CN104880334A - Testing system and method for seepage field model of tunnel in construction and operation periods - Google Patents

Testing system and method for seepage field model of tunnel in construction and operation periods Download PDF

Info

Publication number
CN104880334A
CN104880334A CN201510334858.6A CN201510334858A CN104880334A CN 104880334 A CN104880334 A CN 104880334A CN 201510334858 A CN201510334858 A CN 201510334858A CN 104880334 A CN104880334 A CN 104880334A
Authority
CN
China
Prior art keywords
steel reinforcement
tunnel
reinforcement cage
rock
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510334858.6A
Other languages
Chinese (zh)
Other versions
CN104880334B (en
Inventor
何川
李铮
骆耀文
高翔
汪波
邹育麟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201510334858.6A priority Critical patent/CN104880334B/en
Publication of CN104880334A publication Critical patent/CN104880334A/en
Application granted granted Critical
Publication of CN104880334B publication Critical patent/CN104880334B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a testing system and method for a seepage field model of a tunnel in construction and operation periods, and the testing system comprises a seepage field model box body and data collection device. The top of the seepage field model box body is provided with a pressure meter, and the bottom of a side wall of the seepage field model box body is provided with an overflowing hole. The top and bottom of a side wall of the seepage field model box body are respectively provided with an upper water inlet of the model box and a lower water inlet of the model box. Two opposite side walls are respectively provided with a tunnel hole. Two ends of each fixed steel reinforcement cage are fixed on inner walls of the edges of the tunnel holes, and the fixed steel reinforcement cages are respectively wrapped by a soil isolating layer. Peripheral bolts of flange plates are fixed on outer walls of edges of the tunnel holes, and the internal and external steel reinforcement cages are fixed between the two tunnel holes through the flange plates. Inner holes of the flange plates are provided with cover plates. A construction-period soil isolating plate is connected between the internal and external steel reinforcement cages in a threaded manner. A tunnel face water-blocking plate is fixed in the internal steel reinforcement cage in a threaded manner. Moreover, the construction-period soil isolating plate and the tunnel face water-blocking plate are located on the same vertical section. The system can test the conditions of the seepage field of the tunnel conveniently, accurately and truly in the construction and operation periods under the action of the seepage field.

Description

Construct and run phase seepage field of tunnel model assay systems and test method thereof
Technical field
The present invention relates to and construct always and run phase seepage field of tunnel model assay systems and test method thereof, belong to civil engineering work test field.
Background technology
The long-term percolating water in tunnel may cause that underground water outside tunnel runs off in a large number, underground water table declines, earth surface water source is exhausted, along with generations such as soil erosion, vegetation deterioration, surface collapses; For tunnel structure, percolating water easily causes lining deformation, vault to cave in, and accelerates the corrosion of anchor pole and bow member, and corrode tunnel auxiliary facility, in addition, surface gathered water also can make environment worsen, and affects traffic safety simultaneously, destroys pavement quality.As can be seen here, solve treatment technology for tunnel seepage water problems will contribute to ensureing tunnel structure safely, extend its serviceable life, protection surrounding ecologic environment, its core is exactly to understand the relation between tunnel structure and seepage field body.Each stage of tunnel excavation, underground percolation field can change thereupon, adopting seepage field of tunnel model test apparatus and test method thereof to test underground seepage field, is that the change of Study of The Underground water, water pressure are on a kind of important means of the impact of tunnel structure and Tunnel Seepage etc.
Numerous domestic scientific research institutions have successively carried out model test design to the water problems in Mining Method and shield tunnel:
(1) " rock mechanics and engineering " the 5th phase in 2007 describes a kind of high hydraulic pressure seepage field of tunnel test device systematic, be made up of water pressure charger, containment housing, tunnel structure and water pressure proving installation 4 part, containment housing steel plate, channel-section steel and joist steel welding processing form, be of a size of 2m × 1m × 1.3m, this system only can carry out simulation test to the prefabricated tunnel structure of circle under constant hydrostatic head effect, cannot realize the simulation of each stage seepage field of constructing tunnel and kinetic head and varying head.
(2) patentee is Southwest Jiaotong University, and Chinese Patent Application No. 201120000959.7 describes a kind of shield tunnel draining type segment lining model test box.This chamber comprises the casing of airtight pressure-bearing, the tunnel model of PVC round tube formation and tank, the impact of draining type segment lining on country rock pore water pressure and vent flow can be studied, but the impact of kinetic head and varying head can not be embodied, also cannot simulate grouting layer constructing tunnel being had to significant impact.
(3) patentee is Shandong University, Chinese Patent Application No. 201110412569.5 describes a kind of submarine tunnel fluid-solid coupling model test system and test method thereof, comprise high strength implosion test structure-steel framing, high-strength armoured-glass seal box, monitoring display system, computing machine parametric controller and pressure water tank, plane and accurate three axle fluid structure interaction mode tests can be simulated, but the simulation that cannot realize grouting and reinforcing layer and different infiltration coefficient lining cutting, can not predict the water yield in tunnel under different head and water discharge.
The model assay systems of the above-mentioned unit of comprehensive analysis, also has the following disadvantages:
1, above-mentioned model assay systems head is usually constant can not regulate and control, and simulate formation water level effect is single, is difficult to effectively support tunnel construction completely, more cannot carry out Seepage to differently descending the city tunnel of height of water level, mountain tunnel and seabed tunnel.
2, the constructing tunnel phase is the important stage of tunneling, understand the seepage field change of constructing tunnel phase, prediction water yield, the test distribution of water pressure of country rock-support system and the impact of face slip casting, can complete most important smoothly to Tunnel Engineering, and above-mentioned pilot system all cannot complete the Seepage in tunneling stage.
3, the change of tunnel perimeter wall rock grouting stabilization zone infiltration coefficient and thickness is larger to underground seepage field, also directly can change the water pressure of tunnel structure and gush (row) water yield, existing model test apparatus is not all considered maybe can not adjust, even if adjustable, also can only be realized by the pre-buried soil body changed in casing, complex operation, causes larger interference to test, and consuming time long, be unfavorable for repeatedly revision test.
Summary of the invention
First goal of the invention of the present invention is to provide a kind of construction and operation phase seepage field of tunnel model assay systems.This system can facilitate, test seepage field effect accurately, truly under constructing tunnel, the water pressure of operation phase, gush (row) water yield and seepage field changes, and can carry out freely configuring and changing to country rock, grouting and reinforcing district, face pre-pouring grout district and the first parameter served as a contrast according to test demand, the situation of reduction tunnel and periphery seepage field thereof to greatest extent.
The present invention realizes the technical scheme that its first goal of the invention takes: a kind of construction and operation phase seepage field of tunnel model assay systems, comprise the casing of percolation model case and gather the data collector of hydraulic pressure and seepage flow, described casing top is provided with tensimeter, be provided with the spout hole of draining bottom wall box, its design feature is:
Compared with prior art, the present invention realizes the beneficial effect of the technical scheme that its first goal of the invention is taked and is:
1. by filling different Rock And Soil simulation country rocks outward every soil layer in casing, thus the different hydrology, the ground geologic condition in tunnel can be simulated, inlet opening on model casing is connected with providing the supply equipment of head, can the seepage field in simulated sea bottom tunnel well; ; Inlet opening under model casing is connected with providing the supply equipment of head, can the seepage field of tunnel, simcity, mountain tunnel well; Thus provide reliable test basis, to ensure the safety in tunnel to the seepage prevention design of Tunnel Engineering and construction.
2., except being fixing between fixing steel reinforcement cage and casing, remainder is demountable structure, and dirigibility is strong; The country rock can filled outward at fixing steel reinforcement cage is constant, Rock And Soil in changing between steel reinforcement cage and outer steel reinforcement cage, simulate under same wall rock condition, grouting and reinforcing district (region between interior steel reinforcement cage and the outer steel reinforcement cage) impact on Tunnel Infiltration amount of different infiltration coefficients; Lining cutting and two linings of tunnel structure also can be adjusted according to actual conditions, simple to operate, practical.
3., by the design of ring flange inner ring bolt and draw-in groove, the independent analogue enlargement of grouting and reinforcing district and tunnel structure can be realized, practicality and dirigibility stronger.
4. construction time soil separating plate and face manger board and be threaded connection between interior steel reinforcement cage and outer steel reinforcement cage, the position changing construction time soil separating plate and face manger board can be required according to actual tests, thus seepage field of tunnel and the water yield thereof that tunnel under construction is excavated to diverse location place is measured in simulation, there is provided reliable test basis to the design of Tunnel Engineering and construction, ensure the safety of constructing tunnel.
Further, on model casing of the present invention, under inlet opening or model casing, inlet opening is connected with movable type water case apparatus, the concrete structure of described mobile water tank device is: portable tank is placed on the lifting table of elevating water tank tower, the water inlet of portable tank is connected by the submersible pump of flexible pipe with the fixed water tank inside be arranged at below lifting table, and the water delivering orifice bottom portable tank is connected with inlet opening under inlet opening on model casing or model casing by flexible pipe.
Like this, by controlling movable type water case apparatus, state tunnel being in hydrostatic head, varying head and kinetic head is studied; Constructing tunnel under kinetic head, hydrostatic head and varying head effect, the water pressure of operation phase can be tested truly, gush (row) water yield and seepage field changes.
Second goal of the invention of the present invention is to provide the test method of a kind of above-mentioned construction and operation phase seepage field of tunnel model assay systems construction simulation phase seepage field of tunnel.Can be facilitated by the method, test seepage field effect accurately, truly under the water pressure of constructing tunnel, water yield and seepage field change, and can carry out freely configuring and changing to country rock, grouting and reinforcing district, face pre-pouring grout district and the first parameter served as a contrast according to test demand, the situation of reduction tunnel and periphery seepage field thereof to greatest extent.
The present invention realizes the technical scheme that its second goal of the invention takes: the test method of a kind of above-mentioned construction and operation phase seepage field of tunnel model assay systems construction simulation phase seepage field of tunnel, and its step is as follows:
A. the compactness layering of the Rock And Soil of simulation country rock by setting is laid, is packed in the casing of percolation model case; And in rock-soil layer pre-buried WG;
The Rock And Soil of simulation country rock is filled on the right side of the construction time soil separating plate B. outside between steel reinforcement cage and interior steel reinforcement cage, fills the reinforcing rock-soil layer of simulation grouting and reinforcing district rock mass in the left side of construction time soil separating plate, pre-buried WG in reinforcing rock-soil layer; Geotextile is fitted on the left of face manger board on steel reinforcement cage inwall, with the lining cutting of simulation tunnel;
C. fill up the Rock And Soil of simulation country rock on the right side of the face manger board in interior steel reinforcement cage, cover the cover plate of the ring flange on right side;
D. the water delivering orifice bottom portable tank is connected with inlet opening under inlet opening on model casing or model casing, and portable tank is adjusted to the height of setting;
E. the hydraulic pressure of Rock And Soil between steel reinforcement cage and outer steel reinforcement cage in gathering, the hydraulic pressure of the Rock And Soil laid in casing and do not cover the water yield of ring flange place outflow of cover plate; Terminate test, namely simulation draws seepage field distribution and the tunnel water yield in face dash situation of the constructing tunnel phase under specific country rock, grouting and reinforcing condition;
F. the face manger board in removing in steel reinforcement cage, the hydraulic pressure of the Rock And Soil in Resurvey between steel reinforcement cage and outer steel reinforcement cage, the hydraulic pressure of the Rock And Soil laid in casing and do not cover the water yield of ring flange place outflow of cover plate; Terminate test, namely simulation draws seepage field distribution and the total yield of the constructing tunnel phase under specific country rock, grouting and reinforcing condition.
3rd goal of the invention of the present invention is to provide the test method of a kind of above-mentioned construction and operation phase seepage field of tunnel model assay systems simulation operation phase seepage field of tunnel.The method can facilitate, test seepage field effect accurately, truly under the water pressure of tunnel operation phase, water discharge and seepage field change, and can carry out freely configuring and changing according to the parameter of test demand to country rock, grouting and reinforcing district, lining cutting, the situation of reduction tunnel and periphery seepage field thereof to greatest extent.
The present invention realizes the testing program that its 3rd goal of the invention takes: the test method of a kind of above-mentioned construction and operation phase seepage field of tunnel model assay systems simulation operation phase seepage field of tunnel, and its step is as follows:
A. the construction time soil separating plate between outer steel reinforcement cage and interior steel reinforcement cage and the face manger board in interior steel reinforcement cage is removed;
B. the Rock And Soil of simulation country rock is laid by different compactness layering, is packed in the casing of percolation model case; And in Rock And Soil pre-buried WG;
C. fill the reinforcing rock-soil layer of simulation grouting and reinforcing district rock mass outside between steel reinforcement cage and interior steel reinforcement cage, and reinforce pre-buried WG in rock-soil layer; Geotextile is fitted on interior steel reinforcement cage inwall, with the lining cutting of simulation tunnel; In interior steel reinforcement cage, insert end face is horseshoe-shaped tubulose precast concrete two lining;
D. the water delivering orifice bottom portable tank is connected with inlet opening under inlet opening on model casing or model casing, and portable tank is adjusted to the height of setting;
The hydraulic pressure of the Rock And Soil in E. gathering between steel reinforcement cage and outer steel reinforcement cage, the water yield that the hydraulic pressure of the Rock And Soil laid in casing and ring flange place flow out; Terminate test, namely simulation draws seepage field distribution and the water discharge of the tunnel operation phase under specific country rock, grouting and reinforcing condition.
Below in conjunction with the drawings and specific embodiments, the present invention is described further.
Accompanying drawing explanation
Fig. 1 is the overall cross-sectional view (not drawing movable type water case apparatus) of the embodiment of the present invention.
Fig. 2 is the embodiment of the present invention when carrying out the test of tunnel under construction seepage field, measures the cross-sectional view (not drawing movable type water case apparatus) of the water yield of tunnel in face dash situation.
Fig. 3 is the embodiment of the present invention when carrying out the test of tunnel under construction seepage field, measures the cross-sectional view (not drawing movable type water case apparatus) of tunnel total yield.
Fig. 4 is the cross-sectional view (do not draw movable type water case apparatus) of the embodiment of the present invention when carrying out the seepage field of tunnel test of operation phase.
Fig. 5 is that the embodiment of the present invention is when the seepage field in simulated sea bottom tunnel and the connection diagram of movable type water case apparatus.
Fig. 6 be the embodiment of the present invention when the seepage field of tunnel, simcity, mountain tunnel, with the connection diagram of movable type water case apparatus.
Embodiment
Fig. 1 illustrates, a kind of embodiment of the present invention is: a kind of construction and operation phase seepage field of tunnel model assay systems, comprise the casing 1 of percolation model case and gather the data collector of hydraulic pressure and seepage flow, described casing 1 top is provided with tensimeter 2, casing 1 sidewall bottom is provided with the spout hole 5 of draining, and its design feature is:
The sidewall top of described casing 1 is provided with inlet opening 12 on model casing, and sidewall bottom is provided with inlet opening 13 under model casing; The two side that casing 1 is relative has Tunnel-hole;
The two ends of fixing steel reinforcement cage 6 are fixedly welded on the peritreme inwall of Tunnel-hole, Tunnel-hole is aimed at interior steel reinforcement cage 8 two ends in outer steel reinforcement cage 7 and outer steel reinforcement cage 7, and the two ends of interior steel reinforcement cage 8 are connected with ring flange 3 by the inner ring bolt 3a of ring flange 3, the outer ring bolt 3b of ring flange 3 is screwed on the peritreme outer wall of the Tunnel-hole of casing 1, and the two ends of outer steel reinforcement cage 7 are sticked on the draw-in groove of ring flange 3 inside surface; Ring flange 3 is provided with the cover plate 4 that can cover ring flange 3 endoporus;
The shape of the endoporus of the end face of fixing steel reinforcement cage 6, interior steel reinforcement cage 8, outer steel reinforcement cage 7, Tunnel-hole and ring flange 3 is the shape of a hoof;
Fixing steel reinforcement cage 6 be wrapped with by finer wire net and nonwoven fabrics mix every soil layer 9;
Be threaded between steel reinforcement cage 7 and interior steel reinforcement cage 8 construction time soil separating plate 10 outside; On the inside surface of interior steel reinforcement cage 8, screw thread is fixed with face manger board 11; And construction time soil separating plate 10 and face manger board 11 are positioned on same vertical cross section.
On model casing described in this example, under inlet opening 12 or model casing, inlet opening 13 is connected with movable type water case apparatus, the concrete structure of described mobile water tank device is: portable tank 14 is placed on the lifting table of elevating water tank tower 15, the water inlet 14a of portable tank 14 is connected by the submersible pump 17 of flexible pipe with fixed water tank 16 inside be arranged at below lifting table, and the water delivering orifice 14b bottom portable tank 14 is connected with inlet opening 13 under inlet opening on model casing 12 or model casing by flexible pipe.Water delivering orifice 14b bottom portable tank 14 is connected with inlet opening under model casing 13 by flexible pipe, can tunnel, simcity, mountain tunnel seepage field, as shown in Figure 6.Water delivering orifice 14b bottom portable tank 14 is connected with inlet opening on model casing 12 by flexible pipe, can the seepage field in simulated sea bottom tunnel, as shown in Figure 5.
Fig. 2, Fig. 3 and Fig. 1, Fig. 5 illustrate, with the construction described in this example and operation phase seepage field of tunnel model assay systems, the test method step of the tunnel under construction seepage field in simulated sea bottom tunnel is as follows:
A. the compactness layering of the Rock And Soil of simulation country rock by setting is laid, is packed in the casing 1 of percolation model case; And in rock-soil layer pre-buried WG;
The Rock And Soil of simulation country rock is filled on the right side of the construction time soil separating plate 10 B. outside between steel reinforcement cage 7 and interior steel reinforcement cage 8, fills the reinforcing rock-soil layer of simulation grouting and reinforcing district rock mass in the left side of construction time soil separating plate 10, pre-buried WG in reinforcing rock-soil layer; Geotextile is fitted on the left of face manger board 11 on steel reinforcement cage 8 inwall, with the lining cutting of simulation tunnel;
C. fill up the Rock And Soil of simulation country rock on the right side of the face manger board 11 in interior steel reinforcement cage 8, cover the cover plate 4 of the ring flange on right side;
D. the water delivering orifice 14b bottom portable tank 14 is connected with inlet opening on model casing 12, and portable tank 14 is adjusted to the height of setting;
E. the hydraulic pressure of Rock And Soil between steel reinforcement cage 8 and outer steel reinforcement cage 7 in gathering, the hydraulic pressure of the Rock And Soil laid in casing 1 and do not cover the water yield of ring flange 3 place outflow of cover plate 4; Terminate test, namely simulation draws seepage field distribution and the tunnel water yield in face dash situation of the constructing tunnel phase under specific country rock, grouting and reinforcing condition;
F. the face manger board 11 in removing in steel reinforcement cage 8, the hydraulic pressure of the Rock And Soil in Resurvey between steel reinforcement cage 8 and outer steel reinforcement cage 7, the hydraulic pressure of the Rock And Soil laid in casing 1 and do not cover the water yield of ring flange 3 place outflow of cover plate 4; Terminate test, namely simulation draws seepage field distribution and the total yield of the constructing tunnel phase under specific country rock, grouting and reinforcing condition.
Fig. 2, Fig. 3 and Fig. 1, Fig. 6 illustrate, with the construction described in this example and operation phase seepage field of tunnel model assay systems, the test method step of the tunnel under construction seepage field of tunnel, simcity or mountain tunnel is as follows:
A. the compactness layering of the Rock And Soil of simulation country rock by setting is laid, is packed in the casing 1 of percolation model case; And in rock-soil layer pre-buried WG;
The Rock And Soil of simulation country rock is filled on the right side of the construction time soil separating plate 10 B. outside between steel reinforcement cage 7 and interior steel reinforcement cage 8, fills the reinforcing rock-soil layer of simulation grouting and reinforcing district rock mass in the left side of construction time soil separating plate 10, pre-buried WG in reinforcing rock-soil layer; Geotextile is fitted on the left of face manger board 11 on steel reinforcement cage 8 inwall, with the lining cutting of simulation tunnel;
C. fill up the Rock And Soil of simulation country rock on the right side of the face manger board 11 in interior steel reinforcement cage 8, cover the cover plate 4 of the ring flange on right side;
D. the water delivering orifice 14b bottom portable tank 14 is connected with inlet opening under model casing 13, and portable tank 14 is adjusted to the height of setting;
E. the hydraulic pressure of Rock And Soil between steel reinforcement cage 8 and outer steel reinforcement cage 7 in gathering, the hydraulic pressure of the Rock And Soil laid in casing 1 and do not cover the water yield of ring flange 3 place outflow of cover plate 4; Terminate test, namely simulation draws seepage field distribution and the tunnel water yield in face dash situation of the constructing tunnel phase under specific country rock, grouting and reinforcing condition;
F. the face manger board 11 in removing in steel reinforcement cage 8, the hydraulic pressure of the Rock And Soil in Resurvey between steel reinforcement cage 8 and outer steel reinforcement cage 7, the hydraulic pressure of the Rock And Soil laid in casing 1 and do not cover the water yield of ring flange 3 place outflow of cover plate 4; Terminate test, namely simulation draws seepage field distribution and the total yield of the constructing tunnel phase under specific country rock, grouting and reinforcing condition.
Fig. 4, Fig. 1 and Fig. 5 illustrate, with the construction described in this example and operation phase seepage field of tunnel model assay systems, the test method step of the operation phase seepage field of tunnel in simulated sea bottom tunnel is as follows:
A. the construction time soil separating plate 10 between outer steel reinforcement cage 7 and interior steel reinforcement cage 8 and the face manger board 11 in interior steel reinforcement cage 8 is removed;
B. the Rock And Soil of simulation country rock is laid by different compactness layering, is packed in the casing 1 of percolation model case; And in Rock And Soil pre-buried WG;
C. fill the reinforcing rock-soil layer of simulation grouting and reinforcing district rock mass outside between steel reinforcement cage 7 and interior steel reinforcement cage 8, and reinforce pre-buried WG in rock-soil layer; Geotextile is fitted on interior steel reinforcement cage 8 inwall, with the lining cutting of simulation tunnel; In interior steel reinforcement cage 8, insert end face is horseshoe-shaped tubulose precast concrete two lining;
D. the water delivering orifice 14b bottom portable tank 14 is connected with inlet opening on model casing 12, and portable tank 14 is adjusted to the height of setting;
The hydraulic pressure of the Rock And Soil in E. gathering between steel reinforcement cage 8 and outer steel reinforcement cage 7, the water yield that the hydraulic pressure of the Rock And Soil laid in casing 1 and ring flange 3 place flow out; Terminate test, namely simulation draws seepage field distribution and the water discharge of the tunnel operation phase under specific country rock, grouting and reinforcing condition.
Fig. 4, Fig. 1 and Fig. 6 illustrate, with the construction described in this example and operation phase seepage field of tunnel model assay systems, the test method step of the operation phase seepage field of tunnel of tunnel, simcity or mountain tunnel is as follows:
A. the construction time soil separating plate 10 between outer steel reinforcement cage 7 and interior steel reinforcement cage 8 and the face manger board 11 in interior steel reinforcement cage 8 is removed;
B. the Rock And Soil of simulation country rock is laid by different compactness layering, is packed in the casing 1 of percolation model case; And in Rock And Soil pre-buried WG;
C. fill the reinforcing rock-soil layer of simulation grouting and reinforcing district rock mass outside between steel reinforcement cage 7 and interior steel reinforcement cage 8, and reinforce pre-buried WG in rock-soil layer; Geotextile is fitted on interior steel reinforcement cage 8 inwall, with the lining cutting of simulation tunnel; In interior steel reinforcement cage 8, insert end face is horseshoe-shaped tubulose precast concrete two lining;
D. the water delivering orifice 14b bottom portable tank 14 is connected with inlet opening under model casing 13, and portable tank 14 is adjusted to the height of setting;
The hydraulic pressure of the Rock And Soil in E. gathering between steel reinforcement cage 8 and outer steel reinforcement cage 7, the water yield that the hydraulic pressure of the Rock And Soil laid in casing 1 and ring flange 3 place flow out; Terminate test, namely simulation draws seepage field distribution and the water discharge of the tunnel operation phase under specific country rock, grouting and reinforcing condition.

Claims (4)

1. a construction and operation phase seepage field of tunnel model assay systems, comprise the casing (1) of percolation model case and gather the data collector of hydraulic pressure and seepage flow, described casing (1) top is provided with tensimeter (2), casing (1) sidewall bottom is provided with the spout hole (5) of draining, it is characterized in that:
The sidewall top of described casing (1) is provided with inlet opening on model casing (12), and sidewall bottom is provided with inlet opening (13) under model casing; The two side that casing (1) is relative has Tunnel-hole;
The two ends of fixing steel reinforcement cage (6) are fixedly welded on the peritreme inwall of Tunnel-hole, Tunnel-hole is aimed at interior steel reinforcement cage (8) two ends in outer steel reinforcement cage (7) and outer steel reinforcement cage (7), and the two ends of interior steel reinforcement cage (8) are connected with ring flange (3) by the inner ring bolt (3a) of ring flange (3), the outer ring bolt (3b) of ring flange (3) is screwed on the peritreme outer wall of the Tunnel-hole of casing (1), and the two ends of outer steel reinforcement cage (7) are sticked on the draw-in groove of ring flange (3) inside surface; Ring flange (3) is provided with the cover plate (4) that can cover ring flange (3) endoporus;
The shape of the endoporus of the end face of fixing steel reinforcement cage (6), interior steel reinforcement cage (8), outer steel reinforcement cage (7), Tunnel-hole and ring flange (3) is the shape of a hoof;
Fixing steel reinforcement cage (6) be wrapped with by finer wire net and nonwoven fabrics mix every soil layer (9);
Be threaded between steel reinforcement cage (7) and interior steel reinforcement cage (8) construction time soil separating plate (10) outside; On the inside surface of interior steel reinforcement cage (8), screw thread is fixed with face manger board (11); And construction time soil separating plate (10) and face manger board (11) are positioned on same vertical cross section.
2. one construction according to claim 1 and operation phase seepage field of tunnel model assay systems, it is characterized in that: on described model casing, under inlet opening (12) or model casing, inlet opening (13) is connected with movable type water case apparatus, the concrete structure of described mobile water tank device is: portable tank (14) is placed on the lifting table of elevating water tank tower (15), the water inlet (14a) of portable tank (14) is connected by the submersible pump (17) that flexible pipe is inner with the fixed water tank (16) be arranged at below lifting table, the water delivering orifice (14b) of portable tank (14) bottom is connected with inlet opening (13) under inlet opening on model casing (12) or model casing by flexible pipe.
3., by construction according to claim 2 and a test method of runing seepage field of tunnel model assay systems phase, seepage field of tunnel construction simulation phase, its step is as follows:
A. the compactness layering of the Rock And Soil of simulation country rock by setting is laid, is packed in the casing (1) of percolation model case; And in rock-soil layer pre-buried WG;
The Rock And Soil of simulation country rock is filled on the right side of the construction time soil separating plate (10) B. outside between steel reinforcement cage (7) and interior steel reinforcement cage (8), the reinforcing rock-soil layer of simulation grouting and reinforcing district rock mass is filled, pre-buried WG in reinforcing rock-soil layer in the left side of construction time soil separating plate (10); Geotextile is fitted on interior steel reinforcement cage (8) inwall in face manger board (11) left side, with the lining cutting of simulation tunnel;
C. the Rock And Soil of simulation country rock is filled up on face manger board (11) right side in interior steel reinforcement cage (8), covers the cover plate (4) of the ring flange on right side;
D. the water delivering orifice (14b) of portable tank (14) bottom is connected with inlet opening (13) under inlet opening on model casing (12) or model casing, and portable tank (14) is adjusted to the height of setting;
E. the hydraulic pressure of Rock And Soil between steel reinforcement cage (8) and outer steel reinforcement cage (7) in gathering, the hydraulic pressure of the Rock And Soil laid in casing (1) and do not cover the water yield of ring flange (3) place outflow of cover plate (4); Terminate test, namely simulation draws seepage field distribution and the tunnel water yield in face dash situation of the constructing tunnel phase under specific country rock, grouting and reinforcing condition;
F. the face manger board (11) in removing in steel reinforcement cage (8), the hydraulic pressure of the Rock And Soil in Resurvey between steel reinforcement cage (8) and outer steel reinforcement cage (7), the hydraulic pressure of the Rock And Soil laid in casing (1) and do not cover the water yield of ring flange (3) place outflow of cover plate (4); Terminate test, namely simulation draws seepage field distribution and the total yield of the constructing tunnel phase under specific country rock, grouting and reinforcing condition.
4. simulate a test method for operation phase seepage field of tunnel with construction according to claim 2 and operation phase seepage field of tunnel model assay systems, its step is as follows:
A. the construction time soil separating plate (10) between outer steel reinforcement cage (7) and interior steel reinforcement cage (8) and the face manger board (11) in interior steel reinforcement cage (8) is removed;
B. the Rock And Soil of simulation country rock is laid by different compactness layering, is packed in the casing (1) of percolation model case; And in Rock And Soil pre-buried WG;
C. fill the reinforcing rock-soil layer of simulation grouting and reinforcing district rock mass outside between steel reinforcement cage (7) and interior steel reinforcement cage (8), and reinforce pre-buried WG in rock-soil layer; Geotextile is fitted on interior steel reinforcement cage (8) inwall, with the lining cutting of simulation tunnel; In interior steel reinforcement cage (8), insert end face is horseshoe-shaped tubulose precast concrete two lining;
D. the water delivering orifice (14b) of portable tank (14) bottom is connected with inlet opening (13) under inlet opening on model casing (12) or model casing, and portable tank (14) is adjusted to the height of setting;
The hydraulic pressure of the Rock And Soil in E. gathering between steel reinforcement cage (8) and outer steel reinforcement cage (7), the water yield that the hydraulic pressure of the Rock And Soil laid in casing (1) and ring flange (3) place flow out; Terminate test, namely simulation draws seepage field distribution and the water discharge of the tunnel operation phase under specific country rock, grouting and reinforcing condition.
CN201510334858.6A 2015-06-17 2015-06-17 Construction and operation phase seepage field of tunnel model assay systems and its test method Active CN104880334B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510334858.6A CN104880334B (en) 2015-06-17 2015-06-17 Construction and operation phase seepage field of tunnel model assay systems and its test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510334858.6A CN104880334B (en) 2015-06-17 2015-06-17 Construction and operation phase seepage field of tunnel model assay systems and its test method

Publications (2)

Publication Number Publication Date
CN104880334A true CN104880334A (en) 2015-09-02
CN104880334B CN104880334B (en) 2017-06-06

Family

ID=53947913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510334858.6A Active CN104880334B (en) 2015-06-17 2015-06-17 Construction and operation phase seepage field of tunnel model assay systems and its test method

Country Status (1)

Country Link
CN (1) CN104880334B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105352867A (en) * 2015-09-30 2016-02-24 四川大学 Simulation multi-gap assembled medium tunnel seepage test method
CN106710434A (en) * 2017-02-28 2017-05-24 山东大学 3D printed water-permeable pavement scale simulation device and method under action of runoff
CN107330191A (en) * 2017-06-30 2017-11-07 暨南大学 The Numerical Analysis methods of Groundwater iron shield tunnel construction influence
CN108008118A (en) * 2017-12-31 2018-05-08 浙江大学 Seabed tunnel dynamic response experimental rig under tide simulation load action
CN108426706A (en) * 2018-02-02 2018-08-21 西南交通大学 A kind of high hydraulic pressure area shield formula TBM Segments Design test-beds
CN109470625A (en) * 2018-12-19 2019-03-15 中国地质大学(武汉) A kind of infiltrative model test apparatus of simulation Faults in Tunnels country rock
CN111983193A (en) * 2020-08-26 2020-11-24 西南交通大学 High ground temperature country rock tunnel structure analogue test device
CN112504935A (en) * 2020-11-25 2021-03-16 青岛理工大学 Tunnel seepage test device
CN113358544A (en) * 2021-07-01 2021-09-07 西南交通大学 Method for accurately measuring infiltration line for tunnel steady-state seepage field model test

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10280888A (en) * 1997-04-08 1998-10-20 Kajima Corp Shield tunnel
CN101893617A (en) * 2010-06-24 2010-11-24 同济大学 Tester for testing discount rule of water pressure of grouting circle of anti-water pressure emission-limit tunnel
CN103278376A (en) * 2013-05-29 2013-09-04 浙江大学 Test device of stability control model of earth pressure balance shield excavation surface
CN203755389U (en) * 2014-01-04 2014-08-06 中铁十六局集团第二工程有限公司 High-pressure water device for tunnel
CN104005363A (en) * 2014-06-13 2014-08-27 东南大学 Three-dimensional underground pressure-bearing water flow-subway tunnel structure interaction simulating device
CN204679292U (en) * 2015-06-17 2015-09-30 西南交通大学 Construction and operation phase seepage field of tunnel model assay systems

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10280888A (en) * 1997-04-08 1998-10-20 Kajima Corp Shield tunnel
CN101893617A (en) * 2010-06-24 2010-11-24 同济大学 Tester for testing discount rule of water pressure of grouting circle of anti-water pressure emission-limit tunnel
CN103278376A (en) * 2013-05-29 2013-09-04 浙江大学 Test device of stability control model of earth pressure balance shield excavation surface
CN203755389U (en) * 2014-01-04 2014-08-06 中铁十六局集团第二工程有限公司 High-pressure water device for tunnel
CN104005363A (en) * 2014-06-13 2014-08-27 东南大学 Three-dimensional underground pressure-bearing water flow-subway tunnel structure interaction simulating device
CN204679292U (en) * 2015-06-17 2015-09-30 西南交通大学 Construction and operation phase seepage field of tunnel model assay systems

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105352867B (en) * 2015-09-30 2018-05-04 四川大学 Simulate the test method of more gap set medium tunnel seepage flow
CN105352867A (en) * 2015-09-30 2016-02-24 四川大学 Simulation multi-gap assembled medium tunnel seepage test method
CN106710434A (en) * 2017-02-28 2017-05-24 山东大学 3D printed water-permeable pavement scale simulation device and method under action of runoff
CN107330191B (en) * 2017-06-30 2021-02-05 暨南大学 Numerical simulation analysis method for influence of underground water on subway shield tunnel construction
CN107330191A (en) * 2017-06-30 2017-11-07 暨南大学 The Numerical Analysis methods of Groundwater iron shield tunnel construction influence
CN108008118A (en) * 2017-12-31 2018-05-08 浙江大学 Seabed tunnel dynamic response experimental rig under tide simulation load action
CN108426706A (en) * 2018-02-02 2018-08-21 西南交通大学 A kind of high hydraulic pressure area shield formula TBM Segments Design test-beds
CN108426706B (en) * 2018-02-02 2023-10-17 西南交通大学 Shield type TBM tunnel segment design test bench for high water pressure area
CN109470625A (en) * 2018-12-19 2019-03-15 中国地质大学(武汉) A kind of infiltrative model test apparatus of simulation Faults in Tunnels country rock
CN111983193A (en) * 2020-08-26 2020-11-24 西南交通大学 High ground temperature country rock tunnel structure analogue test device
CN112504935A (en) * 2020-11-25 2021-03-16 青岛理工大学 Tunnel seepage test device
CN113358544A (en) * 2021-07-01 2021-09-07 西南交通大学 Method for accurately measuring infiltration line for tunnel steady-state seepage field model test
CN113358544B (en) * 2021-07-01 2023-04-11 西南交通大学 Method for accurately measuring infiltration line for tunnel steady-state seepage field model test

Also Published As

Publication number Publication date
CN104880334B (en) 2017-06-06

Similar Documents

Publication Publication Date Title
CN104880334A (en) Testing system and method for seepage field model of tunnel in construction and operation periods
CN103884831B (en) A kind of roadbed side slope and underground works multifunction three-dimensional model test platform
CN107587516B (en) A kind of efficient sealing resistance sand precipitation composite system of Follow-up type and its construction method
CN108457285B (en) Ultra-deep pit-in-pit open type dewatering construction method
CN110306557B (en) Earth excavation method based on basement deep foundation pit engineering
CN104153352A (en) Karst geology rotary-drilling bored concrete pile hole forming process
CN205776347U (en) Novel cover for subway station digs against making structural system
CN104900130A (en) Foundation pit pouring demonstrator and foundation pit pouring experiment research method thereof
CN106324226A (en) Pouring and injection integrated indoor testing device and method for monitoring underground water seepage and precipitation
CN110387896B (en) Foundation pit dewatering well design method
CN103195076A (en) Method for constructing silt deep foundation pit tower crane foundation
CN203881756U (en) Multifunctional three-dimensional model testing platform for roadbed slopes and underground engineering
CN110144901A (en) A kind of prefabricated high-pressure gasbag isolation pilework and construction method with slip casting function
CN206132761U (en) Monitoring groundwater seepage flow, subside fill integrative indoor test device
CN203132854U (en) Test device used for simulating stratum deformation triggered by subway shield tunnel construction
CN205263089U (en) Stratum slip casting analog system
CN106759307A (en) Protection device and method that bored concrete pile is irrigated in Karst Cave Formation
CN103245391B (en) Model test apparatus and test method for monitoring dam saturation line
CN103469798A (en) Pit support structure and construction method thereof
CN109505298A (en) A kind of self-balancing foundation pit enclosure method
CN104897877A (en) Indoor reinjection model test system simulating confined water stratum and control method of indoor reinjection model test system
CN104264663A (en) Hard cutting construction technology for secant piles
CN107152038A (en) A kind of geotechnical centrifugal model test equipment and Excavation simulation method
CN103195477A (en) Gravity drainage system for underground roadway high-pressure water inrush
CN103510549B (en) A kind of method to set up of the pressure relief device for structures anti-floating

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant