CN104652391A - Self-elevating platform dismantlement method suitable for lifting function failure circumstance - Google Patents

Self-elevating platform dismantlement method suitable for lifting function failure circumstance Download PDF

Info

Publication number
CN104652391A
CN104652391A CN201310598740.5A CN201310598740A CN104652391A CN 104652391 A CN104652391 A CN 104652391A CN 201310598740 A CN201310598740 A CN 201310598740A CN 104652391 A CN104652391 A CN 104652391A
Authority
CN
China
Prior art keywords
jack
platform
steel strand
construction
ship
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310598740.5A
Other languages
Chinese (zh)
Other versions
CN104652391B (en
Inventor
王翎羽
孟德军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weihai Haien blue sea aquaculture Co.,Ltd.
Original Assignee
NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT Co Ltd filed Critical NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT Co Ltd
Priority to CN201310598740.5A priority Critical patent/CN104652391B/en
Publication of CN104652391A publication Critical patent/CN104652391A/en
Application granted granted Critical
Publication of CN104652391B publication Critical patent/CN104652391B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0052Removal or dismantling of offshore structures from their offshore location

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention relates to a self-elevating platform dismantlement method suitable for a lifting function failure circumstance. The self-elevating platform dismantlement method suitable for the lifting function failure circumstance drops a platform and lifts a pile leg and sediments by using a steel strand jack device installed on the platform pile leg in combination with a constructing ship to unload, achieves integrated dismantlement and later recycling of the platform, and has the advantages of being low in construction cost and small in construction risk.

Description

A kind of jack-up unit method for dismounting being applicable to elevating function and losing efficacy
 
Technical field
The present invention relates to a kind of jack-up unit method for dismounting, particularly about a kind of jack-up unit method for dismounting being applicable to elevating function and losing efficacy.
Background technology
Installation, the dismounting of offshore platform and chunk are high cost, high risk offshore construction project, dismounting for the jack-up unit of elevating function inefficacy need use large-scale floating crane remove according to the ocean platform method for dismounting of routine, and following three aspect problems are existed for the use of large-scale floating crane: one, in the platform removal construction in marginal oil field or Tan Hai marine site, large-scale floating crane cannot enter more greatly the more shallow construction marine site of the depth of water due to drinking water; Two, use crane barge to remove platform, need cut platform, cannot recycle after platform removal; Three, large-scale floating crane hiring cost is high.
Present patent application proposes a kind of jack-up unit method for dismounting being applicable to elevating function and losing efficacy just in this context.
Summary of the invention
Main purpose of the present invention is the above-mentioned shortcoming overcoming prior art existence, and a kind of jack-up unit method for dismounting being applicable to elevating function and losing efficacy is provided, by the steel strand jack device installed on platform leg, coordinative construction boats and ships row carried, carry out that platform is transferred, the lifting of spud leg and precipitation, the recycling in implementation platform overall pulling down and later stage, has construction cost low, the feature that construction risk is little.
The object of the invention is to be realized by following technical scheme:
Be applicable to the jack-up unit method for dismounting that elevating function lost efficacy, it is characterized in that: described dismounting step comprises:
1. select construction ship, determine to load position onto ship;
2. remove jack-up unit original lifting gear that lost efficacy, at each platform leg place, jack platform be installed, and above jack platform the several anchor point of uniform installation, the several steel strand jack device of uniform installation below jack platform;
3. start steel strand jack, remove jack-up unit self-locking device, control steel strand jack, platform is dropped on construction ship, and platform and construction ship are rigidly connected;
4. remove the steel strand jack below jack platform, and be mounted to above jack platform by steel strand jack, anchor point is mounted to the spud leg place below jack platform;
5. start steel strand jack, carry out construction ship row and carry, utilize construction ship to arrange the trim of carrying, precipitation is extracted from mud;
6. to steel strand jack weld anchor solid point in interval on spud leg of uniform installation, carry out steel strand lifting, promote below anchor point to jack platform, to steel strand jack weld anchor solid point on spud leg of not carrying out anchor point welding, tension steel strand, and the anchor point removing the interval welding of institute in early stage, carry out steel strand lifting, circulate successively, be promoted to bottom construction ship to precipitation;
7. construction ship transport jack-up unit entirety leaves construction marine site.
Beneficial effect of the present invention: the present invention is owing to adopting technique scheme, a kind of jack-up unit method for dismounting being applicable to elevating function and losing efficacy is provided, by the steel strand jack device installed on platform leg, coordinative construction boats and ships row carried, carry out that platform is transferred, the lifting of spud leg and precipitation, the recycling in implementation platform overall pulling down and later stage, has construction cost low, the feature that construction risk is little.
Below in conjunction with drawings and Examples, the present invention will be further described.
Accompanying drawing illustrates:
Fig. 1 is ship's fix schematic diagram of the present invention;
Fig. 2 is that schematic diagram transferred by platform of the present invention;
Fig. 3 is that the present invention precipitates mud extraction schematic diagram;
Fig. 4 is that the present invention precipitates lifting schematic diagram;
Fig. 5 is platform discharging mechanism schematic diagram of the present invention;
Fig. 6,7 precipitates hoisting mechanism schematic diagram for the present invention.
Major label description in figure:
1-spud leg; 2-platform; 3-construction ship; 4-precipitation; 5-anchor point bearing; 6-anchor point; 7-steel strand; 8-jack platform; 9-jack.
Detailed description of the invention
Below in conjunction with accompanying drawing and example, the present invention is described in detail.
As shown in Figure 1, according to the position of centre of gravity of the spacing between each spud leg 1 of jack-up unit and platform 2, the construction ship 3 selecting size and carrying capacity all to meet the demands, is then checked by stability, selects optimum shipment position;
As shown in Figure 2, remove the original lifting gear that lost efficacy of jack-up unit, at each platform leg 1 place, jack platform 8 is installed, and above jack platform 8 uniform installation 6 anchor points 6, uniform installation 6 steel strand jack devices below jack platform 8;
As shown in Figure 5, jack 9 is connected by steel strand 7 with the anchor point 6 being welded in the anchor point bearing 5 being distributed on spud leg 1 by jack platform 8;
As shown in Figure 3, after steel strand jack 9 and anchor point 6 all install, be well placed sleeper aboard ship, then jack 9 is started, make jack 9 uniform stressed on spud leg 1, this process, by the sensor monitoring stressing conditions on jack 9, then carries out dismounting or the cutting of platform self-locking device, owing to the stressed of platform 2 having been passed to jack 9, the rear platform 2 be therefore removed when platform self-locking device has still kept original position.The jack 9 controlling spud leg 1 makes platform 2 steadily drop on the sleeper of construction ship 3, then platform 2 and construction ship 3 is rigidly connected.Start jack 9 and make it have pretightning force, then carry out boats and ships row and carry, 4 precipitations are pulled out by the trim utilizing boats and ships row to carry from mud;
As shown in Fig. 4,6,7, to steel strand jack 9 interval weld anchor solid point 6 on spud leg 1 of uniform installation, carry out steel strand 7 to promote, promote below anchor point 6 to jack platform 8, to steel strand jack 9 weld anchor solid point 6 on spud leg 1 of not carrying out anchor point welding, tension steel strand 7, and remove the anchor point 6 of institute in early stage interval welding, carry out steel strand 7 to promote, circulate successively, be promoted to bottom construction ship 3 to precipitation 4, construction ship 3 transports jack-up unit entirety and leaves construction marine site.
The above, it is only preferred embodiment of the present invention, not any pro forma restriction is done to the present invention, every above embodiment is done according to technical spirit of the present invention any simple modification, equivalent variations and modification, all still belong in the scope of technical solution of the present invention.

Claims (1)

1. be applicable to the jack-up unit method for dismounting that elevating function lost efficacy, it is characterized in that: described dismounting step comprises:
1. select construction ship, determine to load position onto ship;
2. remove jack-up unit original lifting gear that lost efficacy, at each platform leg place, jack platform be installed, and above jack platform the several anchor point of uniform installation, the several steel strand jack device of uniform installation below jack platform;
3. start steel strand jack, remove jack-up unit self-locking device, control steel strand jack, platform is dropped on construction ship, and platform and construction ship are rigidly connected;
4. remove the steel strand jack below jack platform, and be mounted to above jack platform by steel strand jack, anchor point is mounted to the spud leg place below jack platform;
5. start steel strand jack, carry out construction ship row and carry, utilize construction ship to arrange the trim of carrying, precipitation is extracted from mud;
6. to steel strand jack weld anchor solid point in interval on spud leg of uniform installation, carry out steel strand lifting, promote below anchor point to jack platform, to steel strand jack weld anchor solid point on spud leg of not carrying out anchor point welding, tension steel strand, and the anchor point removing the interval welding of institute in early stage, carry out steel strand lifting, circulate successively, be promoted to bottom construction ship to precipitation;
7. construction ship transport jack-up unit entirety leaves construction marine site.
CN201310598740.5A 2013-11-25 2013-11-25 A kind of jack-up unit method for dismounting that is applicable to elevating function inefficacy Active CN104652391B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310598740.5A CN104652391B (en) 2013-11-25 2013-11-25 A kind of jack-up unit method for dismounting that is applicable to elevating function inefficacy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310598740.5A CN104652391B (en) 2013-11-25 2013-11-25 A kind of jack-up unit method for dismounting that is applicable to elevating function inefficacy

Publications (2)

Publication Number Publication Date
CN104652391A true CN104652391A (en) 2015-05-27
CN104652391B CN104652391B (en) 2016-05-18

Family

ID=53243985

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310598740.5A Active CN104652391B (en) 2013-11-25 2013-11-25 A kind of jack-up unit method for dismounting that is applicable to elevating function inefficacy

Country Status (1)

Country Link
CN (1) CN104652391B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1201296A (en) * 1983-02-07 1986-03-04 Sherman B. Wetmore Monopod jackup drilling system
CN101196177A (en) * 2006-12-08 2008-06-11 天津市海恩海洋工程技术服务有限公司 Installation construction method for wind generator set on the sea
CN102094429A (en) * 2011-01-12 2011-06-15 广东省长大公路工程有限公司 Lowering control method of double-wall steel cofferdam
CN202000328U (en) * 2011-03-21 2011-10-05 中国船舶工业集团公司第七○八研究所 Pin-type lifting device with hydraulic cylinder jacking ring beam

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1201296A (en) * 1983-02-07 1986-03-04 Sherman B. Wetmore Monopod jackup drilling system
CN101196177A (en) * 2006-12-08 2008-06-11 天津市海恩海洋工程技术服务有限公司 Installation construction method for wind generator set on the sea
CN102094429A (en) * 2011-01-12 2011-06-15 广东省长大公路工程有限公司 Lowering control method of double-wall steel cofferdam
CN202000328U (en) * 2011-03-21 2011-10-05 中国船舶工业集团公司第七○八研究所 Pin-type lifting device with hydraulic cylinder jacking ring beam

Also Published As

Publication number Publication date
CN104652391B (en) 2016-05-18

Similar Documents

Publication Publication Date Title
CN101657633B (en) A method of installing a hydroelectric turbine
CN101657632B (en) Method for the deployment of a hydroelectric turbine
CN102256867B (en) A hydroelectric turbine support system
JP5736133B2 (en) Floating structure work system, work boat, and floating structure work method
CN100548795C (en) Offshore platform and the method for setting up raft
JP2016022783A (en) Construction method of offshore structure
CN103373447B (en) A kind of jacket removes ship and jacket method for dismounting
FR2887900A1 (en) Electricity generating system constructing and installing method, involves towing assembly of ballast, system and structure to site, maintaining descended structure on sea-bed and resetting cans in flotation after detaching, to be reused
WO2013125535A1 (en) Ship for installing offshore wind turbine and method for installing offshore wind turbine
EP3635180B1 (en) Launching method
CN109911125A (en) A kind of rolling of offshore wind power foundation steel-pipe pile takes on board method
CN102530189A (en) Catamaran for ocean engineering
EP3674199A1 (en) Decommissioning of offshore structures
US8181589B2 (en) Gravity anchor
CN104652391B (en) A kind of jack-up unit method for dismounting that is applicable to elevating function inefficacy
CN102991646B (en) Manufacturing methods for gravity anchor
US20170356153A1 (en) Support device configured to be positioned on a lifting vessel in order to lift a topside from its support structure
US20140072371A1 (en) Platform deck installation and removal method and apparatus
AU2010250147B2 (en) Method for installing a topside module on an offshore support structure
KR100944243B1 (en) Supporting mooring gear for a floating body
US20150050089A1 (en) Shallow water jacket installation method
KR20140002178U (en) 4 4 point mooring apparatus of refloat vessel
CN108203975A (en) A kind of ocean platform
CN103807116A (en) Inhaul cable jack lifting type offshore wind power generation set installing device and construction method
CN103963931A (en) Large component semi-submersible water transport installation system and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200825

Address after: 264200 room 810, floor 8, building a, haiyucheng, No. 3-2, Shichang Avenue, Huancui District, Weihai City, Shandong Province

Patentee after: Weihai Haien blue sea aquaculture Co.,Ltd.

Address before: 300384 Tianjin City, Nankai District Huayuan Industrial Park Road No. 1 Industrial Park E block six layer

Patentee before: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT Co.,Ltd.