- CN105010599B CN105010599B CN201510461865.2A CN201510461865A CN105010599B CN 105010599 B CN105010599 B CN 105010599B CN 201510461865 A CN201510461865 A CN 201510461865A CN 105010599 B CN105010599 B CN 105010599B
- Authority
- CN
- China
- Prior art keywords
- tea
- steaming
- cylinder
- heap
- fort
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Tea And Coffee (AREA)
Abstract
The invention discloses a kind of steaming tea methods of six fort tea, comprising the following steps: the six fort tea gross tea screened A, are carried out to assorted, addition fermentation liquid, are put into after steaming tea machine steams tea out after holding together into tea heap;The steaming tea machine includes metal cylinder and metal cover, steams net, and cylinder body bottom is equipped with opening, and the wall of protruding ring, water, cylinder is equipped with water inlet pipe;Vertical shaft, electrode retaining collar, at least two copper billets, electrode plate, the electrode plate and the electrode retaining collar are all connected with electrode;Steaming step includes: to be put into steaming net to be put into cylinder, starts the power supply of electrode, closes power supply after being kept for 1 minute, the cover is opened after 30 minutes and goes out tea;B, the resulting tea heap of step A is unclamped, holds together into tea heap again, be put into the steaming tea machine and steam by steaming step described in step A, out tea;It is so steamed three times and is adding fermentation liquid.The steaming tea method energy consumption that the present invention can solve existing six fort tea is high, processes successfully high problem.
Description
Technical field
The present invention relates to machine for processing tea technical field, especially a kind of method for steaming six fort tea.
Background technique
Steam the critical process that six fort tea are the processing of six fort tea.Generally steaming six fort tea is all first to screen gross tea,
It is assorted, according to mass dryness fraction, to decide whether to add water, then mix thoroughly at semi-finished product, it is put into steaming tea machine and is steamed.And generally steam tea machine all
Include cylinder and cover, the steaming net for putting tealeaves is equipped in cylinder, is connected with jet chimney in cylinder, jet chimney is connected with hair
Hot equipment and supply equipment.The tealeaves for needing to steam equably is placed on steaming on the net, leads to after heat-producing device and supply equipment formation steam
Crossing jet chimney is to provide steam in cylinder.Since the thermal energy of steam is easy loss in transmittance process, cylinder is also lost biggish
Thermal energy, thus the effective rate of utilization of the energy is lower, energy consumption is higher, higher cost.
Summary of the invention
The problem to be solved by the invention is to provide a kind of steaming tea methods of six fort tea, to solve the steaming tea of existing six fort tea
Method energy consumption is high, processes successfully high problem.
To solve the above-mentioned problems, the technical scheme is that the steaming tea method of this six fort tea the following steps are included: A,
The six fort tea gross tea screened progress is assorted, and the fermentation liquid that the gross tea weight 1%~1.5% is then added is stirred 60 points
Clock holds together into after tea heap to be put into and steams tea machine and steam, tea is gone out after steaming;The fermentation liquid is made according to the following steps: the hair after screening
In tea clout plus water blackens sugar again, ferments 6 months, takes liquid after filtering;The ratio of the residue gross tea and water and brown sugar is 2.5
~2.8:10:1;The steaming tea machine includes metal cylinder and metal cover, is equipped in the cylinder and steams net, the cylinder body bottom
Equipped with opening, a circumferential edges of the opening convex to form protruding ring, and water is equipped between the protruding ring and the cylinder inboard wall,
Water inlet pipe is equipped with higher than the position of the protruding ring on the wall of the cylinder;The middle part of the cylinder body bottom opening, which is erect, to be provided with
The vertical shaft of one metal, the bottom of the vertical shaft are equipped with the electrode retaining collar of a circle metal, the protruding ring of the cylinder body bottom and the electricity
It is equipped with gap between polar ring, at least two copper billets, the cylinder are equipped between the cylinder body bottom protruding ring and the electrode retaining collar
It is externally connected with the electrode plate of one block of metal, the electrode plate and the electrode retaining collar are all connected with electrode;It is described steam step include: by
The good tea heap that holds together into tea heap is put on the steaming net, is put into the cylinder, is started the power supply of electrode, when the intracorporal water of cylinder at
For boiling water, power supply is closed after being kept for 1 minute when cylinder body temperature reaches 100 °C~110 °C, the cover is opened after 30 minutes and is gone out
Tea;B, the resulting tea heap of step A is unclamped after sixty minutes, holds together into tea heap again, is put into the steaming tea machine by steaming described in step A
Step processed steams, out tea;After so being steamed out tea pine heap three times, the fermentation of tea weight 0.7%~0.8% is added out
Liquid stirs evenly, and banks up 1 month.
In the above-mentioned technical solutions, more specifically scheme may is that the cylinder inboard wall is equipped with bulge loop, the bulge loop
It is equipped with the steaming net;The steaming net from top to bottom at least two layers and be set to the vertical shaft on.
Further: the mesh for steaming net is equilateral triangle.
It is further: the steel wire of three trends of the mesh is constituted, when by three vertex of each mesh,
Arrangement order is all different the steel wire of these three trends from top to bottom.
By adopting the above-described technical solution, compared with prior art, the present invention has the following advantages:
1, the cylinder for the steaming tea machine that the steaming tea method of this six fort tea uses is equipped with the electrode plate for being directly connected to electrode, cylinder
Interior bottom is equipped with the vertical shaft by electrode retaining collar connection electrode, is connect with electrode retaining collar by copper billet at the intracorporal bottom opening of cylinder,
So that cylinder is directly generated heat with vertical shaft, directly heats the water in cylinder and protruding ring and flash to steam, directly on vertical shaft
The tealeaves that the steaming of side is online is steamed, and greatly reduces heat without heating equipment it is not necessary that raw steaming plant is in addition arranged
Loss in transmitting, processing cost substantially reduce, and 100 degree of electricity, which steam tea amount, to be become using this six fort from original 2.9 tons
6.1 tons steamed after tea method of tea;Heating equipment and steam generating device and jet chimney are decreased simultaneously, reduces equipment
Use cost;The steaming tea method of this six fort tea designs unique steaming net and in turn ensures tealeaves on the benchmark for meeting logical steam
It is sufficiently heated and is not easy to fall;
2, the steaming tea method of this six fort tea is put into fermentation liquid made of specific process before and after steaming, and can greatly shorten it
The time of fermentation afterwards, and the astringent taste of newly picked and processed tea leaves is reduced after fermenting.
Detailed description of the invention
Fig. 1 is the main view of the embodiment of the present invention one;
Fig. 2 is the cross-sectional view in Fig. 1 at A-A;
Fig. 3 is the top view that the embodiment of the present invention one steams net;
Fig. 4 is the main view for the steel wire arranging that the embodiment of the present invention one steams one equilateral triangle of net, three vertex.
Specific embodiment
The embodiment of the present invention is described in further detail with reference to the accompanying drawing:
Embodiment one:
The steaming tea method of this six fort tea the following steps are included:
A, the six fort tea gross tea screened progress is assorted, the fermentation liquid that the gross tea weight 1% is then added is stirred
60 minutes, holds together into after tea heap to be put into and steam tea machine and steam, tea is gone out after steaming.
Fermentation liquid is made according to the following steps: in the gross tea clout after screening plus water blackens sugar again, ferments 6 months, filtering
After take liquid;The ratio of the residue gross tea and water and brown sugar is 2.5:10:1.
Steaming tea machine is as shown in Figure 1, Figure 2, Figure 3, Figure 4, it includes metal cylinder 1 and metal cover 5, and 1 bottom of cylinder is set
There is opening 8,8 circumferential edges of being open convex to form protruding ring 11, and water 12, cylinder 1 are equipped between protruding ring 11 and cylinder inboard wall
Wall on be higher than protruding ring 11 position be equipped with water inlet pipe 10.The middle part of 1 bottom opening of cylinder, 8 protruding ring 11, setting are provided with
The vertical shaft 6 of one metal, the bottom of vertical shaft 6 are equipped with the electrode retaining collar 7 of a circle metal, the electrode retaining collar 7 of cylinder 1 bottom opening 8 and vertical shaft 6
Between be equipped with gap, at least two copper billets 8 are equipped between 1 bottom opening 8 of cylinder and electrode retaining collar 7, cylinder 1 is externally connected with one
The electrode plate 4 of block metal, electrode plate 4 and electrode retaining collar 7 are all connected with electrode.So that cylinder 1 is directly generated heat with vertical shaft 6, makes cylinder 1
Water 12 between inner wall and protruding ring 11 is thermally formed steam, and steam tealeaves directly online to the steaming of 6 top of vertical shaft carries out
It steams, it is not necessary that raw steaming plant is in addition arranged.
It is equipped in cylinder 1 and steams net 3,1 inner wall of cylinder is equipped with bulge loop 2, and bulge loop 2, which is equipped with, steams net 3.Steam net 3 from top to bottom
Equipped with three layers, steams net 3 and be set on vertical shaft 6.The mesh for steaming net 3 is equilateral triangle, on the benchmark for meeting logical steam, and is protected
Tealeaves has been demonstrate,proved sufficiently to be heated and be not easy to fall.The steel wire for constituting three trends of mesh, on three tops by each mesh
When point, arrangement order is all different the steel wire of these three trends from top to bottom.The steel of this trend in the lower right corner is tilted towards in figure
Silk is A, and the steel wire of this trend in the upper right corner is tilted towards in figure as B, and the steel wire of this trend in figure straight down is C, this
In lift a mesh for, wherein three vertex of its mesh are respectively a1, a2, a3, a1 at, three move towards steel wires from
Arrangement order under upper is respectively A, B, C;At a2, arrangement order of the steel wires of three trends under upper be respectively B, C,
A;At a3, arrangement order of the steel wires of three trends under upper is respectively C, A, B.The steel wire phase of so such three trends
It mutually distorts, the steel wire combination of each of staggered place is closer, both ensure that logical hot gas amount big as far as possible, and had in turn ensured that tealeaves filled
Divide heated and be not easy to fall, and using very convenient.
Steaming step includes: that the good tea heap that will hold together into tea heap is put into and steams on net 3, is put into cylinder 1, starts the electricity of electrode
Power supply is closed after being kept for 1 minute when the water 12 in cylinder 1 becomes boiling water, and temperature reaches 100 °C in cylinder 1, after 30 minutes in source
It opens cover 5 and goes out tea.
B, the resulting tea heap of step A is unclamped after sixty minutes, holds together into tea heap again, be put into and steam tea machine by described in step A
It steams step to steam, out tea;After so being steamed out tea pine heap three times, the hair in the step A of tea weight 0.7% is added out
Zymotic fluid stirs evenly, and banks up 1 month.
Embodiment two:
The steaming tea method of this six fort tea the following steps are included:
A, the six fort tea gross tea screened progress is assorted, the fermentation liquid that the gross tea weight 1.5% is then added is stirred
It mixes 60 minutes, holds together into after tea heap to be put into and steam tea machine and steam, tea is gone out after steaming.
Fermentation liquid is made according to the following steps: in the gross tea clout after screening plus water blackens sugar again, ferments 6 months, filtering
After take liquid;The ratio of the residue gross tea and water and brown sugar is 2.8:10:1.
Steam the structure such as embodiment one of tea machine.
Steaming step includes: that the good tea heap that will hold together into tea heap is put into and steams on net 3, is put into cylinder 1, starts the electricity of electrode
Power supply is closed after being kept for 1 minute when the water 12 in cylinder 1 becomes boiling water, and temperature reaches 110 °C in cylinder 1, after 30 minutes in source
It opens cover 5 and goes out tea.
B, the resulting tea heap of step A is unclamped after sixty minutes, holds together into tea heap again, be put into and steam tea machine by described in step A
It steams step to steam, out tea;After so being steamed out tea pine heap three times, the hair in the step A of tea weight 0.7% is added out
Zymotic fluid stirs evenly, and banks up 1 month.
Claims (4)
1. a kind of steaming tea method of six fort tea, it is characterised in that the following steps are included:
A, the six fort tea gross tea screened progress is assorted, the fermentation liquid that the gross tea weight 1%~1.5% is then added is stirred
It mixes 60 minutes, holds together into after tea heap to be put into and steam tea machine and steam, tea is gone out after steaming;
The fermentation liquid is made according to the following steps: in the gross tea clout after screening plus water blackens sugar again, ferments 6 months, filtering
After take liquid;The ratio of the residue gross tea clout and water and brown sugar is 2.5~2.8:10:1;
The steaming tea machine includes metal cylinder and metal cover, is equipped in the cylinder and steams net, and the cylinder body bottom is equipped with and opens
Mouthful, a circumferential edges of the opening convex to form protruding ring, and water, the cylinder are equipped between the protruding ring and the cylinder inboard wall
Water inlet pipe is equipped with higher than the position of the protruding ring on the wall of body;The middle part of the cylinder body bottom opening, which is erect, is provided with a metal
Vertical shaft, the bottom of the vertical shaft is equipped with the electrode retaining collar of a circle metal, the protruding ring of the cylinder body bottom and the electrode retaining collar it
Between be equipped with gap, between the cylinder body bottom protruding ring and the electrode retaining collar be equipped at least two copper billets, the cylinder Ligation in vitro
There is the electrode plate of one block of metal, the electrode plate and the electrode retaining collar are all connected with electrode;
The step that steams includes: that will hold together into the tea heap after tea heap to be put on the steaming net, is put into the cylinder, starting electricity
The power supply of pole, when the intracorporal water of cylinder becomes boiling water, cylinder body temperature closes electricity after being kept for 1 minute when reaching 100 °C~110 °C
Source opens the cover and goes out tea after 30 minutes;
B, the resulting tea heap of step A is unclamped after sixty minutes, holds together into tea heap again, is put into the steaming tea machine by described in step A
It steams step to steam, out tea;After so being steamed out tea pine heap three times, the hair of tea weight 0.7%~0.8% is added out
Zymotic fluid stirs evenly, and banks up 1 month.
2. the steaming tea method of six fort according to claim 1 tea, it is characterised in that: the cylinder inboard wall is equipped with bulge loop,
The bulge loop is equipped with the steaming net;The steaming net from top to bottom at least two layers and be set to the vertical shaft on.
3. the steaming tea method of six fort according to claim 1 or 2 tea, it is characterised in that: the mesh for steaming net is positive three
It is angular.
4. the steaming tea method of six fort according to claim 3 tea, it is characterised in that: constitute three trends of the mesh
Steel wire, when by three vertex of each mesh, arrangement order is all different the steel wire of these three trends from top to bottom.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510461865.2A CN105010599B (en) | 2015-07-31 | 2015-07-31 | The steaming tea method of six fort tea |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510461865.2A CN105010599B (en) | 2015-07-31 | 2015-07-31 | The steaming tea method of six fort tea |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105010599A CN105010599A (en) | 2015-11-04 |
CN105010599B true CN105010599B (en) | 2019-02-15 |
Family
ID=54401247
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510461865.2A Active CN105010599B (en) | 2015-07-31 | 2015-07-31 | The steaming tea method of six fort tea |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105010599B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN86205560U (en) * | 1986-08-02 | 1987-10-03 | 刘正乾 | Electricity-saving three-phase high-efficiency sterilizer |
CN2037422U (en) * | 1988-09-22 | 1989-05-10 | 张光华 | Steam generator for bath cover |
CN101491281A (en) * | 2009-03-09 | 2009-07-29 | 谌小丰 | Processing method of golden-flower loose tea |
CN102940054A (en) * | 2012-11-21 | 2013-02-27 | 广西壮族自治区梧州茶厂 | Double-steaming double-pressing production process for liupu tea |
CN103343104A (en) * | 2013-07-11 | 2013-10-09 | 西安康代生物科技有限公司 | Process for preparing novel plant-source probiotics solution |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2041138U (en) * | 1988-05-30 | 1989-07-19 | 王乃盈 | Non-stick pan bottom grate and its parts |
CN200966565Y (en) * | 2006-07-28 | 2007-10-31 | 周真光 | Grid |
-
2015
- 2015-07-31 CN CN201510461865.2A patent/CN105010599B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN86205560U (en) * | 1986-08-02 | 1987-10-03 | 刘正乾 | Electricity-saving three-phase high-efficiency sterilizer |
CN2037422U (en) * | 1988-09-22 | 1989-05-10 | 张光华 | Steam generator for bath cover |
CN101491281A (en) * | 2009-03-09 | 2009-07-29 | 谌小丰 | Processing method of golden-flower loose tea |
CN102940054A (en) * | 2012-11-21 | 2013-02-27 | 广西壮族自治区梧州茶厂 | Double-steaming double-pressing production process for liupu tea |
CN103343104A (en) * | 2013-07-11 | 2013-10-09 | 西安康代生物科技有限公司 | Process for preparing novel plant-source probiotics solution |
Also Published As
Publication number | Publication date |
---|---|
CN105010599A (en) | 2015-11-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105010612B (en) | The preparation method of six fort tea | |
CN206747532U (en) | Metal alloy casting sizing dewaxing device | |
CN105010599B (en) | The steaming tea method of six fort tea | |
CN206791575U (en) | A kind of almond can process system | |
CN206995501U (en) | One kind forges medicine stove | |
CN104256712B (en) | A kind of apparatus and method of roasted eggs | |
CN105010639A (en) | Liupao tea drying method | |
CN206380599U (en) | A kind of cereal soaking cooking device | |
CN204560853U (en) | With the potato chips semi-finished product processing unit (plant) of seasoning | |
CN207153157U (en) | A kind of ultrasonic extractor | |
CN109393359A (en) | A kind of automation spicing device | |
CN204560856U (en) | The potato chips semi-finished product processing unit (plant) of band spray seasoning assembly | |
CN206443095U (en) | A kind of almond can process system | |
CN204562925U (en) | A kind of Chinese medicine frying machine | |
CN209346000U (en) | A kind of new bean-meal even steam device | |
CN204907821U (en) | Integrated machine of dry fruit processing | |
CN206238323U (en) | A kind of flat frying pan for dried meat floss processing | |
CN201510147U (en) | Making equipment for Hongkong hot milk tea | |
CN204560769U (en) | Potato chips semi-finished product processing unit (plant) | |
CN204070355U (en) | A kind of process units of edible flavouring oil | |
CN104186709B (en) | The process units of a kind of edible flavouring oil and method | |
CN104962701B (en) | A kind of hydraulic press drift non-oxidation decarburization local strengthening Technology for Heating Processing | |
CN204969221U (en) | Tea leaves water removing machine | |
CN106072335A (en) | A kind of Semen Armeniacae Amarum can process system and technique | |
CN205848620U (en) | peanut production line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |