CN103806440B - One can be assembled and be inserted self-clamping type precast hollow diaphram wall and construction method thereof - Google Patents

One can be assembled and be inserted self-clamping type precast hollow diaphram wall and construction method thereof Download PDF

Info

Publication number
CN103806440B
CN103806440B CN201410077569.8A CN201410077569A CN103806440B CN 103806440 B CN103806440 B CN 103806440B CN 201410077569 A CN201410077569 A CN 201410077569A CN 103806440 B CN103806440 B CN 103806440B
Authority
CN
China
Prior art keywords
wallboard
wall
width
shape tenon
seam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410077569.8A
Other languages
Chinese (zh)
Other versions
CN103806440A (en
Inventor
油新华
耿冬青
许国光
马庆松
宋福渊
秦会来
张清林
杨春英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201410077569.8A priority Critical patent/CN103806440B/en
Publication of CN103806440A publication Critical patent/CN103806440A/en
Application granted granted Critical
Publication of CN103806440B publication Critical patent/CN103806440B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

One can be assembled and be inserted self-clamping type precast hollow diaphram wall and construction method thereof, diaphragm wall is pegged graft and is formed by wallboard left and right, the upper surface of wallboard has the loss of weight cavity not connecting, in body of wall, be preset with grouting pipe at the bottom of wall, left surface be connected with wallboard one, vertical section is the T shape tenon of T font, total length is less than the height of wallboard, T shape tenon transverse part lower surface and Dou Shi inclined-plane, vertical portion bottom surface, right flank is tongue-and-groove, tongue-and-groove and the seamless grafting from top to bottom of T shape tenon when construction, and employing post grouting process, carries out respectively seam slip casting and wall rising pouring slurry. Product design of the present invention is reasonable, easy to make, and the vertical joggle form not connecting that adopts that connects, ensures the stability connecting between wallboard; Transverse joint is not set, avoids the large and concentrated problem of stress of rigidity that transverse joint causes; Seam slip casting and wall rising pouring slurry have increased the waterproof effect of body of wall seam crossing and the stable degree of body of wall, and construction technology simple operations is convenient, and workmen's technical requirement is lower.

