CN105098648A - Short-time power-cut operation method for cable line between two ring main units - Google Patents

Short-time power-cut operation method for cable line between two ring main units Download PDF

Info

Publication number
CN105098648A
CN105098648A CN201510524004.4A CN201510524004A CN105098648A CN 105098648 A CN105098648 A CN 105098648A CN 201510524004 A CN201510524004 A CN 201510524004A CN 105098648 A CN105098648 A CN 105098648A
Authority
CN
China
Prior art keywords
cable
ring main
main units
circuit breaker
bypass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510524004.4A
Other languages
Chinese (zh)
Inventor
方静
殷军
秦涛
白苏娜
孟铮铮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510524004.4A priority Critical patent/CN105098648A/en
Publication of CN105098648A publication Critical patent/CN105098648A/en
Pending legal-status Critical Current

Links

Landscapes

  • Locating Faults (AREA)

Abstract

The invention relates to a short-time power-cut operation method for a cable line between two ring main units, comprising the following steps: (1) laying flexible cables, connecting the flexible cables by a middle joint, and connecting a corresponding high-voltage adapter cable with the flexible cables; (2) ensuring that spaced standby circuit breakers of ring main units at the two ends of a bypass system are switched off; (3) inserting the terminal heads of the high-voltage adapter cable into the ring main units in an uncharged state; (4) switching on the circuit breakers at the two ends of the bypass system to put the bypass system into operation; (5) after ensuring that the bypass system works normally, switching off circuit breakers at the two ends of a faulty cable to make the faulty cable exit; (6) discharging the faulty cable, and repairing the faulty cable; (7) connecting the terminal heads at the two ends of the cable line after repair to the ring main units; (8) switching on the circuit breakers at the two ends of the cable line after repair, and ensuring that the circuit breakers work normally; and (9) switching off circuit breakers at the two ends of a bypass cable, discharging the bypass cable, pulling the high-voltage adapter cable out of the ring main units, and making the bypass system exit.

Description

A kind of cable line power failure operation method in short-term between two ring main units
Technical field
The invention belongs to cable machinery detection technique field, cable line power failure operation method in short-term between especially a kind of two ring main units.
Background technology
Bypass uninterrupted operation technology is one and improves the novel charged operation technique of distribution network reliability, and it in a short period of time, can build a set of inicdental bypath electric power system, under power supply state incessantly, completes the scheduled overhaul work of circuit; In addition, for more unmanageable overhead transmission line breakdown repair and cable line fault repairing, this technology can be applied and carry out temporary power, reduce power failure range to greatest extent, reduce power failure to customer impact.
Summary of the invention
The object of the invention is to overcome prior art deficiency, a kind of cable line power failure operation method in short-term between two ring main units is provided.
The technical solution used in the present invention is:
A kind of cable line power failure operation method in short-term between two ring main units, the steps include:
(1) lay flexible cable, utilize transition joint flexible cable to couple together, and the high pressure transit cable of correspondence is connected with flexible cable;
(2) guarantee that the circuit breaker of bypath system two ends ring main unit standby spacing is in open position;
(3) in uncharged situation, high pressure transit cable terminals are inserted ring main unit;
(4) the circuit breaker at bypath system of closing two ends, makes bypath system put into operation;
(5), after confirmation bypath system is working properly, the circuit breaker at open failure cable two ends, makes failure cable out of service;
(6) failure cable is discharged, trouble shooting cable;
(7) the terminals at the cable line two ends of having fixed are connected on ring main unit;
(8) close the circuit breaker at the cable line two ends of having fixed, and confirm that it is working properly;
(9) disconnect the circuit breaker at bypass cable two ends, bypass cable is discharged, high pressure transit cable is extracted from ring main unit, make bypath system out of service.
Advantage of the present invention and good effect are:
Between two ring main units provided by the invention, power failure operation method is compared with prior art in short-term for cable line, the present invention has filled up the blank of the power failure operation in short-term of cable line between two ring main units, use the bypass damage repair technology that do not have a power failure can meet distribution user service without power-off, the job requirements such as equipment replacement, be applied to the reliable power supply in the important great place of temporary power of responsible consumer, significantly promote power supply reliability index, reduce the interruption duration of scheduled overhaul and troubleshooting, launched by bypass flexible cable system, realize 30min emergent restoring in 3km to power, interruption duration more than 80% can be reduced for 8 hours interruption maintenances, many sales of electricity more than 20000kwh.
Embodiment
Below by embodiment, the invention will be further described, and following examples are descriptive, is not determinate, can not limit protection scope of the present invention with this.
A kind of cable line power failure operation method in short-term between two ring main units, the steps include:
1) personnel lines up to read out work ticket, work director assign a work task, explain safety measure, specifically divide the work.
2) lay flexible cable, utilize transition joint flexible cable to couple together, and the high pressure transit cable of correspondence is connected with flexible cable.
3) guarantee that the circuit breaker of bypath system two ends ring main unit standby spacing is in open position, 4) in uncharged situation, high pressure transit cable terminals are inserted ring main unit.
5) circuit breaker at bypath system of closing two ends, makes bypath system put into operation.
6) after confirmation bypath system is working properly, the circuit breaker at open failure cable two ends, makes failure cable out of service.
7) failure cable is discharged, trouble shooting cable.
8) terminals at the cable line two ends of having fixed are connected on ring main unit.
9) close the circuit breaker at the cable line two ends of having fixed, and confirm that it is working properly.
10) disconnect the circuit breaker at bypass cable two ends, bypass cable is discharged, high pressure transit cable is extracted from ring main unit, make bypath system out of service.
Although disclose embodiments of the invention for the purpose of illustration, but it will be appreciated by those skilled in the art that: in the spirit and scope not departing from the present invention and claims, various replacement, change and amendment are all possible, therefore, scope of the present invention is not limited to the content disclosed in embodiment.

