloses one kind and intersects cementing method, is comprised the following steps:S1,20 " surface pipe lower end connection sleeve pipe float shoe, wherein it is provided with side in side wall of the casing float shoe below floating shoe check valve seat and portals;S2, lower 20 " the direct seat bottom of surface pipe, by wiper block, " surface pipe is fixed placed in the middle by 20 at well head;" surface pipe from below rotary table facilitate well cementation to connect union become 20 " hydraulic circulating head position is opened and risen and gets rid of by 20 for S3, rig floor, and for shifting derrick to next well location, bank does not account for well head intersection well cementing operation;S4, artificial situation is returned in observation during well cementation, when well head it was observed that being transferred to replacement operation after cement returns out immediately, completes well cementation." surface pipe well cementing operation, for HTHP pit shaft integrity demands; cement mortar returns to well head; realize full well section sealing, ensure that 20 " sleeve pipe and 30 " pile pipes turn into an entirety, realize wellbore integrity that the present invention connects hydraulic circulating head using bank and completes well cementing operation, is not take up uphole time and completes 20.

Description

It is not take up well head and intersects cementing method
Technical field
The invention belongs to the technical field of drilling well, and in particular to a kind of well cementing operation method.
Background technology
At sea in petroleum exploration and development process, from formula batch drilling well 20, " well cementation of surface pipe is solid using the insertion of interior tubing string Well, shaft mouth operation must be taken because interior tubing string inserts well cementation, and the surface casing cementing activity duration is due to injection cement additional amount and set Pipe is big with bore hole annulus gap, and consumption cement mortar is very big, and the well cementing operation time is longer, is unfavorable for marine batch of brill and improves timeliness.It is interior Tubing string insertion well cementation self shortcoming:(1) activity duration is longer, if complicated feelings occur in sleeve pipe and bore hole annulus during tubing string in tripping in Condition processing means are limited;(2) although well head operation is simple, it will be catastrophic wellhead casing pipe junk once occur;(3) sleeve pipe Seawater is inside filled, insertion seals and tested envelope operation and greater risk be present.And use it is blind have that sleeve pipe wall built-up is more for well cementation, there is slug Phenomenon, cementing quality is poor, and displacement efficiency is low, the drawbacks of for sky or staying high cement plug.Therefore, from the formula batch " surface pipe of drilling well 20 Cementing method need to improve.
Above-mentioned discussion content purpose be to reader introduce may be described below and/or advocate it is of the invention each The various aspects of the related technology of individual aspect, it is believed that the discussion content contributes to as reader with background's information, to be advantageous to more Understand various aspects of the invention well, it is therefore to be understood that be that these discussions are read with this angle, it is existing without being to recognize that Technology.
The content of the invention
One kind is provided and is not take up well head intersection cementing method it is an object of the invention to avoid deficiency of the prior art, It is not take up well head and carries out intersection well cementing operation, improves drillng operation timeliness.
The purpose of the present invention is achieved through the following technical solutions:
One kind is provided and is not take up well head intersection cementing method, is comprised the following steps:
S1, " surface pipe lower end connection sleeve pipe float shoe, wherein side wall of the casing float shoe below floating shoe check valve seat 20 On be provided with side and portal;
S2, lower 20 " the direct seat bottom of surface pipe, by wiper block, " surface pipe is fixed placed in the middle by 20 at well head;
S3, by 20 " surface pipe from below rotary table conveniently connect 20 " sleeve pipe hydraulic circulating head position open and get rid of, move derrick extremely Next well location, bank do not account for well head and intersect well cementing operation;
S4, artificial situation is returned in observation during well cementation, when well head it was observed that being transferred to replacement operation after cement returns out immediately, completes Well cementation.
Wherein, in step s 4, operation is replaced to replace using discharge capacity is become.
