CN206470982U - A kind of Signal Simulation tutoring system - Google Patents
A kind of Signal Simulation tutoring system Download PDFInfo
- Publication number
- CN206470982U CN206470982U CN201621421325.8U CN201621421325U CN206470982U CN 206470982 U CN206470982 U CN 206470982U CN 201621421325 U CN201621421325 U CN 201621421325U CN 206470982 U CN206470982 U CN 206470982U
- Authority
- CN
- China
- Prior art keywords
- model
- simulation
- signal
- goat
- locomotive
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004088 simulation Methods 0.000 title claims abstract description 74
- 241000283707 Capra Species 0.000 claims abstract description 41
- 230000003137 locomotive effect Effects 0.000 claims abstract description 38
- 239000004576 sand Substances 0.000 claims abstract description 31
- 238000002955 isolation Methods 0.000 claims abstract description 16
- 238000001514 detection method Methods 0.000 claims description 11
- 230000008878 coupling Effects 0.000 claims description 9
- 238000010168 coupling process Methods 0.000 claims description 9
- 238000005859 coupling reaction Methods 0.000 claims description 9
- 230000009466 transformation Effects 0.000 claims description 8
- 238000004891 communication Methods 0.000 claims description 3
- 230000001133 acceleration Effects 0.000 claims 1
- 238000006243 chemical reaction Methods 0.000 claims 1
- 230000015556 catabolic process Effects 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000005611 electricity Effects 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000013024 troubleshooting Methods 0.000 description 1
Landscapes
- Train Traffic Observation, Control, And Security (AREA)
Abstract
The utility model belongs to simulated teaching technical field, discloses a kind of Signal Simulation tutoring system, including:Simulation sand table, Simulation Control module and simulation run controller;Railway model and the goat model, goat model, semaphore model and the model locomotive that are associated are set on the simulation sand table;The Simulation Control module includes:Signal machine controller, is connected with the semaphore model;Track switch controller, is connected with the goat model;Locomotive centralized remote control device, is connected with the locomotive;Isolate change-over circuit, the isolation change-over circuit is arranged between the signal machine controller and the track switch controller and the simulation run controller;The simulation run controller sets the port being connected with railway signal control center.The utility model provides a kind of simulation teaching system for being capable of full simulation railway signal system.
Description
Technical field
The utility model is related to simulated teaching technical field, more particularly to a kind of Signal Simulation tutoring system.
Background technology
Railway signal system is to rely on the important tool that railway carries out production and living, is directly connected to the efficiency of production and living
And safety.The Specialized Quality of corresponding its maintenance and operation personnel is also particularly important.Need by strict training ability
Ensure whole operation, the efficiently and accurately of troubleshooting process is carried out.
It is often necessary to specially set up huge experience system, the oversized equipments such as whole signal system system and locomotive are reduced
Combination, for giveing training;It is costly.Or, learnt by simulation softward, but this is theoretic to know after all
Know, teaching result is simultaneously imperfect.Also or, set up sand table and carry out simulating station row shunting service, but demonstration can only be played and make
With, it is impossible to compared with actual operation, still lack practice operation.
Utility model content
The utility model provides a kind of Signal Simulation tutoring system, solves railway signal system personnel in the prior art
Training lacks practice operation, the incomplete technical problem of result of training.
In order to solve the above technical problems, the utility model provides a kind of Signal Simulation tutoring system, including:Emulation
Sand table, Simulation Control module and simulation run controller;
Railway model and the goat model, semaphore model and the locomotive that are associated are set on the simulation sand table
Model;
The Simulation Control module includes:
Signal machine controller, is connected with the semaphore model, controls the operation of the semaphore model and detects its work
Make state;
Track switch controller, is connected with the goat model, controls the operation of the goat model and detects its work
Make state;
Locomotive centralized remote control device, is connected with the locomotive, controls the model locomotive to be moved along railway model;
Track circuit module, is connected with the railway model, and obtain model locomotive goes out clear or seizure condition;
Isolate change-over circuit, the isolation change-over circuit is arranged on the signal machine controller and the track switch controller
Between the simulation run controller, power supply signal is converted into being suitable to the work of Simulation Control module and the simulation sand table
And control signal;
The simulation run controller sets the port being connected with railway signal control center, directly obtains operational control and refers to
Make and feed back the position of the working condition, the working condition of the goat model and the model locomotive of the semaphore model
Configuration state information.
Further, the railway model includes:Track and setting sensor in orbit;
The model locomotive is placed on the track.
Further, the sensor is two or more, is arranged on the diverse location of the track.
Further, the goat model includes:Left shunting trouble, right shunting trouble, symmetrical double turnout, double crossover road
Trouble and goat module;
The left shunting is branched off, the right shunting is branched off, described to being arranged on into double turnout and the double crossover track switch
On the track, and it is connected with the goat module, realizes that track switch positioning or antiposition are rotated.
Further, the goat module includes:Branch road goat;
The quantity of the branch road goat is branched off with left shunting described in the goat model, the right shunting is branched off, described
It is each left shunting trouble, the right shunting trouble, described right to consistent into double turnout and double crossover track switch sum
Into double turnout and the double crossover track switch one branch road goat of correspondence;
The branch road goat is connected with the track switch controller, obtains track switch control instruction.
Further, the semaphore includes:Signal lamp and photoelectric coupling isolation drive detection chip;
The signal lamp is connected with the photoelectric coupling isolation drive detection chip, and driven perform indicates operation;
The photoelectric coupling isolation drive detection chip is connected with the signal machine controller, obtains semaphore control instruction
And the working condition of semaphore is detected, it is fed back to the signal machine controller.
Further, the model locomotive includes:Operation control chip, the driving electricity of locomotive car body and position in the inner
Pond, Worm-drive motor and bogie;
The Worm-drive motor is connected with the wheel pair and the bogie of the locomotive car body respectively, perform parking,
Accelerate, slow down and steering operation;
The operation control chip is connected with the Worm-drive motor respectively, controls turning for the Worm-drive motor
It is dynamic;
The driving battery is connected with the operation control chip, and there is provided the operation energy;
The operation control chip sets wireless communication module, is communicated for setting up with the locomotive concentrator remote control,
Obtain control instruction.
Further, the isolation change-over circuit includes:
Semaphore voltage transformation driving circuit, is connected between the signal machine controller and the simulation run controller, will
High power supply signal is converted into operating on low voltage signal;
Track switch voltage transformation driving circuit, is connected between the track switch controller and the simulation run controller, by height confession
Electric signal is converted into operating on low voltage signal.
Further, the tutoring system also includes:Landscape lamp system;
The landscape lamp system is connected with the simulation run controller.
Further, the landscape lamp system includes:Sand table highway lamp, sand table ornament lamp and Landscape Lamp control panel;
The sand table highway lamp and the sand table ornament lamp are connected with the Landscape Lamp control panel respectively.
The one or more technical schemes provided in the embodiment of the present application, have at least the following technical effects or advantages:
The Signal Simulation tutoring system provided in the embodiment of the present application, end is performed by reduce railway signal system
Part is held, control section highly emulates signal system on sand table;And pass through Simulation Control module and simulation run controller
It is connected with the Signal control Center of reality, by the operation in the control platform of control centre, items is assigned to simulation sand table
Operational order, so that the real railway signal that reduces earnestly is operated really, has reached the purpose of training;Pass through control centre
Each device model on operational order, individual simulation sand table is assigned, and the working condition of each model is subjected to detection and feeds back to control
Center processed, realizes interaction, so as to provide a kind of real practical experience for start-up;When simulation sand table failure,
It can judge to start-up, the training fixed a breakdown, so that complete realizes instruction issuing, breakdown judge, failture evacuation
Etc. process, the integrality and effect of training are improved.
Brief description of the drawings
The Signal Simulation tutoring system structured flowchart that Fig. 1 provides for the utility model;
The semaphore voltage transformation driving circuit figure that Fig. 2 provides for the utility model;
The track switch voltage transformation driving circuit figure that Fig. 3 provides for the utility model.
Embodiment
The embodiment of the present application solves railway signal system in the prior art by providing a kind of Signal Simulation tutoring system
System staff training lacks practice operation, the incomplete technical problem of result of training.
In order to be better understood from above-mentioned technical proposal, below in conjunction with Figure of description and specific embodiment to upper
State technical scheme to be described in detail, it should be understood that the specific features in the utility model embodiment and embodiment are to this Shen
Please technical scheme detailed description, rather than the restriction to technical scheme, in the case where not conflicting, the application is real
Applying the technical characteristic in example and embodiment can be mutually combined.
Referring to Fig. 1, a kind of Signal Simulation tutoring system, including:Simulation sand table, Simulation Control module and emulation fortune
Line control unit;
Railway model and the goat model, semaphore model and the locomotive that are associated are set on the simulation sand table
Model;
The Simulation Control module includes:
Signal machine controller, is connected with the semaphore model, controls the operation of the semaphore model and detects its work
Make state;
Track switch controller, is connected with the goat model, controls the operation of the goat model and detects its work
Make state;
Locomotive centralized remote control device, is connected with the locomotive, controls the model locomotive to be moved along railway model;
Track circuit module, is connected with the railway model, and obtain model locomotive goes out clear or seizure condition;
Isolate change-over circuit, the isolation change-over circuit is arranged on the signal machine controller and the track switch controller
Between the simulation run controller, power supply signal is converted into being suitable to the work of Simulation Control module and the simulation sand table
And control signal;
The simulation run controller sets the port being connected with railway signal control center, directly obtains operational control and refers to
Make and feed back the position of the working condition, the working condition of the goat model and the model locomotive of the semaphore model
Configuration state information.
Further, the railway model includes:Track and setting sensor in orbit;
The model locomotive is placed on the track.
Further, the sensor is two or more, is arranged on the diverse location of the track.
Further, the goat model includes:Left shunting trouble, right shunting trouble, symmetrical double turnout and intersection are crossed
Drawing lines branches off;
The left shunting is branched off, the right shunting is branched off, described to being arranged on into double turnout and the double crossover track switch
On the track, and it is connected with the goat model, realizes that track switch positioning or antiposition are rotated.
Further, the goat module includes:Branch road goat;
The quantity of the branch road goat is branched off with left shunting described in the goat model, the right shunting is branched off, described
It is each left shunting trouble, the right shunting trouble, described right to consistent into double turnout and double crossover track switch sum
Into double turnout and the double crossover track switch one branch road goat of correspondence;
The branch road goat is connected with the track switch controller, obtains track switch control instruction.
Further, the semaphore includes:Signal lamp and photoelectric coupling isolation drive detection chip;
The signal lamp is connected with the photoelectric coupling isolation drive detection chip, and driven perform indicates operation;
The photoelectric coupling isolation drive detection chip is connected with the signal machine controller, obtains semaphore control instruction
And the working condition of semaphore is detected, it is fed back to the signal machine controller.
Further, the model locomotive includes:Operation control chip, the driving electricity of locomotive car body and position in the inner
Pond, Worm-drive motor and bogie;
The Worm-drive motor is connected with the wheel pair and the bogie of the locomotive car body respectively, perform parking,
Accelerate, slow down and steering operation;
The operation control chip is connected with the Worm-drive motor respectively, controls turning for the Worm-drive motor
It is dynamic;
The driving battery is connected with the operation control chip, and there is provided the operation energy;
The operation control chip sets wireless communication module, is communicated for setting up with the locomotive concentrator remote control,
Obtain control instruction.
Referring to Fig. 2 and Fig. 3, the isolation change-over circuit includes:
Semaphore voltage transformation driving circuit, is connected between the signal machine controller and the simulation run controller, will
High power supply signal is converted into operating on low voltage signal;
Track switch voltage transformation driving circuit, is connected between the track switch controller and the simulation run controller, by height confession
Electric signal is converted into operating on low voltage signal.
Further, the tutoring system also includes:Landscape lamp system;
The landscape lamp system is connected with the simulation run controller.
Further, the landscape lamp system includes:Sand table highway lamp, sand table ornament lamp and Landscape Lamp control panel;
The sand table highway lamp and the sand table ornament lamp are connected with the Landscape Lamp control panel respectively.
The one or more technical schemes provided in the embodiment of the present application, have at least the following technical effects or advantages:
The Signal Simulation tutoring system provided in the embodiment of the present application, end is performed by reduce railway signal system
Part is held, control section highly emulates signal system on sand table;And pass through Simulation Control module and simulation run controller
It is connected with the Signal control Center of reality, by the operation in the control platform of control centre, items is assigned to simulation sand table
Operational order, so that the real railway signal that reduces earnestly is operated really, has reached the purpose of training;Pass through control centre
Each device model on operational order, individual simulation sand table is assigned, and the working condition of each model is subjected to detection and feeds back to control
Center processed, realizes interaction, so as to provide a kind of real practical experience for start-up;When simulation sand table failure,
It can judge to start-up, the training fixed a breakdown, so that complete realizes instruction issuing, breakdown judge, failture evacuation
Etc. process, the integrality and effect of training are improved.
It should be noted last that, above embodiment is only to illustrate the technical solution of the utility model rather than limit
System, although the utility model is described in detail with reference to example, it will be understood by those within the art that, can be right
The technical solution of the utility model is modified or equivalent substitution, without departing from the spirit and model of technical solutions of the utility model
Enclose, it all should cover among right of the present utility model.
Claims (10)
1. a kind of Signal Simulation tutoring system, it is characterised in that including:Simulation sand table, Simulation Control module and emulation
Operation controller;
Railway model and the goat model, semaphore model and the locomotive mould that are associated are set on the simulation sand table
Type;
The Simulation Control module includes:
Signal machine controller, is connected with the semaphore model, controls the operation of the semaphore model and detects its work shape
State;
Track switch controller, is connected with the goat model, controls the operation of the goat model and detects its work shape
State;
Locomotive centralized remote control device, is connected with the locomotive, controls the model locomotive to be moved along railway model;
Track circuit module, is connected with the railway model, and obtain model locomotive goes out clear or seizure condition;
Isolate change-over circuit, the isolation change-over circuit is arranged on the signal machine controller and the track switch controller and institute
State between simulation run controller, power supply signal is converted into being suitable to the work and control of Simulation Control module and the simulation sand table
Signal processed;
The simulation run controller sets the port being connected with railway signal control center, directly acquisition operational control instruct with
Feed back the position shape of the working condition, the working condition of the goat model and the model locomotive of the semaphore model
State information.
2. Signal Simulation tutoring system as claimed in claim 1, it is characterised in that:The railway model includes:Track
And sensor in orbit is set;
The model locomotive is placed on the track;
The sensor is connected with the locomotive centralized remote control device.
3. Signal Simulation tutoring system as claimed in claim 2, it is characterised in that:The sensor is two or two
More than individual, the diverse location of the track is arranged on.
4. Signal Simulation tutoring system as claimed in claim 3, it is characterised in that the goat model includes:It is left
Shunting trouble, right shunting trouble, symmetrical double turnout, double crossover track switch and goat module;
The left shunting trouble, the right shunting trouble, the symmetrical double turnout and the double crossover track switch are arranged on described
On track, and it is connected with the goat module, realizes that track switch positioning or antiposition are rotated.
5. Signal Simulation tutoring system as claimed in claim 4, it is characterised in that the goat module includes:Branch
Road goat;
The quantity of the branch road goat is branched off with left shunting described in the goat model, the right shunting is branched off, described symmetrical
Double turnout and double crossover track switch sum are consistent, each left shunting trouble, the right shunting trouble, the symmetric double
Trouble of clearing the way and the double crossover track switch one branch road goat of correspondence;
The branch road goat is connected with the track switch controller, obtains track switch control instruction.
6. Signal Simulation tutoring system as claimed in claim 1, it is characterised in that the semaphore includes:Signal refers to
Show lamp and photoelectric coupling isolation drive detection chip;
The signal lamp is connected with the photoelectric coupling isolation drive detection chip, and driven perform indicates operation;
The photoelectric coupling isolation drive detection chip is connected with the signal machine controller, obtains semaphore control instruction and examines
The working condition of semaphore is surveyed, the signal machine controller is fed back to.
7. Signal Simulation tutoring system as claimed in claim 1, it is characterised in that the model locomotive includes:Locomotive
Operation control chip, driving battery, Worm-drive motor and the bogie of car body and position in the inner;
The Worm-drive motor is connected with the wheel pair and the bogie of the locomotive car body respectively, perform parking, acceleration,
Slow down and steering operation;
The operation control chip is connected with the Worm-drive motor respectively, controls the rotation of the Worm-drive motor;
The driving battery is connected with the operation control chip, and there is provided the operation energy;
The operation control chip sets wireless communication module, communicates, obtains with the locomotive concentrator remote control for setting up
Control instruction.
8. the Signal Simulation tutoring system as described in any one of claim 1~7, it is characterised in that the isolation conversion
Circuit includes:
Semaphore voltage transformation driving circuit, is connected between the signal machine controller and the simulation run controller, by height confession
Electric signal is converted into operating on low voltage signal;
Track switch voltage transformation driving circuit, is connected between the track switch controller and the simulation run controller, and height power supply is believed
Number it is converted into operating on low voltage signal.
9. Signal Simulation tutoring system as claimed in claim 8, it is characterised in that the tutoring system also includes:Scape
See lamp system;
The landscape lamp system is connected with the simulation run controller.
10. Signal Simulation tutoring system as claimed in claim 9, it is characterised in that the landscape lamp system includes:It is husky
Disk highway lamp, sand table ornament lamp and Landscape Lamp control panel;
The sand table highway lamp and the sand table ornament lamp are connected with the Landscape Lamp control panel respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621421325.8U CN206470982U (en) | 2016-12-23 | 2016-12-23 | A kind of Signal Simulation tutoring system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621421325.8U CN206470982U (en) | 2016-12-23 | 2016-12-23 | A kind of Signal Simulation tutoring system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206470982U true CN206470982U (en) | 2017-09-05 |
Family
ID=59711536
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621421325.8U Expired - Fee Related CN206470982U (en) | 2016-12-23 | 2016-12-23 | A kind of Signal Simulation tutoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206470982U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108109463A (en) * | 2017-12-29 | 2018-06-01 | 株洲壹星科技股份有限公司 | A kind of locomotive brake gear comprehensive training method and system device |
CN115019585A (en) * | 2022-06-27 | 2022-09-06 | 无锡学院 | Teaching examination system for point switch fault diagnosis and control method thereof |
-
2016
- 2016-12-23 CN CN201621421325.8U patent/CN206470982U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108109463A (en) * | 2017-12-29 | 2018-06-01 | 株洲壹星科技股份有限公司 | A kind of locomotive brake gear comprehensive training method and system device |
CN115019585A (en) * | 2022-06-27 | 2022-09-06 | 无锡学院 | Teaching examination system for point switch fault diagnosis and control method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103226903B (en) | Dynamic simulation model of electrified high speed railway and simulation method thereof | |
CN202677708U (en) | Simulation teaching sand table for subway station operation control system | |
CN101201982A (en) | Railway synthetic training simulation system | |
CN206470982U (en) | A kind of Signal Simulation tutoring system | |
CN113219855B (en) | Simulation verification method and device for TACS (terminal-to-terminal Security System) | |
CN203134171U (en) | Electrification high-speed railway dynamic model | |
CN105033524A (en) | Switching system of sliding rail | |
CN202880754U (en) | Automatic automatic aligment control device of unwheeling machine compatible with two types of bullet trains of eight marshaling or sixteen marshaling | |
CN102592489A (en) | Skill training system for commissioning operation of traction motor of high-speed motor train unit and control method | |
CN206395349U (en) | A kind of Semi-automatic aerating cabinet produces transfer device | |
CN103323268B (en) | The energy saving and environment friendly tyre tester of Multifunctional multistage | |
CN204384206U (en) | A kind of banding machine for irregular article | |
CN104652186A (en) | Turnout grinding control system and control method of metro rail grinding train | |
CN102430920A (en) | Automatic transmission production line for assembly of passenger car bogie | |
CN201117148Y (en) | Computer interlocking and traction power supplying simulation sand map | |
CN204183132U (en) | Heavily card driver's cabin production line robot robot welding system | |
CN107945609A (en) | A kind of rail traffic vehicle braking simulation training system based on virtual reality technology | |
CN204480590U (en) | Aerial lift device with insulated arm emulation training device | |
CN107134190A (en) | A kind of new energy Training Room equipment configuration system | |
CN209607189U (en) | A kind of novel city rail vehicle braking actual training device | |
CN207123750U (en) | Transformer station's Multi-functional indoor trackless modularization patrols behaviour's system | |
CN102842262B (en) | Urban rail vehicle full-function practical teaching system for urban light rail | |
CN206203584U (en) | Twin-tub wire dispenser | |
CN206430921U (en) | Small scale modularization track train experimental system bogie | |
CN205428276U (en) | Exchange training of transmission diesel locomotive with simulation control system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170905 |