CN104878929A CN201510291841.7A CN201510291841A CN104878929A CN 104878929 A CN104878929 A CN 104878929A CN 201510291841 A CN201510291841 A CN 201510291841A CN 104878929 A CN104878929 A CN 104878929A
Authority
CN
China
Prior art keywords
steel pipe
pipe column
reinforcing cage
colligation
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510291841.7A
Other languages
Chinese (zh)
Other versions
CN104878929B (en
Inventor
于海申
裴鸿斌
高辉
柯子平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201510291841.7A priority Critical patent/CN104878929B/en
Publication of CN104878929A publication Critical patent/CN104878929A/en
Application granted granted Critical
Publication of CN104878929B publication Critical patent/CN104878929B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention provides a reinforced concrete steel pipe column construction method. The reinforced concrete steel pipe column construction method includes, but not limited to, the following steps in sequence: mounting a column leg plate on a construction foundation, wherein the construction foundation is provided with an embedded connecting section and the embedded connecting section is arranged on the column leg plate in a penetrating manner and stretches out of the construction foundation; tying and connecting a reinforcement cage on the embedded connecting section; connecting tensioning pieces between the reinforcement cage and the construction foundation to enable the tied reinforcement cage to be in a vertical state; after the tying of the reinforcement cage is completed, lifting a steel pipe column, housing the reinforcement cage by using the steel pipe column from top to bottom and releasing the tensioning pieces; after the lifting of the steel pipe column is completed, mounting the steel pipe column on the column leg plate. The reinforced concrete steel pipe column construction method solves the problems that the existing ultrahigh small-section reinforced steel pipe column is difficult to construct and the like.

Description

Steel concrete steel pipe column construction method
Technical field
The present invention relates to building foundation engineering technical field, be specifically related to a kind of superelevation small bore steel concrete steel pipe column construction method.
Background technology
Highly more than 10m, diameter of section is less than in the superelevation small bore steel concrete steel pipe column construction of 1.5m, if first install steel pipe column, because steel pipe column sectional dimension is too small, and usually arrange ring flat-plate in steel pipe column, therefore in steel pipe column, reinforcing bar cannot colligation.If reinforcing bar in first construction steel tubing string, then because of highly very high, reinforcing cage is difficult to keep verticality, and the installation of steel pipe column is very difficult.
Summary of the invention
For overcoming the defect existing for prior art, now provide a kind of steel concrete steel pipe column construction method, to solve the problems such as existing superelevation small bore steel concrete steel pipe column constructional difficulties.
For achieving the above object, a kind of steel concrete steel pipe column construction method, include but not limited to the step of following order: erection column sole on construction basis, described construction basis has pre-buried linkage section, described pre-buried linkage section is arranged in heel slab and stretches out described construction basis; Described pre-buried linkage section ties up connecting reinforcement cage; Drawknot tension part between described reinforcing cage and construction basis, makes the described reinforcing cage of colligation be in vertical state; After the colligation completing reinforcing cage, lifting steel pipe column, from top to bottom entangles described reinforcing cage and discharges described tension part thereupon by described steel pipe column; After the lifting completing described steel pipe column, by described erection of steel pipe column on described heel slab.
The further improvement of steel concrete steel pipe column construction method of the present invention is, on construction basis, erection column sole specifically comprises: pre-embedded anchoring bolts on described construction basis, and wears described heel slab on described stone bolt.
The further improvement of steel concrete steel pipe column construction method of the present invention is, on construction basis, erection column sole specifically comprises: reserving hole on described construction basis, stone bolt is put into described reserving hole, and wear described heel slab on described stone bolt.
The further improvement of steel concrete steel pipe column construction method of the present invention is, described tension part is wire rope;
Described reinforcing cage and construction basis between drawknot tension part specifically comprise: whenever described reinforcing cage upwards colligation one section of colligation distance time, by one end drawknot of described wire rope on the described reinforcing cage top of colligation, by the other end oblique pull of described wire rope on described construction basis;
Described steel pipe column from top to bottom entangled described reinforcing cage and discharge described tension part thereupon, specifically comprising: when described steel pipe column declines one section of dropping distance, the described wire rope nearest from described steel pipe column is discharged.
The further improvement of steel concrete steel pipe column construction method of the present invention is, described reinforcing cage comprises four limits, whenever described reinforcing cage upwards colligation one section of colligation distance time, by one end drawknot of described wire rope on the described reinforcing cage top of colligation, the other end of described wire rope is anchored on described construction basis, specifically comprise: whenever described reinforcing cage upwards colligation one section of colligation distance time, four described wire rope are provided, by one end of four described wire rope respectively corresponding drawknot on four limits on described reinforcing cage top being positioned at colligation, by the other end oblique pull of four described wire rope on described construction basis.
Beneficial effect of the present invention is, by coordinating the colligation of reinforcing cage and the lifting of steel pipe column, and temperature pier being carried out to highly higher reinforcing cage, ensure that its verticality, ensure that the smooth lifting of steel pipe column simultaneously, solve the difficult problem that superelevation small bore steel concrete steel pipe is difficult to construct.
Accompanying drawing explanation
Fig. 1 to Fig. 4 is the view of steel concrete steel pipe column construction method of the present invention.
Detailed description of the invention
For the benefit of to the understanding of structure of the present invention, be described below in conjunction with drawings and Examples.
Please refer to Fig. 1 to Fig. 4, the invention provides a kind of steel concrete steel pipe column construction method, include but not limited to the step of following order:
S1, as shown in Figure 1, erection column sole 20 on construction basis 1, construction basis 1 has pre-buried linkage section 30, and pre-buried linkage section 30 is arranged in heel slab 20 and stretches out construction basis 1;
S2, pre-buried linkage section 30 ties up connecting reinforcement cage 3;
S3, as shown in Figure 2, drawknot tension part 4 between reinforcing cage 3 and construction basis 1, makes the reinforcing cage 3 of colligation be in vertical state;
S4, as shown in Figure 3, after the colligation completing reinforcing cage 3, lifting steel pipe column 5, from top to bottom entangles reinforcing cage 3 and release tension part 4 thereupon by steel pipe column 5;
S5, as shown in Figure 4, after the lifting completing steel pipe column 5, is installed on steel pipe column 5 on heel slab 20.
As shown in Figure 1, stone bolt 21 is provided, the mounting method that stone bolt 21 is general is two kinds, the first mounting method is an implantation, during placing of concrete construction basic 1, stone bolt 21 is imbedded, now in step S1, on construction basis 1, erection column sole 20 specifically comprises: pre-embedded anchoring bolts 21 on construction basis 1, and wears heel slab 20 on stone bolt 21; The second mounting method of stone bolt 21 is Reserved Hole Method, now in step S1, on construction basis 1, erection column sole 20 specifically comprises: reserving hole on construction basis 1, described reserving hole is cleaned up, stone bolt 21 is put into described reserving hole, water with than construction basis 1 higher leveled ungauged regions pea gravel concreten, make firm by ramming closely knit, and wear heel slab 20 on stone bolt 21.It should be noted that, when using the first mounting method mounting foot bolt 21, step S1 should prior to performing before step S2 to step S4, and when using the second mounting method mounting foot bolt 21, step S1 can perform after step S2 and step S3 again.
Continue with reference to figure 1, in step s 2, start assembling reinforcement cage 3, as shown in Figure 1, reinforcing cage 3 part is embedded in construction basis 1 in advance, namely reinforcing cage 3 comprises the pre-buried linkage section 30 be embedded in advance in construction basis 1, during assembling reinforcement cage 3, vertical muscle is connected with joint bar, pre-buried linkage section 30 from bottom to top ties up connecting reinforcement cage 3, wherein, heel slab 20 is the intersections being located in reinforcing cage 3 and construction basis 1.
Next, please refer to Fig. 2, in step s3, provide a tension part 4, one end drawknot of tension part 4 is on the reinforcing cage 3 of colligation, and the other end of tension part 4 is anchored on construction basis 1.Wherein, tension part 4 can be oblique rollering steel silk rope, can the pre-buried U-shaped round steel for connecting steel wire ropes 4 on construction basis 1.Drawknot tension part 4 in assembling reinforcement cage 3 process, by one end drawknot of tension part 4 on the reinforcing cage 3 of colligation, the other end of tension part 4 is anchored on construction basis 1, specifically comprise: whenever reinforcing cage 3 upwards colligation one section of colligation distance time, by one end drawknot of wire rope 4 on reinforcing cage 3 top of colligation, the U-shaped round steel of other end oblique pull on construction basis 1 of wire rope 4.Concrete, colligation distance can be 3m, every 3m, wire rope 4 is carried out stretching and fixes, ensure reinforcing cage 3 verticality.Certainly, also just wire rope 4 can be carried out stretching every 2m or 3.5m and fix, the application is not specifically limited colligation distance.In practice, general reinforcing cage 4 is rectangle, comprise four limits, now step S3 can be: whenever reinforcing cage 3 upwards colligation one section of colligation distance time, four wire rope 4 are provided, corresponding drawknot is distinguished on four limits on reinforcing cage 3 top of colligation in one end of four wire rope 4, the U-shaped round steel of other end oblique pull on construction basis 1 of four wire rope 4.Consider that reinforcing cage 4 on construction ground also can for making circle, now, also can every certain altitude, four wire rope 4 are provided, wherein, drawknot is on the reinforcing cage 3 of colligation at equal intervals for one end of four wire rope 4, and four wire rope 4 are divided into two groups, often organize two wire rope 4, two symmetrical drawknots of wire rope 4 often in group are on the reinforcing cage 3 of colligation.
Next, please refer to Fig. 3, in step s 4 which, after reinforcing cage 3 colligation completes, lifting steel pipe column 5, makes steel pipe column 5 from top to bottom entangle reinforcing cage 3, and release tension part 4 thereupon.Steel pipe column 5 is provided with peg 6, when reinforcing cage 3 verticality that colligation completes is inadequate, during lifting steel pipe column 5, be easy to cause the peg 6 on steel pipe column 5 to be stuck on reinforcing cage 3, be unfavorable for the lifting of steel pipe column 5, just because of every certain altitude, wire rope 4 carried out stretching and fix, thus ensure that reinforcing cage 3 verticality, ensure that steel pipe column 5 can lift smoothly.When lifting steel pipe column 5, first release is positioned at the wire rope 4 at reinforcing cage 3 top, along with steel pipe column 5 is toward declining, when steel pipe column 5 declines one section of dropping distance, by from steel pipe column 5 nearest wire rope 4 first discharge, discharge wire rope 4 from top to down along with the decline of steel pipe column 5 thereupon, until steel pipe column 5 falls within mounting platform 2, dropping distance can be equal to colligation distance, also can be different from colligation distance, to this, the application is not specifically limited.
Next, please refer to Fig. 4, in step s 5, steel pipe column 5 falls within after on heel slab 20, is installed on by steel pipe column 5 on heel slab 20, and steel pipe column 5 can be welded on heel slab 20, also can be bolted on heel slab 20 by otic placode, to this, the application be not specifically limited.
Beneficial effect of the present invention is:
By coordinating the colligation of reinforcing cage and the lifting of steel pipe column, and temperature pier being carried out to highly higher reinforcing cage, ensure that its verticality, ensure that the smooth lifting of steel pipe column simultaneously, solved the difficult problem that superelevation small bore steel concrete steel pipe is difficult to construct.
Below embodiment is to invention has been detailed description by reference to the accompanying drawings, and those skilled in the art can make many variations example to the present invention according to the above description.Thus, some details in embodiment should not form limitation of the invention, the present invention by the scope that defines using appended claims as protection domain.

Claims (5)

1. a steel concrete steel pipe column construction method, is characterized in that, includes but not limited to the step of following order:
Erection column sole on construction basis, described construction basis has pre-buried linkage section, and described pre-buried linkage section is arranged in heel slab and stretches out described construction basis;
Described pre-buried linkage section ties up connecting reinforcement cage;
Drawknot tension part between described reinforcing cage and construction basis, makes the described reinforcing cage of colligation be in vertical state;
After the colligation completing reinforcing cage, lifting steel pipe column, from top to bottom entangles described reinforcing cage and discharges described tension part thereupon by described steel pipe column;
After the lifting completing described steel pipe column, by described erection of steel pipe column on described heel slab.
2. steel concrete steel pipe column construction method according to claim 1, is characterized in that, on construction basis, erection column sole specifically comprises: pre-embedded anchoring bolts on described construction basis, and wears described heel slab on described stone bolt.
3. steel concrete steel pipe column construction method according to claim 1, it is characterized in that, on construction basis, erection column sole specifically comprises: reserving hole on described construction basis, stone bolt is put into described reserving hole, and wear described heel slab on described stone bolt.
4. steel concrete steel pipe column construction method according to claim 1, is characterized in that, described tension part is wire rope;
Described reinforcing cage and construction basis between drawknot tension part specifically comprise: whenever described reinforcing cage upwards colligation one section of colligation distance time, by one end drawknot of described wire rope on the described reinforcing cage top of colligation, by the other end oblique pull of described wire rope on described construction basis;
Described steel pipe column from top to bottom entangled described reinforcing cage and discharge described tension part thereupon, specifically comprising: when described steel pipe column declines one section of dropping distance, the described wire rope nearest from described steel pipe column is discharged.
5. steel concrete steel pipe column construction method according to claim 4, it is characterized in that, described reinforcing cage comprises four limits, whenever described reinforcing cage upwards colligation one section of colligation distance time, by one end drawknot of described wire rope on the described reinforcing cage top of colligation, the other end of described wire rope is anchored on described construction basis, specifically comprise: whenever described reinforcing cage upwards colligation one section of colligation distance time, four described wire rope are provided, by one end of four described wire rope respectively corresponding drawknot on four limits on described reinforcing cage top being positioned at colligation, by the other end oblique pull of four described wire rope on described construction basis.
CN201510291841.7A 2015-06-01 2015-06-01 Reinforced concrete steel pipe column construction method Active CN104878929B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510291841.7A CN104878929B (en) 2015-06-01 2015-06-01 Reinforced concrete steel pipe column construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510291841.7A CN104878929B (en) 2015-06-01 2015-06-01 Reinforced concrete steel pipe column construction method

Publications (2)

Publication Number Publication Date
CN104878929A true CN104878929A (en) 2015-09-02
CN104878929B CN104878929B (en) 2017-01-11

Family

ID=53946586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510291841.7A Active CN104878929B (en) 2015-06-01 2015-06-01 Reinforced concrete steel pipe column construction method

Country Status (1)

Country Link
CN (1) CN104878929B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760208A (en) * 2016-12-29 2017-05-31 上海市机械施工集团有限公司 The hanging apparatus and hanging method of a kind of steel core concrete column
CN110835953A (en) * 2019-12-10 2020-02-25 中国电建集团河南省电力勘测设计院有限公司 Novel tangent single-rail special-shaped supporting beam and construction structure thereof
CN111502095A (en) * 2020-04-27 2020-08-07 中国建筑第八工程局有限公司 Connecting structure of large-diameter steel pipe column base and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57119019A (en) * 1981-01-16 1982-07-24 Yoshitaka Kamiike Connecting method of foundation reinforcing concrete bar with reinforcing bar for pillar
JPS62194319A (en) * 1986-02-19 1987-08-26 Kubota Ltd Construction of in-situ concrete pile
JPS6332018A (en) * 1986-07-23 1988-02-10 Hasegawa Komuten Co Ltd Formation of cast-in-place pile
CN102409606A (en) * 2011-07-29 2012-04-11 清华大学 Self-resetting pier column structural system with built-in energy dissipation assembly and implementing method for self-resetting piper column structural system
CN102900076A (en) * 2012-10-24 2013-01-30 广东省第四建筑工程公司 Continuous construction method for concrete pile steel pipe column
CN203960896U (en) * 2014-07-25 2014-11-26 成都城电电力工程设计有限公司 Batter post pile foundation
CN104314100A (en) * 2014-11-24 2015-01-28 广西壮族自治区冶金建设公司 Construction method for installing steel column at a time through reserved hole mold

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57119019A (en) * 1981-01-16 1982-07-24 Yoshitaka Kamiike Connecting method of foundation reinforcing concrete bar with reinforcing bar for pillar
JPS62194319A (en) * 1986-02-19 1987-08-26 Kubota Ltd Construction of in-situ concrete pile
JPS6332018A (en) * 1986-07-23 1988-02-10 Hasegawa Komuten Co Ltd Formation of cast-in-place pile
CN102409606A (en) * 2011-07-29 2012-04-11 清华大学 Self-resetting pier column structural system with built-in energy dissipation assembly and implementing method for self-resetting piper column structural system
CN102900076A (en) * 2012-10-24 2013-01-30 广东省第四建筑工程公司 Continuous construction method for concrete pile steel pipe column
CN203960896U (en) * 2014-07-25 2014-11-26 成都城电电力工程设计有限公司 Batter post pile foundation
CN104314100A (en) * 2014-11-24 2015-01-28 广西壮族自治区冶金建设公司 Construction method for installing steel column at a time through reserved hole mold

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760208A (en) * 2016-12-29 2017-05-31 上海市机械施工集团有限公司 The hanging apparatus and hanging method of a kind of steel core concrete column
CN110835953A (en) * 2019-12-10 2020-02-25 中国电建集团河南省电力勘测设计院有限公司 Novel tangent single-rail special-shaped supporting beam and construction structure thereof
CN111502095A (en) * 2020-04-27 2020-08-07 中国建筑第八工程局有限公司 Connecting structure of large-diameter steel pipe column base and construction method thereof

Also Published As

Publication number Publication date
CN104878929B (en) 2017-01-11

Similar Documents

Publication Publication Date Title
US10358920B2 (en) Tunnel construction method using pre-support and post-support and apparatus suitable for same
US9045878B2 (en) Cementitious foundation cap with post-tensioned helical anchors
US9481973B2 (en) Continuous strand hoop reinforcement for concrete foundations
CN107030874A (en) Precast lattice beam for slope reinforcement and preparation method thereof and construction method
US11976431B2 (en) Methods for constructing tensionless concrete pier foundations and foundations constructed thereby
US11274412B2 (en) Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same
CN106498950A (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body
CN104878929A (en) Reinforced concrete steel pipe column construction method
CN103806451B (en) A kind of anchorage type foundation ditch strengthening structure and construction method thereof
CN110130360A (en) A kind of post-tensioned prestressing supporting construction and its construction method
CN107542086B (en) Anchor cable construction method for filling slope
KR102197106B1 (en) Slab unit implanted with means for pressing pile and the method for carrying out the construction of the steel column using it
CN113756339A (en) Construction method of prestressed anchor cable frame beam structure
CN107366289B (en) Foundation pit concrete support pile structure formed by hole digging and pouring in site and manufacturing method thereof
CN104727307A (en) Construction method for underground variable-cross-section pile column
RU2371560C1 (en) Method for recovery of bearing capacity of reinforced concrete centrifuged support of power transmission line
CN105064357A (en) Embedding type anchoring device and anchoring method for pre-stressed anchor cable
CN210066763U (en) Foundation pit side wall structure reinforcing and supporting device
RU2320819C1 (en) Foundation (variants)
CN206986915U (en) A kind of fan platform installation foundation
CN111809521A (en) Tunnel type anchorage structure for cable crane and construction method thereof
CN206800420U (en) Supporting construction that prestressed anchorage cable and miniature steel-pipe pile unite
US11885092B2 (en) Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same
CN114151108B (en) Soft rock chamber bottom drum treatment supporting method
KR101102792B1 (en) Construction method for footway post

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant