CN104631460A - 环切劈裂法整体破桩方法 - Google Patents

环切劈裂法整体破桩方法 Download PDF

Info

Publication number
CN104631460A
CN104631460A CN201510020934.6A CN201510020934A CN104631460A CN 104631460 A CN104631460 A CN 104631460A CN 201510020934 A CN201510020934 A CN 201510020934A CN 104631460 A CN104631460 A CN 104631460A
Authority
CN
China
Prior art keywords
pile
pile crown
girdling
construction
ring cutting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510020934.6A
Other languages
English (en)
Inventor
殷倩倩
赵开典
张华和
张传令
文璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CR10BG CONSTRUCTION ENGINEERING Co Ltd
Construction Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
CR10BG CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CR10BG CONSTRUCTION ENGINEERING Co Ltd filed Critical CR10BG CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201510020934.6A priority Critical patent/CN104631460A/zh
Publication of CN104631460A publication Critical patent/CN104631460A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/005Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof removing the top of placed piles of sheet piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种环切劈裂法整体破桩方法,包括如下步骤:1)破桩前将钢筋笼深入桩头的钢筋全部用PVC-U塑料管套住;2)破除桩头:①测定桩顶标高做好环切线标记;②在环切线标记处用小型切割机进行环切一周;③在桩头的标高对称位置处钻2个孔洞;④将2个液压劈裂机***孔洞内进行劈裂;⑤将桩头混凝土吊出。所述PVC-U塑料管的内径为钢筋直径的1.2~1.3倍;所述孔洞直径为40mm、深度为200mm的孔洞。本发明的破桩方法桩基钢筋整齐,桩头较平整,为后续施工创造了有利条件,保证了桩头质量;同时提高了施工效率,大大降低劳动强度。

Description

环切劈裂法整体破桩方法
技术领域
本发明涉及一种整体破桩方法,属于建筑施工技术领域。
背景技术
特大桥基础,通常采用桩基础承受上部结构传递下来的全部荷载。按照钻孔灌注桩的施工工艺,为保证桩头质量,通常在灌注混凝土时,顶面要超灌1.1-1.5m左右,待混凝土强度不低于10MPa,人工采用风镐将深入桩头的钢筋剥离后进行桩头吊除。这样做的原因是:在钻孔桩灌注混凝土时顶层约50cm厚的混凝土与泥浆混合,凝固后的混合体不能达到设计强度。为保证桩头混凝土质量,须超灌一定高度的混凝土。桩体满足强度要求后,在承台施工前将高出的桩头打掉(亦称破桩)。目前破桩的方法通常为人工用风镐剥离桩头钢筋后,再将剩余部分桩头进行吊装。这种施工方法易造成桩头不平整,桩头钢筋在剥离时易弯曲受损,影响桩头质量,并且存在着作业难度大,环境差,消耗时间长等问题。
发明内容
本发明所要解决的技术问题是针对现有技术存在的缺陷,提供一种高效破除桩头的施工方法。
为解决这一技术问题,本发明提供了一种环切劈裂法整体破桩方法,具体包括如下步骤:
1)破桩前准备:钻孔桩施工时将钢筋笼深入桩头的钢筋全部用PVC-U
塑料管套住,再进行灌注施工;
2)破除桩头:
①首先,基坑开挖后,测定桩顶标高位置,并做好环切线标记;
②然后,在测定好的环切线标记处用小型切割机进行环切一周;
③在桩头的标高对称位置处进行钻2个孔洞;
④将2个液压劈裂机对称***桩头的孔洞内进行劈裂;
⑤将桩头混凝土吊出。
所述步骤1)中的PVC-U塑料管的内径为钢筋直径的1.2~1.3倍。
所述步骤2)之③所述的孔洞的直径满足液压劈裂机械头施工要求,直径为40mm、深度为200mm的孔洞。
有益效果:本发明的破桩方法桩基钢筋整齐,桩头较平整,为后续施工创造了有利条件,保证了桩头质量;同时提高了施工效率,大大降低劳动强度。
附图说明
图1为本发明钻孔桩施工时进行的破桩前准备施工示意图;
图2为本发明钻孔桩桩顶环切及钻孔施工示意图。
图中:1钢筋笼、2PVC-U塑料管、3桩头、4环切线、5孔洞。
具体实施方式
本发明整体破桩工艺,是在施工时即进行的,施工时将钢筋笼1深入桩头的钢筋全部用PVC-U塑料管2套住,进行灌桩施工,其目的是隔离了伸入桩头部分的钢筋与超灌混凝土粘结,为后续破桩做准备。
下面结合附图及实施例对本发明做具体描述。
图1所示为钻孔桩施工时进行的破桩前准备施工示意图。
图2所示为钻孔桩桩顶环切及钻孔施工示意图。
本发明具体包括如下步骤:
破桩前准备:钻孔桩施工时即将钢筋笼1深入桩头的钢筋全部用PVC-U塑料管2套住,进行灌桩施工(如图1所示),其目的是隔离伸入桩头部分的钢筋与超灌混凝土粘结;
进行破除桩头:
①首先,基坑开挖后,测定桩顶标高位置,确定出设计要求的桩顶位置,
做好环切线4标记;
②然后,在测定好的环切线4标记处用小型切割机进行环切一周;
③在桩头3的标高对称位置处进行钻2个孔洞5;
④用2个液压劈裂机对称***桩头3的孔洞5内进行劈裂,由于钢筋与
桩头3混凝土无粘连,即可直接进行下一步⑤的施工;
⑤用吊装设备将桩头混凝土吊出。
所述步骤1)中的PVC-U塑料管2的内径为钢筋的1.2~1.3倍为宜,如钢筋笼1的主筋直径为16mm,PVC-U塑料管2的内径采用20mm。PVC-U塑料管2的内径过小不方便施工,在安装和拔出时困难,过大会影响灌桩施工质量。
所述步骤2)之③所述的孔洞5的直径满足液压劈裂机械头施工要求,直径为40mm、深度为200mm。
本发明的施工原理:
钢筋笼伸入桩头的钢筋全部用PVC-U塑料管套住,保证伸入桩头部分的钢筋不会与超灌混凝土粘结。在桩头破除时,首先采用小型切割机在桩头标高位置进行环切一周,保证了桩头较为平整;然后在桩头标高位置水平方向进行开设2个孔洞,然后用2个液压劈裂机械***孔洞内将桩头劈开,因钢筋与桩头混凝土无粘结,桩头混凝土即可直接吊出。
本发明的破桩方法一方面保证了施工效率,同时施工后的桩头较平整。
本发明上述实施方案,只是举例说明,不是仅有的,所有在本发明范围内或等同本发明的范围内的改变均被本发明包围。

