CN105089044A - Horizontal push compaction type prefabricated underground continuous wall system and construction method thereof - Google Patents

Horizontal push compaction type prefabricated underground continuous wall system and construction method thereof Download PDF

Info

Publication number
CN105089044A
CN105089044A CN201510545225.XA CN201510545225A CN105089044A CN 105089044 A CN105089044 A CN 105089044A CN 201510545225 A CN201510545225 A CN 201510545225A CN 105089044 A CN105089044 A CN 105089044A
Authority
CN
China
Prior art keywords
wall
wall width
width
groove
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510545225.XA
Other languages
Chinese (zh)
Other versions
CN105089044B (en
Inventor
许国光
耿冬青
油新华
马庆松
张清林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201510545225.XA priority Critical patent/CN105089044B/en
Publication of CN105089044A publication Critical patent/CN105089044A/en
Application granted granted Critical
Publication of CN105089044B publication Critical patent/CN105089044B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a horizontal push compaction type prefabricated underground continuous wall system and a construction method thereof. The system is put in a dig groove section, and comprises a set of underground continuous walls horizontally spliced by inserted wall widths and wall widths to be inserted, and a ground connecting wall splicing device; at least two middle expansion waterproof limiting bars vertically inserted through and limiting a convex head to be deeply inserted into the groove are symmetrically arranged at the front ends of two side surfaces of the convex head; and splicing sunny surfaces and splicing shaded surfaces are respectively provided with at least two edge expansion waterproof connecting bars vertically inserted through at opposite positions close to the outer surfaces of the wall widths. A waterproof seal joint measure is arranged between adjacent two prefabricated continuous wall bodies, so that a mode of post-casting concrete in a joint of traditional prefabricated ground connecting walls is improved, the concrete maintenance time is saved, the continuous wall construction efficiency can be effectively improved, and the construction period is shortened.

Description

A kind of horizontal-top pushing compact form coercion underground continuous wall system and construction method thereof
Technical field
The invention belongs to building underground and go along with sb. to guard him construction field, particularly relate to that a kind of underground can use in underground space space enclosing structure, can be used as horizontal-top pushing compact form coercion underground continuous wall system and the construction method thereof of underground space retaining wall structure, waterproof construction and vertical bearing structure.
Background technology
Along with the develop rapidly of economy and improving constantly of the urbanization level, urban issues becomes increasingly conspicuous, and as densely populated, congested in traffic, resource exhaustion, area deficiency, land price can be utilized surging.Using underground space configuration urban infrastructure is the effective way fundamentally solving issues about the cities' development.At present, what underground space space enclosing structure was the most frequently used is diaphragm wall.
But, because Cast-in-situs type diaphragm wall pours under water, inevitably there is some defects and disadvantage.
One, wait for that concrete setting causes claim for eot
Cast-in-place diaphragm wall is as underground large-sized concrete supporting and protection structure, soil excavation needs wait for diaphragm wall concrete setting and can construct further after reaching some strength, and urban underground space construction requirements is tried one's best the reduction of erection time, cast-in-place ground-connecting-wall does not obviously meet the rapid construction requirement that urban underground space is built.
When two, building, quality not easily ensures
During the underwater casting of ground-connecting-wall, concrete easily presss from both sides mud, during descending reinforcing cage, reinforcing bar is stained with mud, and reduce concrete reinforcement bond stress, wall body difficult quality guarantee, and the random infiltration easily causing metope, this is a cast-in-place ground-connecting-wall insurmountable difficult problem always.
Three, in soft stratum, degree of plainness for wall surface is wayward
When soil layer weakness or layer of sand, if mud conditioning is improper, there is problem of caving in cell wall, commonly metope has evagination phenomenon, and degree of plainness for wall surface is difficult to the problems such as control.
Existing also exist the example that some adopt prefabricated ground-connecting-wall, some defects above can be avoided, but the use of current prefabricated ground-connecting-wall is extensive, the stagnant water effect of the seam between its chief reason or two panels body of wall is bad, and the connection effect of body of wall seam is difficult to be guaranteed.
Summary of the invention
The object of this invention is to provide a kind of horizontal-top pushing compact form coercion underground continuous wall system and construction method thereof, cast-in-place ground-connecting-wall be solved and exist and wait for that concrete setting causes claim for eot, quality not easily ensures and the uppity technical problem of degree of plainness for wall surface in soft stratum when building.
For achieving the above object, the present invention adopts following technical scheme:
A kind of horizontal-top pushing compact form coercion underground continuous wall system, be placed in the groove section excavated, comprise one group by the diaphragm wall inserting wall width and be spliced about being inserted into wall width and ground-connecting-wall split unit, the middle part of its right end face of every sheet wall width is provided with the split sunny side of groove elongated up and down and both sides, the left end face of every sheet wall width be provided with plush copper that is elongated, that match with groove and split sunny side and the split back up and down; The front end of the two sides of described plush copper is arranged with about at least two middle part expansion water-stop positive stop strips elongated, restriction plush copper inserts the degree of depth in groove, described split sunny side and the split back, near the corresponding position of wall width external surface, are arranged with about at least two elongated edge expansion water-stop connection straps separately;
Described ground-connecting-wall split unit is ground-connecting-wall thrustor, be located at the groove side near being inserted into wall width, by the counter-force that the groove section soil body at device back provides, ground-connecting-wall thrustor makes to be inserted into wall width and extrudes closely with the middle part expansion water-stop positive stop strip of the stitching portion of inserting wall width, is inserted into the end face of the plush copper of wall width, the groove inserting wall width and middle part expansion water-stop positive stop strip simultaneously and forms closed middle part slip casting cavity;
By the counter-force that the groove section soil body at device back provides, ground-connecting-wall thrustor makes split sunny side be connected with the edge expansion water-stop connection strap contact on the split back, and while has inserted the split sunny side of wall width, the split back being inserted into wall width and edge expansion water-stop connection strap and forms two closed edge slip casting cavitys respectively.
