CN106771599A - Intelligent substation synchronous phasor measuring device method of testing and test device - Google Patents

Intelligent substation synchronous phasor measuring device method of testing and test device Download PDF

Info

Publication number
CN106771599A
CN106771599A CN201611045043.7A CN201611045043A CN106771599A CN 106771599 A CN106771599 A CN 106771599A CN 201611045043 A CN201611045043 A CN 201611045043A CN 106771599 A CN106771599 A CN 106771599A
Authority
CN
China
Prior art keywords
pmu
test
testers
intelligent substation
measuring device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611045043.7A
Other languages
Chinese (zh)
Other versions
CN106771599B (en
Inventor
刘明忠
何笠
冯世林
姜振超
黄俏音
陈罗飞
李东升
郑永康
崔弘
吴杰
汪晓华
代宇涵
高艺文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING PONOVO POWER Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Original Assignee
BEIJING PONOVO POWER Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING PONOVO POWER Co Ltd, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd filed Critical BEIJING PONOVO POWER Co Ltd
Priority to CN201611045043.7A priority Critical patent/CN106771599B/en
Publication of CN106771599A publication Critical patent/CN106771599A/en
Application granted granted Critical
Publication of CN106771599B publication Critical patent/CN106771599B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R25/00Arrangements for measuring phase angle between a voltage and a current or between voltages or currents

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses intelligent substation synchronous phasor measuring device method of testing and test device, the test device includes:PMU testers, pc client, wherein, intelligent substation SCD file is imported with the PMU testers, PMU testers send Current Voltage and switching value to PMU collecting units;Data in PMU collecting units are by being transmitted back to PMU testers after the treatment of PMU centralized units, PMU testers will send data and carry out the functional test that contrast completes intelligent substation synchronous phasor measuring device with return data, realize the technique effect tested intelligent substation synchronous phasor measuring device.

Description

Intelligent substation synchronous phasor measuring device method of testing and test device
Technical field
The present invention relates to intelligent substation synchronous phasor measuring device research field, in particular it relates to intelligent substation is same Step phasor measuring set method of testing and test device.
Background technology
Synchronous phasor measuring device (PMU devices) is that a kind of measurement for transformer station and power plant's synchronized phasor and dynamic are remembered The device of record.In recent years, PMU devices are configured with intelligent substations at different levels, based on the synchronous phasor measurement function of PMU devices The WAMS that stands calculates analysis offer data source support using with electricity net safety stable, therefore it is responsible for the weight of power grid security and stabilization Big responsibility.At present, the PMU devices and measuring technology of conventional substation have tended to ripe, and the technology of intelligent substation PMU devices Specification (company standard) is issued soon, is still lacked and the supporting intelligent substation PMU device to test instrument of technical specification and test side Case, needs badly and proposes PMU device to test technical schemes according to technical specification, researches and develops the work of related intelligent substation PMU testers Work is also urgently carried out.
In sum, present inventor has found above-mentioned technology extremely during the present application technical scheme is realized There is following technical problem less:
In the prior art, existing intelligent substation PMU devices presence cannot carry out the technical problem of Validity Test.
The content of the invention
The invention provides a kind of intelligent substation synchronous phasor measuring device method of testing and test device, solve existing With the presence of intelligent substation PMU devices cannot carry out the technical problem of Validity Test, realizing can effectively to intelligent change The technique effect that power station synchronous phasor measuring device is tested.
Intelligent substation PMU devices are different with conventional substation PMU devices, its voltage x current amount, switch input/output amount It is transmitted by way of optical fiber is with communication message, not the hardwire transmission means of conventional substation.Therefore need to intelligence The transmission signal of PMU devices can be related to be parsed in transformer station's SCD file, using PMU tester analog input voltage electric currents Amount and switching value, detect the performance of intelligent substation PMU devices and the correctness and integrality of function.
According to the QGDW 11202.6-2014 that State Grid Corporation of China is newest《Intelligent substation automation equipment inspection criterion 6th part:Synchronized phase measurement device》Specification, the present situation of PMU apparatus functions is detected for the means of testing for lacking system, According to intelligent substation on-site actual situations, the complete measuring technology scheme of intelligent substation PMU devices is proposed, and according to test The related intelligent substation PMU testers of technical scheme research and development, realize the test of intelligent substation PMU apparatus functions.
In order to solve the above technical problems, being filled this application provides a kind of test of intelligent substation synchronous phasor measuring device Put, the test device includes:
PMU testers, pc client, wherein, intelligent substation SCD file is imported with the PMU testers, PMU is surveyed Examination instrument sends Current Voltage and switching value to PMU collecting units;The place that data in PMU collecting units pass through PMU centralized units It is transmitted back to PMU testers after reason, PMU testers will send data and return data and carry out the synchronous phase of contrast completion intelligent substation The functional test of measuring device.
Synchronous phasor measuring device (PMU) device is mainly made up of PMU collecting units and PMU centralized units.
Wherein, PMU collecting units:Synchronous phasor measuring device utilizes the Big Dipper/GPS satellite clock signal and high speed FPGA numbers Word signal processing technology, energy synchro measure goes out the signal such as access node voltage, electric current phasor and frequency, active, idle, is complete set The functions such as system power network monitoring, automation of transformation substations observing and controlling, stability contorting, wide area protection provide necessary initial data and realize hand Section.
Wherein, the data in PMU collecting units include:Busbar voltage, circuit/main transformer current signal.Initially come from circuit/ The measurement winding analog quantity of the corresponding voltage transformer summation current transformer of main transformer, symbol is processed into by corresponding combining unit The data signal of 61850-9-2 agreements is closed, this data signal is sent to PMU devices via the network switch and gathered by optical fiber Unit.And the signal such as the frequency of PMU collecting units, active, idle be by corresponding voltage x current amount calculate and come reality When data.
Wherein, PMU devices centralized unit is used to being responsible for collecting and forwarding for many PMU device collecting unit data.
PMU testers send current and voltage data to PMU collecting units, and receive the echo back data of PMU centralized units, and Both are compared.
Wherein, it is characterised in that the test device includes pc client, the pc client is used to configure PMU tests The interface of instrument and PMU collecting units, and PMU testers are controlled.