Claims (1)

1. a cable line power failure operation method in short-term between two ring main units, is characterized in that: the steps include:
(1) lay flexible cable, utilize transition joint flexible cable to couple together, and the high pressure transit cable of correspondence is connected with flexible cable;
(2) guarantee that the circuit breaker of bypath system two ends ring main unit standby spacing is in open position;
(3) in uncharged situation, high pressure transit cable terminals are inserted ring main unit;
(4) the circuit breaker at bypath system of closing two ends, makes bypath system put into operation;
(5), after confirmation bypath system is working properly, the circuit breaker at open failure cable two ends, makes failure cable out of service;
(6) failure cable is discharged, trouble shooting cable;
(7) the terminals at the cable line two ends of having fixed are connected on ring main unit;
(8) close the circuit breaker at the cable line two ends of having fixed, and confirm that it is working properly;
(9) disconnect the circuit breaker at bypass cable two ends, bypass cable is discharged, high pressure transit cable is extracted from ring main unit, make bypath system out of service.
CN201510524004.4A 2015-08-24 2015-08-24 Short-time power-cut operation method for cable line between two ring main units Pending CN105098648A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510524004.4A CN105098648A (en) 2015-08-24 2015-08-24 Short-time power-cut operation method for cable line between two ring main units

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510524004.4A CN105098648A (en) 2015-08-24 2015-08-24 Short-time power-cut operation method for cable line between two ring main units

Publications (1)

Publication Number Publication Date
CN105098648A true CN105098648A (en) 2015-11-25

Family

ID=54578529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510524004.4A Pending CN105098648A (en) 2015-08-24 2015-08-24 Short-time power-cut operation method for cable line between two ring main units

Country Status (1)

Country Link
CN (1) CN105098648A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112510573A (en) * 2020-09-29 2021-03-16 浙江大有实业有限公司带电作业分公司 Outgoing cable overhauling method based on temporary mobile power supply application

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201937196U (en) * 2010-12-30 2011-08-17 徐州海伦哲专用车辆股份有限公司 Mobile cabinet type transformer vehicle for high-voltage load transfer
CN103078268A (en) * 2012-12-28 2013-05-01 上海市电力公司 Uninterrupted power overhauling method of 10kV cables between two annular net cabinets
CN103245862A (en) * 2013-05-08 2013-08-14 国家电网公司 Condition monitoring system used for ring main unit of intelligent power distribution network
CN103812041A (en) * 2014-02-21 2014-05-21 国网湖南省电力公司带电作业中心 Method for overhauling ring main unit of 10kV cable circuit without switching power supply off

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201937196U (en) * 2010-12-30 2011-08-17 徐州海伦哲专用车辆股份有限公司 Mobile cabinet type transformer vehicle for high-voltage load transfer
CN103078268A (en) * 2012-12-28 2013-05-01 上海市电力公司 Uninterrupted power overhauling method of 10kV cables between two annular net cabinets
CN103245862A (en) * 2013-05-08 2013-08-14 国家电网公司 Condition monitoring system used for ring main unit of intelligent power distribution network
CN103812041A (en) * 2014-02-21 2014-05-21 国网湖南省电力公司带电作业中心 Method for overhauling ring main unit of 10kV cable circuit without switching power supply off

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
牛捷: "10KV电缆线路不停电作业旁路***研究", 《电网技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112510573A (en) * 2020-09-29 2021-03-16 浙江大有实业有限公司带电作业分公司 Outgoing cable overhauling method based on temporary mobile power supply application

Similar Documents

Publication Publication Date Title
CN101425685B (en) Internal bridge connecting and protection implementing method for linkage standby electricity supply mode
CN102684087B (en) Bypass operation vehicle capable of enabling users to change distribution transformer without power cutting
US20240106208A1 (en) High voltage overhead electric transmission line equipped with switchgear unit
CN105098648A (en) Short-time power-cut operation method for cable line between two ring main units
CN109245291B (en) Maintenance safety measure arrangement method for double-bus double-subsection power supply system of transformer substation
CN104218457A (en) Power distribution device and electric master system thereof
CN104836212A (en) Arc light protection system suitable for double-power supply
CN102064598A (en) Uninterrupted switching device for DC power supply in transformer substation
CN113437795B (en) Mobile box transformer substation vehicle with input voltage automatic switching function
CN205790973U (en) The electric power system of transformer lines unit connection
KR102332571B1 (en) An electric power supply method of the control unit for pad mounted type switchgear for underground line
CN102684153A (en) Device for controlling linkage of circuit breakers of line transformer bank
KR100844037B1 (en) Uninterruptible hpower exchanging method of cable for underground power distrbution line
HRP20210941T1 (en) Electric vehicle charging station for connecting to high or extra high voltage transmission line and operation method thereof
JP3128368U (en) High-pressure air switch with optically insulated ground fault protection relay
CN101820184B (en) Communication power supply system
CN105391165A (en) Inlet wire emergency power supply automatic switch-in control method and system
CN206697557U (en) Quick release and the battery of installation
CN205231314U (en) Disconnect secondary circuit and termination do not have a power failure and and meet terminal arrangement thereof
EA020927B1 (en) United electrical supply device with the dc bus
KR20130063275A (en) Terminal plate and method for uninterruptible power supply
CN203367823U (en) Device for replacing fuse
CN102594114B (en) Cophase supply current transformer system
KR102375023B1 (en) Potential Transformer Replacement Operation Standard Procedure and Temporary Power Supply Device, Load Break Switches for Underground Line
KR102622675B1 (en) The ground transformer uninterruptible replacement method using the ground transformer elbow connector three phase batch separation connection apparatus and feed through

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151125