Described ground-connecting-wall thrustor comprise with wall width with on the left of high horizontal pushing tow reaction frame and the support body being connected to this horizontal pushing tow reaction frame, vertical with wall width and along one group of the setting in column of support body short transverse jack under water, described horizontal pushing tow reaction frame and the distance be inserted between wall width are no more than the pushing tow stroke of jack under water.
The pushing tow position of described jack is under water the bottom surface of the groove being inserted into wall width.
Grouting pipe at the bottom of the wall that at least twice are vertically elongated is embedded with in described wall width.
A construction method for horizontal-top pushing compact form coercion underground continuous wall system, construction sequence is as follows:
Step one, use the wall width of template prefabricated reinforced concrete in factory, grouting pipe at the bottom of wall is imbedded in wall width inside, and does antirust treatment to grouting pipe at the bottom of wall, and prefabricated wall width is transported to construction plant;
Step 2, to soil excavation grooving, the length of fluting and width are all greater than length and the width of monolithic wall width, and it is levelling to spread one deck rubble at bottom land;
Step 3, a slice of slinging wall width is also transferred to the groove section excavated, and becomes and inserts wall width;
Step 4, fluting is continued in the groove side of inserting wall width, the width of fluting is greater than the width of monolithic wall width, the length of fluting is greater than the length of monolithic wall width and the length sum of horizontal pushing tow reaction frame, and ensure that the pushing tow length of jack is under water within its stroke, spread one deck rubble at bottom land levelling simultaneously;
Step 5, namely another sheet wall width of slinging is inserted into wall width, transfer in the groove section that to continue to slot to step 4, by the plush copper being inserted into wall width from top to bottom or be on close level and insert the groove of wall width, the front end of plush copper is inserted within groove, the middle part expansion water-stop positive stop strip now having inserted wall width just contacts with the inwall of the groove being inserted into wall width
Step 6, makes ground-connecting-wall thrustor;
Step 7, ground-connecting-wall thrustor is transferred in lifting, makes the back of horizontal pushing tow reaction frame withstand cell wall, and to rely on cell wall soil pressure to provide counter-force, the pushing tow of jack boosting is under water inserted into wall width and slowly moves to inserting wall amplitude shift;
Step 8, after pushing tow distance reaches slip casting cavity in the middle part of the middle part expansion water-stop positive stop strip jam-packed formation making two panels wall width seam crossing, edge expansion water-stop positive stop strip contact formation edge slip casting cavity, jack pressure release under water, hangs away ground-connecting-wall thrustor;
Step 9, carries out slip casting by grouting pipe at the bottom of wall to bottom wall width, and the bottom of wall width is fixedly connected with the bottom land soil body;
Step 10, after two panels wall web stabilization, to inserting wall width and being inserted into injected clear water displacement mud wherein in the middle part slip casting cavity between wall width;
Step 11, by inserting Grouting Pipe in middle part slip casting cavity, carries out slip casting to middle part slip casting cavity;
Step 12, repeats above 5th step to the 11 step and completes follow-up 3rd construction to N sheet wall width piecewise;
Step 13, to insert wall width and be inserted into wall width edge slip casting cavity in injected clear water displacement mud wherein;
Step 14, by inserting Grouting Pipe in edge slip casting cavity, carries out slip casting to edge slip casting cavity and the space between body of wall periphery and cell wall, and adjacent two panels wall width is fixedly connected with;
Step 15, repeating the 12 step to the is 14 steps until complete the construction of ground-connecting-wall.
Compared with prior art the present invention has following characteristics and beneficial effect:
One, the present invention is by arranging ground-connecting-wall thrustor in the groove side being inserted into wall width, rely on the jacking force of jack under water to make two panels wall width compress close by middle part expansion water-stop positive stop strip and edge expansion water-stop connection strap top, when effectively avoiding insertion second wall width, two walls are difficult to compact siro spinning technology thus the ground water seepage problem that may cause.
Two, the present invention arranges the measure of waterproof seal strip joint between the prefabricated diaphragm wall body of wall of adjacent two panels, improve existing prefabricated ground-connecting-wall in the concrete form of seam crossing after-pouring, save concrete curing time, can effectively improve construction of diaphragm wall efficiency, reduce the duration of a project.
Three, the water expandable waterstop adaptivity water joint measure in the present invention, by water swelling, reaches stagnant water effect, ensures the reliability of joint waterproofing, reduces gushing water in Excavation Process and to dash forward mud accident occurrence probability, improve the quality of construction.
Four, the present invention also forms middle part slip casting cavity and edge slip casting cavity in joint, and in cavity, slip casting is to connect two panels wall width, the performance of further reinforced joint waterproof.
Five, various ground-connecting-wall flat shape can be realized by the working special-shaped ground-connecting-wall that is prefabricated in the factory, and do not need the measure of other design specialized groove end joint, the scope of application is extremely wide.
Six, the present invention is the prefabricated diaphragm wall of flush type, can strengthen body of wall vertical bearing capacity by bottom slip casting measure, can use, reach the application target of Two walls unite as one as underground space enclosed structure and basement interior wall.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention will be further described in detail.
Fig. 1 is the perspective view of structure of the present invention.
Fig. 2 is the plan structure schematic diagram of Fig. 1.
Fig. 3 is the partial enlarged drawing of connector in Fig. 2.
Fig. 4 is the perspective view in Fig. 1 after jack boosting under water.
Fig. 5 is the partial enlarged drawing of connector in Fig. 4.
Fig. 6 is the structural representation that structure of the present invention is in groove section.
Reference numeral: 1-has inserted wall width, 2-is inserted into wall width, 3-plush copper, 4-groove, 5-ground-connecting-wall thrustor, the horizontal pushing tow reaction frame of 5.1-, 5.2-in the middle part of expansion water-stop positive stop strip, 7-, at the bottom of slip casting cavity, 8-wall, grouting pipe, 9-split sunny side, the 10-split back, 11-edge expansion water-stop connection strap, 12-edge slip casting cavity, 13-have excavated in the middle part of jack, 6-under water groove section, the 14-groove section soil body.
Detailed description of the invention
Embodiment is see shown in Fig. 1-6, a kind of horizontal-top pushing compact form coercion underground continuous wall system, be placed in the groove section 13 excavated, comprise one group by inserting wall 1 and being inserted into wall about 2 diaphragm walls be spliced and ground-connecting-wall split unit, the middle part of its right end face of every sheet wall width is provided with groove 4 elongated up and down and the split sunny side 9 of both sides, the left end face of every sheet wall width be provided with plush copper 3 that is elongated, that match with groove 4 and split sunny side 9 and the split back 10 up and down; The front end of the two sides of described plush copper 3 is arranged with about at least two middle part expansion water-stop positive stop strips 6 elongated, restriction plush copper 3 inserts the degree of depth in groove 4, described split sunny side 9 and the split back 10, near the corresponding position of wall width external surface, are arranged with about at least two elongated edge expansion water-stop connection straps 11 separately;
Described ground-connecting-wall split unit is ground-connecting-wall thrustor 5, be located at groove 4 side near being inserted into wall 2, by the counter-force that the groove section soil body at device back provides, ground-connecting-wall thrustor 5 makes to be inserted into wall 2 and extrudes closely with the middle part expansion water-stop positive stop strip 6 of the stitching portion of having inserted wall 1, is inserted into the end face of the plush copper 3 of wall 2, the groove 4 inserting wall 1 and middle part expansion water-stop positive stop strip 6 simultaneously and forms closed middle part slip casting cavity 7;
By the counter-force that the groove section soil body at device back provides, ground-connecting-wall thrustor 5 makes split sunny side 9 be connected with edge expansion water-stop connection strap 11 contact on the split back 10, and while has inserted the split sunny side 9 of wall 1, the split back 10 being inserted into wall 2 and edge expansion water-stop connection strap 11 and forms two closed edge slip casting cavitys 12 respectively.
Described ground-connecting-wall thrustor 5 comprise with wall width with on the left of high horizontal pushing tow reaction frame 5.1 and the support body being connected to this horizontal pushing tow reaction frame 5.1, vertical with wall width and along one group of the setting in column of support body short transverse jack 5.2 under water, described horizontal pushing tow reaction frame 5.1 and the distance be inserted between wall 2 are no more than the pushing tow stroke of jack under water.
The pushing tow position of described jack under water 5.2 is the bottom surface of the groove 4 being inserted into wall width.
Grouting pipe 8 at the bottom of the wall that at least twice are vertically elongated is embedded with in described wall width.
In the present embodiment, the thickness of water-stop glue bar can be 2cm, and width can be 3cm.
The construction method of this horizontal-top pushing compact form coercion underground continuous wall system, construction sequence is as follows:
Step one, uses the wall width of template prefabricated reinforced concrete in factory, the strict dimensional tolerance controlling wall body built-in fitting and wallboard, and externally bleed-out component does antirust treatment; In wall width and wall width, built-in fitting ensures certain machining accuracy, makes plush copper 3 easier can embed groove 4 position of adjacent wall board; Grouting pipe 8 at the bottom of wall is imbedded in wall width inside, and antirust treatment is done to grouting pipe at the bottom of wall 8, prefabricated wall width is transported to construction plant, described wall width can be pre-buried in body of wall bolt sleeve, the hoisting transportation that sleeve connection suspension ring can facilitate wall width vertical and horizontal, water-swellable watertight seal notes waterproof and touching in processing or transportation, lengthening flat car is used by wall width to be transported to construction plant, ensure in transportation that dry wall is injury-free, bracket and steel-wire fastener can be used if desired to fix.
Step 2, uses grab bucket or other groovers to soil excavation grooving, and the length of fluting and width are slightly larger than the length of monolithic wall width and width, and it is levelling to spread one deck rubble at bottom land.
Step 3, crane is used to be sling a slice wall width the groove section 13 transferred to having excavated by hoisting ring, need in decentralization process to ensure certain mud level, ensure the position stability of mud liquid level, ensure the soil stabilization of mud off gutter section, avoid caving in of sidewall occurs, prevent soil body collapse hole in groove, measured by level gauge in decentralization process and adjust prefabricated ground-connecting-wall verticality; First wall width becomes and inserts wall 1.
Step 4, grab bucket or groove 4 side that other groovers are inserting wall 1 is used to continue fluting, the width of slotting is slightly larger than the width of monolithic wall width, the length of fluting is greater than the length of monolithic wall width and the length sum of horizontal pushing tow reaction frame, and ensure that the pushing tow length of jack is under water within its stroke, spread one deck rubble at bottom land levelling simultaneously.
Step 5, crane is used namely to be inserted into wall 2 by ground-connecting-wall hoisting ring another sheet wall width of slinging, transfer in the groove section that to continue to slot to step 4, by the plush copper being inserted into wall 2 from top to bottom or be on close level and insert the groove 4 of wall 1, the front end of plush copper 3 is inserted within groove 4, the middle part expansion water-stop positive stop strip 6 now having inserted wall 1 just contacts with the inwall of the groove 4 being inserted into wall 2, sealing adhesive tape contacts but does not apply horizontal-top thrust, measured by level gauge in decentralization process and adjust prefabricated ground-connecting-wall verticality, insert from groove in decentralization process and ensure certain mud level.
Step 6, makes ground-connecting-wall thrustor.
Step 7, ground-connecting-wall thrustor 5 is transferred in lifting, makes the back of horizontal pushing tow reaction frame 5.1 withstand cell wall, and to rely on cell wall soil pressure to provide counter-force, jack 5.2 pushing tow that boosts is inserted into wall 2 and slowly moves to inserting wall 1 under water.
Step 8, after pushing tow distance reaches slip casting cavity 7 in the middle part of the middle part expansion water-stop positive stop strip 6 jam-packed formation making two panels wall width seam crossing, edge expansion water-stop positive stop strip 11 contact formation edge slip casting cavity 12, jack 5.2 pressure release under water, hangs away ground-connecting-wall thrustor 5; Middle part expansion water-stop positive stop strip crimp forms extruding force.
Step 9, by carrying out slip casting bottom the 8 pairs of wall width of grouting pipe at the bottom of wall, makes the bottom of wall width be fixedly connected with the bottom land soil body.
Step 10, after two panels wall web stabilization, to inserting wall 1 and being inserted into injected clear water displacement mud wherein in the middle part slip casting cavity 7 between wall 2.
Step 11, by inserting Grouting Pipe in middle part slip casting cavity 7, carries out slip casting to middle part slip casting cavity 7.
Step 12, repeats above 5th step to the 11 step and completes follow-up 3rd construction to N sheet wall width piecewise, uses perpendicular type abnormal shape can assemble flush type diaphragm wall realize the construction of prefabricated ground-connecting-wall at right angle corner place.
Step 13, injected clear water displacement mud wherein in the edge slip casting cavity 12 inserting wall 1 and be inserted into wall 2, avoids forming mud skin at water-swellable adhesive tape surface, affects soaking effect.
Step 14, by inserting Grouting Pipe in edge slip casting cavity 12, carries out slip casting to edge slip casting cavity 12 and the space between body of wall periphery and cell wall, and adjacent two panels wall width is fixedly connected with.
Step 15, repeating the 12 step to the is 14 steps until complete the construction of ground-connecting-wall.
Content described in this manual embodiment is only enumerating the way of realization of inventive concept; protection scope of the present invention should not be regarded as being only limitted to the concrete form that embodiment is stated, protection scope of the present invention also and conceive the equivalent technologies means that can expect according to the present invention in those skilled in the art.

Claims (5)

1. a horizontal-top pushing compact form coercion underground continuous wall system, be placed in the groove section (13) excavated, comprise one group by inserting wall width (1) and being inserted into wall width (2) diaphragm wall that is spliced of left and right and ground-connecting-wall split unit, the middle part of its right end face of every sheet wall width is provided with groove (4) elongated up and down and the split sunny side (9) of both sides, the left end face of every sheet wall width be provided with plush copper (3) that is elongated, that match with groove (4) and split sunny side (9) and the split back (10) up and down; It is characterized in that: the front end of the two sides of described plush copper (3) is arranged with about at least two middle parts expansion water-stop positive stop strip (6) elongated, groove (4) the interior degree of depth is inserted in restriction plush copper (3), described split sunny side (9) and the split back (10), near the corresponding position of wall width external surface, are arranged with about at least two elongated edge expansion water-stop connection straps (11) separately;
Described ground-connecting-wall split unit is ground-connecting-wall thrustor (5), be located at groove (4) side near being inserted into wall width (2), by the counter-force that the groove section soil body at device back provides, ground-connecting-wall thrustor (5) makes to be inserted into wall width (2) and extrudes closely with middle part expansion water-stop positive stop strip (6) of the stitching portion of inserting wall width (1), and the end face being simultaneously inserted into the plush copper (3) of wall width (2), the groove (4) inserting wall width (1) and middle part expansion water-stop positive stop strip (6) form the middle part slip casting cavity (7) closed;
By the counter-force that the groove section soil body at device back provides, ground-connecting-wall thrustor (5) makes split sunny side (9) be connected with edge expansion water-stop connection strap (11) contact on the split back (10), and while has inserted the split sunny side (9) of wall width (1), the split back (10) being inserted into wall width (2) and edge expansion water-stop connection strap (11) and forms two closed edge slip casting cavitys (12) respectively.
2. a kind of horizontal-top pushing compact form coercion underground continuous wall system according to claim 1, it is characterized in that: described ground-connecting-wall thrustor (5) comprise with wall width with on the left of high horizontal pushing tow reaction frame (5.1) and the support body being connected to this horizontal pushing tow reaction frame (5.1), vertical with wall width and along one group of the setting in column of support body short transverse jack (5.2) under water, described horizontal pushing tow reaction frame (5.1) and the distance be inserted between wall width (2) are no more than the pushing tow stroke of jack under water.
3. a kind of horizontal-top pushing compact form coercion underground continuous wall system according to claim 2, is characterized in that: the pushing tow position of described jack under water (5.2) is the bottom surface of the groove (4) being inserted into wall width.
4. a kind of horizontal-top pushing compact form coercion underground continuous wall system according to claim 1, is characterized in that: be embedded with grouting pipe (8) at the bottom of the wall that at least twice are vertically elongated in described wall width.
5. the construction method of the horizontal-top pushing compact form coercion underground continuous wall system according to claim 1-4 any one, it is characterized in that, construction sequence is as follows:
Step one, use the wall width of template prefabricated reinforced concrete in factory, grouting pipe at the bottom of wall (8) is imbedded in wall width inside, and does antirust treatment to grouting pipe at the bottom of wall (8), and prefabricated wall width is transported to construction plant;
Step 2, to soil excavation grooving, the length of fluting and width are all greater than length and the width of monolithic wall width, and it is levelling to spread one deck rubble at bottom land;
Step 3, a slice of slinging wall width is also transferred to the groove section (13) excavated, and becomes and inserts wall width (1);
Step 4, fluting is continued in groove (4) side of inserting wall width (1), the width of fluting is greater than the width of monolithic wall width, the length of fluting is greater than the length of monolithic wall width and the length sum of horizontal pushing tow reaction frame, and ensure that the pushing tow length of jack is under water within its stroke, spread one deck rubble at bottom land levelling simultaneously;
Step 5, namely another sheet wall width of slinging is inserted into wall width (2), transfer in the groove section that to continue to slot to step 4, by be inserted into wall width (2) plush copper from top to bottom or the groove (4) inserting wall width (1) of being on close level, inserted within groove (4) front end of plush copper (3), middle part expansion water-stop positive stop strip (6) of now having inserted wall width (1) just contacts with the inwall of the groove (4) being inserted into wall width (2);
Step 6, makes ground-connecting-wall thrustor;
Step 7, ground-connecting-wall thrustor (5) is transferred in lifting, make the back of horizontal pushing tow reaction frame (5.1) withstand cell wall, to rely on cell wall soil pressure to provide counter-force, it is slowly mobile to inserting wall width (1) that the pushing tow of jack (5.2) boosting is under water inserted into wall width (2);
Step 8, after pushing tow distance reaches slip casting cavity (7) in the middle part of middle part expansion water-stop positive stop strip (6) the jam-packed formation making two panels wall width seam crossing, edge expansion water-stop positive stop strip (11) contact formation edge slip casting cavity (12), jack (5.2) pressure release under water, hangs away ground-connecting-wall thrustor (5);
Step 9, carries out slip casting by grouting pipe at the bottom of wall (8) to bottom wall width, and the bottom of wall width is fixedly connected with the bottom land soil body;
Step 10, after two panels wall web stabilization, to inserting wall width (1) and being inserted into the interior injected clear water displacement of middle part slip casting cavity (7) mud wherein between wall width (2);
Step 11, by inserting Grouting Pipe in middle part slip casting cavity (7), carries out slip casting to middle part slip casting cavity (7);
Step 12, repeats above 5th step to the 11 step and completes follow-up 3rd construction to N sheet wall width piecewise;
Step 13, to inserting wall width (1) and being inserted into the interior injected clear water displacement of the edge slip casting cavity (12) of wall width (2) mud wherein;
Step 14, by inserting Grouting Pipe in edge slip casting cavity (12), carrying out slip casting to edge slip casting cavity (12) and the space between body of wall periphery and cell wall, adjacent two panels wall width is fixedly connected with;
Step 15, repeating the 12 step to the is 14 steps until complete the construction of ground-connecting-wall.
CN201510545225.XA 2015-08-31 2015-08-31 A kind of construction method of horizontal pushing tow compression type coercion underground continuous wall system Expired - Fee Related CN105089044B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510545225.XA CN105089044B (en) 2015-08-31 2015-08-31 A kind of construction method of horizontal pushing tow compression type coercion underground continuous wall system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510545225.XA CN105089044B (en) 2015-08-31 2015-08-31 A kind of construction method of horizontal pushing tow compression type coercion underground continuous wall system

Publications (2)

Publication Number Publication Date
CN105089044A true CN105089044A (en) 2015-11-25
CN105089044B CN105089044B (en) 2017-03-15

Family

ID=54570304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510545225.XA Expired - Fee Related CN105089044B (en) 2015-08-31 2015-08-31 A kind of construction method of horizontal pushing tow compression type coercion underground continuous wall system

Country Status (1)

Country Link
CN (1) CN105089044B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625458A (en) * 2016-03-01 2016-06-01 沈阳建筑大学 Concrete-slab-poured cross-shaped foundation of separate house
CN106120569A (en) * 2016-08-25 2016-11-16 中铁五局集团路桥工程有限责任公司 A kind of continuous rigid frame bridge closure section pushing reaction shelf structure
CN106436690A (en) * 2016-09-20 2017-02-22 俞晓东 Waterproof structure of underground diaphragm wall
CN106436691A (en) * 2016-10-11 2017-02-22 上海市政工程设计研究总院(集团)有限公司 Prefabricated underground continuous wall vertical assembly method
CN106555395A (en) * 2016-12-15 2017-04-05 岩土科技股份有限公司 A kind of assembled underground continuous wall and construction method
CN107989025A (en) * 2017-11-24 2018-05-04 上海市机械施工集团有限公司 The construction method of diaphram wall connection structure and diaphram wall
CN108086302A (en) * 2017-12-29 2018-05-29 章胜南 A kind of transverse direction based on underground wall body construction is whole to pour wall width subsidence process
CN108118690A (en) * 2018-01-09 2018-06-05 上海应用技术大学 A kind of integral hoisting formula coercion underground continuous wall structure and its prefabricated and construction method
CN109778836A (en) * 2019-02-15 2019-05-21 中煤江南建设发展有限公司 A kind of prefabricated ground-connecting-wall structure and structure-based construction method
CN110258530A (en) * 2019-06-04 2019-09-20 广州穗岩土木科技股份有限公司 A kind of diaphram wall and its construction method using fore shaft pipe fitting
CN111042100A (en) * 2019-12-30 2020-04-21 广州地铁设计研究院股份有限公司 Method for assembling prefabricated underground continuous wall
CN111172970A (en) * 2020-01-17 2020-05-19 上海力行工程技术发展有限公司 Construction method of underground continuous wall
CN113981949A (en) * 2021-10-26 2022-01-28 重庆建工第七建筑工程有限责任公司 Fully-prefabricated underground continuous wall and construction method
CN114718064A (en) * 2022-04-11 2022-07-08 上海建工集团股份有限公司 Horizontal pushing device for prefabricated underground continuous wall and wall forming method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09317398A (en) * 1996-05-28 1997-12-09 Kumagai Gumi Co Ltd Segment for underground continuous wall
US20110200390A1 (en) * 2009-12-28 2011-08-18 Rodriguez Joseph E Free Draining Seal Device and Installation Method for Mechanically Stabilized Earth Wall Structures
CN203530958U (en) * 2013-01-04 2014-04-09 朱立新 Thin-wall prefabricated overlapped concrete underground diaphragm wall
CN103806440A (en) * 2014-03-05 2014-05-21 中国建筑股份有限公司 Assembled plug-in-connection-type self-clamped hollow fabricated underground diaphragm wall and construction method thereof
CN204098017U (en) * 2014-09-04 2015-01-14 中国建筑股份有限公司 A kind of novel full coercion underground continuous wall
CN204479416U (en) * 2015-03-04 2015-07-15 中国建筑股份有限公司 A kind of coercion underground continuous wall joint seal adhesive tape pressure test device
CN204940246U (en) * 2015-08-31 2016-01-06 中国建筑股份有限公司 A kind of horizontal-top pushing compact form coercion underground continuous wall system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09317398A (en) * 1996-05-28 1997-12-09 Kumagai Gumi Co Ltd Segment for underground continuous wall
US20110200390A1 (en) * 2009-12-28 2011-08-18 Rodriguez Joseph E Free Draining Seal Device and Installation Method for Mechanically Stabilized Earth Wall Structures
CN203530958U (en) * 2013-01-04 2014-04-09 朱立新 Thin-wall prefabricated overlapped concrete underground diaphragm wall
CN103806440A (en) * 2014-03-05 2014-05-21 中国建筑股份有限公司 Assembled plug-in-connection-type self-clamped hollow fabricated underground diaphragm wall and construction method thereof
CN204098017U (en) * 2014-09-04 2015-01-14 中国建筑股份有限公司 A kind of novel full coercion underground continuous wall
CN204479416U (en) * 2015-03-04 2015-07-15 中国建筑股份有限公司 A kind of coercion underground continuous wall joint seal adhesive tape pressure test device
CN204940246U (en) * 2015-08-31 2016-01-06 中国建筑股份有限公司 A kind of horizontal-top pushing compact form coercion underground continuous wall system

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625458B (en) * 2016-03-01 2018-01-30 沈阳建筑大学 A kind of concrete slab pours separate house cross basis
CN105625458A (en) * 2016-03-01 2016-06-01 沈阳建筑大学 Concrete-slab-poured cross-shaped foundation of separate house
CN106120569A (en) * 2016-08-25 2016-11-16 中铁五局集团路桥工程有限责任公司 A kind of continuous rigid frame bridge closure section pushing reaction shelf structure
CN106436690A (en) * 2016-09-20 2017-02-22 俞晓东 Waterproof structure of underground diaphragm wall
CN106436691A (en) * 2016-10-11 2017-02-22 上海市政工程设计研究总院(集团)有限公司 Prefabricated underground continuous wall vertical assembly method
CN106555395A (en) * 2016-12-15 2017-04-05 岩土科技股份有限公司 A kind of assembled underground continuous wall and construction method
CN107989025A (en) * 2017-11-24 2018-05-04 上海市机械施工集团有限公司 The construction method of diaphram wall connection structure and diaphram wall
CN108086302B (en) * 2017-12-29 2019-06-28 章胜南 A kind of transverse direction based on underground wall body construction is whole to pour wall width subsidence process
CN108086302A (en) * 2017-12-29 2018-05-29 章胜南 A kind of transverse direction based on underground wall body construction is whole to pour wall width subsidence process
CN108118690A (en) * 2018-01-09 2018-06-05 上海应用技术大学 A kind of integral hoisting formula coercion underground continuous wall structure and its prefabricated and construction method
CN109778836A (en) * 2019-02-15 2019-05-21 中煤江南建设发展有限公司 A kind of prefabricated ground-connecting-wall structure and structure-based construction method
CN110258530A (en) * 2019-06-04 2019-09-20 广州穗岩土木科技股份有限公司 A kind of diaphram wall and its construction method using fore shaft pipe fitting
CN111042100A (en) * 2019-12-30 2020-04-21 广州地铁设计研究院股份有限公司 Method for assembling prefabricated underground continuous wall
CN111042100B (en) * 2019-12-30 2022-04-29 广州地铁设计研究院股份有限公司 Method for assembling prefabricated underground continuous wall
CN111172970A (en) * 2020-01-17 2020-05-19 上海力行工程技术发展有限公司 Construction method of underground continuous wall
CN113981949A (en) * 2021-10-26 2022-01-28 重庆建工第七建筑工程有限责任公司 Fully-prefabricated underground continuous wall and construction method
CN114718064A (en) * 2022-04-11 2022-07-08 上海建工集团股份有限公司 Horizontal pushing device for prefabricated underground continuous wall and wall forming method thereof
CN114718064B (en) * 2022-04-11 2023-10-24 上海建工集团股份有限公司 Horizontal pushing device for prefabricated underground diaphragm wall and wall forming method thereof

Also Published As

Publication number Publication date
CN105089044B (en) 2017-03-15

Similar Documents

Publication Publication Date Title
CN105089044A (en) Horizontal push compaction type prefabricated underground continuous wall system and construction method thereof
CN103334422B (en) Assembled embedded type prefabricated hollow underground continuous wall and construction method thereof
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN103981898B (en) A kind of inverse underground engineering construction method done of overall open cut node
CN103806440B (en) One can be assembled and be inserted self-clamping type precast hollow diaphram wall and construction method thereof
CN107313431B (en) Close on not contour foundation pit method for synchronously constructing
CN107542115B (en) Underground engineering waterproof structure and construction method thereof
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN204940246U (en) A kind of horizontal-top pushing compact form coercion underground continuous wall system
CN203334270U (en) Mountable buried type prefabricated hollow underground diaphragm wall
CN207794133U (en) Precast assembly tunnel
CN213143117U (en) Assembled keyway basis retaining wall structure
CN106760173B (en) Prefabricated plate at post-pouring zone of basement outer wall
CN106284303B (en) A kind of prefabricated ground-connecting-wall and its construction method with the limit of angle steel connector
CN104594389A (en) Post-cast strip external wall plugging structure with elastic water stoppers
CN210151660U (en) Embedded concrete antiskid tenon grout stone retaining wall
CN218757629U (en) Waterproof structure of plugging into of new and old basement structure under narrow and small space
CN203247838U (en) Fully-buried basement side wall post-pouring belt advance water stop formwork
CN105113513A (en) Anti-seepage foundation pit supporting structure and construction method
CN205804365U (en) A kind of cap excavation method top board node structure
CN115095330A (en) Construction method for excavating holes in hidden mode on secondary lining structure of urban existing tunnel
CN108411938A (en) A kind of precast assembly tunnel
CN211113774U (en) Assembled PC basement lateral wall post-cast strip structure
CN206015720U (en) A kind of prefabricated ground-connecting-wall with limiting card groove plate joint
CN211446883U (en) Underground continuous wall antiseep connection structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant