Tunnel collapse disposing method and tunnel collapse support structure Download PDF

Info

Publication number
CN105065038A
CN105065038A CN201510488563.4A CN201510488563A CN105065038A CN 105065038 A CN105065038 A CN 105065038A CN 201510488563 A CN201510488563 A CN 201510488563A CN 105065038 A CN105065038 A CN 105065038A
Authority
CN
China
Prior art keywords
arch
collapse
tunnel collapse
tunnel
landslide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510488563.4A
Other languages
Chinese (zh)
Inventor
张涛
俞灵光
秦晓亮
彭继乐
赵继勇
余志超
刘淑芳
赵星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201510488563.4A priority Critical patent/CN105065038A/en
Publication of CN105065038A publication Critical patent/CN105065038A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a tunnel collapse disposing method and a tunnel collapse support structure. The method is characterized in that an arch-on-arch structure corresponding to the shape and the range of a collapse cavity is arranged on the top of a steel arch frame of a primary support; the collapse cavity is supported through the arch-on-arch structure; and meanwhile, network concrete and anchor rods are used in an auxiliary way, so that the further enlargement of the collapse is prevented. Through the arrangement of the arch-on-arch structure on the top of the steel arch frame, the problems that the collapse cavity stress continuously changes and the collapse cavity trend is further enlarged are effectively solved; through engineering measures, the engineering requirements are met; the engineering investment is reduced; and the engineering construction period is shortened.

Description

A kind of processing method of Tunnel Collapse and Tunnel Collapse supporting and protection structure
Technical field
the present invention relates to a kind of processing method and Tunnel Collapse supporting and protection structure of Tunnel Collapse, belong to the hydraulic architecture technical field in Hydraulic and Hydro-Power Engineering.
Background technology
in Hydraulic and Hydro-Power Engineering Tunnel excavation process, the surrounding rock category that tunnel passes through varies, after judging surrounding rock category according to geology personnel on site, carry out first liner timbering in time, as three class surrounding rocks take shotcrete measure, four class surrounding rocks take shotcrete local be aided with steel shotcrete support etc.; According to engineering experience, the needs of engineering mostly can be met after supporting completes, but due to the existence that Stress relieving of surrounding rocks and adjustment, the effect of underground water, country rock weakness are with, tunnel local still may cave in, bolt-spary supports is generally taked in chamber of collapsing now for tunnel crown, this kind of engineering measure, if for the good situation of crown geological conditions, can solve the trend that chamber of collapsing expands further timely and effectively; If poor for geological conditions, when there is water burst, weak intercalated layer, often can not solve chamber of collapsing and cave in again, finally cause the increase of investment, the delay of duration.
Summary of the invention
the object of the invention is to, a kind of processing method and Tunnel Collapse supporting and protection structure of Tunnel Collapse is provided, with while reduction engineering construction difficulty, effective reduction construction costs, shorten the construction period, solve Tunnel Collapse problem timely rapidly, thus overcome the deficiencies in the prior art.
technical scheme of the present invention is achieved in that
the processing method of a kind of Tunnel Collapse of the present invention is, the method arranges arch structure on arch corresponding with landslide cavity shape and scope together again at the steel arch-shelf top of first liner timbering, by encircleing upper arch structure, landslide cavity is supported, be aided with in-network processing and anchor pole simultaneously, expand further to prevent from caving in.
of the present invention a kind of Tunnel Collapse supporting and protection structure according to said method formation is that this structure comprises first liner timbering, is provided with the arch identical with first liner timbering structure arches up in landslide place at first liner timbering top.
in aforementioned structure, the shape of described arch arch is similar to landslide cavity shape, and the length of arch arch is greater than landslide extent length.
in aforementioned structure, described arch arch is respectively equipped with steel arch-shelf and in-network processing from the inside to the outside, and in-network processing is fixed on landslide cavity surface through anchor pole.
owing to have employed technique scheme, compared with prior art, the present invention, by laying arch structure on arch at the top of steel arch-shelf, effectively solves the chamber stress that collapses and continues change, the problem that chamber trend of collapsing expands further in the present invention; By this engineering measure, meet the needs of engineering, saved construction investment, shortened the duration of a project.
Accompanying drawing explanation
structural representation when Fig. 1 is the invention process use;
fig. 2 is the structural representation of first liner timbering;
fig. 3 is the structural representation that landslide cavity appears in first liner timbering top.
mark in accompanying drawing: 1-first liner timbering, 2-encircles arch, 3-steel arch-shelf, 4-in-network processing, 5-anchor pole, and 6-caves in cavity.
Detailed description of the invention
below in conjunction with drawings and Examples, the present invention is described in further detail, but not as any limitation of the invention.
the processing method of a kind of Tunnel Collapse of the present invention, as shown in Figure 1: the method arranges arch structure on arch corresponding with landslide cavity shape and scope together again at the steel arch-shelf top of existing first liner timbering, by encircleing upper arch structure, landslide cavity is supported, be aided with in-network processing and anchor pole simultaneously, expand further to prevent from caving in.
according to of the present invention a kind of Tunnel Collapse supporting and protection structure that said method is formed, as shown in Figure 1: this structure comprises existing first liner timbering 1, be provided with the arch identical with first liner timbering structure in landslide place at first liner timbering 1 top and arch up 2.The shape of arch arch is similar to landslide cavity shape, and the length of arch arch is slightly larger than landslide extent length.Arch arch is respectively equipped with steel arch-shelf 3 and in-network processing 4 from the inside to the outside, and in-network processing is fixed on landslide cavity 6 surface through anchor pole 5.
Embodiment
in this example, existing first liner timbering as shown in Figure 2, structural representation during the invention process as shown in Figure 1, due to the existence that Stress relieving of surrounding rocks and adjustment, the effect of underground water, country rock weakness are with, caving in as shown in Figure 2 is there occurs at the part of first liner timbering, if carry out supporting not in time to cave in and likely continue expanded scope, therefore need to carry out secondary supporting to the position that caves in of tunnel.Secondary supporting adopts the support pattern of arch arch.
structure of the present invention is as shown in Figure 1: the first liner timbering 1 before this structure comprises, secondary supporting is carried out in the landslide cavity 6 at first liner timbering top, the structure of secondary supporting is identical with first liner timbering structure, comprises steel arch-shelf 3, in-network processing 4 and anchor pole more than 5 part.The steel arch-shelf of secondary supporting and the steel arch-shelf top being fixed on first liner timbering, play restriction to surrouding rock deformation, be aided with in-network processing and anchor pole simultaneously, the further expansion in the chamber that effectively prevents from collapsing.On arch, the shape of arch structure, material can be selected according to the shape in chamber of collapsing, scope and the order of severity, and common materials mainly contains reinforcing bar, i iron, angle steel etc.; The spacing of anchor pole is determined according to collapse chamber execution conditions, the order of severity of job site.
as follows in the present embodiment work progress:
1, after tunnel excavation one segment length, carry out first liner timbering in time, mainly comprise linked network, anchor pole, pneumatically placed concrete, bracing members etc., can choose according to surrounding rock category; Excavation length is determined according to on-the-spot country rock situation and execution conditions.
2, after first liner timbering completes, continue in work progress at tunnel, if supporting completes hole section before finding, there is landslide phenomenon on top, hole, processes in time.
3, first treatment measures clear up the slag body caved in hole, clear up in time loosening block in Ding Ta chamber, hole during cleaning, after having cleared up, carry out in-network processing 4 and anchor pole 5 is constructed, anchor spacing, length, thickness of shotcrete are determined according to collapse chamber situation or engineering experience.
4, after in-network processing 4 and anchor pole 5 have been constructed, carry out arch arch construction, shape, the material of arch arch 2 structure can be selected according to the shape in chamber of collapsing, scope and the order of severity, and common materials mainly contains reinforcing bar, i iron, angle steel etc.; If collapse, chamber situation is relatively serious, can ribbing in the middle of arch structure on arch, increases the strong point.
when 5, carrying out arch arch construction, if find, first liner timbering steel arch-shelf loosens or instability should be fixed in time; If find, first liner timbering is without steel arch-shelf, first can carry out steel arch-shelf construction, carries out arch arch construction after completing.

Claims (4)

1. the processing method of a Tunnel Collapse, it is characterized in that: the method arranges arch structure on arch corresponding with landslide cavity shape and scope together again at the steel arch-shelf top of first liner timbering, by encircleing upper arch structure, landslide cavity is supported, be aided with in-network processing and anchor pole simultaneously, expand further to prevent from caving in.
2. according to claim 1 method form a Tunnel Collapse supporting and protection structure, comprise first liner timbering (1), it is characterized in that: be provided with the arch identical with first liner timbering (1) structure in landslide place at first liner timbering (1) top and arch up (2).
3. Tunnel Collapse supporting and protection structure according to claim 2, is characterized in that: the shape of described arch arch (2) is similar with landslide cavity shape, and the length that arch arches up is greater than landslide extent length.
4. Tunnel Collapse supporting and protection structure according to claim 2, is characterized in that: described arch arch (2) is respectively equipped with steel arch-shelf (3) and in-network processing (4) from the inside to the outside, and it is surperficial that in-network processing is fixed on landslide cavity (6) through anchor pole (5).
CN201510488563.4A 2015-08-11 2015-08-11 Tunnel collapse disposing method and tunnel collapse support structure Pending CN105065038A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510488563.4A CN105065038A (en) 2015-08-11 2015-08-11 Tunnel collapse disposing method and tunnel collapse support structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510488563.4A CN105065038A (en) 2015-08-11 2015-08-11 Tunnel collapse disposing method and tunnel collapse support structure

Publications (1)

Publication Number Publication Date
CN105065038A true CN105065038A (en) 2015-11-18

Family

ID=54494518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510488563.4A Pending CN105065038A (en) 2015-08-11 2015-08-11 Tunnel collapse disposing method and tunnel collapse support structure

Country Status (1)

Country Link
CN (1) CN105065038A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106837373A (en) * 2017-04-13 2017-06-13 中国电建集团成都勘测设计研究院有限公司 A kind of tunnel abutment wall collapses the supporting construction at place
CN106894826A (en) * 2017-05-08 2017-06-27 中国水利水电建设工程咨询中南有限公司 The supporting construction and method for protecting support of section of being caved in a kind of hole
CN108343447A (en) * 2017-01-22 2018-07-31 新疆北方建设集团有限公司 A kind of tunnel inner steel web safety support construction suitable for frangible rock stratum
CN111878121A (en) * 2020-08-03 2020-11-03 天津爱纷销科技有限公司 Tunnel repairing method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1696712A1 (en) * 1989-09-25 1991-12-07 Восточное Отделение Всесоюзного Научно-Исследовательского Института Горноспасательного Дела Method of driving through falls in mine workings
CN101781990A (en) * 2009-12-30 2010-07-21 中铁十二局集团有限公司 Construction method for dealing with tunnel collapses
CN103321653A (en) * 2013-06-27 2013-09-25 中国水电顾问集团成都勘测设计研究院 Method of treating lining after collapse of underground cavern crown
CN203499699U (en) * 2013-09-27 2014-03-26 中国水电顾问集团贵阳勘测设计研究院 Supporting structure of corrosion and collapse tunnel section
CN104196546A (en) * 2014-08-06 2014-12-10 山东大学 Treatment method for fault fracture zone collapse in tunnel construction process
CN104632248A (en) * 2015-01-22 2015-05-20 山东大学 Protection and treatment method for tunnel top karst cave
CN104790980A (en) * 2015-04-02 2015-07-22 济南城建集团有限公司 Method for treating karst caves in tunnel construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1696712A1 (en) * 1989-09-25 1991-12-07 Восточное Отделение Всесоюзного Научно-Исследовательского Института Горноспасательного Дела Method of driving through falls in mine workings
CN101781990A (en) * 2009-12-30 2010-07-21 中铁十二局集团有限公司 Construction method for dealing with tunnel collapses
CN103321653A (en) * 2013-06-27 2013-09-25 中国水电顾问集团成都勘测设计研究院 Method of treating lining after collapse of underground cavern crown
CN203499699U (en) * 2013-09-27 2014-03-26 中国水电顾问集团贵阳勘测设计研究院 Supporting structure of corrosion and collapse tunnel section
CN104196546A (en) * 2014-08-06 2014-12-10 山东大学 Treatment method for fault fracture zone collapse in tunnel construction process
CN104632248A (en) * 2015-01-22 2015-05-20 山东大学 Protection and treatment method for tunnel top karst cave
CN104790980A (en) * 2015-04-02 2015-07-22 济南城建集团有限公司 Method for treating karst caves in tunnel construction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴建兵: "大断面土质隧道塌方处理及预防", 《土工基础》 *
许来宝等: "关于隧道穿越复杂地层塌方处理的对策与方法", 《公路工程》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108343447A (en) * 2017-01-22 2018-07-31 新疆北方建设集团有限公司 A kind of tunnel inner steel web safety support construction suitable for frangible rock stratum
CN106837373A (en) * 2017-04-13 2017-06-13 中国电建集团成都勘测设计研究院有限公司 A kind of tunnel abutment wall collapses the supporting construction at place
CN106894826A (en) * 2017-05-08 2017-06-27 中国水利水电建设工程咨询中南有限公司 The supporting construction and method for protecting support of section of being caved in a kind of hole
CN106894826B (en) * 2017-05-08 2024-02-23 中国水利水电建设工程咨询中南有限公司 Supporting structure and supporting method for collapse section in hole
CN111878121A (en) * 2020-08-03 2020-11-03 天津爱纷销科技有限公司 Tunnel repairing method
CN111878121B (en) * 2020-08-03 2022-09-30 中铁九局集团第五工程有限公司 Tunnel repairing method

Similar Documents

Publication Publication Date Title
CN109854255B (en) Method for processing tunnel unconverged collapse
CN103628894B (en) Method is repaiied in a kind of rich water fault belt based on angle umbrella pre-grouting lane, tunnel of collapsing
CN109209392B (en) Full-ring excavation method suitable for IV-V-grade surrounding rock of large-section tunnel
CN104533446A (en) Construction method and structure of two-layer preliminary support for preventing geological disaster of large-section weak surrounding rock tunnel
CN105649012A (en) Construction method for bored pile of subway station enclosure structure of upper-soft lower-hard ground
CN107762529B (en) Lateral Hole and tunnel main tunnel infall construction method based on gib system
CN105065038A (en) Tunnel collapse disposing method and tunnel collapse support structure
CN105041333A (en) Method for treating tunnel collapse through dugand covered method
CN104314585A (en) Pre-reinforcement method and pre-reinforcement structure for full section of tunnel
CN109026020B (en) Water-rich tunnel karst cave treatment and excavation method
CN108979644A (en) A kind of rich water tunnel solution cavity collapses processing and tunnel excavation construction method
CN103982188A (en) Supporting structure system of rock stratum large-section deep vertical shaft and construction method of supporting structure system
CN109252877B (en) Multi-step construction method for double-layer two-lining combined beam plate structure of proximity tunnel
CN103016027A (en) Tunnel or roadway excavating method under weak and broken complicated geological conditions
CN107905796A (en) A kind of tunnels in soil Guan Peng operating rooms construction method
CN102305091A (en) Support structure for hard rock large-section tunnel construction, and construction method for support structure
CN103161474B (en) Construction method of down hole interchange roadway
CN109184742B (en) Advanced pre-grouting method for high-pressure water-rich soft surrounding rock mountain tunnel
CN107313430A (en) The deep big foundation pit subregion construction method of three face Nearby Structures
CN207609428U (en) The ground handling well Shed-pipe Advanced Support pre-add solid system of existing object is worn under shield section
CN204851291U (en) Tunnel landslide supporting construction
CN103775102B (en) Hidden hole drilling is stablized free face with pipe pore-forming backfill concrete and is processed landslide construction method
CN209228377U (en) A kind of multistage set arch structure and pipe canopy set arch structure for tunnel portal supporting
CN107218062A (en) A kind of contrary sequence method handles the construction method of Tunnel Collapse
CN110159276A (en) Tunnel excavation technique in a kind of disintegration in water ultimate soft rock stratum

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151118