Wherein, the test device also include clock synchronization module, the clock synchronization module be used for for PMU testers, PMU collecting units, PMU centralized units provide unified clock.
Wherein, when PMU collecting units and PMU centralized units are in same screen cabinet, the test device also includes:PC client End and the network switch, the network switch are all connected with pc client, PMU testers, PMU centralized units.
Wherein, when PMU collecting units and PMU centralized units be not in same screen cabinet, the test device also includes:PC visitors Family end 1, pc client 2, pc client 1 send data to PMU collecting units, and pc client 2 receives the number of PMU centralized units According to.
Wherein, when transformer station is in double bus scheme mode or double-bus section wiring mode, circuit or main transformer Using single combining unit electric current, the single combining unit synchronous network of simulation sends depressor electric current, by optical fiber connecting test instrument optical port with PMU device collecting unit optical ports or interchanger optical port are connected;When transformer station is in 3/2 mode of connection, circuit or main transformer pressure Device electric current is simulated many combining unit synchronous networks and is sent by the way of the electric current of two combining units synthesizes line current, A plurality of optical fiber is connected into multichannel optical port, and the current data of these optical ports is required to by tester software synchronization process, otherwise It is easily caused optical fiber link data step-out and causes circuit or the invalid alarm of main transformer electric current.
Wherein, when transformer station is in double bus scheme mode or double-bus section wiring mode, single conjunction can be simulated And unit synchronous network sends, by optical fiber connecting test instrument optical port and interchanger optical port;When transformer station is in 3/2 mode of connection When, many combining unit synchronous networks can be simulated and sent, a plurality of optical fiber is connected into multichannel optical port.
Wherein, the PMU testers are additionally operable to automatically generate test report according to test result, and test report includes:Quilt Survey PMU devices essential information, test environment conditions essential information and test result information.
On the other hand, present invention also provides a kind of intelligent substation synchronous phasor measuring device method of testing, the side Method includes:
Step 1:Installing PMU schematic diagram of device carries out testing closed loop wiring;
Step 2:Intelligent substation SCD file is imported in PMU testers;
Step 3:According to intelligent substation SCD file, configuration PMU testers input/output port, interval information;
Step 4:Connection PMU testers and PMU devices, configure PMU tester dependence test projects;
Step 5:PMU device to test is carried out, PMU device to test is completed, and generate test report.
Wherein, it was in the past, by artificial ready-made test report template, according to the test result done, manually to fill in simultaneously Process test data, workload is big, poor reliability.Store and carry out in software corresponding by by the test result of test event Data processing, it is last that Auto-writing is carried out according to test report template integrated in software, the generation versions of word 2007 Test report.
Wherein, SCD configuration files can be imported using PMU testers, the passages such as the Current Voltage of PMU devices can be solved Analysis, so as to be more efficiently connected with PMU devices;PMU testers can show that the Chinese of the internal data of PMU mounted casts is retouched State, facilitate that user is more convenient, intuitively to PMU mounted casts be attached configuration in the internal data of PMU testers.
One or more technical schemes that the application is provided, at least have the following technical effect that or advantage:
Due to according to intelligent substation on-site actual situations, employing PMU device closed loop test technological means, so, have Effect solves the presence of existing intelligent substation PMU devices and cannot carry out the technical problem of Validity Test, and then realize can The effective technique effect tested intelligent substation synchronous phasor measuring device.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the embodiment of the present invention, constitutes of the application Point, do not constitute the restriction to the embodiment of the present invention;
Fig. 1 is PMU devices monospace digital simulation test philosophy figure in the application;
Fig. 2 is PMU device multi-compartment digital simulation test philosophy figures in the application;
Fig. 3 is PMU device to test schematic diagrams in the application;
Fig. 4 is elementary diagram when PMU centralized units are closer to the distance with PMU collecting units in the application;
Fig. 5 is elementary diagram when PMU centralized units are distant with PMU collecting units in the application;
Fig. 6 is PMU device to test schematic flow sheets in application.
Specific embodiment
The invention provides a kind of intelligent substation synchronous phasor measuring device method of testing and test device, solve existing With the presence of intelligent substation PMU devices cannot carry out the technical problem of Validity Test, realizing can effectively to intelligent change The technique effect that power station synchronous phasor measuring device is tested.
It is below in conjunction with the accompanying drawings and specific real in order to be more clearly understood that the above objects, features and advantages of the present invention Mode is applied to be further described in detail the present invention.It should be noted that in the case where not conflicting mutually, the application's Feature in embodiment and embodiment can be mutually combined.