Wherein, it is described to become discharge capacity replacement according to the change of displacement pressure in displacement process, used when pressure is relatively low Higher speed, ensure that annular space cement mortar replaces in the state of flat board stream, and protected when pressure is higher using relatively low speed Card annular space cement mortar replaces in the state of plug flow, and the high and low separation of pressure is highest operation pressure in work progress.
Wherein, in side wall of the described sleeve pipe float shoe below floating shoe check valve seat it is circumferentially arranged have it is multiple equally distributed Portal side.
Wherein, in step s 2, by four wiper blocks, " surface pipe is fixed placed in the middle by 20 at well head.
Beneficial effects of the present invention:The present invention abandons tubing string cementing method in routine, and connecing hydraulic circulating head using bank completes Well cementing operation, it is not take up uphole time and completes 20 " surface pipe well cementing operations, for HTHP pit shaft integrity demands, water Mud returns to well head, realizes full well section sealing, ensures that 20 " sleeve pipe and 30 " pile pipes turn into an entirety, realizes wellbore integrity, Replaced using discharge capacity is become, reduce sleeve pipe wall built-up, bored surface pipe well cementing operation timeliness beneficial to sea batch and improve.
Brief description of the drawings
Using accompanying drawing, the invention will be further described, but the embodiment in accompanying drawing does not form any limit to the present invention System, for one of ordinary skill in the art, on the premise of not paying creative work, can also be obtained according to the following drawings Other accompanying drawings.
Fig. 1 is the structural representation of casing float shoe.
Fig. 2 is 20, and " surface pipe fixes top view placed in the middle.
Embodiment
In order that those skilled in the art more fully understands technical scheme, it is below in conjunction with the accompanying drawings and specific real Apply example the present invention is described in further detail, it is necessary to explanation, in the case where not conflicting, embodiments herein and Feature in embodiment can be mutually combined.
The well head of the present invention that is not take up intersects cementing method, comprises the following steps:
S1,20, " 4 lower end connection sleeve pipe float shoe 1 of surface pipe, the structure of casing float shoe is as shown in figure 1, casing float shoe 1 Multiple equally distributed sides are provided with side wall of the floating shoe check valve seat below 2 and portal 3, pass through the side wall in casing float shoe 1 On be provided with side and portal 3, the usable side runner to be formed that portals ensures well cementing operation, and casing float shoe plays ball-and-seat and provides stream The double action in road.
Surface pipe 4 is fixed between two parties at S2, lower 20 " 4 direct bottoms of surface pipe, by wiper block 6 by 20 at well head 5 ", Specifically, by four wiper blocks 6 by 20 at well head 5, " surface pipe is fixed placed in the middle, and stationary state is as shown in Figure 2.
S3, rig floor by 20 " surface pipe from below rotary table conveniently connect 20 " sleeve pipe hydraulic circulating head position open and get rid of, move well To next well location, bank does not account for well head and intersects well cementing operation frame.
S4, artificial situation is returned in observation during well cementation, when well head it was observed that being transferred to replacement operation after cement returns out immediately, passes through The well cementation accurate feature of pump replacement amount, reduce as far as possible in sleeve pipe and stay cement plug length, finally complete well cementation.
Preferably, in step s 4, operation is replaced to replace using discharge capacity is become.The change discharge capacity is replaced according in displacement process The change of displacement pressure, using higher speed when pressure is relatively low, ensure annular space cement mortar in the state of flat board stream Replace, and when pressure is higher using relatively low speed, ensure that annular space cement mortar replaces in the state of plug flow, pressure it is high with it is low Separation be highest operation pressure in work progress.
Many details are elaborated in above description to facilitate a thorough understanding of the present invention, still, the present invention can be with It is different from other modes described here using other to implement, it is thus impossible to be interpreted as limiting the scope of the invention.
In a word, although the present invention illustrates above-mentioned preferred embodiment, although it should be noted that those skilled in the art Member can carry out various change and remodeling, unless such change and remodeling deviate from the scope of the present invention, otherwise should all wrap Include within the scope of the present invention.

Claims (5)

1. one kind, which is not take up well head, intersects cementing method, comprise the following steps:
S1, " surface pipe lower end connection sleeve pipe float shoe, wherein set in side wall of the casing float shoe below floating shoe check valve seat 20 Side is equipped with to portal;
S2, lower 20 " the direct seat bottom of surface pipe, by wiper block, " surface pipe is fixed placed in the middle by 20 at well head;
S3, by 20 " surface pipe from below rotary table conveniently connect 20 " sleeve pipe hydraulic circulating head position open and get rid of, move derrick to next Well location, bank do not account for well head and intersect well cementing operation;
S4, artificial situation is returned in observation during well cementation, when well head it was observed that being transferred to replacement operation after cement returns out immediately, completes solid Well.
2. the well head according to claim 1 that is not take up intersects cementing method, it is characterised in that:In step s 4, replace and make Industry is replaced using discharge capacity is become.
3. the well head according to claim 2 that is not take up intersects cementing method, it is characterised in that:The change discharge capacity replaces basis The change of displacement pressure in displacement process, using higher speed when pressure is relatively low, ensure annular space cement mortar in flat board Replaced in the state of stream, and ensure that annular space cement mortar replaces in the state of plug flow using relatively low speed when pressure is higher, The high and low separation of pressure is highest operation pressure in work progress.
4. the well head that is not take up according to claim 1 or 2 or 3 intersects cementing method, it is characterised in that:Described sleeve pipe float shoe It is circumferentially arranged in side wall below floating shoe check valve seat to there are multiple equally distributed sides to portal.
5. the well head that is not take up according to claim 1 or 2 or 3 intersects cementing method, it is characterised in that:In step s 2, By four wiper blocks by 20 at well head, " surface pipe is fixed placed in the middle.
CN201510505683.0A 2015-08-17 2015-08-17 It is not take up well head and intersects cementing method Active CN105114028B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510505683.0A CN105114028B (en) 2015-08-17 2015-08-17 It is not take up well head and intersects cementing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510505683.0A CN105114028B (en) 2015-08-17 2015-08-17 It is not take up well head and intersects cementing method

Publications (2)

Publication Number Publication Date
CN105114028A CN105114028A (en) 2015-12-02
CN105114028B true CN105114028B (en) 2018-01-26

Family

ID=54662114

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510505683.0A Active CN105114028B (en) 2015-08-17 2015-08-17 It is not take up well head and intersects cementing method

Country Status (1)

Country Link
CN (1) CN105114028B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105545247B (en) * 2015-12-08 2018-08-10 中国石油天然气股份有限公司 A kind of oil gas well cementing operation method
CN108301790B (en) * 2018-03-21 2024-02-02 中海石油(中国)有限公司湛江分公司 Well head auxiliary sleeve centering slip setting device and application method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4291767A (en) * 1980-02-06 1981-09-29 Hall Jr Emmitt D Method for stabilizing and hanging surface casing
CN201206456Y (en) * 2008-04-23 2009-03-11 华丽缘 Cycling head for cementing
CN202194587U (en) * 2011-08-17 2012-04-18 四川蓉瑞华宝科技有限公司 Hydraulic drive rotation sleeve guide shoe
CN102787810A (en) * 2011-05-18 2012-11-21 中国石油化工集团公司 Method for centering horizontal well cementing casing pipe
CN203081394U (en) * 2012-10-10 2013-07-24 西安航威石化设备有限公司 Float collar and float shoe for horizontal well
CN103352673A (en) * 2013-07-30 2013-10-16 中国海洋石油总公司 Monocular twin-well surface layer well cementation technology
CN203716924U (en) * 2014-03-04 2014-07-16 新疆华油技术服务股份有限公司 Rotating self-guiding floating shoe
CN103967412A (en) * 2013-01-24 2014-08-06 中国石油化工股份有限公司 Rotational flow shoe
CN104514515A (en) * 2013-09-30 2015-04-15 扬州市油田金达实业有限公司 Automatic grouting float shoe

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10487618B2 (en) * 2013-10-11 2019-11-26 Weatherford Netherlands, B.V. System and method for sealing a wellbore

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4291767A (en) * 1980-02-06 1981-09-29 Hall Jr Emmitt D Method for stabilizing and hanging surface casing
CN201206456Y (en) * 2008-04-23 2009-03-11 华丽缘 Cycling head for cementing
CN102787810A (en) * 2011-05-18 2012-11-21 中国石油化工集团公司 Method for centering horizontal well cementing casing pipe
CN202194587U (en) * 2011-08-17 2012-04-18 四川蓉瑞华宝科技有限公司 Hydraulic drive rotation sleeve guide shoe
CN203081394U (en) * 2012-10-10 2013-07-24 西安航威石化设备有限公司 Float collar and float shoe for horizontal well
CN103967412A (en) * 2013-01-24 2014-08-06 中国石油化工股份有限公司 Rotational flow shoe
CN103352673A (en) * 2013-07-30 2013-10-16 中国海洋石油总公司 Monocular twin-well surface layer well cementation technology
CN104514515A (en) * 2013-09-30 2015-04-15 扬州市油田金达实业有限公司 Automatic grouting float shoe
CN203716924U (en) * 2014-03-04 2014-07-16 新疆华油技术服务股份有限公司 Rotating self-guiding floating shoe

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《JZ9-3W沉箱集中快钻密集丛式井表层技术》;姜伟;《钻采工艺》;19981031;第21卷(第5期);第1-3页 *
《渤海油田快速钻井技术及其应用研究》;赵景芳 等;《石油天然气学报(江汉石油学院学报)》;20060831;第28卷(第4期);第312-314页 *

Also Published As

Publication number Publication date
CN105114028A (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CA2950951C (en) Curaua fibers as lost-circulation materials and fluid-loss additives in wellbore fluids
AU2010292219B2 (en) Systems and methods for circulating out a well bore influx in a dual gradient environment
US10990717B2 (en) Software simulation method for estimating fluid positions and pressures in the wellbore for a dual gradient cementing system
CN106320983B (en) A kind of ultra-deep-water is with boring cased method and device
Mohamed et al. Liner hangers technology advancement and challenges
Turner et al. Casing rotation for improved cement quality in unconventional horizontal wellbores
CN105114028B (en) It is not take up well head and intersects cementing method
CN102155163A (en) Deepwater multifunctional water pump drilling system and installation method thereof
WO2012140445A2 (en) Subsea wellbore construction method and apparatus
Calderoni et al. Microflux control and E-CD continuous circulation valves allow operator to reach HPHT reservoirs for the first time
US10273761B2 (en) Axial retention connection for a downhole tool
CN108086924A (en) A kind of method that deepwater drilling platform suspension marine riser moves well location
CN202000892U (en) Multi-functional deep-water undersea pump drilling system
Delabroy et al. Perforate wash and cement for large casing sizes
KR20150042313A (en) Drillship
Gordon et al. Underbalanced drilling with casing evolution in the South Texas vicksburg
CN207715118U (en) A kind of Novel hydraulic rotation reaming hole float shoe
KR20150145554A (en) Dual gradient drilling system
Koch Ferreira et al. Tailored Dependable Barrier Enables Operator to Flawlessly Complete True One Trip Ultra Slender Deepwater Well
CN203430501U (en) Combined drilling tool capable of measuring inclination through opened hole
RU2505667C1 (en) Method of multilay field development
Bourgoyne Jr et al. An experimental study of well control procedures for deepwater drilling operations
Hegazy Modern Drilling and Completion in Contradiction of New Artificial Lift Method Concept
KR20160035257A (en) Bulk/cement system of offshore structure and method for commonly using bulk tank adn cement tank
Gilmore et al. A case history review of the effects of drilling fluids on shale stability in the Central Gulf of Mexico

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Applicant after: China Offshore Oil Group Co., Ltd.

Applicant after: CNOOC (China) Limited Zhanjiang Branch

Address before: China CNOOC Building No. 25 Beijing 100000 Chaoyang District Chaoyangmen North Street

Applicant before: China National Offshore Oil Corporation

Applicant before: CNOOC (China) Limited Zhanjiang Branch

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant