CN104863125A - Bougainvillea spectabilis willd-shaped drilling pile and shaping method thereof - Google Patents
Bougainvillea spectabilis willd-shaped drilling pile and shaping method thereof Download PDFInfo
- Publication number
- CN104863125A CN104863125A CN201510206709.1A CN201510206709A CN104863125A CN 104863125 A CN104863125 A CN 104863125A CN 201510206709 A CN201510206709 A CN 201510206709A CN 104863125 A CN104863125 A CN 104863125A
- Authority
- CN
- China
- Prior art keywords
- pile
- pile body
- shape
- triangular
- flos mume
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/48—Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention belongs to the technical field of architecture, relates to a bougainvillea spectabilis willd-shaped drilling pile, and solves the technical problem that conventional technologies are poor in pulling resistance and pile body strength. The drilling pile comprises a pile body, wherein the pile body comprises three pile shafts fitted with each other and distributed in a triangle form. The frilling pile is good in the stability of the pile foundation, pulling resistance and bearing capacity resistance.
Description
Technical field
The invention belongs to technical field of buildings, relate to a kind of cement drilled pile, particularly relate to a kind of Triangular Flos Mume shape drilled pile.
Background technology
Drilled pile adopts underwater concrete pile, is to adopt mechanical hole building.Existing drilled pile adopts drill hole of drilling machine, grout injection after boring completes, and in order to reinforce fastness, is drilled pile after also needing to add reinforcing cage curing molding when being in the milk.But existing drilled pile is all single-column stake, when the higher uplift resistance of needs and compressive resistance, need the aperture of boring to do large thus make the boring post of larger aperture.
Chinese patent literature discloses a kind of one-tenth pile operation method [notification number: CN1632233A] of bidirectional stirring pile, comprises the following steps: a, leveling place; B, bidirectional stirring pile machine are located: crane suspention mixer is to referring to fixed pile and centering; C, stirring are sunk, and start bidirectional stirring pile machine, make bidirectional stirring pile driver drilling rod native along leading truck to incision, open and send stock pump, to soil body water-spray type slurry, and the blade of the forward and reverse rotation of difference Stirring cement-soil simultaneously on bidirectional stirring pile driver drilling rod; D, bidirectional stirring pile driver drilling rod continues to sink and stirring concrete earth, until projected depth; E, stirs while promoting, and the blade of forward and reverse rotation on bidirectional stirring pile driver drilling rod continues stirring concrete earth; F, promotes, is stirred to earth's surface or the above 50cm of design elevation, complete the construction of two-way stirring concrete drill hole stake.Its weak point: one be shaping stake is still single-column cement earth pile, the single-column cement earth pile being in soft foundation because pile foundation area is little, stake surrounding soil property is rare softly, vertical is not enough to support single-column cement earth pile by support force and keeps vertically, thus very easily causing shaping single-column cement earth pile run-off the straight and scrapping; Two is because cement paste in single-column cement earth pile and native stirring are for stir in the same way, mixing between cement paste with soil cannot be made cannot to reach even, shaping single-column strength of the cement-soil piles thus certainly will be caused low.
Summary of the invention
The object of the invention is for the problems referred to above, the Triangular Flos Mume shape drilled pile that a kind of pile strength is high, uplift resistance is high is provided.
Another object of the present invention is to provide a kind of manufacturing process of Triangular Flos Mume shape drilled pile of easy construction.
For achieving the above object, present invention employs following technical proposal: a kind of Triangular Flos Mume shape drilled pile, comprises pile body, and described pile body forms by the pile body of three distributions triangular in shape is bonded to each other.
In above-mentioned Triangular Flos Mume shape drilled pile, the cross section of described pile body is circular, and wherein every pile body and other two pile bodies overlap, and the center of circle distribution triangular in shape of the cross section of three pile bodies.
In above-mentioned Triangular Flos Mume shape drilled pile, the cross sectional area of every pile body is identical or not identical.
In above-mentioned Triangular Flos Mume shape drilled pile, wherein a pile body is equal or unequal with the cross sectional area of other two pile body laps.
In above-mentioned Triangular Flos Mume shape drilled pile, also reinforcing cage is provided with in described pile body, the shape of described reinforcing cage cross section is identical with the shape of pile body cross section, and the size of reinforcing cage cross section is less than the size of pile body cross section thus makes reinforcing cage be placed in pile body.
In above-mentioned Triangular Flos Mume shape drilled pile, described pile body is provided with the expansion section that at least one protrudes pile body outer wall.
In above-mentioned Triangular Flos Mume shape drilled pile, described expansion section is interconnected by the pile body protuberance that three protrude each pile body outer wall respectively and forms.
In above-mentioned Triangular Flos Mume shape drilled pile, described expansion section is along the axially-aligned of pile body.
A manufacturing process for Triangular Flos Mume shape drilled pile, comprises the following steps:
A, borehole, dig out the cylindrical hole of 3 distributions triangular in shape in the earth formation, and three cylindrical hole formation stake holes bonded to each other;
B, grouting, pour into for shaping cement paste or mortar in stake holes, and make the top of cement paste or mortar and stake holes have space;
C, in stake holes, put into reinforcing cage, continue to pour into cement paste or mortar, after coagulation forming, be drilled pile.
In the manufacturing process of above-mentioned Triangular Flos Mume shape drilled pile, in step, casing is squeezed in advance in soil layer, casing submergence depth is through covering layer, borehole adopts three axle rigs, by three of rig auger spindles by rounded projections arranged, three auger spindles form three cylindrical holes of Triangle-Profile from ground toward underground drilling simultaneously, and the drill bit that described auger spindle is installed is the adjustable reaming bit of the radius of gyration; In stepb, the height pouring into cement paste or mortar is the 1/3-2/3 of the stake holes degree of depth, and in filling process, casing rises along with the height of cement paste or mortar and progressively upwards promotes; In step C, the shape of reinforcing cage but size identical with the shape of stake holes is less than the size of stake holes.
Compared with prior art, the invention has the advantages that: because the loaded area of pile foundation is large, the distribution triangular in shape of bearing support point, the thus good stability of pile foundation, ensure that cement earth pile does not tilt in soft foundation simultaneously, stand vertically; Have employed the pile body of many non-linear configuration, serve the effect of the contact area increasing pile body and ground, improve uplift resistance and anti-bearing capacity; Expansion section is suitable in the good soil layer of soil property, improves uplift resistance and anti-bearing capacity further.
Accompanying drawing explanation
Fig. 1 is structural representation provided by the invention;
Fig. 2 is another kind of structural representation provided by the invention;
Fig. 3 is another kind of structural representation provided by the invention
Fig. 4 is the schematic cross-section of Fig. 2.
In figure: pile body 10, pile body 11, reinforcing cage 20, expansion section 30, pile body protuberance 31.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention will be further described in detail.
As shown in Figure 1, the invention provides a kind of Triangular Flos Mume shape drilled pile, comprise pile body 10, described pile body 10 forms by the pile body 11 of three distributions triangular in shape is bonded to each other.It should be noted that, pile body 11 is fitted bonded to each other by pile lining or pile body, and be not fitted by the end of pile body 11, three pile bodies 11 rear formation petal-shaped structure bonded to each other, especially as Triangular Flos Mume shape.In order to improve bending resistance degree and the structural strength of pile body 11, reinforcing cage 20 is also provided with in pile body 11, the shape of reinforcing cage 20 cross section is identical with the shape of pile body 10 cross section, and the size of reinforcing cage 20 cross section is less than the size of pile body 10 cross section thus makes reinforcing cage 20 can be placed in pile body 10, reinforcing cage is made up of longitudinal reinforcement 21 and steel hoop 22, wherein longitudinal reinforcement 21 is parallel to each other and is erected in pile body 10, and steel hoop 22 is fixedly connected with longitudinal reinforcement 21 thus forms the reinforcing cage 20 of cage.
In the present embodiment, can be understood as: when pile body 11 is not overlapping, the cross section of every pile body 11 is circular.Again shown in composition graphs 2 and Fig. 4, wherein every pile body 11 overlaps with other two pile bodies 11, and the center of circle distribution triangular in shape of the cross section of three pile bodies 11.The cross sectional area of every pile body 11 is identical or not identical.Wherein a pile body 11 is equal or unequal with the cross sectional area of other two pile body 11 laps.
As shown in Figure 3, pile body 10 is provided with the expansion section 30 that at least one protrudes pile body 10 outer wall.Expansion section 30 is interconnected by the pile body protuberance 31 that three protrude each pile body 11 outer wall respectively and forms, and the external surface of pile body protuberance 31 is circular arc, and specifically, pile body protuberance 31 is outstanding along pile body 11 radial direction, and the line of ledge is circular arc.Preferably, there is two or more expansion section 30 and along the axially-aligned of pile body 10, more preferably, when expansion section 30 is multiple, the spacing between every two expansion sections 30 is identical.
Present invention also offers a kind of manufacturing process of Triangular Flos Mume shape drilled pile, comprise the following steps: A, borehole, dig out the cylindrical hole of 3 distributions triangular in shape in the earth formation, and three cylindrical hole formation stake holes bonded to each other;
B, grouting, pour into for shaping cement paste or mortar in stake holes, and make the top of cement paste or mortar and stake holes have space;
C, in stake holes, put into reinforcing cage, continue to pour into cement paste or mortar, after coagulation forming, be drilled pile.
Preferred version, in step, casing is squeezed in advance in soil layer, casing submergence depth is through covering layer, borehole adopts three axle rigs, by three of rig auger spindles by rounded projections arranged, three auger spindles form three cylindrical holes of Triangle-Profile from ground toward underground drilling simultaneously, and the drill bit that described auger spindle is installed is the adjustable reaming bit of the radius of gyration; In stepb, the height pouring into cement paste or mortar is the 1/3-2/3 of the stake holes degree of depth, and in filling process, casing rises along with the height of cement paste or mortar and progressively upwards promotes; In step C, the shape of reinforcing cage but size identical with the shape of stake holes is less than the size of stake holes.
Specifically; in borehole step; the casing conformed to drilled pile profile is first squeezed into severely-weathered layer as guide pile by survey crew; the size of this casing should be more than or equal to the size of drilled pile; the key of boring success or failure prevents hole wall collapse; when holing darker; hole wall soil below groundwater table can cave in, even quicksand phenomenon occur under hydrostatic pressure in hole; casing plays the effect preventing hole wall collapse, isolates the effects such as surface water, protection ground, aperture, spud pile hole site and drill bit guiding in addition simultaneously.The material making casing has wood, steel, steel concrete three kinds.Casing requires sturdy and durable, water-tight, and its internal diameter should be larger than bore diameter.
Boring adopts normal circulation slewing drilling machine to enter construction technology, suitably earth is thrown less at clay layer, pulping is voluntarily crept into by auger spindle, concentration of hydraulic mixture Gu Bi is then strengthened at sandy soils, three auger spindle rate of penetrations adapt with mud discharge rate all the time, when meeting scall, suitably increase specific gravity of mud and denseness, alleviate as far as possible and rush the impact of liquid on hole wall, reduction rotating speed and the pressure of the drill are to meet quality control on construction requirement simultaneously.
Reinforcing cage needs prefabricated in advance, in borehole process, as run into the good geological stratification of soil property, reaming bit should expand the radius of gyration thus form the hollow part protruding pile body, when making grouting, cement paste can be circulated in hollow part and form expansion section 30, improves uplift resistance and the bearing capacity of pile body 10.Easy construction simultaneously, substantially increases the speed of stake processed.
Specific embodiment described herein is only to the explanation for example of the present invention's spirit.Those skilled in the art can make various amendment or supplement or adopt similar mode to substitute to described specific embodiment, but can't depart from spirit of the present invention or surmount the scope that appended claims defines.
Although more employ the terms such as pile body 10, pile body 11, reinforcing cage 20, expansion section 30, pile body protuberance 31 herein, do not get rid of the possibility using other term.These terms are used to be only used to describe and explain essence of the present invention more easily; The restriction that they are construed to any one additional is all contrary with spirit of the present invention.
Claims (10)
1. a Triangular Flos Mume shape drilled pile, comprises pile body (10), it is characterized in that, described pile body (10) forms by the pile body (11) of three distributions triangular in shape is bonded to each other.
2. Triangular Flos Mume shape drilled pile according to claim 1, it is characterized in that, the cross section of described pile body (11) is circular, wherein every pile body (11) overlaps with other two pile bodies (11), and the center of circle distribution triangular in shape of the cross section of three pile bodies (11).
3. Triangular Flos Mume shape drilled pile according to claim 1 and 2, is characterized in that, the cross sectional area of every pile body (11) is identical or not identical.
4. Triangular Flos Mume shape drilled pile according to claim 2, is characterized in that, wherein a pile body (11) is equal or unequal with the cross sectional area of other two pile body (11) laps.
5. Triangular Flos Mume shape drilled pile according to claim 1 and 2, it is characterized in that, reinforcing cage (20) is also provided with in described pile body (11), the shape of described reinforcing cage (20) cross section is identical with the shape of pile body (10) cross section, and the size of reinforcing cage (20) cross section is less than the size of pile body (10) cross section thus makes reinforcing cage (20) can be placed in pile body (10).
6. Triangular Flos Mume shape drilled pile according to claim 1 and 2, is characterized in that, described pile body (10) is provided with the expansion section (30) that at least one protrudes pile body (10) outer wall.
7. Triangular Flos Mume shape drilled pile according to claim 6, is characterized in that, described expansion section (30) is interconnected by the pile body protuberance (31) that three protrude each pile body (11) outer wall respectively and forms.
8. Triangular Flos Mume shape drilled pile according to claim 6, is characterized in that, described expansion section (30) is along the axially-aligned of pile body (10).
9. a manufacturing process for Triangular Flos Mume shape drilled pile, is characterized in that, comprises the following steps:
A, borehole, dig out the cylindrical hole of 3 distributions triangular in shape in the earth formation, and three cylindrical hole formation stake holes bonded to each other;
B, grouting, pour into for shaping cement paste or mortar in stake holes, and make the top of cement paste or mortar and stake holes have space;
C, in stake holes, put into reinforcing cage, continue to pour into cement paste or mortar, after coagulation forming, be drilled pile.
10. the manufacturing process of Triangular Flos Mume shape drilled pile according to claim 9, is characterized in that,
In step, casing is squeezed in advance in soil layer, casing submergence depth is through covering layer, borehole adopts three axle rigs, by three of rig auger spindles by rounded projections arranged, three auger spindles form three cylindrical holes of Triangle-Profile from ground toward underground drilling simultaneously, and the drill bit that described auger spindle is installed is the adjustable reaming bit of the radius of gyration; In stepb, the height pouring into cement paste or mortar is the 1/3-2/3 of the stake holes degree of depth, and in filling process, casing rises along with the height of cement paste or mortar and progressively upwards promotes; In step C, the shape of reinforcing cage but size identical with the shape of stake holes is less than the size of stake holes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510206709.1A CN104863125A (en) | 2014-04-29 | 2015-04-27 | Bougainvillea spectabilis willd-shaped drilling pile and shaping method thereof |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2014101746550 | 2014-04-29 | ||
CN201410174655.0A CN104032730A (en) | 2014-04-29 | 2014-04-29 | Triangular plum-blossom-shaped shaped drilling pile and forming method thereof |
CN201510206709.1A CN104863125A (en) | 2014-04-29 | 2015-04-27 | Bougainvillea spectabilis willd-shaped drilling pile and shaping method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104863125A true CN104863125A (en) | 2015-08-26 |
Family
ID=51463707
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410174655.0A Pending CN104032730A (en) | 2014-04-29 | 2014-04-29 | Triangular plum-blossom-shaped shaped drilling pile and forming method thereof |
CN201520262482.8U Active CN204662422U (en) | 2014-04-29 | 2015-04-27 | The quincunx drilled pile bonded to each other by the pile body of three distributions triangular in shape |
CN201510206709.1A Pending CN104863125A (en) | 2014-04-29 | 2015-04-27 | Bougainvillea spectabilis willd-shaped drilling pile and shaping method thereof |
Family Applications Before (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410174655.0A Pending CN104032730A (en) | 2014-04-29 | 2014-04-29 | Triangular plum-blossom-shaped shaped drilling pile and forming method thereof |
CN201520262482.8U Active CN204662422U (en) | 2014-04-29 | 2015-04-27 | The quincunx drilled pile bonded to each other by the pile body of three distributions triangular in shape |
Country Status (1)
Country | Link |
---|---|
CN (3) | CN104032730A (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104032730A (en) * | 2014-04-29 | 2014-09-10 | 周兆弟 | Triangular plum-blossom-shaped shaped drilling pile and forming method thereof |
CN106337429A (en) * | 2016-08-30 | 2017-01-18 | 中国建筑西南勘察设计研究院有限公司 | Engaged type pouring groove wall pile foundation |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1126264A (en) * | 1994-12-26 | 1996-07-10 | 石寅生 | Making method for non-annular borehole cast-in-place pile |
CN1208102A (en) * | 1998-07-31 | 1999-02-17 | 叶长生 | Deposited pile and its construction |
JP2004270440A (en) * | 2003-02-17 | 2004-09-30 | Mitani Sekisan Co Ltd | Construction method for foundation pile, and prefabricated pile |
CN1632233A (en) * | 2004-12-23 | 2005-06-29 | 东南大学 | Pile forming operation method for bi-directional stirring piles |
CN101608448A (en) * | 2009-07-28 | 2009-12-23 | 武汉高铁桩工科技有限公司 | Cement paste spraying multi-directional core entraining agitation pile piling method |
CN204662422U (en) * | 2014-04-29 | 2015-09-23 | 周兆弟 | The quincunx drilled pile bonded to each other by the pile body of three distributions triangular in shape |
-
2014
- 2014-04-29 CN CN201410174655.0A patent/CN104032730A/en active Pending
-
2015
- 2015-04-27 CN CN201520262482.8U patent/CN204662422U/en active Active
- 2015-04-27 CN CN201510206709.1A patent/CN104863125A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1126264A (en) * | 1994-12-26 | 1996-07-10 | 石寅生 | Making method for non-annular borehole cast-in-place pile |
CN1208102A (en) * | 1998-07-31 | 1999-02-17 | 叶长生 | Deposited pile and its construction |
JP2004270440A (en) * | 2003-02-17 | 2004-09-30 | Mitani Sekisan Co Ltd | Construction method for foundation pile, and prefabricated pile |
CN1632233A (en) * | 2004-12-23 | 2005-06-29 | 东南大学 | Pile forming operation method for bi-directional stirring piles |
CN101608448A (en) * | 2009-07-28 | 2009-12-23 | 武汉高铁桩工科技有限公司 | Cement paste spraying multi-directional core entraining agitation pile piling method |
CN204662422U (en) * | 2014-04-29 | 2015-09-23 | 周兆弟 | The quincunx drilled pile bonded to each other by the pile body of three distributions triangular in shape |
Also Published As
Publication number | Publication date |
---|---|
CN104032730A (en) | 2014-09-10 |
CN204662422U (en) | 2015-09-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204662425U (en) | Polygonal cement mixing method | |
CN104563148B (en) | building pile foundation construction method | |
CN107023002A (en) | Down-the-hole impacts churning composite pile pile making method | |
CN105113498A (en) | Method for constructing high-strength core composite piles | |
CN104389516B (en) | A kind of squeezed drilling pouring pile hole method | |
CN204662426U (en) | Cement mixing method | |
CN103556628B (en) | Spiral conical soil compaction pile construction method | |
CN103015413A (en) | Construction method of composite pile with implanting-in rigid-body embedded into hard bearing stratum | |
CN206784372U (en) | Injection forming club-footed pile | |
CN109183790A (en) | A kind of Screw Pile and its construction tool and construction method | |
CN106677166A (en) | Flow construction method for forming cast-in-place bored pile for gravel-decomposed rock stratum in double-machine combined mode | |
CN104563104B (en) | Pile work drilling machine is with coordinated type breast wall apparatus and use its construction method | |
CN206752454U (en) | One kind perfusion embedded pile | |
CN104863125A (en) | Bougainvillea spectabilis willd-shaped drilling pile and shaping method thereof | |
CN206721875U (en) | A kind of pressure-bearing type boulder and cobble soil layer enlarging anchor rod | |
CN108049804B (en) | Non-excavation in-situ replacement spiral drilling method for unconsolidated formation | |
CN104863123B (en) | Drilling bearing pile and forming method thereof | |
CN110318392A (en) | A kind of major diameter cement earth pile method of construction | |
CN104863127A (en) | Polygonal boring pile and formation method thereof | |
CN108049401A (en) | A kind of screw thread rammed bulb pile and its construction method | |
CN104929110B (en) | The long-spiral drilling machine used in variation rigidity composite pile and its construction method and construction method | |
CN213173700U (en) | Precast pile for soft foundation treatment | |
CN204825912U (en) | Defeated material drilling tool of composite pile dual circuit | |
CN203846488U (en) | Plum-blossom-shaped high-strength bored pile | |
CN203846487U (en) | Triangular-plum-blossom-shaped high-strength bored pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150826 |
|
RJ01 | Rejection of invention patent application after publication |