CN104690018B - Ceramic production device cleans the recovery system of material - Google Patents

Ceramic production device cleans the recovery system of material Download PDF

Info

Publication number
CN104690018B
CN104690018B CN201510082354.XA CN201510082354A CN104690018B CN 104690018 B CN104690018 B CN 104690018B CN 201510082354 A CN201510082354 A CN 201510082354A CN 104690018 B CN104690018 B CN 104690018B
Authority
CN
China
Prior art keywords
water
recovery pond
ball mill
transported
recovery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510082354.XA
Other languages
Chinese (zh)
Other versions
CN104690018A (en
Inventor
吴炎辉
张国栋
陈华杰
吴炎榕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinjiang Fujian Province Ten Thousand Li Ci Industry Co Ltd
Original Assignee
Jinjiang Fujian Province Ten Thousand Li Ci Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinjiang Fujian Province Ten Thousand Li Ci Industry Co Ltd filed Critical Jinjiang Fujian Province Ten Thousand Li Ci Industry Co Ltd
Priority to CN201510082354.XA priority Critical patent/CN104690018B/en
Publication of CN104690018A publication Critical patent/CN104690018A/en
Application granted granted Critical
Publication of CN104690018B publication Critical patent/CN104690018B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam

Landscapes

  • Separation Of Suspended Particles By Flocculating Agents (AREA)

Abstract

A kind of ceramic production device cleans the recovery system of material, the material that material recovering system is reclaimed includes water, it is dissolved in the solid material of water and impaired solid adobe, material recovering system includes sedimentation tank, dehydration device, ball mill recovery pond, drying tower recovery pond, glaze spraying line recovery pond, collection conduit, ball mill recovery pond includes the recovery pond of blank ball mill and glaze ball mill, recovery pond collects cleaning and the muddy material of the sound of rain pattering is transported to sedimentation tank, water and the solid material for being dissolved in water are separated into clear water layer and pulp layer after precipitation, clear water layer is transported to ball mill and replaces raw water to use, after the slurry of pulp layer is transported to dehydration device dehydration, stock ground is input to including impaired solid adobe and individually deposits stand-by.

Description

Ceramic production device cleans the recovery system of material
Technical field
The present invention relates to a kind of ceramic production device cleans the recovery system of material, more particularly to including including rinse water Comprehensive recovery system, belongs to resource regeneration technical field.
Background technology
In architectural pottery production procedure, including the blanks such as mineral kaolin to be ground to form the slurry of certain fineness, slurry Spray into ceramic tile base, to adobe into the powder of certain water content, by powder pressing in drying tower high-pressure fog dewatered drying Enter klining again after glaze drying and make ceramic tile.It is the core embodiment for constituting different performance, pattern ceramic tile as blank and glaze, no With the ceramic tile of the category such as difference in functionality such as exterior wall tile, all-body tile, floor tile, for batch components structure is that have significantly Different formulations are required.And the ball mill as grinding raw material, slurry is converted into the drying tower of powder, in every replacing primary material Conscientious cleaning will be carried out once before formula.Being retained in slurry its amount between each ball mill perisporium and grinding stone can be by Ton meter, remains in and is dried the powder of inner wall of tower and does not also include decimal, and often clean once all to clean these water for leaving material Want tens tons.Traditional way is directly to emit these cleaning materials.Such way not only great waste of resource, it is also tight Heavily contaminated environment.
The content of the invention
In order to solve the problems, such as the above-mentioned wasting of resources, pollution environment, the present invention discloses a kind of ceramic production device cleaning materials The recovery system of material.
The technical solution adopted in the present invention is:The material that material recovering system is reclaimed includes water, is dissolved in the solid of water Material and impaired solid adobe, material recovering system include that sedimentation tank, dehydration device, ball mill recovery pond, drying tower are returned Receives pond, glaze spraying line recovery pond, collection conduit, ball mill recovery pond include the recovery pond of blank ball mill and glaze ball mill, return Receives pond collects cleaning and the muddy material of the sound of rain pattering is transported to sedimentation tank, and water is separated with the solid material for being dissolved in water after precipitation Into clear water layer and pulp layer, clear water layer is transported to ball mill and replaces raw water to use, and the slurry of pulp layer is transported to dehydration dress After putting dehydration, stock ground is input to including impaired solid adobe and individually deposits stand-by.
Sedimentation tank includes cell body, Chi Gai, clarified water pump, slush pump, and the inner bottom of cell body, wall are hardened into water barrier, pond Lid is arranged on cell body, plays rainwater-proof and dust function, and the aqueduct of clarified water pump is connected to ball mill water supply line, slush pump Stock line be connected to dehydration device.
Ball mill recovery pond, drying tower recovery pond, glaze spraying line recovery pond are connected to sedimentation tank, collection conduit by collection conduit Including pump delivery line and drop drainage pipe, the material Jing collection conduits of recovery pond are transported to sedimentation tank.
The invention has the beneficial effects as follows:Rinse water in efficient recovery cleaning process and the original for being deposited in the equipment of being cleaned Material, while reducing production cost, reduces the wasting of resources and environmental pollution.
Description of the drawings
The present invention is further described below in conjunction with the accompanying drawings:
Accompanying drawing is the recovery system schematic flow sheet of the present invention.
1, sedimentation tank in figure, 2, dehydration device, 3, ball mill recovery pond, 4, drying tower recovery pond, 5, glaze spraying line recovery pond, 6th, collection conduit, 7, stock ground, 8, impaired solid adobe, 9, water supply line, 11, clarified water pump, 12, slush pump, 13, aqueduct, 14th, stock line.
Specific embodiment
In the examples in the drawings, material recovering system includes sedimentation tank 1, dehydration device 2, ball mill recovery pond 3, drying Tower recovery pond 4, glaze spraying line recovery pond 5, collection conduit 6, the muddy material that recovery pond is collected are transported to sedimentation tank 1, Jing precipitations Clear water layer afterwards is transported to ball mill and replaces raw water to use, and the slurry of pulp layer is transported to after dehydration device 2 is dehydrated and is input into To stock ground 7, stock ground 7 is also passed into including impaired solid adobe 8.
Sedimentation tank 1 includes cell body, Chi Gai, clarified water pump 11, slush pump 12, and the inner bottom of cell body, wall are hardened into water proof Layer, the aqueduct 13 of clarified water pump 11 are connected to ball mill water supply line 9, and the stock line 14 of slush pump 12 is connected to dehydration dress Put 2.
Ball mill recovery pond 3, drying tower recovery pond 4, glaze spraying line recovery pond 5 are connected to sedimentation tank 1 by collection conduit 6, receive Collection pipeline 6 includes pump delivery line and drop drainage pipe, and the material Jing collection conduits 6 of recovery pond are transported to sedimentation tank 1.
Embodiment 1:Ball mill as grinding raw material, the drying tower for slurry being converted into powder, it is once former in every replacing Conscientious cleaning will be carried out once before material formula, using clear water is to ball mill and is dried inner wall of tower and is rinsed during cleaning, Clear water carries a large amount of remaining adobe raw materials and glaze and flows out from ball mill and drying tower into muddy water.The muddy water of outflow is divided Do not drain into ball mill recovery pond 3 and drying tower recovery pond 4, into recovery pond muddy water Jing collection conduits 6 be transported to it is heavy Concentrate in shallow lake pond 1.
Embodiment 2:Glaze spraying line redundance when glaze water is sprayed can be trickled along spraying equipment medial wall downwards, flowed down Glaze water is drained into glaze spraying line recovery pond 5, is returned into glaze spraying line because being returned the use of glaze spraying line by a certain degree of pollution The glaze water Jing collection conduits 6 of receives pond 5 are transported to sedimentation tank 1 and concentrate.
Embodiment 3:Ball mill recovery pond 3, drying tower recovery pond 4, glaze spraying line recovery pond 5 collect the muddiness of cleaning and the sound of rain pattering After material is transported to 1 concentration of precipitation, Jing after regular hour precipitation, the upper strata that is raised to waterborne is dissolved in the water into clear water layer Solid material sinks to lower floor into pulp layer.Start clarified water pump 11, the clear water Jing aqueducts 13 on upper strata are transported to ball mill Water supply line 9, alternative raw water is cleaned or dispensing is used;Start slush pump 12, be deposited in the pulp layer of 1 lower floor of sedimentation tank Picked up by slush pump 12, Jing stock lines 14 are transported to dehydration device 2, slurry is input to stock ground 7 Jing after the dehydration of dehydration device 2 Independent storage is stand-by.
Embodiment 4:Including including impaired solid adobe 8, because being contaminated with blank and glaze, comparison of ingredients is complicated, and using should Sample examination after mixing is needed to confirm composition, the added use that feeds intake again of the most close blank formulation group of reselection before reclaimed materials.

Claims (3)

1. a kind of ceramic production device cleans the recovery system of material, it is characterized in that:The thing that described material recovering system is reclaimed Material includes water, the solid material for being dissolved in water and impaired solid adobe, and material recovering system includes sedimentation tank, dehydration dress Put, ball mill recovery pond, drying tower recovery pond, glaze spraying line recovery pond, collection conduit, ball mill recovery pond includes blank ball mill With the recovery pond of glaze ball mill, recovery pond collects cleaning and the muddy material of the sound of rain pattering is transported to sedimentation tank, after precipitation water Clear water layer and pulp layer are separated into the solid material for being dissolved in water, clear water layer is transported to ball mill and replaces raw water to use, slurry After the slurry of the bed of material is transported to dehydration device dehydration, stock ground is input to including impaired solid adobe and individually deposits stand-by.
2. ceramic production device according to claim 1 cleans the recovery system of material, it is characterized in that:Described sedimentation tank Including cell body, Chi Gai, clarified water pump, slush pump, the inner bottom of cell body, wall are hardened into water barrier, and Chi Gai is arranged on cell body, Rainwater-proof and dust function are played, the aqueduct of clarified water pump is connected to ball mill water supply line, the stock line connection of slush pump To dehydration device.
3. ceramic production device according to claim 1 cleans the recovery system of material, it is characterized in that:Described ball mill Recovery pond, drying tower recovery pond, glaze spraying line recovery pond are connected to sedimentation tank by collection conduit, and collection conduit includes pump delivery line With drop drainage pipe, the material Jing collection conduits of recovery pond are transported to sedimentation tank.
CN201510082354.XA 2015-02-16 2015-02-16 Ceramic production device cleans the recovery system of material Expired - Fee Related CN104690018B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510082354.XA CN104690018B (en) 2015-02-16 2015-02-16 Ceramic production device cleans the recovery system of material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510082354.XA CN104690018B (en) 2015-02-16 2015-02-16 Ceramic production device cleans the recovery system of material

Publications (2)

Publication Number Publication Date
CN104690018A CN104690018A (en) 2015-06-10
CN104690018B true CN104690018B (en) 2017-03-29

Family

ID=53337785

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510082354.XA Expired - Fee Related CN104690018B (en) 2015-02-16 2015-02-16 Ceramic production device cleans the recovery system of material

Country Status (1)

Country Link
CN (1) CN104690018B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201643903U (en) * 2010-01-26 2010-11-24 梁双红 Glaze recovery machine
CN102276262A (en) * 2011-04-13 2011-12-14 岑溪市华进花岗岩废料综合利用有限公司 Production method for extracting K, Na and Al ceramic raw material from granite stone waste material
CN202539166U (en) * 2012-02-24 2012-11-21 广东中窑窑业股份有限公司 Polishing slag and waste recovery system for building ceramic
CN104177119A (en) * 2014-08-14 2014-12-03 合肥科斯孚安全科技有限公司 Preparation method of heat insulating porous ceramic made from light coal ash
CN104193292A (en) * 2014-08-06 2014-12-10 苏州科德溯源仪器有限公司 Carbon nano tube enhanced ceramic tile
CN204486352U (en) * 2015-02-16 2015-07-22 福建省晋江万利瓷业有限公司 The recovery system of ceramic production device cleaning material

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101344922B1 (en) * 2012-04-20 2013-12-27 경북대학교 산학협력단 Moss brick for purifying water and method for preparing the same

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201643903U (en) * 2010-01-26 2010-11-24 梁双红 Glaze recovery machine
CN102276262A (en) * 2011-04-13 2011-12-14 岑溪市华进花岗岩废料综合利用有限公司 Production method for extracting K, Na and Al ceramic raw material from granite stone waste material
CN202539166U (en) * 2012-02-24 2012-11-21 广东中窑窑业股份有限公司 Polishing slag and waste recovery system for building ceramic
CN104193292A (en) * 2014-08-06 2014-12-10 苏州科德溯源仪器有限公司 Carbon nano tube enhanced ceramic tile
CN104177119A (en) * 2014-08-14 2014-12-03 合肥科斯孚安全科技有限公司 Preparation method of heat insulating porous ceramic made from light coal ash
CN204486352U (en) * 2015-02-16 2015-07-22 福建省晋江万利瓷业有限公司 The recovery system of ceramic production device cleaning material

Also Published As

Publication number Publication date
CN104690018A (en) 2015-06-10

Similar Documents

Publication Publication Date Title
CN204282117U (en) A kind of mthod of white water from paper making recovery system
CN107971325A (en) A kind of architecture sediment regenerates soil treatment technology
CN103213961B (en) Closed cyclic utilization method for production water of monoammonium phosphate
CN204689755U (en) The comprehensive treating pond of construction site Water Sproading cyclic utilization system and construction site Water Sproading cyclic utilization system
CN204486352U (en) The recovery system of ceramic production device cleaning material
CN104358176A (en) Recovery system for white water produced from papermaking
CN101423203A (en) Water-saving and emission-reducing wet method phosphoric acid manufacture process
CN104690018B (en) Ceramic production device cleans the recovery system of material
CN206561504U (en) Concrete gravel effluent cycle recovery system
CN105201040A (en) Catch basin with incipient rain separation and purification function
CN208786676U (en) A kind of fine sand recycling dehydrating integrated machine
CN103663763A (en) Waste and wastewater recovery system and method for recycling by using system
CN207726232U (en) A kind of sandstone belt conditioning system
CN203781934U (en) Sewage treatment equipment of ceramic production line
CN215252089U (en) Durable's multilayer environmental protection terrace that permeates water
CN205242602U (en) A cistern for concrete grout retrieves
CN105583148A (en) Dry ore washing and dressing method
CN106995718A (en) A kind of online processing unit of oil field settling tank tank bottom spoil disposal and processing method
CN107151034A (en) A kind of mixing plant sewage water treatment method
CN209348412U (en) For the ecosystem of townm refuse transfer station
CN206858493U (en) A kind of online processing unit of oil field settling tank tank bottom spoil disposal
CN106219704A (en) A kind of mixing plant wastewater recycling system
CN206081729U (en) Defecation formula extraction tank of pipeline device is rinsed in area
CN104058377A (en) Clean production process of wet process phosphoric acid
CN202808460U (en) Flocculant production equipment and device for separating and cleaning fly ash feed liquid

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Wu Yanhui

Inventor after: Zhang Guodong

Inventor after: Chen Huajie

Inventor after: Wu Yanrong

Inventor before: Wu Yanhui

Inventor before: Chen Huajie

Inventor before: Wu Yanrong

COR Change of bibliographic data
CB03 Change of inventor or designer information

Inventor after: Wu Yanhui

Inventor after: Zhang Guodong

Inventor after: Chen Huajie

Inventor after: Wu Yanrong

Inventor before: Wu Yanhui

Inventor before: Chen Huajie

Inventor before: Wu Yanrong

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wu Yanhui

Inventor after: Zhang Guodong

Inventor after: Chen Huajie

Inventor after: Wu Yanrong

Inventor after: Xiao yukuan

Inventor after: Zhang Fusheng

Inventor after: Wu Yating

Inventor after: Zhang Xinhuan

Inventor before: Wu Yanhui

Inventor before: Zhang Guodong

Inventor before: Chen Huajie

Inventor before: Wu Yanrong

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329