Description

One can be assembled and be inserted self-clamping type precast hollow diaphram wall and construction method thereof
Technical field
The present invention relates to a kind of can use in underground space supporting, can be used as assembled the insertions self-clamping type precast hollow diaphram wall of underground space retaining wall structure, waterproof construction and vertical bearing structure and construction method accordingly thereof.
Background technology
Along with improving constantly of economic develop rapidly and the level of urbanization, urban issues becomes increasingly conspicuous, as densely populated, congested in traffic, resource exhaustion, can utilize area deficiency etc. Utilizing underground space configuration urban infrastructure is an effective way that solves issues about the cities' development. What at present, underground space building enclosure was the most frequently used is diaphram wall. But, because cast-type diaphram wall pours under water, inevitably there is some defects and disadvantage, as wait for concrete setting cause claim for eot, while building quality be difficult for ensureing and soft stratum in degree of plainness for wall surface wayward etc.
The one occurring at present can be assembled flush type precast hollow diaphram wall, adopt baroque connector to connect up and down, be that plane strain problems has the left and right of decisive role to connect the more common joggle of only employing etc. to solving body of wall stress deformation problem, effective reinforcing mode that less employing is extra, cause the bonding strength between wallboard inadequate, and existing prefabricated panel and connect up and down the complex structure of framework, cost is higher, the corner of construction of diaphragm wall needs the corner joint of other design specialized, working procedure is many, long in time limit, technical staff's competency profiling is high. therefore, need at present one effective precast hollow diaphram wall and construction method thereof cheaply badly.
Summary of the invention
The object of the invention is to provide one to assemble and inserts self-clamping type precast hollow diaphram wall and construction method thereof, overcome cast-in-place diaphram wall and exist the baroque connector of employing to connect up and down to, left and right connectivity problem is only adopted more common joggle, other effective reinforcing modes of less employing, causes the inadequate problem of bonding strength between wallboard; What solve existing prefabricated panel connects frame construction complexity, the prefabricated time is long, cost is high problem simultaneously up and down; Also solve existingly prefabricatedly descend hollowly the working procedure of diaphragm wall many, the corner of construction of diaphragm wall needs the corner joint of other design specialized, complicated operation, the problem high to technical staff's competency profiling.
The technical solution adopted for the present invention to solve the technical problems is:
One can be assembled and be inserted self-clamping type precast hollow diaphram wall, peg graft and form by several wallboard left and right, the upper surface of described wallboard has the loss of weight cavity that bottom does not connect, in body of wall, be embedded with grouting pipe at the bottom of hoisting ring installing sleeve and wall, described wall rising pouring slurry catheter opening is at the upper surface of wallboard, it is characterized in that: the left surface of described wallboard is the T shape tenon being connected with wallboard one, the total length of described T shape tenon is less than the whole height of wallboard left surface, the transverse part top of described T shape tenon width concordant with the upper surface of wallboard and width and wallboard left surface is identical, described T shape tenon is all low inside and high outside inclined-plane at the lower surface of transverse part and the bottom surface of vertical portion, the right flank of described wallboard is the tongue-and-groove mating completely with T shape tenon, carry out seamless grafting with T shape tenon.
Described T shape tenon is equal at the angle of inclination on the inclined-plane of transverse part lower surface and vertical portion bottom surface, and it is greater than the angle of friction of pre-cast concrete walling contact level, and the bevel angle of tongue-and-groove equates with the bevel angle of T shape tenon.
As the preferred technical solution of the present invention, the thickness of described transverse part is 1/3~2/5 of wallboard whole height.
As present invention further optimization technical scheme, the total length of described T shape tenon is 4/5~2/3 of wallboard whole height.
As present invention further optimization technical scheme, the left surface of described wallboard is provided with the sealing adhesive tape of 2~4 water-swellable, and described sealing adhesive tape fits tightly the outer wall at T shape tenon from top to bottom.
As present invention further optimization technical scheme, the T shape tenon of described wallboard is provided with seam grouting pipe, and described seam grouting pipe opening is located at the upper surface of T shape tenon, and after perforation T shape tenon, another opening is on the inclined-plane of vertical portion bottom surface.
As present invention further optimization technical scheme, described seam grouting pipe has 2~3.
As present invention further optimization technical scheme, described wallboard is tabular wallboard for forming plane body of wall or the perpendicular type wallboard for corner construction, and described perpendicular type wallboard is the special-shaped wallboard after centre bends.
The invention still further relates to a kind of construction method of making above-mentioned assembled insertion self-clamping type precast hollow diaphram wall, it is characterized in that: comprise the steps:
Step 1, wallboard prefabricated: use the wallboard of the prefabricated diaphram wall of template at prefabricated workshop, strictly control the size of wall body built-in fitting and wallboard, be embedded in sealing adhesive tape at prefabricated sealing adhesive tape mounting groove, guarantee that sealing adhesive tape installs firm;
The transport of step 2, wallboard: prefabricated wallboard is transported to construction site, will ensures in transportation that wallboard is injury-free, can use if desired bracket and steel wire rope to fix;
Step 3, open the mounting groove of first wallboard: use grab bucket or other groovers fluting, slotting length and width are slightly larger than length and the width of single width wallboard;
Step 4, lifting the first width wallboard: hoisting ring is connected on the hoisting ring installing sleeve of wallboard, use crane to lift by crane first width wallboard, in decentralization process, keep prefabricated panel perpendicularity by horizon rule, transfer to being slowly adjusted to after in groove and reach designed elevation, after stable, remove hanging apparatus;
Step 5, open the mounting groove of next wallboard: use grab bucket or other groovers lifting chase mortise one side of the first complete width wallboard, be close to the first width wallboard and open mounting groove, slotting length and width are slightly larger than length and the width of single width wallboard;
Step 6, lift next width wallboard: hoisting ring is connected on the hoisting ring installing sleeve of wallboard, use crane to lift by crane the second width wallboard, make the T shape tenon of the second width wallboard along the tongue-and-groove natural downslide of first width wallboard, instantly when sliding into certain altitude to the lower surface of T shape tenon transverse part and the inclined-plane of the bottom surface of vertical portion and contacting with the inclined surface on tongue-and-groove, decrease speed slows down, rely on body of wall deadweight that the second width wallboard is glided along inclined-plane, with the first width wallboard jam-packed;
Step 7, in the seam of two wallboard joggles, note clear water: in the seam of two width prefabricated panel joggles, inject clear water, the mud in displacement seam, avoids forming mud skin at sealing adhesive tape surface, affects soaking effect;
Step 8, by joggle place up/down perforation seam grouting pipe to slip casting in seam: after the complete and periphery disturbed soil intensity of wallboard construction is recovered, by joggle place up/down perforation seam grouting pipe to slip casting in seam, now sealing adhesive tape plays a role, and has greatly strengthened the degree of being connected firmly between wallboard after joint grouting;
Step 9, body of wall bottom slip casting: carry out body of wall bottom slip casting by grouting pipe at the bottom of wall 5, realize being connected and fixed of whole body of wall and the soil body;
Step 10, repeating step five to step 9 complete the construction of whole precast hollow diaphram wall.
As present invention further optimization technical scheme, the construction method of above-mentioned assembled insertion self-clamping type precast hollow diaphram wall, it is characterized in that: in described step 10, in the time that precast hollow diaphram wall runs into turning, use perpendicular type wallboard to realize turning and arrange.
Compared with prior art, beneficial effect of the present invention is as follows:
Product design of the present invention is reasonable, without complicated connector, simple in structure, easy to make, has solved existing prefabricated panel and has connected up and down frame construction complexity, the prefabricated time is long, cost is high problem;
The vertical joggle form not connecting that adopts that connects, by upper and lower twice inclined-plane is set between two width wallboards, rely on body of wall deadweight to be adjacent to two width wallboards, while effectively avoiding inserting the second width wallboard, two walls are difficult to close-connected problem, have ensured the stability connecting between wallboard; Transverse joint is not set, has avoided the large and problem of stress concentration of rigidity that transverse joint causes, adopted post grouting process, carry out respectively seam slip casting and wall rising pouring slurry, increase and strengthen body of wall vertical bearing capacity, ensure the soundness of body of wall; Contiguous prefabricated wallboard joggle place arranges sealing adhesive tape and carries out the measure of adaptivity water joint, reduce the prominent mud accident occurrence probability of gushing water in Excavation Process, ensure the water-proof function of joint, by the slip casting of seam cavity, the further performance of reinforced joint waterproof, exists and adopts baroque connector to connect up and down, left and right connectivity problem is only adopted to the inadequate problem of bonding strength between more common joggle or other connected modes, other effective reinforcing modes of less employing, wallboard thereby well overcome cast-in-place diaphram wall;
Work progress is simple, workmen's technical requirement is low, prefabricated panel is prefabricated in the factory and forms, dimensional standard, ensure to connect the flatness of back wall, promote construction quality, solved existingly prefabricatedly descend hollowly the working procedure of diaphragm wall many, complicated operation, the problem high to technical staff's competency profiling;
Wallboard of the present invention has tabular and two kinds of forms of perpendicular type, and various wallboard flat shapes can realize by the working special-shaped wallboard that is prefabricated in the factory, and do not need the corner joint of other design specialized, effectively improve construction of diaphragm wall efficiency, reduce the duration of a project;
Finally, the present invention is applied widely, can be used as underground space enclosed structure and basement interior wall and uses, and reaches the application target of two wall unifications.
Brief description of the drawings
Fig. 1 is facade structures schematic diagram of the present invention, the structure of the T shape tenon 2 of outstanding left surface;
Fig. 2 facade structures schematic diagram of the present invention, the structure of the tongue-and-groove 3 of outstanding right flank;
Fig. 3 is top view of the present invention, the structural representation of outstanding upper surface;
Fig. 4 is the A-A cross-sectional view of Fig. 3 of the present invention.
Reference numeral: grouting pipe, 6-loss of weight cavity, 7-sealing adhesive tape, 8-hoisting ring installing sleeve, 9-inclined-plane, the inclined-plane of 91-T shape tenon, the inclined-plane of 92-tongue-and-groove at the bottom of 1-wallboard, 2-T shape tenon, 21-transverse part, the vertical portion of 22-, 3-tongue-and-groove, 4-seam grouting pipe, 5-wall.
Below in conjunction with accompanying drawing, the invention will be further described:
As shown in Figure 1 to 4, one can be assembled and be inserted self-clamping type precast hollow diaphram wall, is pegged graft and is formed by several wallboard 1 left and right, and the upper surface of described wallboard 1 has loss of weight cavity 6, be used for reducing prefabricated panel weight, reduce concrete amount, the bottom of loss of weight cavity 6 does not connect; In body of wall, be embedded with grouting pipe 5 at the bottom of hoisting ring installing sleeve 8 and wall, at the bottom of wall, the opening of grouting pipe 5 is at the upper surface of wallboard 1, connect whole wallboard, outlet is on the bottom surface of wallboard, hoisting ring installing sleeve 8 comprises horizontal hoisting ring installing sleeve and vertical hoisting ring installing sleeve, the end of vertical hoisting ring installing sleeve is at the upper surface of wallboard, and the end of horizontal hoisting ring installing sleeve is exposed at the leading flank of wallboard, can facilitate the vertical of body of wall 1 and laterally lift or transport after connection suspension ring; The left surface of described wallboard 1 is the T shape tenon 2 being connected with wallboard one, the total length of described T shape tenon 2 is less than the whole height of wallboard left surface, and the upper surface of wallboard is concordant and the width of width and wallboard left surface is identical for described T shape tenon 2 upper surfaces of transverse part 21, the Dou Shi inclined-plane, bottom surface 9 of the lower surface of described transverse part 21 and vertical portion 22; Comprise low inside and high outside T shape tenon inclined-plane 91 and high outside and low outside,, the closely inclined-plane 92 of chimeric tongue-and-groove, inclined-plane 91 with T shape tenon, the right flank of wallboard is the tongue-and-groove 3 mating completely with T shape tenon 2, and described T shape tenon 2 can carry out seamless grafting with tongue-and-groove 3 from top to bottom; The angle of inclination on the inclined-plane 91 of described T shape tenon and the inclined-plane 92 of tongue-and-groove equates, is 30 ° of left and right, and this angle requires to be greater than the angle of friction on precast concrete surface, to ensure that body of wall can rely on deadweight to slip into and clamp; The thickness of the transverse part 21 of described T shape tenon 2 be wallboard left surface whole height 1/3~2/5, the total length of described T shape tenon 2 be wallboard left surface whole height 4/5~2/3; On the left surface of described wallboard 1, have the sealing adhesive tape 7 of 2~4 water-swellable from top to bottom, sealing adhesive tape 7 is closely entrenched in the default groove of T shape tenon 2 outer walls; The T shape tenon 2 of described wallboard 1 is provided with seam grouting pipe 4, described seam grouting pipe 4 openings are located at the upper surface of T shape tenon 2, connect after the transverse part 21 and vertical portion 22 of T shape tenon 2, opening is on the inclined-plane of vertical portion bottom surface, and described seam grouting pipe 4 can have 2~4; Described wallboard 1 can have various flat shapes, the perpendicular type wallboard of constructing as the tabular wallboard for forming plane body of wall or for corner, and perpendicular type wallboard 1 is to carry out the special-shaped wallboard that left and right is bent to form in centre. Wallboard 1 uses template to process in factory, and built-in fitting will ensure certain machining accuracy in it, makes the T shape tenon 2 of wallboard can easier embed in the tongue-and-groove 3 of adjacent wall board and fit tightly; Sealing adhesive tape 7 is closely entrenched in the prefabricated groove of wallboard T shape tenon 2 sidewalls from top to bottom, in the processing of wallboard 1 or transportation, should be noted that waterproof and touching.
In underground space process of construction, realize processing and the construction of underground space supporting construction-prefabricated diaphram wall by following steps, ensure rapid construction and construction quality:
Step 1, wallboard 1 prefabricated: use the wallboard 1 of the prefabricated diaphram wall of template at prefabricated workshop, strictly control the dimensional tolerance of wall body built-in fitting and wallboard, and guarantee that water-swellable sealing adhesive tape 7 installs firm;
The transport of step 2, wallboard 1: prefabricated wallboard 1 is connected and is transported to construction site, ensure in transportation that wallboard 1 is injury-free, can use if desired bracket and steel wire rope to fix;
Step 3, open the mounting groove of first wallboard 1: use grab bucket or other groovers fluting, slotting length and width are slightly larger than length and the width of single width wallboard 1;
Step 4, lifting the first width wallboard 1: hoisting ring is connected on the hoisting ring installing sleeve 8 of wallboard 1, use crane to lift by crane first width wallboard 1, in decentralization process, keep prefabricated panel perpendicularity by horizon rule, transfer to being slowly adjusted to after in groove and reach designed elevation, after stable, remove hanging apparatus;
Step 5, open the mounting groove of next wallboard: use grab bucket or other groovers lifting chase mortise one side of the first complete width wallboard, be close to the first width wallboard and open mounting groove, slotting length and width are slightly larger than length and the width of single width wallboard;
Step 6, lift next width wallboard: hoisting ring is connected on the hoisting ring installing sleeve 8 of wallboard, use crane to lift by crane the second width wallboard, make the T shape tenon 2 of the second width wallboard along tongue-and-groove 3 natural downslides of first width wallboard, instantly when sliding into certain altitude to the lower surface of T shape tenon transverse part 21 and the inclined-plane of the bottom surface of vertical portion 22 and contacting with the inclined surface on tongue-and-groove 3, decrease speed slows down, rely on body of wall deadweight that the second width wallboard is glided along inclined-plane, with the first width wallboard jam-packed;
Step 7, in the seam of two wallboard joggles, note clear water: in the seam of two width prefabricated panel joggles, inject clear water, the mud in displacement seam, avoids forming mud skins on sealing adhesive tape 7 surfaces, affects soaking effect;
Step 8, seam grouting pipe 4 by joggle place are to slip casting in seam: wallboard 1 is constructed after complete and periphery disturbed soil intensity recovers, seam grouting pipe 4 by joggle place is to slip casting in seam, now sealing adhesive tape 7 plays a role, and has greatly strengthened the degree of being connected firmly between wallboard after joint grouting;
Step 9, body of wall bottom slip casting: carry out body of wall bottom slip casting by grouting pipe at the bottom of wall 5, realize being connected and fixed of whole body of wall and the soil body;
Step 10, repeating step five to step 9 complete the construction of whole precast hollow diaphram wall. In the time that precast hollow diaphram wall runs into turning, use perpendicular type wallboard to realize turning.
Content described in this description embodiment is only enumerating of way of realization to inventive concept; protection scope of the present invention should not be regarded as only limiting to the concrete form of embodiment statement, and protection scope of the present invention also and conceive the equivalent technologies means that can expect according to the present invention in those skilled in the art.

Claims (8)

1. one kind can be assembled insertion self-clamping type precast hollow diaphram wall, peg graft and form by several wallboards (1) left and right, the upper surface of described wallboard (1) has the loss of weight cavity (6) that bottom does not connect, in body of wall, be embedded with grouting pipe (5) at the bottom of hoisting ring installing sleeve (8) and wall, grouting pipe at the bottom of described wall (5) opening is at the upper surface of wallboard, it is characterized in that: the left surface of described wallboard (1) is the T shape tenon (2) being connected with wallboard one, the total length of described T shape tenon (2) is less than the whole height of wallboard left surface, transverse part (21) top of described T shape tenon (2) is identical with the upper surface of wallboard width concordant and width and wallboard left surface, described T shape tenon (2) is all low inside and high outside inclined-plane (9) at the lower surface of transverse part and the bottom surface of vertical portion, the right flank of described wallboard (1) is the tongue-and-groove that carries out seamless grafting (3) mating completely with T shape tenon (2),
The left surface of described wallboard (1) is provided with the sealing adhesive tape (7) of 2~4 water-swellable, and described sealing adhesive tape (7) fits tightly the outer wall at T shape tenon from top to bottom;
The T shape tenon (2) of described wallboard (1) is provided with seam grouting pipe (4), and described seam grouting pipe (4) opening is located at the upper surface of T shape tenon (2), connects rear another opening of T shape tenon (2) on the inclined-plane of vertical portion bottom surface.
2. according to claim 1 assembling inserted self-clamping type precast hollow diaphram wall, it is characterized in that: described T shape tenon (2) all equates at the angle of inclination on the inclined-plane (9) of transverse part lower surface and vertical portion bottom surface, it is greater than the angle of friction of pre-cast concrete walling contact level.
3. according to claim 1 assembling inserted self-clamping type precast hollow diaphram wall, it is characterized in that: the thickness of described transverse part (21) is 1/3~2/5 of wallboard whole height.
4. according to claim 1 assembling inserted self-clamping type precast hollow diaphram wall, it is characterized in that: the total length of described T shape tenon (2) is 4/5~2/3 of wallboard whole height.
5. according to claim 1 assembling inserted self-clamping type precast hollow diaphram wall, it is characterized in that: described seam grouting pipe (4) has 2~3.
6. according to claim 1 assembling inserted self-clamping type precast hollow diaphram wall, it is characterized in that:
Described wallboard (1) is the perpendicular type wallboard for forming the tabular wallboard of plane body of wall or constructing for corner, and described perpendicular type wallboard is the special-shaped wallboard after centre bends.
7. a construction method of making the assembled insertion self-clamping type precast hollow diaphram wall described in claim 1~6 any one, is characterized in that: comprise the steps:
Step 1, wallboard (1) prefabricated: the wallboard (1) that uses the prefabricated diaphram wall of template at prefabricated workshop, the strict size of controlling wall body built-in fitting and wallboard, be embedded in sealing adhesive tape (7) at prefabricated sealing adhesive tape mounting groove, guarantee that sealing adhesive tape (7) installation is firm;
The transport of step 2, wallboard (1): prefabricated wallboard (1) is transported to construction site, will ensures in transportation that wallboard (1) is injury-free, use bracket and steel wire rope to fix;
Step 3, open the mounting groove of first wallboard (1): use grab bucket or other groovers fluting, slotting length and width are slightly larger than length and the width of single width wallboard (1);
Step 4, lifting the first width wallboard: hoisting ring is connected on the hoisting ring installing sleeve (8) of wallboard, use crane to lift by crane first width wallboard, in decentralization process, keep prefabricated panel perpendicularity by horizon rule, transfer to being slowly adjusted to after in groove and reach designed elevation, after stable, remove hanging apparatus;
Step 5, open the mounting groove of next wallboard: use grab bucket or other groovers lifting chase mortise one side of the first complete width wallboard, be close to the first width wallboard and open mounting groove, slotting length and width are slightly larger than length and the width of single width wallboard;
Step 6, lift next width wallboard: hoisting ring is connected on the hoisting ring installing sleeve (8) of wallboard, use crane to lift by crane the second width wallboard, make the T shape tenon (2) of the second width wallboard along tongue-and-groove (3) natural downslide of first width wallboard, instantly when sliding into certain altitude to the lower surface of the transverse part (21) of T shape tenon and the inclined-plane (9) of the bottom surface of vertical portion (22) and contacting with the inclined surface on tongue-and-groove (3), decrease speed slows down, rely on body of wall deadweight that the second width wallboard is glided along inclined-plane, with the first width wallboard jam-packed;
Step 7, in the seam of two wallboard joggles, note clear water: in the seam of two width prefabricated panel joggles, inject clear water, the mud in displacement seam, avoids forming mud skin on sealing adhesive tape (7) surface, affects soaking effect;
Step 8, by joggle place up/down perforation seam grouting pipe (4) to slip casting in seam: after the complete and periphery disturbed soil intensity of wallboard construction is recovered, by joggle place up/down perforation seam grouting pipe (4) to slip casting in seam, now sealing adhesive tape (7) plays a role, and has greatly strengthened the degree of being connected firmly between wallboard after joint grouting;
The bottom slip casting of step 9, body of wall: carry out the bottom grouting and reinforcing of body of wall by grouting pipe at the bottom of wall (5), realize being connected and fixed of whole body of wall and the soil body;
Step 10, repeating step five to step 9 complete the construction of whole precast hollow diaphram wall.
8. the construction method of inserting self-clamping type precast hollow diaphram wall of assembling according to claim 7, is characterized in that: in described step 10, in the time that precast hollow diaphram wall runs into turning, use perpendicular type wallboard to realize turning and arrange.
CN201410077569.8A 2014-03-05 2014-03-05 One can be assembled and be inserted self-clamping type precast hollow diaphram wall and construction method thereof Expired - Fee Related CN103806440B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410077569.8A CN103806440B (en) 2014-03-05 2014-03-05 One can be assembled and be inserted self-clamping type precast hollow diaphram wall and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410077569.8A CN103806440B (en) 2014-03-05 2014-03-05 One can be assembled and be inserted self-clamping type precast hollow diaphram wall and construction method thereof

Publications (2)

Publication Number Publication Date
CN103806440A CN103806440A (en) 2014-05-21
CN103806440B true CN103806440B (en) 2016-05-25

Family

ID=50703792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410077569.8A Expired - Fee Related CN103806440B (en) 2014-03-05 2014-03-05 One can be assembled and be inserted self-clamping type precast hollow diaphram wall and construction method thereof

Country Status (1)

Country Link
CN (1) CN103806440B (en)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105089044B (en) * 2015-08-31 2017-03-15 中国建筑股份有限公司 A kind of construction method of horizontal pushing tow compression type coercion underground continuous wall system
CN105863069B (en) * 2016-04-06 2018-03-23 山东同圆设计集团有限公司 A kind of gravity type is from anchor connection device and assembly method
CN105887806B (en) * 2016-06-13 2018-08-24 上海强劲地基工程股份有限公司 Assembled underground continuous wall and its construction method
CN106284303B (en) * 2016-08-05 2018-11-23 中国建筑股份有限公司 A kind of prefabricated ground-connecting-wall and its construction method with the limit of angle steel connector
CN106351208A (en) * 2016-10-11 2017-01-25 上海市政工程设计研究总院(集团)有限公司 Prefabricated underground diaphragm wall vertical-splicing structure
CN108330971B (en) * 2018-02-12 2020-04-28 中国铁路设计集团有限公司 Assembled underground continuous wall insertion equipment
CN108951607A (en) * 2018-06-26 2018-12-07 上海建工集团股份有限公司 The hollow continuous underground wall structure of cast-in-place post-tensioned prestressed concrete and its construction method
CN109083128B (en) * 2018-09-10 2020-06-05 浙江吉通地空建筑科技有限公司 Profile steel upright assembled underground continuous wall with high bearing capacity
CN109577314A (en) * 2018-11-22 2019-04-05 浙江吉通地空建筑科技有限公司 Canal formula soil cement interpolation assembled underground connects wall prestressing force wallboard
CN109403351A (en) * 2018-12-18 2019-03-01 中建地下空间有限公司 One kind is from card column splice assembling coercion underground continuous wall
CN110725334B (en) * 2019-10-17 2021-08-20 广西大学 Mid-partition wall of subway station group pit and construction method thereof
CN111042100B (en) * 2019-12-30 2022-04-29 广州地铁设计研究院股份有限公司 Method for assembling prefabricated underground continuous wall
CN111576661B (en) * 2020-05-28 2021-07-06 重庆天地人建设集团有限公司 Concrete prefabricated wall and construction process thereof
CN111733853A (en) * 2020-07-24 2020-10-02 张延年 Tongue-and-groove type prefabricated underground continuous wall structure
CN111733854B (en) * 2020-07-30 2021-10-26 四川港航建设工程有限公司 Water-stop glass core wall structure with curtain grouting function and construction method thereof
CN112627214A (en) * 2020-10-30 2021-04-09 安徽柱石建设工程有限公司 Concrete continuous wall structure and construction method thereof
CN113882421A (en) * 2021-09-24 2022-01-04 中交一航局第三工程有限公司 Offshore wind power generation gravity type foundation and installation method
CN117684548B (en) * 2024-02-01 2024-04-16 中国建筑第六工程局有限公司 CT clamping groove permanent-face combined assembled type ground connection wall connection method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2729684A1 (en) * 1995-01-23 1996-07-26 Linant Jean Jacques Barrier block for water retaining wall
CN102011410A (en) * 2010-10-29 2011-04-13 广东省基础工程公司 Prefabricated prestressed underground continuous wall and construction method thereof
CN202248389U (en) * 2011-09-29 2012-05-30 云南省建筑科学研究院 Connection structure of lightweight wallboard
CN103334422A (en) * 2013-06-26 2013-10-02 中国建筑股份有限公司 Assembled embedded type prefabricated hollow underground continuous wall and construction method thereof
CN203755295U (en) * 2014-03-05 2014-08-06 中国建筑股份有限公司 Self-clamped type prefabricated hollow underground diaphragm wall capable of being assembled in inserted mode

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2729684A1 (en) * 1995-01-23 1996-07-26 Linant Jean Jacques Barrier block for water retaining wall
CN102011410A (en) * 2010-10-29 2011-04-13 广东省基础工程公司 Prefabricated prestressed underground continuous wall and construction method thereof
CN202248389U (en) * 2011-09-29 2012-05-30 云南省建筑科学研究院 Connection structure of lightweight wallboard
CN103334422A (en) * 2013-06-26 2013-10-02 中国建筑股份有限公司 Assembled embedded type prefabricated hollow underground continuous wall and construction method thereof
CN203755295U (en) * 2014-03-05 2014-08-06 中国建筑股份有限公司 Self-clamped type prefabricated hollow underground diaphragm wall capable of being assembled in inserted mode

Also Published As

Publication number Publication date
CN103806440A (en) 2014-05-21

Similar Documents

Publication Publication Date Title
CN103806440B (en) One can be assembled and be inserted self-clamping type precast hollow diaphram wall and construction method thereof
CN105089044B (en) A kind of construction method of horizontal pushing tow compression type coercion underground continuous wall system
CN103835283B (en) Full wet joint prefabricated prestressed underground continuous wall and construction method thereof
CN103334422B (en) Assembled embedded type prefabricated hollow underground continuous wall and construction method thereof
CN109403351A (en) One kind is from card column splice assembling coercion underground continuous wall
CN109797755B (en) Steel pipe Larsen steel sheet pile enclosure structure supported by steel mesh frame and construction method thereof
CN102011410A (en) Prefabricated prestressed underground continuous wall and construction method thereof
CN210368983U (en) Supporting construction that bored concrete pile and underground continuous wall combined together
CN203546916U (en) Assembled reinforced concrete wall body connection structure
CN102561316A (en) Construction method for diaphragm walls
CN107130585A (en) A kind of construction method of underground continuous wall
CN203334270U (en) Mountable buried type prefabricated hollow underground diaphragm wall
CN107443550A (en) Prefabricated cushion cap template and its installation method
CN102561387A (en) Reverse construction method of underground core-tube diaphragm wall
CN204940246U (en) A kind of horizontal-top pushing compact form coercion underground continuous wall system
CN203755295U (en) Self-clamped type prefabricated hollow underground diaphragm wall capable of being assembled in inserted mode
CN214194613U (en) Building mechanism of cushion cap template
CN203559431U (en) Precast guide wall of underground diaphragm wall
CN209457015U (en) One kind is from card column splice assembling coercion underground continuous wall
CN203530958U (en) Thin-wall prefabricated overlapped concrete underground diaphragm wall
CN205242441U (en) Oval contrary shaft of doing of suspension type
CN101979777B (en) Construction method of combined underground continuous wallboard of cast-in-place hollow square pile
CN205024719U (en) Pile foundation and integrated reverse construction vertical braces system of underground continuous wall
CN110607800A (en) Turnover type steel open caisson supporting device and construction method thereof
CN205742151U (en) A kind of continuous underground wall structure of adverse construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160525