Claims (3)

1.一种环切劈裂法整体破桩方法,其特征在于,具体包括如下步骤:
1)破桩前准备:钻孔桩施工时即将钢筋笼(1)深入桩头的钢筋全部用PVC-U塑料管(2)套住,然后进行灌装施工;
2)破除桩头:
①首先,基坑开挖后,测定桩顶标高位置,并做好环切线(4)标记;
②然后,在测定好的环切线(4)标记处用小型切割机进行环切一周;
③在桩头(3)的标高对称位置处钻2个孔洞(5);
④将2个液压劈裂机对称***桩头(3)的孔洞(5)内进行劈裂;
⑤将桩头混凝土吊出。
2.根据权利要求1所述的环切劈裂法整体破桩方法,其特征在于:所述步骤1)中的PVC-U塑料管(2)的内径为钢筋的1.2~1.3倍。
3.根据权利要求1所述的环切劈裂法整体破桩方法,其特征在于:所述步骤2)之③所述的孔洞(5)的直径满足液压劈裂机械头施工要求,直径为40mm、深度为200mm。
CN201510020934.6A 2015-01-15 2015-01-15 环切劈裂法整体破桩方法 Pending CN104631460A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510020934.6A CN104631460A (zh) 2015-01-15 2015-01-15 环切劈裂法整体破桩方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510020934.6A CN104631460A (zh) 2015-01-15 2015-01-15 环切劈裂法整体破桩方法

Publications (1)

Publication Number Publication Date
CN104631460A true CN104631460A (zh) 2015-05-20

Family

ID=53210658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510020934.6A Pending CN104631460A (zh) 2015-01-15 2015-01-15 环切劈裂法整体破桩方法

Country Status (1)

Country Link
CN (1) CN104631460A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105756063A (zh) * 2016-03-02 2016-07-13 华东交通大学 一种简易桩头破除辅助施工方法
CN106400803A (zh) * 2016-10-31 2017-02-15 中国葛洲坝集团第六工程有限公司 一种钻孔灌注桩桩头整体破除工艺
CN106930289A (zh) * 2017-03-10 2017-07-07 东南大学 一种无声破桩装置及破桩方法
CN106939603A (zh) * 2016-01-03 2017-07-11 张新强 截桩头机
CN107034887A (zh) * 2017-03-30 2017-08-11 河南大建桥梁钢构股份有限公司 钻孔桩桩头环切施工方法
CN107326905A (zh) * 2017-06-30 2017-11-07 中国冶集团有限公司 便于剥离桩基密实混凝土钢护筒的施工方法
CN108952612A (zh) * 2018-06-15 2018-12-07 上海二十冶建设有限公司 一种人工挖孔桩的快速入岩成孔施工方法
CN110485421A (zh) * 2019-09-24 2019-11-22 中国五冶集团有限公司 一种桩头快速破除施工工艺

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101603313A (zh) * 2009-07-01 2009-12-16 中铁十三局集团第三工程有限公司 一种灌注桩桩头凿除方法
CN201386279Y (zh) * 2009-02-11 2010-01-20 中国建筑材料科学研究总院 一种混凝土灌注桩桩头静态切割装置
JP2013253455A (ja) * 2012-06-08 2013-12-19 Yokoyama Kiso Koji:Kk ファーストチューブ及び地中障害物撤去工法
CN104234038A (zh) * 2014-03-03 2014-12-24 王磊 一种灌注桩免破碎桩头施工工艺

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201386279Y (zh) * 2009-02-11 2010-01-20 中国建筑材料科学研究总院 一种混凝土灌注桩桩头静态切割装置
CN101603313A (zh) * 2009-07-01 2009-12-16 中铁十三局集团第三工程有限公司 一种灌注桩桩头凿除方法
JP2013253455A (ja) * 2012-06-08 2013-12-19 Yokoyama Kiso Koji:Kk ファーストチューブ及び地中障害物撤去工法
CN104234038A (zh) * 2014-03-03 2014-12-24 王磊 一种灌注桩免破碎桩头施工工艺

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939603A (zh) * 2016-01-03 2017-07-11 张新强 截桩头机
CN106939603B (zh) * 2016-01-03 2020-06-02 张新强 截桩头机
CN105756063A (zh) * 2016-03-02 2016-07-13 华东交通大学 一种简易桩头破除辅助施工方法
CN105756063B (zh) * 2016-03-02 2018-03-30 华东交通大学 一种简易桩头破除辅助施工方法
CN106400803A (zh) * 2016-10-31 2017-02-15 中国葛洲坝集团第六工程有限公司 一种钻孔灌注桩桩头整体破除工艺
CN106930289A (zh) * 2017-03-10 2017-07-07 东南大学 一种无声破桩装置及破桩方法
CN106930289B (zh) * 2017-03-10 2019-03-12 东南大学 一种无声破桩装置及破桩方法
CN107034887A (zh) * 2017-03-30 2017-08-11 河南大建桥梁钢构股份有限公司 钻孔桩桩头环切施工方法
CN107326905A (zh) * 2017-06-30 2017-11-07 中国冶集团有限公司 便于剥离桩基密实混凝土钢护筒的施工方法
CN107326905B (zh) * 2017-06-30 2019-10-18 中国一冶集团有限公司 便于剥离桩基密实混凝土钢护筒的施工方法
CN108952612A (zh) * 2018-06-15 2018-12-07 上海二十冶建设有限公司 一种人工挖孔桩的快速入岩成孔施工方法
CN110485421A (zh) * 2019-09-24 2019-11-22 中国五冶集团有限公司 一种桩头快速破除施工工艺

Similar Documents

Publication Publication Date Title
CN104631460A (zh) 环切劈裂法整体破桩方法
CN102312429B (zh) 混凝土灌注桩桩头快速分离与整体吊装方法
CN106193141B (zh) 一种地震受损桥墩基础补强加固方法
CN106400803A (zh) 一种钻孔灌注桩桩头整体破除工艺
CN103628473A (zh) 复合式组合桩及其施工方法
CN104631438B (zh) 长螺旋钻孔压灌混凝土抗拔桩施工方法
CN108411918A (zh) 成孔灌注桩桩头破除装置及其施工方法
CN106120792A (zh) 一种桩基础桩头混凝土预剥离组件及施工方法
CN104652423B (zh) 双向螺旋挤土灌注桩施工方法
CN105421445A (zh) 非预应力离心高强混凝土桩植桩施工方法
CN109024721B (zh) 一种加固基础及提高既有建筑刚性基础抗弯剪能力的方法
CN106049563B (zh) 地震受损桥墩基础补强加固***
CN202039368U (zh) 预应力管桩桩芯补强简易手动螺旋取土装置
CN108842792B (zh) 一种分层内抬升卸荷式地拉锚杆及施工方法
CN204510194U (zh) 咬合式连桩墙施工用栗形钢筋笼及导模钢板
CN108385686A (zh) 一种钻孔灌注桩免剥离免环切截桩头工艺
CN106939604A (zh) 一种钢筋隔浆保护套管的混凝土桩头破除方法
CN209211459U (zh) 一种深埋pba地铁车站围护边桩
CN104372793A (zh) 采用旋喷桩法预应力锚索用于既有地下室抗浮的方法
CN106638600A (zh) 一种破除钻孔灌注桩桩头的施工方法
CN203583501U (zh) 一种抵抗岩体滑动的深层抗剪装置
CN103911986B (zh) 一种组合复打钢管桩的施工方法
CN108086306A (zh) 一种桩头混凝土施工及凿除方法
CN104631458B (zh) 一种静力压桩机扩孔沉桩工法
CN107740592A (zh) 一种预应力孔道成孔的保护装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150520