Many details are elaborated in the following description in order to fully understand the present invention, but, the present invention may be used also Implemented with the other modes in the range of using other being different from being described herein, therefore, protection scope of the present invention do not receive down The limitation of specific embodiment disclosed in face.
The purpose of patent of the present invention is to provide intelligent substation PMU apparatus function method of testings, and thus develops intelligence Energy transformer station PMU testers, realization is detected to intelligent substation PMU apparatus functions, and it is automatic to pass through PMU test results Generation test report.
To realize above-mentioned technical problem, the present invention uses following technical scheme:
This method for testing PMU apparatus functions by importing intelligent substation SCD file, mainly by four main skills Art principle is constituted:The sampled datas such as the importing and configuration of SCL (substation configuration description language), simulation transmission electric current, voltage, PMU device to test principle and testing scheme, the one-touch generation of PMU apparatus function testing process.
The importing and configuration of the SCD file, wherein intelligent substation SCD file describe all intelligence electricity in transformer station The information such as communication configuration and transforming plant primary system architecture between the exemplary configuration and messaging parameter, IED of sub- equipment, and it is right The parsing of SCD file is the basis of SCD file application, main to extract the configuration informations such as GOOSE and SV.Therefore, configured using SCD File imports PMU testers, can quickly parse the current and voltage quantities passage of PMU devices, and be the tunnels analogy of PMU devices Dosage provides basis.
Further technical scheme is that PMU testers, PMU collecting units and PMU centralized units are both needed to same by clock Step, clock synchronously can provide unified clock source for PMU testers, PMU collecting units and PMU centralized units, and three are ensured with this Person's synchronization.According to different wiring, its method of testing is also not quite similar.Connect for double bus scheme mode or double-bus segmentation Line mode, can carry out dosage on heart interchanger in the line.Because under this wiring, circuit or transformer relate only to separate room Every, i.e., the required voltage magnitude of current only can be gathered with single combining unit, therefore can be by connecting test instrument optical port and exchange Machine optical port, can simulate single combining unit carries out the dosage of Current Voltage, i.e. analog line combining unit or main transformer merging list Unit carries out the input of Current Voltage.For such as 3/2 mode of connection, it is necessary to carry out dosage on every a string of center switch.By In the Current Voltage dosage for being related to multiple intervals, multiple combining units, therefore it is needed by multichannel optical port, simulation side breaker, Middle breaker combining unit, circuit combining unit or main transformer combining unit carry out the input dosage of Current Voltage.
Further technical scheme is that the test philosophy is to configure PMU testers by PMU testers pc client With the interface of PMU collecting units, the related Current Voltage of PMU testers transmission and switching value to PMU collecting units are controlled;PMU Collecting unit data are sent by sending PMU testers back to by netting twine after the treatment of PMU centralized units by with PMU testers The contrast of data completes corresponding functional test.Significantly, since target number when PMU centralized unit data are band According to, therefore the comparison of data can be completed by back production to PMU testers.By the data processing of PMU testers, electricity can be completed Stream voltage trueness error, phase angle error and its dynamic response error.In intelligent substation, in general, portion voltage etc. The PMU devices collecting unit of level is with PMU devices centralized unit not in same screen cabinet.PMU devices collecting unit is with centralized unit It is no to have considerable influence, test wiring of this utility patent to both of these case to PMU device to test connection principles in same screen cabinet Principle is designed respectively.
Further technical scheme is that the one-touch generation of PMU apparatus functions testing process refers to this PMU testers According to QGDW 11202.6-2014《The part of intelligent substation automation equipment inspection criterion the 6th:Synchronized phase measurement device》Rule Model, main test module and test passes standard can be configured in tester in advance, and tester needs only to Click on dependence test project, it is possible to which the specific test content of selection carries out the one-touch confirmation of test event, while can pass through Software algorithm, target reception data when sending data with band is carried out automatically corresponding, and calculates its precision size automatically, is alleviated The work load of PMU tests, reduces test errors rate.May then pass through the one-touch generation PMU test results of test result Report, test report includes tested PMU devices essential information, test environment conditions essential information and test result information, institute There is information to be automatically generated according to test result by PMU testers, both avoided the work of cumbersome artificial establishment report, keep away again Exempt from Human disturbance, increased the objective neutrality of report.
Fig. 1 show PMU testers, PMU collecting units and PMU centralized units and is both needed to by clock synchronization, and clock is same Step can provide unified clock source for PMU testers, PMU collecting units and PMU centralized units, and three's synchronization is ensured with this.It is right In double bus scheme mode or double-bus section wiring mode, dosage is carried out from wire center interchanger.Due to being related to Monospace, single combining unit, therefore Current Voltage can be carried out by optical port, analog line combining unit or main transformer combining unit Input.
Fig. 2 show PMU testers, PMU collecting units and PMU centralized units and is both needed to by clock synchronization, and clock is same Step can provide unified clock source for PMU testers, PMU collecting units and PMU centralized units, and three's synchronization is ensured with this.It is right In such as 3/2 mode of connection, dosage is carried out from string center switch.Due to being related to multiple intervals, multiple combining units, therefore Can simulate side breaker, middle breaker combining unit, circuit combining unit or main transformer combining unit and enter by multiple optical ports The input of row Current Voltage.
Fig. 3 show PMU device to test general principles, by pc client, PMU testers, PMU collecting units, PMU collection Middle unit and clock timing device form following closed loop wiring.PMU testers, PMU collecting units and PMU centralized units are equal Need to be by clock synchronization.The interface of PMU testers and PMU collecting units is configured by PMU testers pc client, PMU is controlled Tester sends related Current Voltage and switching value to PMU collecting units;PMU collecting units data pass through PMU centralized units Treatment after PMU testers are sent back to by netting twine, by contrast the completions corresponding function survey that data are sent with PMU testers Examination.
Significantly, since target data when PMU centralized unit data are band, therefore can be by back production to PMU Tester completes the comparison of data.By the data processing of PMU testers, current and voltage quantities trueness error, phase angle can be completed Error and its dynamic response error.
In intelligent substation, in general, PMU devices collecting unit and the PMU devices of portion voltage grade concentrate single Unit is not in same screen cabinet.Whether PMU devices collecting unit has in same screen cabinet with centralized unit to PMU device to test connection principles Considerable influence, below the test connection principle to both of these case be illustrated respectively.
Fig. 4 is shown in the case where PMU devices collecting unit and centralized unit are closer to the distance, can be using same PC visitors Sending and receiving for PMU device data is realized in family end by netting twine, and data are transmitted in PMU testers and data are received Treatment, generate final PMU regulations test report.
As can be seen that an indirect network switch of this kind of wiring in pc client and PMU testers, it is possible to achieve Using only the same data of pc client to the transmission of PMU testers, and PMU device centralized unit data are received, so that real The comparison and treatment of existing data.
Fig. 5 is shown in the case where PMU devices collecting unit and centralized unit are distant, it is impossible to only with one Pc client receives data by a netting twine from PMU centralized units.Two pc clients are now used, respectively by PC client End 1 sends data to PMU devices collecting unit, and PMU device centralized units are received by pc client 2.Thus in pc client 1 Form band markers and send data file, while target receives data file when pc client 2 forms band, finally by two files Import and processed in PMU tester softwares, automatically generate test report.Specific wiring is as shown in Figure 3.
As can be seen that this kind of wiring forms closed loop wiring by two pc clients and PMU devices testing, it is adaptable to PMU Situation when device centralized unit and distant collecting unit, transmission from one of client to PMU device collecting units Data, another client receives PMU device centralized unit data, so as to realize the comparison and treatment of data.
Fig. 6 show the idiographic flow of the innovation patent.By closed loop wiring, import intelligent substation SCD file, configuration PMU testers and PMU devices input/output port and interval information, connection PMU tests and PMU devices, configuration PMU testers are surveyed The links such as examination item, beginning PMU testing experiments, generation PMU testing experiment reports, complete whole PMU device to test experiment process.
Technical scheme in above-mentioned the embodiment of the present application, at least has the following technical effect that or advantage:
Due to according to intelligent substation on-site actual situations, employing PMU device closed loop test technological means, so, have Effect solves the presence of existing intelligent substation PMU devices and cannot carry out the technical problem of Validity Test, and then realize can The effective technique effect tested intelligent substation synchronous phasor measuring device.
, but those skilled in the art once know basic creation although preferred embodiments of the present invention have been described Property concept, then can make other change and modification to these embodiments.So, appended claims are intended to be construed to include excellent Select embodiment and fall into having altered and changing for the scope of the invention.
Obviously, those skilled in the art can carry out various changes and modification without deviating from essence of the invention to the present invention God and scope.So, if these modifications of the invention and modification belong to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising these changes and modification.

Claims (10)

1. intelligent substation synchronous phasor measuring device method of testing, it is characterised in that methods described includes:
Step 1:Installing PMU schematic diagram of device carries out testing closed loop wiring;
Step 2:Intelligent substation SCD file is imported in PMU testers;
Step 3:According to intelligent substation SCD file, configuration PMU testers input/output port, interval information;
Step 4:Connection PMU testers and PMU devices, configure PMU tester dependence test projects;
Step 5:Complete, with click beginning testing button is postponed, PMU device to test to be carried out automatically, complete PMU device to test, and root According to test event and result test report is automatically generated according to test report template.
2. intelligent substation synchronous phasor measuring device test device, it is characterised in that the test device includes:
PMU testers, pc client, wherein, synchronous phasor measuring device includes PMU centralized units and PMU collecting units, described Intelligent substation SCD file is imported with PMU testers, PMU testers send Current Voltage and switching value and gather single to PMU Unit;Data in PMU collecting units will be sent by being transmitted back to PMU testers, PMU testers after the treatment of PMU centralized units Data carry out the functional test that contrast completes intelligent substation synchronous phasor measuring device with return data.
3. intelligent substation synchronous phasor measuring device test device according to claim 2, it is characterised in that described PMU collecting units are used to gather intelligent substation synchronizing signal, and the PMU centralized units are used for the letter of the single collection of PMU collections Number collected and forwarded.
4. intelligent substation synchronous phasor measuring device test device according to claim 2, it is characterised in that the PC Client is used to configure the interface of PMU testers and PMU collecting units, and PMU testers are controlled.
5. intelligent substation synchronous phasor measuring device test device according to claim 2, it is characterised in that the survey Trial assembly is put also includes clock synchronization module, and the clock synchronization module is used to be concentrated for PMU testers, PMU collecting units, PMU Unit provides unified clock.
6. intelligent substation synchronous phasor measuring device test device according to claim 2, it is characterised in that work as PMU With PMU centralized units in same screen cabinet, the test device also includes collecting unit:Pc client and the network switch, institute The network switch is stated to be all connected with pc client, PMU testers, PMU centralized units.
7. intelligent substation synchronous phasor measuring device test device according to claim 2, it is characterised in that work as PMU With PMU centralized units not in same screen cabinet, the test device also includes collecting unit:Pc client 1, pc client 2, PC Client 1 sends data to PMU collecting units, and pc client 2 receives the data of PMU centralized units.
8. intelligent substation synchronous phasor measuring device test device according to claim 2, it is characterised in that work as power transformation Stand during in double bus scheme mode or double-bus section wiring mode, circuit or main transformer electric current merge single using single Elementary current, the single combining unit synchronous network of simulation sends, by optical fiber connecting test instrument optical port and PMU device collecting unit optical ports or Interchanger optical port is connected;When transformer station is in 3/2 mode of connection, circuit or main transformer electric current use two combining units Electric current synthesize the mode of line current, simulate many combining unit synchronous networks and send, a plurality of optical fiber is connected into multichannel optical port, And the current data of optical port synchronizes treatment by tester software.
9. intelligent substation synchronous phasor measuring device test device according to claim 2, it is characterised in that described PMU testers are additionally operable to automatically generate test report according to test result, and test report includes:Tested PMU devices essential information, Test environment conditions essential information and test result information.
10. intelligent substation synchronous phasor measuring device test device according to claim 2, it is characterised in that described Closed loop test method according to PMU device collecting unit data and the data type of two kinds of centralized unit, it is parsed;Root According to the requirement of station end integrated monitoring system, what PMU devices collecting unit was received is intelligent substation 61850-9-2 agreement numbers According to simultaneously the data of loopback are Ethernet protocol data from after the treatment of PMU devices centralized unit, and PMU tester softwares can be to intelligence Energy transformer station 61850-9-2 protocol datas and Ethernet protocol data carry out analysis and comparison.
CN201611045043.7A 2016-11-21 2016-11-21 The test device of intelligent substation synchronous phasor measuring device Active CN106771599B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611045043.7A CN106771599B (en) 2016-11-21 2016-11-21 The test device of intelligent substation synchronous phasor measuring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611045043.7A CN106771599B (en) 2016-11-21 2016-11-21 The test device of intelligent substation synchronous phasor measuring device

Publications (2)

Publication Number Publication Date
CN106771599A true CN106771599A (en) 2017-05-31
CN106771599B CN106771599B (en) 2019-08-20

Family

ID=58975213

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611045043.7A Active CN106771599B (en) 2016-11-21 2016-11-21 The test device of intelligent substation synchronous phasor measuring device

Country Status (1)

Country Link
CN (1) CN106771599B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107942167A (en) * 2017-11-22 2018-04-20 国网四川省电力公司电力科学研究院 Intelligent substation synchronous phasor measuring device boss, which stands, tests system and method
CN109521300A (en) * 2018-11-29 2019-03-26 贵州电网有限责任公司 A kind of test method of multifunctional digital tester
CN111999690A (en) * 2020-08-25 2020-11-27 中电普瑞电力工程有限公司 Batch factory detection system and method for adaptive PMU device
CN112671101A (en) * 2020-12-11 2021-04-16 广西电网有限责任公司电力科学研究院 Closed-loop test system and method for intelligent power transformation protection equipment with whole-screen cabinet access

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1760686A (en) * 2005-11-16 2006-04-19 上海华东电力信息工程技术有限公司 Method for checking out phase handling unit (PHU) in site
US20060259255A1 (en) * 2005-04-05 2006-11-16 Anderson James C Method of visualizing power system quantities using a configurable software visualization tool
CN1904623A (en) * 2005-07-25 2007-01-31 华东电力试验研究院 Performance test method of synchronous phasor measuring device and test system
CN2906632Y (en) * 2005-11-16 2007-05-30 上海南瑞实业有限公司 Portable dynamic PMU performance tester
CN101629995A (en) * 2009-08-10 2010-01-20 华中电网有限公司 Detection method of phasor measurement unit PMU
CN202837399U (en) * 2012-08-28 2013-03-27 南京国电南自电网自动化有限公司 Synchronized phasor measurement apparatus
CN103033789A (en) * 2012-12-26 2013-04-10 华北电力大学 Static and dynamic test system of synchronous phasor measurement unit pressure measuring unit (PMU)
CN103163499A (en) * 2013-03-01 2013-06-19 江西省电力科学研究院 Synchronous phasor measuring unit (PMU) detecting device
CN103400215A (en) * 2013-06-20 2013-11-20 国家电网公司 Method associating PMU measurement equipment with electrical-network operational data equipment
CN103823200A (en) * 2014-03-06 2014-05-28 国家电网公司 Method for detecting distributed PMU

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060259255A1 (en) * 2005-04-05 2006-11-16 Anderson James C Method of visualizing power system quantities using a configurable software visualization tool
CN1904623A (en) * 2005-07-25 2007-01-31 华东电力试验研究院 Performance test method of synchronous phasor measuring device and test system
CN1760686A (en) * 2005-11-16 2006-04-19 上海华东电力信息工程技术有限公司 Method for checking out phase handling unit (PHU) in site
CN2906632Y (en) * 2005-11-16 2007-05-30 上海南瑞实业有限公司 Portable dynamic PMU performance tester
CN101629995A (en) * 2009-08-10 2010-01-20 华中电网有限公司 Detection method of phasor measurement unit PMU
CN202837399U (en) * 2012-08-28 2013-03-27 南京国电南自电网自动化有限公司 Synchronized phasor measurement apparatus
CN103033789A (en) * 2012-12-26 2013-04-10 华北电力大学 Static and dynamic test system of synchronous phasor measurement unit pressure measuring unit (PMU)
CN103163499A (en) * 2013-03-01 2013-06-19 江西省电力科学研究院 Synchronous phasor measuring unit (PMU) detecting device
CN103400215A (en) * 2013-06-20 2013-11-20 国家电网公司 Method associating PMU measurement equipment with electrical-network operational data equipment
CN103823200A (en) * 2014-03-06 2014-05-28 国家电网公司 Method for detecting distributed PMU

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107942167A (en) * 2017-11-22 2018-04-20 国网四川省电力公司电力科学研究院 Intelligent substation synchronous phasor measuring device boss, which stands, tests system and method
CN109521300A (en) * 2018-11-29 2019-03-26 贵州电网有限责任公司 A kind of test method of multifunctional digital tester
CN111999690A (en) * 2020-08-25 2020-11-27 中电普瑞电力工程有限公司 Batch factory detection system and method for adaptive PMU device
CN111999690B (en) * 2020-08-25 2023-08-22 中电普瑞电力工程有限公司 Batch delivery detection system and method for self-adaptive PMU devices
CN112671101A (en) * 2020-12-11 2021-04-16 广西电网有限责任公司电力科学研究院 Closed-loop test system and method for intelligent power transformation protection equipment with whole-screen cabinet access
CN112671101B (en) * 2020-12-11 2022-11-04 广西电网有限责任公司电力科学研究院 Closed-loop test system and method for intelligent power transformation protection equipment with whole-screen cabinet access

Also Published As

Publication number Publication date
CN106771599B (en) 2019-08-20

Similar Documents

Publication Publication Date Title
CN102901881B (en) On-site debugging method for digital substation
CN105785199B (en) Multifunctional ligand electric terminals integrated test system and its working method
CN108414849B (en) Intelligent substation automatic test system and method
CN107786000B (en) Intelligent generation method for configuration file of digital relay protection tester
CN106771599A (en) Intelligent substation synchronous phasor measuring device method of testing and test device
CN104360298B (en) Performance test system and method for merging unit tester
CN104375038B (en) A kind of expansible closed-loop synchronization distribution power automation terminal detection platform and method
CN107025344B (en) Power distribution automation simulation system and simulation method for power distribution DTS
CN107942167A (en) Intelligent substation synchronous phasor measuring device boss, which stands, tests system and method
CN110429991A (en) A kind of electrical energy data acquiring emulation test system
CN107453405A (en) A kind of Fault Locating Method and system based on transient state recording fault detector
CN103684907A (en) Regional power network intelligent equipment time analyzer
CN107741549A (en) The intelligent substation synchronism tester synchronously occurred based on analog quantity and digital quantity
CN105847076B (en) Signal testing system, method and device for substation control level equipment of transformer substation
CN109814061A (en) The information security reliability checking method and device of measuring terminal and intelligent electric meter
CN106990384A (en) A kind of three-phase electric energy meter false wiring detection means and detection method
CN110266548A (en) A kind of constructing communication network simulation detection system
CN105093017A (en) Integrated GOOSE tester of intelligent transformer station and test method of tester
CN106921522A (en) Intelligent substation network message record analysis device networked information model inspection device
CN111308242A (en) Test platform and test method of distribution automation system
CN108132455A (en) Global error check system based on combining unit
CN113704987B (en) Three-dimensional presentation method based on secondary optical fiber loop fault positioning algorithm
CN103576014B (en) The clock monitor device of transformer station and monitoring method
CN112014669A (en) Online detection method and system for angle difference and ratio difference of merging unit
CN211239790U (en) Photovoltaic conflux case monitoring facilities

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant