CN104815852B - 热连轧层流冷却带钢头部不冷却长度的控制方法 - Google Patents

热连轧层流冷却带钢头部不冷却长度的控制方法 Download PDF

Info

Publication number
CN104815852B
CN104815852B CN201510258485.9A CN201510258485A CN104815852B CN 104815852 B CN104815852 B CN 104815852B CN 201510258485 A CN201510258485 A CN 201510258485A CN 104815852 B CN104815852 B CN 104815852B
Authority
CN
China
Prior art keywords
strip steel
length
head
cool down
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510258485.9A
Other languages
English (en)
Other versions
CN104815852A (zh
Inventor
马峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taigang Stainless Steel Co Ltd
Original Assignee
Shanxi Taigang Stainless Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taigang Stainless Steel Co Ltd filed Critical Shanxi Taigang Stainless Steel Co Ltd
Priority to CN201510258485.9A priority Critical patent/CN104815852B/zh
Publication of CN104815852A publication Critical patent/CN104815852A/zh
Application granted granted Critical
Publication of CN104815852B publication Critical patent/CN104815852B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/74Temperature control, e.g. by cooling or heating the rolls or the product
    • B21B37/76Cooling control on the run-out table

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Control Of Metal Rolling (AREA)
  • Heat Treatment Of Strip Materials And Filament Materials (AREA)

Abstract

热连轧层流冷却带钢头部不冷却长度的控制方法,属于冶金工业生产自动控制领域,即在带钢进入精轧机组F7时,脉冲发生器开始动作,二级计算机通过延时计算公式计算出延时时间,带钢进入层流冷却区阀架后,一级计算机根据二级计算机的喷水指令控制阀架喷水阀的开闭操作,实现带钢头部的不冷却控制。本发明充分利用计算机控制技术的先进性和可操作性的特点,在层流冷却控制中使用,节约了投资,改善了头部不冷却长度控制的稳定性,带钢头部的切损率明显降低,避免了因带钢头部温度低造成卷取机堆钢的问题,取得了良好的效益。

Description

热连轧层流冷却带钢头部不冷却长度的控制方法
技术领域
本发明属于冶金工业生产自动控制领域,热连轧带钢层流冷却头部不冷却长度的控制技术。
背景技术
2250生产线层流冷却带钢头部不冷却长度控制不够稳定。当不冷长度较长时,带钢头部性能无法达到机械控制要求,成品切除量大,生产成本高。当不冷长度非常短,甚至头部完全冷却时,极易造成卷取机堆钢,从而影响生产效率,企业经济效益遭受损失。故此,层流冷却头部不冷却长度的控制技术成为我们重点研究的问题。
发明内容
本发明目的是为了使热轧带钢层流冷却头部不冷却长度控制稳定,且控制长度在1~1.5米之间,既保证带钢头部切损量不大,同时又能满足卷取机能够正常卷取,不会出现废钢故障。
热连轧层流冷却带钢头部不冷却长度的控制方法,即在带钢进入精轧机组F7时,脉冲发生器开始动作,二级计算机通过延时计算公式计算出延时时间,带钢进入层流冷却区阀架后,一级计算机根据二级计算机的喷水指令控制阀架喷水阀的开闭操作,实现带钢头部的不冷却控制;
延时计算公式:delaytime =(int)( f_NSPLeng*1000) % (int)( f_SectionLeng*1000) /1000/f_Speed+ delaytimecrr ;
其中:delaytime为延时时间(单位是秒);f_NSPLeng为头部不冷长度设定值(单位是米);f_SectionLeng为跟踪段的长度,薄规格带钢为4.56米,厚规格带钢为2.28米;f_Speed为带钢实际速度(单位:米/秒);delaytimecrr为延时时间修正值(单位:秒);
头部不冷却长度设定值为1~1.5米;延时时间修正值为0.2~0.5。
本发明解决了热轧带钢层流冷却头部不冷长度控制不稳定的问题。
太钢热连轧厂层流冷却使用该发明,效果如下:
(1)带钢头部不冷长度控制更加稳定。
(2)避免了卷取机堆钢的废钢事故。
(3)带钢头部切损率明显下降,取得的直接经济效益每年200万元左右。
具体实施方式
下表为部分钢种的头部不冷长度设定值f_NSPLeng(m)和延时修正给定值delaytimeccr (s):
(1)由二级计算机完成头部不冷长度的设定计算及下送工作。
如表1所示,头部不冷却长度通过转化成延时时间得以实现,延时时间的计算过程如下:
delaytime =((int)( f_NSPLeng*1000)) % ((int)( f_SectionLeng *1000)) /1000/f_Speed+ delaytimecrr (公式1)
delaytime为延时时间,f_NSPLeng为头部不冷长度设定值,f_SectionLeng为跟踪段的长度,薄规格带钢为4.56米,厚规格带钢为2.28米, f_Speed为带钢实际速度,delaytimecrr为延时时间修正值。
由于在精轧机组中,带钢易产生抖动、受阻、温度等异常波动,从而使带钢的实际速度存在波动,而钢种规格不同产生的速度波动情况也不同,速度波动直接对delaytime造成影响,故使用delaytimecrr 对delaytime进行修正。delaytimecrr 延时修正值如表中所示。
在程序当中,若delaytime > 0,执行Time::Wait(delaytime)的延时下送工作。
(2)二级计算机执行延时后,一级计算机根据接到的指令指挥现场阀的打开操作,从而保证带钢头部的不冷却控制。

Claims (1)

1.热连轧层流冷却带钢头部不冷却长度的控制方法,即在带钢进入精轧机组F7时,脉冲发生器开始动作,二级计算机通过延时计算公式计算出延时时间,带钢进入层流冷却区阀架后,一级计算机根据二级计算机的喷水指令控制阀架喷水阀的开闭操作,实现带钢头部的不冷却控制;
延时计算公式:delaytime =((int)( f_NSPLeng*1000)) % ((int)( f_SectionLeng*1000)) /1000/f_Speed+ delaytimecrr ;
其中:delaytime为延时时间, 单位是秒;f_NSPLeng为头部不冷长度设定值,单位是米;f_SectionLeng为跟踪段的长度,单位是米;薄规格带钢跟踪段的长度为4.56米,厚规格带钢跟踪段的长度为2.28米;f_Speed为带钢实际速度,单位是米/秒;delaytimecrr为延时时间修正值,单位是米;
头部不冷却长度设定值为1~1.5米;延时时间修正值为0.2~0.5米。
CN201510258485.9A 2015-05-20 2015-05-20 热连轧层流冷却带钢头部不冷却长度的控制方法 Active CN104815852B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510258485.9A CN104815852B (zh) 2015-05-20 2015-05-20 热连轧层流冷却带钢头部不冷却长度的控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510258485.9A CN104815852B (zh) 2015-05-20 2015-05-20 热连轧层流冷却带钢头部不冷却长度的控制方法

Publications (2)

Publication Number Publication Date
CN104815852A CN104815852A (zh) 2015-08-05
CN104815852B true CN104815852B (zh) 2016-08-24

Family

ID=53726466

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510258485.9A Active CN104815852B (zh) 2015-05-20 2015-05-20 热连轧层流冷却带钢头部不冷却长度的控制方法

Country Status (1)

Country Link
CN (1) CN104815852B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106391727A (zh) * 2016-06-28 2017-02-15 东北大学 一种热轧带钢超快冷区域头部不冷控制方法
CN111530936B (zh) * 2020-03-31 2021-02-19 燕山大学 一种基于d数理论的分段冷却控制方法及***
CN112756404B (zh) * 2020-11-23 2022-04-01 阳春新钢铁有限责任公司 一种高线线材生产头部不冷段精准量化自动控制***及控制方法
CN114618894B (zh) * 2022-03-23 2023-07-21 马鞍山钢铁股份有限公司 一种薄规格带钢卷取防飞飘堆钢的层冷控制方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1500573A (zh) * 2002-11-13 2004-06-02 鞍钢集团新钢铁有限责任公司 热轧带钢中间坯层流冷却方法
CN101502849A (zh) * 2009-03-19 2009-08-12 东北大学 中厚板层流冷却链式边部遮蔽装置控制方法
CN101745551A (zh) * 2008-12-11 2010-06-23 宝山钢铁股份有限公司 一种热轧带钢自由冷却方法
CN102380514A (zh) * 2011-11-13 2012-03-21 首钢总公司 一种提高热轧钢板控制冷却温度均匀性的方法
JP5181137B2 (ja) * 2011-07-21 2013-04-10 新日鐵住金株式会社 冷却装置、熱延鋼板の製造装置、及び熱延鋼板の製造方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6698266B2 (en) * 2001-03-20 2004-03-02 General Electric Company System and method for optimizing mill cuts

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1500573A (zh) * 2002-11-13 2004-06-02 鞍钢集团新钢铁有限责任公司 热轧带钢中间坯层流冷却方法
CN101745551A (zh) * 2008-12-11 2010-06-23 宝山钢铁股份有限公司 一种热轧带钢自由冷却方法
CN101502849A (zh) * 2009-03-19 2009-08-12 东北大学 中厚板层流冷却链式边部遮蔽装置控制方法
JP5181137B2 (ja) * 2011-07-21 2013-04-10 新日鐵住金株式会社 冷却装置、熱延鋼板の製造装置、及び熱延鋼板の製造方法
CN102380514A (zh) * 2011-11-13 2012-03-21 首钢总公司 一种提高热轧钢板控制冷却温度均匀性的方法

Also Published As

Publication number Publication date
CN104815852A (zh) 2015-08-05

Similar Documents

Publication Publication Date Title
CN104815852B (zh) 热连轧层流冷却带钢头部不冷却长度的控制方法
CN103240278B (zh) 变系数活套控制方法
CN103484643B (zh) 一种防止取向硅钢热轧边裂的方法
CN103272856B (zh) 热连轧不锈钢带钢尾部活套控制方法
CN104624665B (zh) 控制热连轧带钢粗轧翘头的方法
CN103252347A (zh) 减少热轧中间坯头尾切舍量的连铸板坯头尾形状预控方法
CN103605390B (zh) 一种热连轧线超快速冷却***的供水控制方法
CN103157658A (zh) 一种在常规热连轧生产线上轧制不锈钢卷的工艺
CN102430591A (zh) 一种低温厚规格特殊钢活套控制方法
CN104209343A (zh) 热连轧精轧机架补偿速降的控制方法
CN204109087U (zh) 一种线棒材辊环的冷却装置
CN103990649A (zh) 一种灭火器用冷轧钢带生产方法
CN105478696A (zh) 一种冷镦钢小方坯连铸矫直裂纹的控制方法
CN104792079B (zh) 一种蒸汽型溴化锂吸收式冷水机组的温度闭环控制方法
CN103056171A (zh) 一种粗轧立辊短行程二次曲线控制方法
CN102935547A (zh) 一种去除板坯毛刺的***
CN103223423A (zh) 一种走停式大侧压定宽机的控制方法
CN104475460A (zh) 一种控制高磁感取向硅钢常化后冷轧边裂的方法
CN105598169B (zh) 一种2250mm轧机飞剪切尾带钢实际速度的控制方法
CN100515593C (zh) 普通四辊热带钢连轧机带钢边部增厚综合控制方法
CN102755999A (zh) 热轧h型钢的机架间冷却装置
CN104209344B (zh) 热连轧特殊钢动态自适应压下控制方法
CN106345805B (zh) 一种φ12mm钢筋的三切分轧制方法
CN203484416U (zh) 一种可机动配置的棒材控轧控冷工艺装置
CN105132855A (zh) 一种热轧螺纹钢轧后穿水控冷工艺生产在线表面防锈的新工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant