CN104702333B - A kind of UAV TT & C's signal distributor and distribution method - Google Patents

A kind of UAV TT & C's signal distributor and distribution method Download PDF

Info

Publication number
CN104702333B
CN104702333B CN201510018305.XA CN201510018305A CN104702333B CN 104702333 B CN104702333 B CN 104702333B CN 201510018305 A CN201510018305 A CN 201510018305A CN 104702333 B CN104702333 B CN 104702333B
Authority
CN
China
Prior art keywords
remote
tunnel
road
analog switch
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510018305.XA
Other languages
Chinese (zh)
Other versions
CN104702333A (en
Inventor
鲁希团
刘少华
吕慧
田雪涛
张波
臧频阳
孙美蕊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwestern Polytechnical University
Xian Aisheng Technology Group Co Ltd
Original Assignee
Northwestern Polytechnical University
Xian Aisheng Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwestern Polytechnical University, Xian Aisheng Technology Group Co Ltd filed Critical Northwestern Polytechnical University
Priority to CN201510018305.XA priority Critical patent/CN104702333B/en
Publication of CN104702333A publication Critical patent/CN104702333A/en
Application granted granted Critical
Publication of CN104702333B publication Critical patent/CN104702333B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/14Relay systems
    • H04B7/15Active relay systems
    • H04B7/185Space-based or airborne stations; Stations for satellite systems
    • H04B7/1851Systems using a satellite or space-based relay
    • H04B7/18515Transmission equipment in satellites or space-based relays
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/14Relay systems
    • H04B7/15Active relay systems
    • H04B7/185Space-based or airborne stations; Stations for satellite systems
    • H04B7/18502Airborne stations
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/14Relay systems
    • H04B7/15Active relay systems
    • H04B7/185Space-based or airborne stations; Stations for satellite systems
    • H04B7/1851Systems using a satellite or space-based relay
    • H04B7/18519Operations control, administration or maintenance

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Astronomy & Astrophysics (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Selective Calling Equipment (AREA)

Abstract

The present invention relates to a kind of UAV TT & C's signal distributor and distribution method, UAV TT & C's signal distributor receives the two-way telemetry that ground data terminal is sent simultaneously.In automatic control mode, according to channel priorities, data delay time and accuracy voluntarily select all the way telemetry be transmitted;It in artificial control model, by MTS, can select to be transmitted all the way in two-way telemetry, and selected telemetered signal is distributed into four road signals simultaneously.

Description

A kind of UAV TT & C's signal distributor and distribution method
Technical field
The present invention relates to unmanned plane remote measurement and remote-control data transmission technique field, specially a kind of UAV TT & C's signal point Orchestration and distribution method.
Background technology
In existing UAV TT & C's communication process, unmanned plane remote measurement downstream signal is by ground data chain terminal observing and controlling The real-time processing computer connection of interface and ground control station, real-time processing computer receives telemetry frame, then passes through net Network is sent to multiple surface-monitoring equipments.
When surface-monitoring equipment sends telecommand, remote-control data frame is sent to real-time processing computer by network, Send in real time to ground data chain terminal to processing calculating cycle, form that remote information is up to be sent to unmanned plane.
Which is received using separate unit real-time processing computer as measuring and control data (remote control and remote measurement) with forwarding nucleus equipment, There is transmission link many, the problems such as delay is big, the bit error rate is high, intelligence degree is low, redundancy is poor, influence unmanned plane during flying peace Entirely.
The content of the invention
The technical problem to be solved
It is many in order to avoid the transmission link of prior art, delay is big, the bit error rate is high, intelligence degree is low, redundancy is poor etc. Problem, the present invention proposes a kind of UAV TT & C's signal distributor and distribution method.
Technical scheme
A kind of UAV TT & C's signal distributor, it is characterised in that including single-chip microcomputer C8051F020, the first analog switch 74HC4066, the second analog switch 74HC4066, the first level shifting circuit 75175, second electrical level change-over circuit 75175, Three level shifting circuits 75175, multiple level shifting circuits 75174 and three switching switches;First level shifting circuit 75175th, the output end of second electrical level change-over circuit 75175 connects single-chip microcomputer C8051F020 dual serial interface, monolithic respectively Machine C8051F020 two pins of I/O port connect the first analog switch 74HC4066, the second analog switch 74HC4066 respectively Pin is enabled, the 3rd level is connected after the first analog switch 74HC4066, the second analog switch 74HC4066 output end parallel connection The input of change-over circuit 75175, the output end of the 3rd level shifting circuit 75175 connects multiple level shifting circuits 75174, three Position switching switch is connected with single-chip microcomputer C8051F020 three pins of I/O port.
When being distributed for remote measurement, the output end of the 3rd level shifting circuit 75175 connects four level shifting circuits 75174。
When being distributed for remote control, the output end of the 3rd level shifting circuit 75175 connects two level shifting circuits 75174。
A kind of telemetered signal distribution method carried out using UAV TT & C's signal distributor, it is characterised in that three switchings Switch is respectively to " 1 " " 2 " " 3 " number position, and step is as follows:
Step 1a:Three switching switches are to " 1 " number position, and single-chip microcomputer C8051F020 enables 1 tunnel telemetered signal corresponding first Analog switch 74HC4066, the first analog switch 74HC4066 opening;
Step 1b:1 tunnel telemetered signal is transmitted to the 3rd level shifting circuit 75175, and differential type level signal is converted to Transistor-Transistor Logic level signal, is then input to four level shifting circuits 75174 by Transistor-Transistor Logic level signal;
Step 1c:Transistor-Transistor Logic level signal is reverted to differential type level signal by four level shifting circuits 75174, realizes 1 tunnel Remote measurement separates four road signals;
Step 2a:Three switching switches are to " 2 " number position, and single-chip microcomputer C8051F020 enables 2 tunnel telemetered signals corresponding second Analog switch 74HC4066, the second analog switch 74HC4066 opening;
Step 2b:2 tunnel telemetered signals are transmitted to the 3rd level shifting circuit 75175, and differential type level signal is converted to Transistor-Transistor Logic level signal, is then input to four level shifting circuits 75174 by Transistor-Transistor Logic level signal;
Step 2c:Transistor-Transistor Logic level signal is reverted to differential type level signal by four level shifting circuits 75174, realizes 2 tunnels Remote measurement separates four road signals;
Step 3a:Three switchings are switched to " 3 " number position, the first level shifting circuit 75175 or second electrical level change-over circuit 75175 are converted to telemetered signal the Transistor-Transistor Logic level signal adapted to single-chip microcomputer C8051F020, and single-chip microcomputer C8051F020 is according to connecing 1 tunnel or 2 tunnel telemetries received is voluntarily controlled;
Step 3b:1 road telemetry interface interrupt response is opened, 2 tunnel remote measurement interrupt responses are closed;
Step 3c:Judge whether there is 1 road telemetry interface interrupt response in continuous 2 seconds:If without 1 tunnel remote measurement Interface interrupt is responded, and the corresponding first analog switch 74HC4066 of 1 tunnel remote measurement is closed, into step 3e;If 1 tunnel remote measurement connects Mouth interrupt response, receives 1 tunnel telemetry, and carry out correction judgement to receiving telemetry frame;
Such as telemetry frame is incorrect at continuous 25 times, closes the corresponding first analog switch 74HC4066 of 1 tunnel remote measurement, enters Enter step 3e;Such as in 25 times, correct telemetry frame is received, corresponding first analog switch of 1 tunnel remote measurement is opened 74HC4066, it is identical with 1c principles with step 1b, realize that 1 tunnel telemetry separates four road signals, into step 3d;
Step 3d:Judge three switching position of the switch states:" 1 " position return to step 1a, " 2 " number position return to step 2a, " 3 " Number position returns to step 3c;
Step 3e:1 road telemetry interface interrupt response is closed, 2 road telemetry interface interrupt responses are opened;
Step 3f:Judge whether there are 2 road telemetry interface interrupt responses in continuous 2 seconds:If without 2 tunnel remote measurements Interface interrupt is responded, and the corresponding second analog switch 74HC4066 of 2 tunnel remote measurements is closed, into step 3b;If 2 tunnel remote measurements connect Mouth interrupt response, receives 2 tunnel telemetries, and carry out correction judgement to receiving telemetry frame;
Such as telemetry frame is incorrect at continuous 25 times, closes the corresponding second analog switch 74HC4066 of 2 tunnel remote measurements, enters Enter step 3b;Such as in 25 times, correct telemetry frame is received, corresponding second analog switch of 2 tunnel remote measurements is opened 74HC4066, it is identical with 2c principles with step 2b, realize that 2 tunnel telemetries separate four road signals, into step 3g;
Step 3g:Judge three switching position of the switch states:" 1 " position return to step 1a, " 2 " number position return to step 2a, " 3 " Number position returns to step 3f;
Telemetry frame described in step 3c and 3f in 25 times whether correct basis for estimation:The frame of telemetry frame Head, check code, synchronous code and frame length, described frame head are respectively hexadecimal " 51 ", " 52 ", " 53 ", " 54 ".
A kind of remote signal distribution method carried out using UAV TT & C's signal distributor, it is characterised in that three switchings Switch is respectively to " 1 " " 2 " " 3 " number position, and step is as follows:
Step 1a:Three switching switches are to " 1 " number position, and single-chip microcomputer C8051F020 enables corresponding first simulation of 1 tunnel remote control 74HC4066 is switched, the first analog switch 74HC4066 is opened;
Step 1b:1 tunnel remote signal is transmitted to the 3rd level shifting circuit 75175, and differential type level signal is converted to Transistor-Transistor Logic level signal, and Transistor-Transistor Logic level signal is input to two level shifting circuits 75174;
Step 1c:Transistor-Transistor Logic level signal is reverted to differential type level signal by two level shifting circuits 75174, realizes 1 tunnel Remote control separates two paths of signals;
Step 2a:Three switching switches are to " 2 " number position, and single-chip microcomputer C8051F020 enables corresponding second simulation of 2 tunnel remote controls 74HC4066 is switched, the second analog switch 74HC4066 is opened;
Step 2b:2 tunnel remote signals are transmitted to the 3rd level shifting circuit 75175, and differential type level signal is converted to Transistor-Transistor Logic level signal, and Transistor-Transistor Logic level signal is input to two level shifting circuits 75174;
Step 2c:Transistor-Transistor Logic level signal is reverted to differential type level signal by two level shifting circuits 75174, realizes 2 tunnels Remote control separates two paths of signals;
Step 3a:Three switchings are switched to " 3 " number position, the first level shifting circuit 75175 or second electrical level change-over circuit 75175 are converted to remote signal the Transistor-Transistor Logic level signal adapted to single-chip microcomputer C8051F020, and single-chip microcomputer C8051F020 is according to connecing 1 tunnel or 2 road remote-control datas received is voluntarily controlled;
Step 3b:1 road Remote Control Interface interrupt response is opened, 2 road Remote Control Interface interrupt responses are closed;
Step 3c:Judge whether there is 1 road Remote Control Interface interrupt response in continuous 2 seconds:If without 1 tunnel remote control Interface interrupt is responded, and the corresponding first analog switch 74HC4066 of 1 tunnel remote control is closed, into step 3e;If 1 tunnel remote control connects Mouth interrupt response, receives 1 road remote-control data, and carry out correction judgement to receiving remote-control data frame;
Such as remote-control data frame is incorrect at continuous 25 times, closes the corresponding first analog switch 74HC4066 of 1 tunnel remote control, enters Enter step 3e;Such as in 25 times, correct remote-control data frame is received, corresponding first analog switch of 1 tunnel remote control is opened 74HC4066, it is identical with 1c principles with step 1b, realize that 1 road remote-control data separates two paths of signals, into step 3d;
Step 3d:Judge three switching position of the switch states:" 1 " position return to step 1a, " 2 " number position return to step 2a, " 3 " Number position returns to step 3c;
Step 3e:Close 1 tunnel remote control and survey interface interrupt response, open 2 tunnel remote controls and survey interface interrupt response;
Step 3f:Judge whether there are 2 road Remote Control Interface interrupt responses in continuous 2 seconds:If without 2 tunnel remote controls Interface interrupt is responded, and the corresponding second analog switch 74HC4066 of 2 tunnel remote controls is closed, into step 3b;If 2 tunnel remote controls connect Mouth interrupt response, receives 2 road remote-control datas, and carry out correction judgement to receiving remote-control data frame;
Such as remote-control data frame is incorrect at continuous 25 times, closes the corresponding second analog switch 74HC4066 of 2 tunnel remote controls, enters Enter step 3b;Such as in 25 times, correct remote-control data frame is received, the corresponding analog switch second of 2 tunnel remote controls is opened and simulates 74HC4066 is switched, it is identical with 2c principles with step 2b, realize that 2 road remote-control datas separate two paths of signals, into step 3g;
Step 3g:Judge three switching position of the switch states:" 1 " position return to step 1a, " 2 " number position return to step 2a, " 3 " Number position returns to step 3f;
Remote-control data frame described in step 3c and 3f in 25 times whether correct basis for estimation:The frame of remote-control data frame Head, check code, synchronous code and frame length, described frame head are fixed frame head hexadecimal " 4F ".
Beneficial effect
A kind of UAV TT & C's signal distributor proposed by the present invention and distribution method, are tested and application shows, unmanned plane Measurement and control signal distributor is communication backbone between ground control station and unmanned aerial vehicle platform, and its reliability directly affects unmanned plane during flying Safety.UAV TT & C's signal distributor improves ground using dual redundant data channel transmission means and intelligent switch mode Remote control and the reliability of telemetry transmitted in both directions, reduce flight control personnel between face monitoring device and ground data terminal Pressure, and with low delay feature, it has also become indispensable key equipment in UAV TT & C's data transmission procedure.
Brief description of the drawings
Fig. 1 telemetered signal distributor circuits
Single-chip microcomputer control method in Fig. 2 telemetered signal distributor circuits
Fig. 3 remote signal distributor circuits
Single-chip microcomputer control method in Fig. 4 remote signal distributor circuits
The first level shifting circuits of 1- 75175;The first analog switches of 2- 74HC4066;3- second electrical level change-over circuits 75175;The second analog switches of 4- 74HC4066;5- single-chip microcomputers C8051F020;The level shifting circuits 75175 of 6- the 3rd;7- first Level shifting circuit 75174;8- second electrical levels change-over circuit 75174;The level shifting circuits 75174 of 9- the 3rd;The level of 10- the 4th Change-over circuit 75174;Tri- switching switches of 11-.
Embodiment
In conjunction with embodiment, accompanying drawing, the invention will be further described:
Fig. 1 be telemetered signal distributor circuit, comprising single-chip microcomputer C8051F020, first, second analog switch 74HC4066, First, second, third level shifting circuit 75175 and first, second, third, fourth level shifting circuit 75174 and three Switching switch.First level shifting circuit 75175, the output end of second electrical level change-over circuit 75175 connect single-chip microcomputer respectively C8051F020 dual serial interface, single-chip microcomputer C8051F020 two pins of I/O port connect the first analog switch respectively 74HC4066, the second analog switch 74HC4066 enable pin, the first analog switch 74HC4066, the second analog switch The input of the 3rd level shifting circuit 75175 is connected after 74HC4066 output end is in parallel, the 3rd level shifting circuit 75175 Output end connects four level shifting circuits 75174;At three switching switches " 1,2,3 " are connected respectively to single-chip microcomputer On three pins of C8051F020 I/O port, by the way that " the level height at 1,2,3 " places, judges working method.
Three switching switches are to " 1 " number position, and single-chip microcomputer C8051F020 enables corresponding first analog switch of 1 tunnel remote measurement 74HC4066, i.e. the first analog switch 74HC4066 are opened, and 1 tunnel telemetered signal is transmitted to the 3rd level shifting circuit 75175, will Differential type level conversion is Transistor-Transistor Logic level, and Transistor-Transistor Logic level signal is input into first, second, third and fourth level shifting circuit 75174, then telemetered signal is reverted into differential signal, realize that 1 tunnel remote measurement separates four road signals.Three switchings are switched to " 2 " number The working method of position is identical with " 1 " number position.Three switching switches are believed remote measurement by level shifting circuit 75175 to " 3 " number position The Transistor-Transistor Logic level signal adapted to single-chip microcomputer C8051F020 number is converted to, single-chip microcomputer C8051F020 is according to the 1 tunnel remote measurement received Data and 2 tunnel telemetries, voluntarily control the first analog switch 74HC4066 or the second analog switch 74HC4066 opening with Close.
Fig. 2 is single-chip microcomputer control method in telemetered signal distributor circuit, after initialization, is broadly divided into three phases.
First stage:Judge three switching position of the switch:Three switching switches simulate 1 tunnel remote measurement correspondence to " 1 " number position Switch is opened, and is shown only to receive 1 tunnel remote measurement, is then back to after program initialization.Three switching switches are to " 2 " number position, by 2 Remote measurement correspondence analog switch in road is opened, and is shown only to receive 2 tunnel remote measurements, is then back to after program initialization.Three switching switches It is Automatic control of single chip microcomputer mode, into second stage to " 3 " number position.
Second stage:This stage main task receives 1 tunnel telemetry.The first step, opens 1 road telemetry interface and interrupts and ring Should, 2 road telemetry interface interrupt responses are closed, into second step.Second step, begins to respond to 1 road telemetry interface interrupt response, judges Whether there is telemetry interface interrupt response in continuous 2 seconds, such as without the response of telemetry interface data outage, 1 tunnel remote measurement number Reset according to the incorrect number counter of frame and the non-response time interval timer of interrupt response, close the corresponding simulation of 1 tunnel remote measurement Switch, into the phase III.If any 1 road telemetry interface interrupt response, 1 tunnel telemetry is received, and to receiving telemetry frame Correction judgement is carried out, such as telemetry frame is incorrect at continuous 25 times, the 1 incorrect number counter of tunnel telemetry frame is with The disconnected non-response time interval timer of response is reset, and 1 tunnel remote measurement analog switch is closed, into the phase III.Such as in 25 times, connect Correct telemetry frame is received, the 1 incorrect number counter of tunnel telemetry frame is counted with the non-response time interval of interrupt response When device reset, open 1 tunnel remote measurement correspondence analog switch, show only to receive 1 tunnel remote measurement.3rd step, has received 1 tunnel remote measurement number every time After frame, three switching on off states are judged, such as the first stage are returned to for " 1 " or " 2 " number position.As being " 3 " number position, return Return to this stage second step.
Phase III:This stage main task receives 2 tunnel telemetries, and the first step is closed 1 road telemetry interface and interrupted and rings Should, 2 road telemetry interface interrupt responses are opened, into second step.Second step, begins to respond to 2 road telemetry interface interrupt responses, judges Whether there is telemetry interface interrupt response in continuous 2 seconds, such as without 2 road telemetry interface interrupt responses, 2 tunnel telemetries The incorrect number counter of frame is reset with the non-response time interval timer of interrupt response, closes 2 tunnel remote measurement correspondence analog switches, Into the 4th step.If any 2 road telemetry interface interrupt responses, telemetry is received, and correctness is carried out to receiving telemetry frame Judge, such as telemetry frame is incorrect at continuous 25 times, and the 2 tunnel incorrect number counters of telemetry frame do not ring with interrupt response Answer time interval timer to reset, the corresponding analog switch of 2 tunnel remote measurements is closed, into the 4th step.Such as in 25 times, receive just True telemetry frame, the 2 incorrect number counters of tunnel telemetry frame and the non-response time interval timer of interrupt response are clear Zero, 2 tunnel remote measurement correspondence analog switches are opened, show only to receive 2 tunnel remote measurements.3rd step, has received 2 tunnel telemetry frames every time Afterwards, three switching position of the switch are judged, such as returns to the first stage for " 1 " or " 2 " number position.As being " 3 " number position, return to This stage second step.4th step, judges three switching position of the switch, is such as " 1 " or " 2 " number, then to enter the first stage, is such as " 3 " number, then return to second stage.
In Fig. 2, by distinguishing the frame head of telemetry frame, check code, synchronous code and frame length, to judge remote measurement number According to frame correctness.Table 1 is the data structure of telemetry frame, mainly comprising frame head, telemetry, check code, synchronous code, the word of overall length 32 Section, check code be 28 byte telemetries it is cumulative and.Telemetry frame is divided into four classes, and frame head is different, other identical, frame head point Wei not hexadecimal " 51 ", " 52 ", " 53 ", " 54 ".
Table 1
Fig. 3 be remote signal distributor circuit, comprising single-chip microcomputer C8051F020, first, second analog switch 74HC4066, First, second, third level shifting circuit 75175 and first, second level shifting circuit 75174 and three switching switches. First level shifting circuit 75175, the output end of second electrical level change-over circuit 75175 connect single-chip microcomputer C8051F020's respectively Dual serial interface, single-chip microcomputer C8051F020 two pins of I/O port connect the first analog switch 74HC4066, the second mould respectively Intend switch 74HC4066 enable pin, the first analog switch 74HC4066, the second analog switch 74HC4066 output end simultaneously The 3rd level shifting circuit 75175 is connected after connection, the output end of the 3rd level shifting circuit 75175 connects two level conversion electricity At the input of road 75174, three switching switches " 1,2,3 " be connected respectively to single-chip microcomputer C8051F020 I/O port three draw On pin, by the way that " the level height at 1,2,3 " places, judges working method.
Three switching switches are to " 1 " number position, and single-chip microcomputer C8051F020 enables corresponding first analog switch of 1 tunnel remote control 74HC4066, i.e. the first analog switch 74HC4066 are opened, and 1 tunnel remote signal is transmitted to the 3rd level shifting circuit 75175, will Differential type level conversion is Transistor-Transistor Logic level, and Transistor-Transistor Logic level signal is input into first level shifting circuit 75174 and second Level shifting circuit 75174, then remote signal is reverted into differential signal, realize that 1 tunnel remote control separates two paths of signals.Three switchings The working method switched to " 2 " number position is identical with " 1 " number position.Three switching switches pass through level shifting circuit to " 3 " number position 75175 are converted to remote signal the Transistor-Transistor Logic level signal adapted to single-chip microcomputer C8051F020, and single-chip microcomputer C8051F020 is according to connecing The 1 road remote-control data and 2 road remote-control datas received, voluntarily controls the first analog switch 74HC4066 or the second analog switch 74HC4066 opening and closing.
Fig. 4 is single-chip microcomputer control method in remote signal distributor circuit, after initialization, is broadly divided into three phases.
First stage:Judge three switching position of the switch:Three switching switches simulate 1 tunnel remote control correspondence to " 1 " number position Switch is opened, and is shown only to receive 1 tunnel remote control, is then back to after program initialization.Three switching switches are to " 2 " number position, by 2 Remote control correspondence analog switch in road is opened, and is shown only to receive 2 tunnel remote controls, is then back to after program initialization.Three switching switches It is Automatic control of single chip microcomputer mode, into second stage to " 3 " number position.
Second stage:This stage main task receives 1 road remote-control data.The first step, opens 1 road Remote Control Interface and interrupts and ring Should, 2 road Remote Control Interface interrupt responses are closed, into second step.Second step, begins to respond to 1 road Remote Control Interface interrupt response, judges Whether there is Remote Control Interface interrupt response in continuous 2 seconds, there is no Remote Control Interface interrupt response, 1 road remote-control data frame such as Incorrect number counter is reset with the non-response time interval timer of interrupt response, is closed 1 tunnel remote control correspondence analog switch, is entered Enter the phase III.If any 1 road Remote Control Interface interrupt response, remote-control data is received, and correctness is carried out to receiving remote-control data frame Judge, such as remote-control data frame is incorrect at continuous 25 times, and the 1 road incorrect number counter of remote-control data frame does not ring with interrupt response Answer time interval timer to reset, 1 tunnel remote control correspondence analog switch is closed, into the phase III.Such as in 25 times, receive just True remote-control data frame, the 1 incorrect number counter of road remote-control data frame and the non-response time interval timer of interrupt response are clear Zero, 1 tunnel remote control correspondence analog switch is opened, shows only to receive 1 tunnel remote control.3rd step, has received 1 road remote-control data frame every time Afterwards, three switching on off states are judged, such as returns to the first stage for " 1 " or " 2 " number position.As being " 3 " number position, return to This stage second step.
Phase III:This stage main task receives 2 road remote-control datas, and the first step is closed 1 road Remote Control Interface and interrupted and rings Should, 2 road Remote Control Interface interrupt responses are opened, into second step.Second step, begins to respond to 2 road Remote Control Interface interrupt responses, judges Whether there is Remote Control Interface interrupt response in continuous 2 seconds, such as without 2 road Remote Control Interface interrupt responses, 2 road remote-control datas The incorrect number counter of frame is reset with the non-response time interval timer of interrupt response, closes 2 tunnel remote control correspondence analog switches, Into the 4th step.If any 2 road Remote Control Interface interrupt responses, remote-control data is received, and correctness is carried out to receiving remote-control data frame Judge, such as remote-control data frame is incorrect at continuous 25 times, and the 2 road incorrect number counters of remote-control data frame do not ring with interrupt response Answer time interval timer to reset, the corresponding analog switch of 2 tunnel remote controls is closed, into the 4th step.Such as in 25 times, receive just True remote-control data frame, the 2 incorrect number counters of road remote-control data frame and the non-response time interval timer of interrupt response are clear Zero, 2 tunnel remote control correspondence analog switches are opened, show only to receive 2 tunnel remote controls.3rd step, has received 2 road remote-control data frames every time Afterwards, three switching position of the switch are judged, such as returns to the first stage for " 1 " or " 2 " number position.As being " 3 " number position, return to This stage second step.4th step, judges three switching position of the switch, is such as " 1 " or " 2 " number, then into the first stage, is such as " 3 " number, then into second stage.
In Fig. 4, by distinguishing the frame head of remote control frame, check code, synchronous code and frame length, to judge remote-control data Frame correctness.Table 2 is the data structure of remote control frame, mainly comprising frame head, remote-control data, check code, synchronous code, the word of overall length 32 Section, check code be 28 byte remote-control datas it is cumulative and.
Table 2
When actual use, observing and controlling interface 1 and the observing and controlling interface 2 of this equipment connection UAS ground data terminal and Surface-monitoring equipment 1, surface-monitoring equipment 2, surface-monitoring equipment 3 and surface-monitoring equipment 4.When receiving remote measurement, ground data The observing and controlling interface 1 of terminal is main interface, and observing and controlling interface 2 is secondary interface, and under normal circumstances, this equipment receives the distant of observing and controlling interface 1 Data, i.e. 1 tunnel remote measurement are surveyed, such as observing and controlling interface 1 breaks down, and this equipment receives the telemetry of observing and controlling 2, i.e. 2 tunnel remote measurements automatically. Or force equipment to receive the telemetry of observing and controlling mouthful 1 or observing and controlling mouthful 2 to " 1 " or " 2 " number position by manual three switching switches, Telemetry after reception separates four tunnels, at the same be distributed to surface-monitoring equipment for 1 to surface-monitoring equipment 4.
When receiving remote control, surface-monitoring equipment is that based on 1, surface-monitoring equipment 2 is pair, and under normal circumstances, this equipment is only Receive the remote-control data of surface-monitoring equipment 1, i.e. 1 tunnel remote control, while being distributed to observing and controlling interface 1 and the observing and controlling of ground data terminal Interface 2.In unmanned plane during flying, surface-monitoring equipment 1 breaks down or telecommand is abnormal, and this equipment receives ground prison automatically Control the remote-control data of equipment 2, i.e. 2 tunnel remote controls.And it is sent to ground data terminal observing and controlling interface 1 and observing and controlling interface 2.If in spy In the case of different, it is only necessary to receive surface-monitoring equipment 1 (or surface-monitoring equipment 2) remote control, manual three switchings switch to " 1 " or " 2 " Number position.
Remote measurement and remote-control data are transmitted without single-chip microcomputer C8051F020, single-chip microcomputer C8051F020 be only involved in remote control with it is distant The selection of transmission channel is surveyed, therefore data transfer is real-time;Remote signal distributor circuit and telemetered signal distributor circuit are mutual Independent, a fault will not cause another fault, and this equipment dependability is high.

Claims (7)

1. a kind of UAV TT & C's signal distributor, it is characterised in that including single-chip microcomputer C8051F020 (5), the first analog switch 74HC4066 (2), the second analog switch 74HC4066 (4), the first level shifting circuit 75175 (1), second electrical level change-over circuit 75175 (3), the 3rd level shifting circuit 75175 (6), multiple level shifting circuits 75174 and three switching switches (11);The One level shifting circuit 75175 (1), the output end of second electrical level change-over circuit 75175 (3) connect single-chip microcomputer respectively C8051F020 (5) dual serial interface, single-chip microcomputer C8051F020 (5) two pins of I/O port connect the first simulation and opened respectively Close 74HC4066 (2), the second analog switch 74HC4066 (4) enable pin, the first analog switch 74HC4066 (2), second The 3rd level shifting circuit 75175 (6) input, the 3rd level are connected after analog switch 74HC4066 (4) output end is in parallel The output end of change-over circuit 75175 (6) connects multiple level shifting circuits 75174, three switching switches (11) and single-chip microcomputer C8051F020 (5) three pin connections of I/O port.
2. a kind of UAV TT & C's signal distributor according to claim 1, it is characterised in that when being distributed for remote measurement, The output end of 3rd level shifting circuit 75175 (6) connects four level shifting circuits 75174.
3. a kind of UAV TT & C's signal distributor according to claim 1, it is characterised in that when being distributed for remote control, The output end of 3rd level shifting circuit 75175 (6) connects two level shifting circuits 75174.
4. the telemetered signal distribution method that a kind of UAV TT & C's signal distributor using described in claim 2 is carried out, it is special Levy and be three switching switches respectively to " 1 " " 2 " " 3 " number position, step is as follows:
Step 1a:Three switching switches are to " 1 " number position, and single-chip microcomputer C8051F020 (5) enables 1 tunnel telemetered signal corresponding first Analog switch 74HC4066 (2), the first analog switch 74HC4066 (2) are opened;
Step 1b:1 tunnel telemetered signal is transmitted to the 3rd level shifting circuit 75175 (6), and differential type level signal is converted to Transistor-Transistor Logic level signal, is then input to four level shifting circuits 75174 (7) (8) (9) (10) by Transistor-Transistor Logic level signal;
Step 1c:Transistor-Transistor Logic level signal is reverted to differential type level letter by four level shifting circuits 75174 (7) (8) (9) (10) Number, realize that 1 tunnel remote measurement separates four road signals;
Step 2a:Three switching switches are to " 2 " number position, and single-chip microcomputer C8051F020 (5) enables 2 tunnel telemetered signals corresponding second Analog switch 74HC4066 (4), the second analog switch 74HC4066 (4) are opened;
Step 2b:2 tunnel telemetered signals are transmitted to the 3rd level shifting circuit 75175 (6), and differential type level signal is converted to Transistor-Transistor Logic level signal, is then input to four level shifting circuits 75174 (7) (8) (9) (10) by Transistor-Transistor Logic level signal;
Step 2c:Transistor-Transistor Logic level signal is reverted to differential type level letter by four level shifting circuits 75174 (7) (8) (9) (10) Number, realize that 2 tunnel remote measurements separate four road signals;
Step 3a:Three switchings are switched to " 3 " number position, the first level shifting circuit 75175 (1) or second electrical level change-over circuit 75175 (3) are converted to telemetered signal the Transistor-Transistor Logic level signal adapted to single-chip microcomputer C8051F020 (5), single-chip microcomputer C8051F020 (5) voluntarily controlled according to 1 tunnel or 2 tunnel telemetries that receive;
Step 3b:1 road telemetry interface interrupt response is opened, 2 road telemetry interface interrupt responses are closed;
Step 3c:Judge whether there is 1 road telemetry interface interrupt response in continuous 2 seconds:If without 1 road telemetry interface Interrupt response, closes the corresponding first analog switch 74HC4066 (2) of 1 tunnel remote measurement, into step 3e;If 1 tunnel remote measurement connects Mouth interrupt response, receives 1 tunnel telemetry, and carry out correction judgement to receiving telemetry frame:
Such as telemetry frame is incorrect at continuous 25 times, closes the corresponding first analog switch 74HC4066 (2) of 1 tunnel remote measurement, enters Enter step 3e;Such as in 25 times, correct telemetry frame is received, corresponding first analog switch of 1 tunnel remote measurement is opened 74HC4066 (2), it is identical with 1c principles with step 1b, realize that 1 tunnel telemetry separates four road signals, into step 3d;
Step 3d:Judge three switching position of the switch states:" 1 " position return to step 1a, " 2 " number position return to step 2a, " 3 " number position Return to step 3c;
Step 3e:1 road telemetry interface interrupt response is closed, 2 road telemetry interface interrupt responses are opened;
Step 3f:Judge whether there are 2 road telemetry interface interrupt responses in continuous 2 seconds:If without 2 road telemetry interfaces Interrupt response, closes the corresponding second analog switch 74HC4066 (4) of 2 tunnel remote measurements, into step 3b;If 2 tunnel remote measurements connect Mouth interrupt response, receives 2 tunnel telemetries, and carry out correction judgement to receiving telemetry frame:
Such as telemetry frame is incorrect at continuous 25 times, closes the corresponding second analog switch 74HC4066 (4) of 2 tunnel remote measurements, enters Enter step 3b;Such as in 25 times, correct telemetry frame is received, corresponding second analog switch of 2 tunnel remote measurements is opened 74HC4066 (4), it is identical with 2c principles with step 2b, realize that 2 tunnel telemetries separate four road signals, into step 3g;
Step 3g:Judge three switching position of the switch states:" 1 " position return to step 1a, " 2 " number position return to step 2a, " 3 " number position Return to step 3f.
5. telemetered signal distribution method according to claim 4, it is characterised in that the telemetry described in step 3c and 3f Frame in 25 times whether correct basis for estimation:Frame head, check code, synchronous code and the frame length of telemetry frame, described frame head Respectively hexadecimal " 51 ", " 52 ", " 53 ", " 54 ".
6. the remote signal distribution method that a kind of UAV TT & C's signal distributor using described in claim 3 is carried out, it is special Levy and be three switching switches respectively to " 1 " " 2 " " 3 " number position, step is as follows:
Step 1a:Three switching switches are to " 1 " number position, and single-chip microcomputer C8051F020 (5) enables corresponding first simulation of 1 tunnel remote control 74HC4066 (2) is switched, the first analog switch 74HC4066 (2) is opened;
Step 1b:1 tunnel remote signal is transmitted to the 3rd level shifting circuit 75175 (6), and differential type level signal is converted to Transistor-Transistor Logic level signal, and Transistor-Transistor Logic level signal is input to two level shifting circuits 75174 (7) (8);
Step 1c:Transistor-Transistor Logic level signal is reverted to differential type level signal by two level shifting circuits 75174 (7) (8), realizes 1 Road remote control separates two paths of signals;
Step 2a:Three switching switches are to " 2 " number position, and single-chip microcomputer C8051F020 (5) enables corresponding second simulation of 2 tunnel remote controls 74HC4066 (4) is switched, the second analog switch 74HC4066 (4) is opened;
Step 2b:2 tunnel remote signals are transmitted to the 3rd level shifting circuit 75175 (6), and differential type level signal is converted to Transistor-Transistor Logic level signal, and Transistor-Transistor Logic level signal is input to two level shifting circuits 75174 (7) (8);
Step 2c:Transistor-Transistor Logic level signal is reverted to differential type level signal by two level shifting circuits 75174 (7) (8), realizes 2 Road remote control separates two paths of signals;
Step 3a:Three switchings are switched to " 3 " number position, the first level shifting circuit 75175 (1) or second electrical level change-over circuit 75175 (3) are converted to remote signal the Transistor-Transistor Logic level signal adapted to single-chip microcomputer C8051F020 (5), single-chip microcomputer C8051F020 (5) voluntarily controlled according to 1 tunnel or 2 road remote-control datas that receive;
Step 3b:1 road Remote Control Interface interrupt response is opened, 2 road Remote Control Interface interrupt responses are closed;
Step 3c:Judge whether there is 1 road Remote Control Interface interrupt response in continuous 2 seconds:If without 1 road Remote Control Interface Interrupt response, closes the corresponding first analog switch 74HC4066 (2) of 1 tunnel remote control, into step 3e;If 1 tunnel remote control connects Mouth interrupt response, receives 1 road remote-control data, and carry out correction judgement to receiving 1 road remote-control data frame;
Such as remote-control data frame is incorrect at continuous 25 times, closes the corresponding first analog switch 74HC4066 (2) of 1 tunnel remote control, enters Enter step 3e;Such as in 25 times, correct remote-control data frame is received, corresponding first analog switch of 1 tunnel remote control is opened 74HC4066 (2), it is identical with 1c principles with step 1b, realize that 1 road remote-control data separates two paths of signals, into step 3d;
Step 3d:Judge three switching position of the switch states:" 1 " position return to step 1a, " 2 " number position return to step 2a, " 3 " number position Return to step 3c;
Step 3e:1 road Remote Control Interface interrupt response is closed, 2 road Remote Control Interface interrupt responses are opened;
Step 3f:Judge whether there are 2 road Remote Control Interface interrupt responses in continuous 2 seconds:If without 2 road Remote Control Interfaces Interrupt response, closes the corresponding second analog switch 74HC4066 (4) of 2 tunnel remote controls, into step 3b;If 2 tunnel remote controls connect Mouth interrupt response, receives 2 road remote-control datas, and carry out correction judgement to receiving remote-control data frame:
Such as remote-control data frame is incorrect at continuous 25 times, closes the corresponding second analog switch 74HC4066 (4) of 2 tunnel remote controls, enters Enter step 3b;Such as in 25 times, correct remote-control data frame is received, the corresponding analog switch second of 2 tunnel remote controls is opened and simulates 74HC4066 (4) is switched, it is identical with 2c principles with step 2b, realize that 2 road remote-control datas separate two paths of signals, into step 3g;
Step 3g:Judge three switching position of the switch states:" 1 " position return to step 1a, " 2 " number position return to step 2a, " 3 " number position Return to step 3f.
7. remote signal distribution method according to claim 6, it is characterised in that the remote-control data described in step 3c and 3f Frame in 25 times whether correct basis for estimation:Frame head, check code, synchronous code and the frame length of remote-control data frame, described frame head For fixed frame head hexadecimal " 4F ".
CN201510018305.XA 2015-01-14 2015-01-14 A kind of UAV TT & C's signal distributor and distribution method Active CN104702333B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510018305.XA CN104702333B (en) 2015-01-14 2015-01-14 A kind of UAV TT & C's signal distributor and distribution method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510018305.XA CN104702333B (en) 2015-01-14 2015-01-14 A kind of UAV TT & C's signal distributor and distribution method

Publications (2)

Publication Number Publication Date
CN104702333A CN104702333A (en) 2015-06-10
CN104702333B true CN104702333B (en) 2017-10-03

Family

ID=53349139

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510018305.XA Active CN104702333B (en) 2015-01-14 2015-01-14 A kind of UAV TT & C's signal distributor and distribution method

Country Status (1)

Country Link
CN (1) CN104702333B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109347541B (en) * 2018-10-18 2021-07-27 上海歌尔泰克机器人有限公司 Equipment switching method and device and data transmission system
CN109917746B (en) * 2019-04-09 2020-09-25 中国科学院高能物理研究所 Signal distributor for small-angle X-ray scattering experiment and distribution method thereof
CN111857009B (en) * 2020-07-31 2024-06-04 西安爱生技术集团公司 Manual antenna control panel with self-checking function

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008029948B4 (en) * 2008-06-26 2018-08-30 Phoenix Contact Gmbh & Co. Kg monitoring system
KR101010248B1 (en) * 2009-07-02 2011-01-21 충남대학교산학협력단 Method and Device to Control the Load of a Packet Inspection Device
CN101704411B (en) * 2009-11-04 2012-05-23 北京航空航天大学 Flight remote controller suitable for unmanned plane
CN103414598B (en) * 2013-07-09 2016-08-24 中国航空工业集团公司沈阳飞机设计研究所 A kind of UAS information propagation time delay test Apparatus and method for
CN205179046U (en) * 2015-01-14 2016-04-20 西安爱生技术集团公司 Unmanned aerial vehicle observes and controls signal distribution ware

Also Published As

Publication number Publication date
CN104702333A (en) 2015-06-10

Similar Documents

Publication Publication Date Title
CN205179046U (en) Unmanned aerial vehicle observes and controls signal distribution ware
CA1078965A (en) Remote controlled test interface unit
CN105262211B (en) The synchronous online self-diagnosing method of a kind of distribution main website and terminal
CN104702333B (en) A kind of UAV TT & C's signal distributor and distribution method
CN104680905B (en) A kind of teaching process automatic monitoring system and monitoring method for being applied to experimental teaching
CN103777526A (en) Simulation testing system of integrated electronic system of satellite
CN105553885B (en) A kind of FC interchanger priority test method
CN206193123U (en) Distribution automation integration testing arrangement
CN110632410B (en) Intelligent debugging system for automatic equipment of intelligent substation and application method thereof
CN109541353A (en) Power distribution automation detection system
US4688171A (en) Serial bus for master/slave computer system
CN106787199A (en) A kind of portable substation simulated testing system and method
CN102752145A (en) Novel detecting and isolating system for fault of RS-485 port and method thereof
CN103925853A (en) Carrier rocket ground test system device
CN103676661B (en) Multifunction emulation verifies system and its emulation verification method
CN102355378B (en) Carrier channel testing system
CN106549500A (en) A kind of device of transformer station's telecontrol communication machine Two-channel switching and its method for automatic switchover
CN104184215B (en) Transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method
CN106771599A (en) Intelligent substation synchronous phasor measuring device method of testing and test device
CN109831349A (en) A kind of SpaceWire bus free topology error rate test system and method
CN109347548B (en) Optical path integration test platform
CN106777755A (en) The calibration equipment and system of a kind of wall latching logic
CN101232408B (en) Method and system for testing stability of mass of numeral subscriber line port for chain building and breaking
CN109856474A (en) The test macro of partition security computing platform in middling speed magnetic suspension system
CN106093823A (en) A kind of self checking technology of insulation monitoring and warning device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant