CN104801969B - Shrouding mounting work station after the cylinder of heating furnace production line - Google Patents

Shrouding mounting work station after the cylinder of heating furnace production line Download PDF

Info

Publication number
CN104801969B
CN104801969B CN201510187220.4A CN201510187220A CN104801969B CN 104801969 B CN104801969 B CN 104801969B CN 201510187220 A CN201510187220 A CN 201510187220A CN 104801969 B CN104801969 B CN 104801969B
Authority
CN
China
Prior art keywords
shrouding
cylinder
production line
work station
heating furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510187220.4A
Other languages
Chinese (zh)
Other versions
CN104801969A (en
Inventor
王玉庆
段明涛
苏海亭
孙丹
王海峰
闫继超
李文军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Junma Petroleum Equipment Manufacturing Co Ltd
Original Assignee
Junma Petroleum Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Junma Petroleum Equipment Manufacturing Co Ltd filed Critical Junma Petroleum Equipment Manufacturing Co Ltd
Priority to CN201510187220.4A priority Critical patent/CN104801969B/en
Publication of CN104801969A publication Critical patent/CN104801969A/en
Application granted granted Critical
Publication of CN104801969B publication Critical patent/CN104801969B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P21/00Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Automatic Assembly (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The present invention proposes shrouding mounting work station after the cylinder of heating furnace production line, and structure includes:Storage rack, for shrouding after placement;After seal panel assembly apparatus, including:Installed in the base track of mill floor, the base track is provided with the dolly being adapted, and the dolly is provided with material-taking rack;The material-taking rack liftable, pivotal it is installed on dolly;The material-taking rack front end be provided with can before and after upset trip shaft, the trip shaft provided with rear shrouding magnechuck and cylinder school circle deck;Control device, for controlling this work station storage rack, the coordination of rear envelope each structure division of panel assembly apparatus, information to exchange.It belongs to a part of steam injection unit production line, causes storage rack, each structure division of rear envelope panel assembly apparatus to carry out coordination by control device, after the completion of shrouding assemble.

Description

Shrouding mounting work station after the cylinder of heating furnace production line
Technical field
The present invention relates to oil equipment technical field, shrouding assembler after the cylinder in steam injection unit production line is specifically referred to Stand.
Background technology
Steam injection machine set product is main by radiation root module, transition root module, convection section module, skid module four module structure Into outfit burner, plunger pump, air compressor, control system four are equipped greatly.
Steam injection unit production line realizes that logistics delivery, group, to assembling, the automation of welding, form the production flowing water of modernization Line.Meanwhile, the construction of production line is using the stream of people, logistics, information flow as starting point, and technique by being reasonably laid out, ripe, stream Smooth beat realizes the construction object of production line.In addition, production line itself should meet the requirement of environment and safety.
In the traditional forms of enterprises, one steam injection unit of production needs some months, it is difficult to meet market needs.If shortening production Time, then large-scale automatic production line is needed, each load module is required for corresponding design and supporting.
The content of the invention
Shrouding mounting work station after the cylinder of heating furnace production line proposed by the present invention, belongs to steam injection unit fully-automatic production Heating furnace production line in line, it is used to realize that shrouding to be assembled after the cylinder of heating furnace production line in the production of steam injection unit.
The technical proposal of the invention is realized in this way:
Shrouding mounting work station after the cylinder of heating furnace production line, its structure includes:
Storage rack, for shrouding after placement;
After seal panel assembly apparatus, including:
Installed in the base track of mill floor, the base track is provided with the dolly being adapted, the dolly and set There is material-taking rack;
The material-taking rack liftable, pivotal it is installed on dolly;
The material-taking rack front end be provided with can before and after upset trip shaft, the trip shaft be provided with rear shrouding magnechuck Justify deck with cylinder school;
Control device, for controlling this work station storage rack, the coordination of rear each structure division of envelope panel assembly apparatus, letter Breath is exchanged.
In above-mentioned technical proposal, the dolly is driven by variable-frequency motor, can be walked and is installed on base track, the speed of travel Variable ratio frequency changer is adjusted.
In above-mentioned technical proposal, the lifting of the material-taking rack is driven by variable-frequency motor, and line slideway is oriented to, trapezoidal silk Thick stick is driven.
In above-mentioned technical proposal, the dolly is provided with column;The material-taking rack provides rotary motive power by alternating current generator, can Pivotally it is arranged on column.
In above-mentioned technical proposal, the trip shaft is electric turnover axle, and it drives rear the shrouding magnechuck and cylinder Overturn before and after the circle deck of school, for shrouding after adjustment and the relative angle of cylinder.
In above-mentioned technical proposal, the school circle deck is justified for cylinder school, is oriented to, is driven by alternating current generator by line slideway It is dynamic.
In above-mentioned technical proposal, the rear shrouding magnechuck is for shrouding after the absorption from the storage rack and transports.
In above-mentioned technical proposal, the storage rack is liftable storage rack, and its lifting travel is 600 millimeters, lifts load For 2 tons.
In above-mentioned technical proposal, its running stroke of the dolly of the rear envelope panel assembly apparatus is 1500 millimeters, the feeding Frame lifting travel is 2000 millimeters, and the load-carrying of the rear shrouding magnechuck is 1 ton.
In above-mentioned technical proposal, the control device includes PLC central control units, for completing this work station storing Coordination, information between frame, rear envelope each structure division of panel assembly apparatus are exchanged;And provided with master operating station, for carrying out work Make station Stateful Inspection;I/O communication interfaces are additionally provided with, chain control is completed by switching value I/O communication interfaces and other systems.
Specifically, the control device can be using programmable controller PLC as main frame, if PLC control cabinet, using master Operating desk completes station and controlled in real time.
In above-mentioned technical proposal, field operation box, and hand-held box are also provided with, to facilitate operating personnel to this The rigging position of shrouding assembly manipulation machine is finely adjusted afterwards.
In summary, shrouding mounting work station is a part of steam injection unit production line after cylinder of the invention, Cause storage rack, each structure division of rear envelope panel assembly apparatus to carry out coordination by control device, after the completion of shrouding assemble.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also To obtain other accompanying drawings according to these accompanying drawings.
Fig. 1 for heating furnace production line of the present invention cylinder after shrouding mounting work station structural representation;
In figure:Shrouding after 1-;2- dollies;3- columns;4- material-taking racks;5- trip shafts;6- magnechucks;7- cylinders.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Shrouding mounting work station after the cylinder of heating furnace production line as shown in Figure 1, its structure includes:
Storage rack, for shrouding after placement 1;
After seal panel assembly apparatus, including:
Installed in the base track of mill floor, the base track is provided with the dolly 2 being adapted, the dolly 2 Provided with material-taking rack 4;
The liftable of material-taking rack 4, pivotal it is installed on dolly 2;
The front end of material-taking rack 4 be provided with can before and after upset trip shaft 5, the trip shaft 5 be provided with rear shrouding electromagnetism Sucker 6 and cylinder school circle deck;
Control device, for controlling this work station storage rack, the coordination of rear each structure division of envelope panel assembly apparatus, letter Breath is exchanged.
In above-mentioned technical proposal, the dolly 2 is driven by variable-frequency motor, can be walked on base track, the speed of travel Variable ratio frequency changer is adjusted.
In above-mentioned technical proposal, the lifting of the material-taking rack 4 is driven by variable-frequency motor, and line slideway is oriented to, trapezoidal Leading screw is driven.
In above-mentioned technical proposal, the dolly 2 is provided with column 3;The material-taking rack 4 provides back rotation by alternating current generator Power, is pivotally arranged on column 3.
In above-mentioned technical proposal, the trip shaft 5 is electric turnover axle, and it drives rear the shrouding magnechuck 6 and cylinder Overturn before and after sports school's circle deck, for shrouding after adjustment 1 and the relative angle of cylinder 7.
In above-mentioned technical proposal, the school that the school circle deck is used for cylinder 7 is justified, and is oriented to by line slideway, by alternating current generator Driving.
In above-mentioned technical proposal, the rear shrouding magnechuck 6 is for shrouding 1 after the absorption from the storage rack and turns Fortune.
In above-mentioned technical proposal, the storage rack is liftable storage rack, and its lifting travel is 600 millimeters, lifts load For 2 tons.
In above-mentioned technical proposal, its running stroke of the dolly 2 of the rear envelope panel assembly apparatus is 1500 millimeters, the feeding The lifting travel of frame 4 is 2000 millimeters, and the load-carrying of the rear shrouding magnechuck 6 is 1 ton.
In above-mentioned technical proposal, the control device includes PLC central control units, for completing this work station storing Coordination, information between frame, rear envelope each structure division of panel assembly apparatus are exchanged;And provided with master operating station, for carrying out work Make station Stateful Inspection;I/O communication interfaces are additionally provided with, chain control is completed by switching value I/O communication interfaces and other systems.
Specifically, the control device can be using programmable controller PLC as main frame, if PLC control cabinet, using master Operating desk completes station and controlled in real time.It will be understood by those skilled in the art that the master operating station includes selection mode switch, referred to Make button, indicator lamp.Indicator lamp is used to show work station running state information, and selecting switch, order button are used to set work The VS .NET Prerequisites functions such as mode, direction movement, startup, pause, jerk, fault clearance.
In above-mentioned technical proposal, field operation box, and hand-held box are also provided with, to facilitate operating personnel to this The rigging position of shrouding assembly manipulation machine is finely adjusted afterwards.
That is, in the technical program, the control mode of the rear envelope panel assembly apparatus includes control, field operation box control in PLC System and three kinds of modes of hand-held box.
In summary, shrouding mounting work station is a part of steam injection unit production line after cylinder of the invention, Cause storage rack, each structure division of rear envelope panel assembly apparatus to carry out coordination by control device, after the completion of shrouding assemble.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention God is with principle, and any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.

Claims (9)

1. shrouding mounting work station after the cylinder of heating furnace production line, it is characterised in that structure includes:
Storage rack, the storage rack is liftable storage rack, for shrouding after placement;
After seal panel assembly apparatus, including:
Installed in the base track of mill floor, the base track is provided with the dolly being adapted, and the dolly is provided with and taken Bin;
The material-taking rack liftable, pivotal it is installed on dolly;
The material-taking rack front end be provided with can before and after upset trip shaft, the trip shaft be provided with rear shrouding magnechuck and cylinder Sports school justifies deck;
Control device, including PLC central control units, for completing between this work station storage rack, material-taking rack, vehicle structure Coordination, information are exchanged;
And provided with master operating station, for being operated station Stateful Inspection;
I/O communication interfaces are additionally provided with, chain control is completed by switching value I/O communication interfaces and other systems.
2. shrouding mounting work station after the cylinder of heating furnace production line according to claim 1, it is characterised in that:
The dolly is driven by variable-frequency motor, can be walked and is installed on base track, the adjustment of speed of travel variable ratio frequency changer.
3. shrouding mounting work station after the cylinder of heating furnace production line according to claim 2, it is characterised in that:
The lifting of the material-taking rack is driven by variable-frequency motor, and line slideway is oriented to, and trapezoidal screw is driven.
4. shrouding mounting work station after the cylinder of heating furnace production line according to claim 3, it is characterised in that:
The dolly is provided with column;
The material-taking rack provides rotary motive power by alternating current generator, is pivotally arranged on column.
5. shrouding mounting work station after the cylinder of heating furnace production line according to claim 4, it is characterised in that:
The trip shaft is electric turnover axle, and it overturns before and after driving the rear shrouding magnechuck and cylinder school circle deck, uses In shrouding after adjustment and the relative angle of cylinder.
6. shrouding mounting work station after the cylinder of heating furnace production line according to claim 5, it is characterised in that:
The school circle deck is justified for cylinder school, is oriented to, is driven by alternating current generator by line slideway.
7. shrouding mounting work station after the cylinder of heating furnace production line according to claim 6, it is characterised in that:
The rear shrouding magnechuck is for shrouding after the absorption from the storage rack and transports.
8. shrouding mounting work station after the cylinder of heating furnace production line according to claim 7, it is characterised in that:
The control device, as main frame, if PLC control cabinet, station is completed using master operating station using programmable controller PLC Control in real time.
9. shrouding mounting work station after the cylinder of heating furnace production line according to claim 8, it is characterised in that:
Field operation box, and hand-held box are additionally provided with, to facilitate assembling of the operating personnel to the rear shrouding assembly manipulation machine Position is finely adjusted.
CN201510187220.4A 2015-04-20 2015-04-20 Shrouding mounting work station after the cylinder of heating furnace production line Expired - Fee Related CN104801969B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510187220.4A CN104801969B (en) 2015-04-20 2015-04-20 Shrouding mounting work station after the cylinder of heating furnace production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510187220.4A CN104801969B (en) 2015-04-20 2015-04-20 Shrouding mounting work station after the cylinder of heating furnace production line

Publications (2)

Publication Number Publication Date
CN104801969A CN104801969A (en) 2015-07-29
CN104801969B true CN104801969B (en) 2017-07-28

Family

ID=53687383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510187220.4A Expired - Fee Related CN104801969B (en) 2015-04-20 2015-04-20 Shrouding mounting work station after the cylinder of heating furnace production line

Country Status (1)

Country Link
CN (1) CN104801969B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201677954U (en) * 2010-04-30 2010-12-22 中国第一汽车集团公司 Split charging and assembling device for windshields
CN202170126U (en) * 2011-07-11 2012-03-21 安徽省思维新型建材有限公司 Lifting rotary proportioning feeding car

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60145287A (en) * 1984-01-09 1985-07-31 Mitsubishi Heavy Ind Ltd Automatic welding device for pipe material and tubular parts
CN101954560B (en) * 2010-10-28 2013-07-31 新疆威奥科技股份有限公司 Shell ring horizontal assembly device and using method thereof
CN102513824B (en) * 2011-12-26 2014-02-19 浙江中柴机器有限公司 Forklift transmission assembling line
CN103143878B (en) * 2013-03-26 2015-01-21 宝鸡石油钢管有限责任公司 Five-freedom adjustable pipeline butt joint tooling
CN203371254U (en) * 2013-07-10 2014-01-01 佛山市广顺电器有限公司 Automatic oilless air compressor cylinder cover and valve plate assembling mechanism
CN205111252U (en) * 2015-04-20 2016-03-30 骏马石油装备制造有限公司 Shrouding fitting work station behind barrel of heating furnace production line

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201677954U (en) * 2010-04-30 2010-12-22 中国第一汽车集团公司 Split charging and assembling device for windshields
CN202170126U (en) * 2011-07-11 2012-03-21 安徽省思维新型建材有限公司 Lifting rotary proportioning feeding car

Also Published As

Publication number Publication date
CN104801969A (en) 2015-07-29

Similar Documents

Publication Publication Date Title
CN201923824U (en) All-electric pallet truck
CN205220756U (en) Building machine was climbed to thing in electronic year
CN110282578A (en) Spacecraft large size bay section general assembly Liftable type multi-purpose stand vehicle
CN104876089B (en) Zhi Qu elevators steering mechanism
CN206456897U (en) Body of a motor car detent mechanism jacking apparatus
CN104801969B (en) Shrouding mounting work station after the cylinder of heating furnace production line
CN208103850U (en) A kind of full-automatic double drive V shape carriers
CN207861338U (en) A kind of Alley Oop lifting transmission device
CN101837198A (en) Robot control system for shadow puppet performance
CN208916206U (en) Double layer rotating platform bracket institution
CN207290081U (en) A kind of network new A BB robot controllers
CN203359434U (en) Hoisting mechanism of automatic guided vehicle
CN203654809U (en) Modularized lifting stage
CN205111252U (en) Shrouding fitting work station behind barrel of heating furnace production line
CN204036589U (en) A kind of assembling machine manufacturing pallet
CN103286786B (en) A kind of intelligence of the Liftable type based on Automatic Track Finding food and drink equipment
CN206470982U (en) A kind of Signal Simulation tutoring system
CN204624562U (en) Flexible assembly wire system
CN106743253A (en) A kind of body of a motor car detent mechanism jacking apparatus
CN203076567U (en) Trolley for pouring
CN107354318A (en) A kind of Full automatic unmanned tuyere puncher
CN206973661U (en) A kind of smoke deflector elevating mechanism of range hood
CN107289479A (en) A kind of smoke deflector elevating mechanism of range hood
CN209682923U (en) Multi-functional 3D printer
CN207242760U (en) One kind automation double track wire body production module

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170728

CF01 Termination of patent right due to non-payment of annual fee