CN104668953B - Corridor LED assembling line - Google Patents

Corridor LED assembling line Download PDF

Info

Publication number
CN104668953B
CN104668953B CN201510095521.4A CN201510095521A CN104668953B CN 104668953 B CN104668953 B CN 104668953B CN 201510095521 A CN201510095521 A CN 201510095521A CN 104668953 B CN104668953 B CN 104668953B
Authority
CN
China
Prior art keywords
line
feeding
assembling
feeding device
lens
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510095521.4A
Other languages
Chinese (zh)
Other versions
CN104668953A (en
Inventor
周俊雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Lyric Robot Automation Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510095521.4A priority Critical patent/CN104668953B/en
Publication of CN104668953A publication Critical patent/CN104668953A/en
Application granted granted Critical
Publication of CN104668953B publication Critical patent/CN104668953B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P21/00Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control
    • B23P21/004Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control the units passing two or more work-stations whilst being composed
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B11/00Connecting constructional elements or machine parts by sticking or pressing them together, e.g. cold pressure welding
    • F16B11/006Connecting constructional elements or machine parts by sticking or pressing them together, e.g. cold pressure welding by gluing

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Automatic Assembly (AREA)

Abstract

The invention discloses a kind of corridor LED assembling line, including pasting product serial code, the first assembling line in drawing aluminium front patch pad for transfer drawing aluminium and at the drawing aluminium back side, for the second assembling line of installation lamp plate, reflecting piece and lens on drawing aluminium and the 3rd assembling line for end cap and iron plate to be separately mounted to draw aluminium two ends;It is connected by manipulator between first assembling line and the second assembling line, the second assembling line and the 3rd assembling line;The first assembling line part such as including the first artificial station, the first feeding line, the second assembling line part such as including the second feeding line, reflecting piece feeding device, lamp plate feeding device, the 3rd assembling line part such as including the 3rd feeding line, the second artificial station, third party's work station;The semi-automatic Assembling Production of the achievable corridor LED of the present invention, has the advantages that Assembling Production efficiency high, can simplify artificial operation, reduce hand labor intensity.

Description

Corridor LED assembling line
Technical field
The present invention relates to corridor LED Assembling Production technical field, and in particular to a kind of corridor LED assembling line.
Background technology
, it is necessary to draw the aluminium back side patch product serial code during LED Assembling Production of corridor, aluminium front patch pad is being drawn, then Drawing lamp plate, reflecting piece and lens are installed on aluminium, and lens are fixed on drawing aluminium by screw;Then again by PVC board, patch The aluminium sheet and end cap for having sponge are fitted together and dispensing, and the end cap for being assembled with PVC board and posting the aluminium sheet of sponge is pacified by screw Dress is fixed on drawing aluminium one end, and the iron plate that will post sponge is fixed on the drawing aluminium other end by screw.Above-mentioned Assembling Production process All by being accomplished manually, can there is a problem of that Assembling Production efficiency is low, hand labor intensity is high, therefore, it is to improve Assembling Production Efficiency, reduction hand labor intensity, it is necessary to develop a set of by the dress for manually realizing corridor LED semi-automation Assembling Production With production line.
The content of the invention
In view of the shortcomings of the prior art, the present invention is intended to provide a kind of Assembling Production efficiency high, artificial operation, drop can be simplified The corridor LED assembling line for realizing corridor LED semi-automation Assembling Production of low hand labor intensity.
To achieve the above object, the present invention is adopted the following technical scheme that:
Corridor LED assembling line, including draw aluminium and drawing the aluminium back side to paste product serial code, drawing aluminium just for transferring The first assembling line of pad is pasted in face, for draw installed on aluminium lamp plate, the second assembling line of reflecting piece and lens and The 3rd assembling line for end cap and iron plate to be separately mounted to draw aluminium two ends;First assembling line passes through the 5th Suction manipulator is connected with the second assembling line, and the second assembling line passes through the 6th suction manipulator and the 3rd Assembling Production Line is connected.
Further, first assembling line include the first artificial station, the first feeding line, first for gluing mechanism, Second for gluing mechanism, the first suction manipulator and the second suction manipulator, and the first artificial station is arranged on the charging of the first feeding line End, installation settings has tool on the first feeding line, and first is arranged on the first feeding line side for gluing mechanism and second for gluing mechanism, Second is located at first for gluing mechanism downstream for gluing mechanism, and the first suction manipulator send for gluing mechanism across being arranged on first with first Between stockline, the second suction manipulator is across being arranged on second between gluing mechanism and the first feeding line.
Further, second assembling line includes the second feeding line, reflecting piece feeding device, lamp plate feeding dress Put, four axis robots, the first lens feeding device, the second lens feeding device, the 3rd suction manipulator, the first vibrating disk straight line Feed appliance, the first conveying tracheae, the second vibrating disk straight line feeder, the second conveying tracheae, the first lock screw device, the 4th suction Manipulator and defective products storage bracing wire, reflecting piece feeding device are same with the feed end that lamp plate feeding device is arranged on the second feeding line Side, four axis robots be arranged on the second feeding line feed end side be located at the second feeding line and reflecting piece feeding device it Between, the first lens feeding device and the second lens feeding device are separately positioned on the second feeding line both sides and positioned at reflecting piece feeding Device downstream, the 3rd suction manipulator across being arranged between the first lens feeding device and the second lens feeding device, first Vibrating disk straight line feeder and the second vibrating disk straight line feeder are separately positioned on the second feeding line both sides on the first lens Material device and the second lens feeding device downstream, the first vibrating disk straight line feeder and the first lens feeding device are arranged on second Feeding line the same side, the second vibrating disk straight line feeder and the second lens feeding device are arranged on second feeding line the same side, the One conveying tracheae one end connects the first vibrating disk straight line feeder discharge end, and it is straight that second conveying tracheae one end connects the second vibrating disk Line feed appliance, the first lock screw device is fixed on the second feeding line and is located on the first lens feeding device and the second lens Material device downstream, the first conveying tracheae and the second conveying tracheae other end are connected with the first lock screw device two ends respectively, and the 4th Suction manipulator is mounted on the second feeding line discharge end side, and defective products storage bracing wire is arranged on the second feeding line discharge end Side, its feed end is located at the 4th suction machinery subordinate side.
Further, the 3rd assembling line include the 3rd feeding line, the second artificial station, third party's work station, Point glue equipment, the 3rd vibrating disk straight line feeder, the 3rd conveying tracheae, the second lock screw device, the 4th vibrating disk linear feeding Device, the 4th conveying tracheae and the 3rd lock screw device, the second artificial station are separately positioned on the 3rd with third party's work station Feeding line both sides, point glue equipment and the second artificial station are arranged on the 3rd feeding line the same side and under the second artificial station Trip, the 3rd conveying tracheae one end connects the 3rd vibrating disk straight line feeder discharge end, and screw device is locked in other end connection second, the Four conveying tracheae one end connect the 4th vibrating disk straight line feeder discharge ends, and screw device is locked in other end connection the 3rd, and described the It is same that three vibrating disk straight line feeders, the 3rd conveying tracheae, the second lock screw device and point glue equipment are arranged on the 3rd feeding line Side and positioned at the point glue equipment downstream, the 4th vibrating disk straight line feeder, the 4th conveying tracheae, the 3rd lock screw device The 3rd feeding line the same side is arranged on third party's work station and positioned at third party's work station downstream.
Preferably, it is provided with safe grating on the described first artificial station, the second artificial station and third party's work station.
The present invention has the advantages that:
LED assembling line in corridor of the present invention, its semi-automatic Assembling Production that can realize corridor LED, with dress Advantage high with production efficiency, that artificial operation can be simplified, hand labor intensity is reduced.
Brief description of the drawings
Fig. 1 is its plane figure schematic diagram of corridor LED assembling line of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment, the invention will be further described, and this is understood in order to clearer The claimed technological thought of invention.
LED assembling line in corridor of the present invention as shown in Figure 1, including draw aluminium and drawing aluminium back side patch product for transferring Sequence code, the first assembling line 1 in drawing aluminium front patch pad, for drawing installation lamp plate, reflecting piece and lens on aluminium Second assembling line 2 and the 3rd assembling line 3 for end cap and iron plate to be separately mounted to draw aluminium two ends.Described first Assembling line 1 includes the first artificial station 10, the first feeding line 11, first for gluing mechanism 12, second for gluing mechanism 13, first The suction manipulator 15 of suction manipulator 14 and second, the first artificial station 10 is used for by will manually draw aluminium to be placed on the first feeding line 11 On, the first artificial station 10 is arranged on the feed end of the first feeding line 11, and the first feeding line 11 is used to transfer and draws aluminium, and described the Installation settings has the tool for supporting fixed drawing aluminium on one feeding line 11, and first is used for automatic transport product sequence for gluing mechanism 12 Row code, second is used for automatic transport pad for gluing mechanism 13, and described first is arranged on for gluing mechanism 12 and second for gluing mechanism 13 The side of first feeding line 11, second is located at described first for the downstream of gluing mechanism 12 for gluing mechanism 13, and the first suction manipulator 14 is used In being attached to the drawing aluminium back side for drawing product serial code on gluing mechanism 12 and transfer from first, the second suction manipulator 15 is for from the Two draw aluminium front for drawing pad on gluing mechanism 13 and transfer to be attached to, and the first suction manipulator 14 is across being arranged on described the One between the feeding line 11 of gluing mechanism 12 and first, the second suction manipulator 15 across be arranged on described second for gluing mechanism 13 with Between first feeding line 11.
Second assembling line 2 include the second feeding line 20, reflecting piece feeding device 21, lamp plate feeding device 22, Four axis robots 23, the first lens feeding device 24a, the second lens feeding device 24b, the 3rd suction manipulator 25, first shake Moving plate straight line feeder 26a, the first conveying tracheae 27a, the second vibrating disk straight line feeder 26b, the second conveying tracheae 27b, the One lock screw device 28, the 4th suction manipulator 29 and defective products storage bracing wire 29a, the second feeding line 20 are used for transfer and have pasted product The drawing aluminium of product sequence code and pad, reflecting piece feeding device 21 is used to store and send out reflecting piece, and lamp plate feeding device 22 is used for Lamp plate is stored and sends out, reflecting piece feeding device 21 is same with the feed end that lamp plate feeding device 22 is arranged on the second feeding line 20 Side, four axis robots 23 are used to draw reflecting piece and lamp plate simultaneously from reflecting piece feeding device 21 and lamp plate feeding device 22 respectively By reflecting piece and lamp plate mounted in drawing on aluminium, the feed end side that four axis robot 23 is arranged on the second feeding line 20 is located at institute State between the second feeding line 20 and reflecting piece feeding device 21;First lens feeding device 24a and the second lens feeding device 24b For storing and send out lens, the 3rd suction manipulator 25 is used for from the first lens feeding device 24a and the second lens Lens are drawn on material device 24b and by lens mounted in drawing on aluminium, the first lens feeding device 24a and the second lens feeding are filled Put 24b and be separately positioned on the both sides of the second feeding line 20 and positioned at the downstream of reflecting piece feeding device 21, the 3rd suction manipulator 25 is horizontal Across being arranged between the first lens feeding device 24a and the second lens feeding device 24b;First vibrating disk straight line feeder 26a It is used for screw self-feeding with the second vibrating disk straight line feeder 26b, the first conveying tracheae 27a and the second conveying tracheae 27b are used Second is delivered in the screw respectively by the first vibrating disk straight line feeder 26a and the second vibrating disk straight line feeder 26b submittings On feeding line 20, the first vibrating disk straight line feeder 26a and the second vibrating disk straight line feeder 26b are separately positioned on second The both sides of feeding line 20 are located at the first lens feeding device 24a and the second lens feeding device 24b downstreams, and the first vibrating disk is straight Line feed appliance 26a and the first lens feeding device 24a are arranged on the same side of the second feeding line 20, the second vibrating disk straight line feeder 26b and the second lens feeding device 24b are arranged on the same side of the second feeding line 20, first conveying tracheae 27a one end connection first Vibrating disk straight line feeder 26a discharge ends, second conveying tracheae 27b one end connects the second vibrating disk straight line feeder 26b;First Lock screw device 28 realizes the locking of lens for locking the screw that the first conveying tracheae 27a and the second conveying tracheae 27b send out Fixed, the first lock screw device 28 is fixed on and the first lens feeding device 24a and second is located on the second feeding line 20 Lens feeding device 24b downstreams, the first conveying tracheae 27a and the second conveying tracheae 27b other ends are filled with the first lock screw respectively Put the connection of 28 two ends;4th suction manipulator 29 is used to draw the underproof drawing aluminium for being provided with reflecting piece, lamp plate and lens, The 4th suction manipulator 29 is mounted on the discharge end side of the second feeding line 20, and defective products storage bracing wire 29a is used to connect Receive the underproof drawing aluminium for being provided with reflecting piece, lamp plate and lens of the absorption of the 4th suction manipulator 29, the defective products storage Bracing wire 29a is arranged on the discharge end side of the second feeding line 20, and its feed end is located at the lower section of the 4th suction manipulator 29.
3rd assembling line 3 includes the 3rd feeding line 30, the second artificial station 31, third party's work station 32, point Adhesive dispenser 33, the 3rd vibrating disk straight line feeder 34a, the 3rd conveying tracheae 35a, the second lock screw device 36a, the 4th vibrating disk Straight line feeder 34b, the 4th conveying tracheae 35b and the 3rd lock screw device 36b, the 3rd feeding line 30 are qualified for transferring The drawing aluminium for having been loaded with reflecting piece, lamp plate and lens, the second artificial station 31 is used for by manually by PVC board, end cap and posting sea Continuous aluminium sheet is fitted together, and third party's work station 32 is used for by manually to aluminium sheet and iron plate patch sponge, the second artificial work Position 31 is separately positioned on the both sides of the 3rd feeding line 30 with third party's work station 32;Point glue equipment 33 is used for fitting together PVC board, end cap and post the aluminium sheet of sponge and carry out dispensing, the artificial station 31 of point glue equipment 33 and second is arranged on the 3rd feeding The same side of line 30 and point glue equipment 33 are located at the downstream of the second artificial station 31;3rd vibrating disk straight line feeder 34a and the 4th shakes Moving plate straight line feeder 34b is used for screw automatic charging, and the 3rd conveying tracheae 35a and the 4th conveying tracheae 35b are used to convey spiral shell Silk, the second lock screw device 36a and the 3rd lock screw device 36b are used for lock screw, the 3rd conveying tracheae 35a one end connection the Screw device 36a is locked in three vibrating disk straight line feeder 34a discharge ends, other end connection second;4th conveying tracheae 35b one end connects The 4th vibrating disk straight line feeder 34b discharge ends are connect, screw device 36b is locked in other end connection the 3rd;3rd vibrating disk is straight It is same that line feed appliance 34a, the 3rd conveying tracheae 35a, the second lock screw device 36a and point glue equipment 33 are arranged on the 3rd feeding line 30 Side and positioned at the downstream of the point glue equipment 33, the 4th vibrating disk straight line feeder 34b, the 4th conveying tracheae 35b, the 3rd Lock screw device 36b is arranged on the same side of the 3rd feeding line 30 and positioned at third party's work station 32 with third party's work station 32 Downstream.
The discharge end of its first feeding line 11 of the first assembling line 1 is by the 5th suction manipulator 40 and the second dress Feed end linking with its second feeding line 20 of production line 2, the discharge end of its second feeding line 20 of the second assembling line 2 It is connected with the feed end of the 3rd assembling line 3 its 3rd feeding line 30 by the 6th suction manipulator 41.
In order to protect artificial safe operation, the first artificial station 10, the second artificial station 31 and third party's work station Safe grating 50 is provided with 32.
Operation principle of the invention is:Aluminium is drawn by being manually placed on the tool of the first feeding line 11 from the first artificial station 10 On, the first feeding line 11 will draw aluminium to be transferred to the lower section of the first suction manipulator 14, and first for the automatic transport product sequence of gluing mechanism 12 Row code, the first suction manipulator 14 is attached to the drawing aluminium back of the body from first for absorption product serial code on gluing mechanism 12 and by product serial code Face, the drawing aluminium that the first feeding line 11 continues to have pasted product serial code is transferred to the lower section of the second suction manipulator 15, and second for glue The automatic transport pad of mechanism 13, the second suction manipulator 15 from second for drawing pad on gluing mechanism 13 and be attached to drawing aluminium front, The drawing aluminium for having pasted product serial code and pad is drawn from the discharge end of the first feeding line 11 by the 5th suction manipulator 40 and is transferred to the The feed end of two feeding line 20, four axis robots 23 are drawn reflective from reflecting piece feeding device 21 with lamp plate feeding device 22 respectively Piece and lamp plate and by reflecting piece and lamp plate mounted in drawing on aluminium, the second feeding line 20 transfers the drawing aluminium of anti-loaded mating plate and lamp plate to the The lower section of three suction manipulator 25, the 3rd suction manipulator 25 is from the first lens feeding device 24a and the second lens feeding device 24b Simultaneously be mounted in lens on drawing aluminium by upper absorption lens, and the drawing aluminium for having filled lens, reflecting piece and lamp plate is transferred to by the second feeding line 20 The lower section of first lock screw device 28, the first lock screw device 28 respectively send the first conveying tracheae 27a and the second conveying tracheae 27b The screw locking for going out is fixed on lens, and the drawing aluminium that the second feeding line 20 will fill lens, reflecting piece and lamp plate delivers to the 4th suction The lower section of material manipulator 29, the 4th suction manipulator 29 is drawn the underproof drawing aluminium equipped with lens, reflecting piece and lamp plate and is transferred to Defective products storage bracing wire 29a output, the qualified drawing aluminium equipped with lens, reflecting piece and lamp plate is by the 6th suction manipulator 41 from the The discharge end of two feeding lines 20 is transferred to the feed end of the 3rd feeding line 30, and third party's work station 32 is by manually pasting aluminium sheet and iron plate Upper sponge, the second artificial station 31 by manually by PVC board, end cap and posting the aluminium sheet of sponge and fitting together, and by dispensing 33 pairs of PVC boards for fitting together of device, end cap and post the aluminium sheet of sponge and carry out dispensing, two ends are separately installed with end cap and iron The drawing aluminium of piece is transferred respectively by the second lock screw device 36a and the 3rd lock screw device 36b lock screws by the 3rd feeding line 30 End cap and iron plate are fixed on drawing aluminium two ends, the assembling of product is so far completed.
For a person skilled in the art, technical scheme that can be as described above and design, make other each Plant corresponding change and deform, and all these changes and deforms the protection model that should all belong to the claims in the present invention Within enclosing.

Claims (4)

1. corridor LED assembling line, it is characterised in that:Including for transferring drawing aluminium and drawing aluminium back side patch product serial Code, the first assembling line in drawing aluminium front patch pad(1), for draw installed on aluminium lamp plate, reflecting piece and lens the Two assembling lines(2)With the 3rd assembling line for end cap and iron plate to be separately mounted to draw aluminium two ends(3);Described One assembling line(1)By the 5th suction manipulator(40)With the second assembling line(2)Linking, the second assembling line (2)By the 6th suction manipulator(41)With the 3rd assembling line(3)Linking;First assembling line(1)Including One artificial station(10), the first feeding line(11), first for gluing mechanism(12), second for gluing mechanism(13), the first suction machinery Hand(14)With the second suction manipulator(15), the first artificial station(10)It is arranged on the first feeding line(11)Feed end, first send Stockline(11)Upper installation settings has tool, and first for gluing mechanism(12)With second for gluing mechanism(13)It is arranged on the first feeding line (11)Side, second for gluing mechanism(13)Positioned at first for gluing mechanism(12)Downstream, the first suction manipulator(14)Across setting First for gluing mechanism(12)With the first feeding line(11)Between, the second suction manipulator(15)Across being arranged on second for glue machine Structure(13)With the first feeding line(11)Between;
Second assembling line(2)Including the second feeding line(20), reflecting piece feeding device(21), lamp plate feeding device (22), four axis robots(23), the first lens feeding device(24a), the second lens feeding device(24b), the 3rd suction machinery Hand(25), the first vibrating disk straight line feeder(26a), first conveying tracheae(27a), the second vibrating disk straight line feeder(26b)、 Second conveying tracheae(27b), first lock screw device(28), the 4th suction manipulator(29)Bracing wire is stored with defective products(29a), Reflecting piece feeding device(21)With lamp plate feeding device(22)It is arranged on the second feeding line(20)Feed end the same side, four axle machines Tool hand(23)It is arranged on the second feeding line(20)Feed end side be located at the second feeding line(20)With reflecting piece feeding device (21)Between, the first lens feeding device(24a)With the second lens feeding device(24b)It is separately positioned on the second feeding line(20) Both sides and positioned at reflecting piece feeding device(21)Downstream, the 3rd suction manipulator(25)Across being arranged on the first lens feeding device (24a)With the second lens feeding device(24b)Between, the first vibrating disk straight line feeder(26a)Sent with the second vibrating disk straight line Glassware(26b)It is separately positioned on the second feeding line(20)Both sides are located at the first lens feeding device(24a)With the second lens feeding Device(24b)Downstream, the first vibrating disk straight line feeder(26a)With the first lens feeding device(24a)It is arranged on the second feeding Line(20)The same side, the second vibrating disk straight line feeder(26b)With the second lens feeding device(24b)It is arranged on the second feeding line (20)The same side, the first conveying tracheae(27a)One end connects the first vibrating disk straight line feeder(26a)Discharge end, the second conveying Tracheae(27b)One end connects the second vibrating disk straight line feeder(26b), the first lock screw device(28)Second is fixed on to send Stockline(20)It is upper to be located at the first lens feeding device(24a)With the second lens feeding device(24b)Downstream, the first conveying tracheae (27a)With the second conveying tracheae(27b)The other end locks screw device with first respectively(28)Two ends connect, the 4th suction manipulator (29)It is mounted on the second feeding line(20)Discharge end side, defective products storage bracing wire(29a)It is arranged on the second feeding line (20)Discharge end side, the feed end of defective products storage bracing wire is located at the 4th suction manipulator(29)Lower section.
2. LED assembling line in corridor as claimed in claim 1, it is characterised in that:3rd assembling line(3)Bag Include the 3rd feeding line(30), the second artificial station(31), third party's work station(32), point glue equipment(33), the 3rd vibrating disk it is straight Line feed appliance(34a), the 3rd conveying tracheae(35a), second lock screw device(36a), the 4th vibrating disk straight line feeder (34b), the 4th conveying tracheae(35b)With the 3rd lock screw device(36b), the second artificial station(31)With third party's work work Position(32)It is separately positioned on the 3rd feeding line(30)Both sides, point glue equipment(33)With the second artificial station(31)The 3rd is arranged on to send Stockline(30)The same side and positioned at the second artificial station(31)Downstream, the 3rd conveying tracheae(35a)One end connects the 3rd vibrating disk Straight line feeder(34a)Screw device is locked in discharge end, other end connection second(36a), the 4th conveying tracheae(35b)One end connects 4th vibrating disk straight line feeder(34b)Screw device is locked in discharge end, other end connection the 3rd(36b), the 3rd vibrating disk Straight line feeder(34a), the 3rd conveying tracheae(35a), second lock screw device(36a)With point glue equipment(33)It is arranged on the 3rd Feeding line(30)The same side and positioned at the point glue equipment(33)Downstream, the 4th vibrating disk straight line feeder(34b), the 4th Conveying tracheae(35b), the 3rd lock screw device(36b)With third party's work station(32)It is arranged on the 3rd feeding line(30)The same side And positioned at third party's work station(32)Downstream.
3. LED assembling line in corridor as claimed in claim 2, it is characterised in that:The first artificial station(10)On It is provided with safe grating(50).
4. LED assembling line in corridor as claimed in claim 3, it is characterised in that:The second artificial station(31)With Third party's work station(32)On be provided with safe grating(50).
CN201510095521.4A 2015-03-04 2015-03-04 Corridor LED assembling line Active CN104668953B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510095521.4A CN104668953B (en) 2015-03-04 2015-03-04 Corridor LED assembling line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510095521.4A CN104668953B (en) 2015-03-04 2015-03-04 Corridor LED assembling line

Publications (2)

Publication Number Publication Date
CN104668953A CN104668953A (en) 2015-06-03
CN104668953B true CN104668953B (en) 2017-06-06

Family

ID=53304813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510095521.4A Active CN104668953B (en) 2015-03-04 2015-03-04 Corridor LED assembling line

Country Status (1)

Country Link
CN (1) CN104668953B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105619067A (en) * 2016-03-02 2016-06-01 王琼琦 LED lamp panel assembly machine

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105485547B (en) * 2016-01-07 2018-07-27 苏州市璟硕自动化设备有限公司 LEDbulb lamp production system
CN105479167B (en) * 2016-01-13 2017-08-25 江苏宝德照明器材有限公司 The automatic assembling machine of LED
CN105666126B (en) * 2016-01-13 2017-10-31 江苏新大成光电科技股份有限公司 The lens of LED lamp panel install equipment
CN106642020A (en) * 2016-12-23 2017-05-10 惠州市华阳光电技术有限公司 Automatic mounting equipment for light source plate of LED lamp
CN108723763A (en) * 2017-04-18 2018-11-02 广东迈智机器人科技有限公司 A kind of LED ceiling lamp automatic assembly line
CN107322293B (en) * 2017-08-07 2024-02-23 广东利元亨智能装备有限公司 Garbage bin equipment
CN107470903A (en) * 2017-08-28 2017-12-15 昆山拓誉自动化科技有限公司 A kind of flat lamp assembly line
CN107378482A (en) * 2017-08-28 2017-11-24 昆山拓誉自动化科技有限公司 A kind of automatic assembly line of flat lamp
CN107470902A (en) * 2017-08-28 2017-12-15 昆山拓誉自动化科技有限公司 A kind of automatic assembly line of LED planar lamp
CN107470901A (en) * 2017-08-28 2017-12-15 昆山拓誉自动化科技有限公司 A kind of automatic assembly line of LED flat lamp
CN107457564A (en) * 2017-08-29 2017-12-12 昆山拓誉自动化科技有限公司 A kind of flat lamp assembly line
CN109340233A (en) * 2018-11-28 2019-02-15 深圳市诺峰光电设备有限公司 A kind of electronic product auxiliary material automation make-up machine
CN109605022B (en) * 2018-12-05 2024-01-12 深圳市哈德胜精密科技股份有限公司 Assembling process of wireless charging module and assembling bonding wire
CN110977460B (en) * 2019-12-25 2021-04-09 江门市四季登辉照明科技有限公司 Automatic assembling equipment for LED lamp strip

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20022490U1 (en) * 2000-04-17 2002-01-17 Reis Gmbh & Co Maschinenfabrik assembly cell
CN202877861U (en) * 2012-11-07 2013-04-17 上海无线电设备研究所 Full-automatic flexible assembly line of light-emitting diode (LED) bulb lamp
CN202877864U (en) * 2012-11-07 2013-04-17 上海无线电设备研究所 Light source assembling work station for full-automatic flexible assembly line for bulb lamps
CN103307487B (en) * 2013-06-18 2015-01-21 杭州中为光电技术股份有限公司 LED bulb lamp assembly and production equipment
CN204657918U (en) * 2015-03-04 2015-09-23 周俊雄 Corridor LED assembling line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105619067A (en) * 2016-03-02 2016-06-01 王琼琦 LED lamp panel assembly machine

Also Published As

Publication number Publication date
CN104668953A (en) 2015-06-03

Similar Documents

Publication Publication Date Title
CN104668953B (en) Corridor LED assembling line
CN103600969B (en) A kind of Turnover Box that adopts is that the workpiece sensing conveyor line of carrier is plugged into optimization method
CN205112485U (en) Medicine tablet press of band elimination sediment function
CN105398807A (en) Automatic diode feeding and taking device
CN102897351B (en) Automatic bag feeding, holding and conveying packing machine
CN204657918U (en) Corridor LED assembling line
CN104801970B (en) A kind of robot pastes auxiliary material assembly line automatically
CN207278644U (en) A kind of mobile phone auxiliary material automatic laminating machine utilizing
CN204588058U (en) Silicon chip conveying mechanism between screen printing machine and sintering furnace
CN202703896U (en) Automatic casing machine for bulk bags
CN205661679U (en) Powder coating's semi -automatic packaging machine
CN204847230U (en) Processing lines
CN110039309A (en) Assembly system suitable for collector
CN207629436U (en) Lamination welding equipment
CN207226476U (en) A kind of new efficient feeding system
CN102948968B (en) The automatic bag coil apparatus of a kind of button
CN102633007B (en) Full-automatic box filling machine for flexible package
CN205114479U (en) Battery utmost point crowd coating machine's transport mechanism
CN203738224U (en) Automatic welding and assembling device of lighter
CN208931763U (en) The feeder of tape relay blanking function
CN207536801U (en) A kind of material-transporting system and the mixing plant with the transport system
CN105083664A (en) Battery labeling machine
CN106586094A (en) Overturning device and stacker
CN104340677B (en) Transfer mechanism
CN205098565U (en) Pharmaceutical packaging box work or material rest

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180209

Address after: 516005, Huizhou, Guangdong province Huicheng District Shuikou Street office, Tong Tung Road, No. 5 (plant B)

Patentee after: Guangdong LiYuanHeng Intelligent Automation Co., Ltd.

Address before: 516057 Guangdong Province, Huizhou city Huicheng District Ma new group Industrial Park (east school nearby)

Patentee before: Zhou Junxiong

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 516005 Dongjiang Vocational School Road 2 (workshop), Huizhou Road, Ma An Town, Huicheng District, Huizhou, Guangdong.

Patentee after: Guangdong Liyuan Heng intelligent equipment Limited by Share Ltd

Address before: 516005 No. 5 Tung Sheng Road, Shuikou Subdistrict Office, Huicheng District, Huizhou, Guangdong (factory B)

Patentee before: Guangdong LiYuanHeng Intelligent Automation Co., Ltd.