CN104539051B - A kind of secondary equipment of intelligent converting station online evaluation system - Google Patents
A kind of secondary equipment of intelligent converting station online evaluation system Download PDFInfo
- Publication number
- CN104539051B CN104539051B CN201410841131.2A CN201410841131A CN104539051B CN 104539051 B CN104539051 B CN 104539051B CN 201410841131 A CN201410841131 A CN 201410841131A CN 104539051 B CN104539051 B CN 104539051B
- Authority
- CN
- China
- Prior art keywords
- assessment
- module
- evaluation
- subitem
- value
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Sequence number assesses subitem | Point value of evaluation |
1 running environment | 5 |
2 failure free times | 15 |
3 familial failure free times | 15 |
4 performance factors (RCO) | 15 |
5 insulation status | 10 |
6 device state informations | 10 |
7 device process layer status informations | 10 |
8 communication conditions | 10 |
9 passage ruuning situations | 10 |
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410841131.2A CN104539051B (en) | 2014-12-30 | 2014-12-30 | A kind of secondary equipment of intelligent converting station online evaluation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410841131.2A CN104539051B (en) | 2014-12-30 | 2014-12-30 | A kind of secondary equipment of intelligent converting station online evaluation system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104539051A CN104539051A (en) | 2015-04-22 |
CN104539051B true CN104539051B (en) | 2017-06-23 |
Family
ID=52854541
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410841131.2A Active CN104539051B (en) | 2014-12-30 | 2014-12-30 | A kind of secondary equipment of intelligent converting station online evaluation system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104539051B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108183482A (en) * | 2018-01-31 | 2018-06-19 | 国网安徽省电力有限公司 | A kind of method of intelligent substation digitlization secondary circuit presence assessment |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105046402B (en) * | 2015-06-23 | 2018-03-02 | 国家电网公司 | A kind of state evaluating method applied to secondary equipment of intelligent converting station |
CN106611244A (en) * | 2016-12-06 | 2017-05-03 | 国电南瑞科技股份有限公司 | Multi-dimensional comprehensive assessment method for state of power distribution automation secondary device |
CN107294205B (en) * | 2017-06-27 | 2020-05-05 | 国家电网公司 | Substation state monitoring method based on information protection master station data |
CN107493207A (en) * | 2017-08-30 | 2017-12-19 | 南方电网科学研究院有限责任公司 | Secondary equipment of intelligent converting station management-control method, apparatus and system |
CN107657381A (en) * | 2017-09-27 | 2018-02-02 | 北京龙德时代技术服务有限公司 | Civilian explosive device security risk assessment system |
CN109167433A (en) * | 2018-09-14 | 2019-01-08 | 国电南瑞科技股份有限公司 | A kind of substation concentrates the classification managing and control system and its method of O&M |
CN109005076A (en) * | 2018-09-27 | 2018-12-14 | 广东电网有限责任公司 | A kind of intelligent substation switch monitoring system and interchanger monitoring method |
CN110795680B (en) * | 2019-10-16 | 2023-04-18 | 国网湖北省电力有限公司电力科学研究院 | Multi-objective programming based comprehensive evaluation method for state of direct current protection system |
CN113346614A (en) * | 2021-05-28 | 2021-09-03 | 国网甘肃省电力公司白银供电公司 | State evaluation system for secondary equipment of power grid intelligent substation |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102035258A (en) * | 2010-12-08 | 2011-04-27 | 宁夏电力公司宁东供电局 | Electric power monitoring management system and electric power monitoring management method and communication equipment for transformer substation |
CN102222276A (en) * | 2011-05-16 | 2011-10-19 | 广东电网公司深圳供电局 | State maintenance method and device for secondary equipment of power grid |
CN102832708A (en) * | 2012-08-06 | 2012-12-19 | 华北电力大学 | Intelligent transformer substation based on integrated multi-stage server framework |
CN103078403A (en) * | 2012-12-28 | 2013-05-01 | 中国电力科学研究院 | On-line state evaluation method for secondary system of intelligent substation |
CN103218695A (en) * | 2013-05-03 | 2013-07-24 | 国家电网公司 | Secondary equipment intelligence state evaluation diagnostic system and method thereof |
CN103545924A (en) * | 2013-09-24 | 2014-01-29 | 许继集团有限公司 | Secondary equipment state online monitoring method |
CN103617561A (en) * | 2013-12-02 | 2014-03-05 | 深圳供电局有限公司 | System and method for evaluating state of secondary device of power grid intelligent substation |
CA2903912A1 (en) * | 2013-03-07 | 2014-09-12 | State Grid Anhui Wuhu Power Supply Company | Network for online monitoring of power transformer at intelligent substation |
-
2014
- 2014-12-30 CN CN201410841131.2A patent/CN104539051B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102035258A (en) * | 2010-12-08 | 2011-04-27 | 宁夏电力公司宁东供电局 | Electric power monitoring management system and electric power monitoring management method and communication equipment for transformer substation |
CN102222276A (en) * | 2011-05-16 | 2011-10-19 | 广东电网公司深圳供电局 | State maintenance method and device for secondary equipment of power grid |
CN102832708A (en) * | 2012-08-06 | 2012-12-19 | 华北电力大学 | Intelligent transformer substation based on integrated multi-stage server framework |
CN103078403A (en) * | 2012-12-28 | 2013-05-01 | 中国电力科学研究院 | On-line state evaluation method for secondary system of intelligent substation |
CA2903912A1 (en) * | 2013-03-07 | 2014-09-12 | State Grid Anhui Wuhu Power Supply Company | Network for online monitoring of power transformer at intelligent substation |
CN103218695A (en) * | 2013-05-03 | 2013-07-24 | 国家电网公司 | Secondary equipment intelligence state evaluation diagnostic system and method thereof |
CN103545924A (en) * | 2013-09-24 | 2014-01-29 | 许继集团有限公司 | Secondary equipment state online monitoring method |
CN103617561A (en) * | 2013-12-02 | 2014-03-05 | 深圳供电局有限公司 | System and method for evaluating state of secondary device of power grid intelligent substation |
Non-Patent Citations (1)
Title |
---|
四川电网二次设备在线监视与分析***实用化浅析;陈愚;《四川电力技术》;20120820;第35卷(第4期);第46-48页 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108183482A (en) * | 2018-01-31 | 2018-06-19 | 国网安徽省电力有限公司 | A kind of method of intelligent substation digitlization secondary circuit presence assessment |
CN108183482B (en) * | 2018-01-31 | 2019-11-12 | 国网安徽省电力有限公司 | A kind of method of intelligent substation digitlization secondary circuit presence assessment |
Also Published As
Publication number | Publication date |
---|---|
CN104539051A (en) | 2015-04-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104539051B (en) | A kind of secondary equipment of intelligent converting station online evaluation system | |
CN103454516B (en) | Intelligent transformer substation secondary equipment health state diagnostic method | |
CN102005736B (en) | On-line monitoring method of state of relay protection equipment | |
CN102324067B (en) | Electrical secondary equipment state evaluation method and system thereof | |
CN104360208A (en) | Acquisition failure analyzing and processing method of electricity utilization information acquisition operating and maintaining system | |
CN105427039A (en) | Efficient processing method of distribution network repair work orders based on responsibility areas | |
CN107180314B (en) | Operation and maintenance business model modeling method based on primary and secondary system incidence relation | |
CN106447522A (en) | Full voltage sequence integrated power grid reliability and risk evaluation method | |
CN103823433A (en) | Method for realizing relay protection equipment on-line monitoring by use of communication process analysis | |
CN102063651A (en) | Urban power grid risk evaluation system based on on-line data acquisition | |
CN102737287B (en) | Regional power grid on-line power supply risk assessment system | |
CN105184521B (en) | A kind of methods of risk assessment of grid operation mode, apparatus and system | |
CN103971294B (en) | One kind assesses information display system based on power transmission and transformation equipment state | |
CN108710099A (en) | Capacitance type potential transformer monitoring alarm method and system | |
CN107093017B (en) | The business datum acquisition methods and its device and system of power-off event | |
CN103618385B (en) | One puies forward high-precision state estimation data correction system and method | |
CN105447657A (en) | Risk-based operation and maintenance management system of 750KV power equipment | |
CN104820884A (en) | Power network dispatching real-time data inspection method combined with characteristics of power system | |
CN106952178B (en) | Telemetry bad data identification and reason distinguishing method based on measurement balance | |
CN106160218A (en) | The real-time monitoring analysis system of electrical network distribution line | |
CN107453354A (en) | A kind of weak link recognition methods of power distribution network | |
CN105913126A (en) | Transformer station intelligent alarm model method for big data and cloud environment | |
CN108933482A (en) | Distribution power automation terminal equipment off-line analysis of causes method based on wireless network signal strength big data | |
CN105590164A (en) | Power failure incident automatic integration-based analysis device for analyzing reliability of power transmission and transformation system | |
CN113471864A (en) | Transformer substation secondary equipment field maintenance device and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant after: State Grid Corporation of China Applicant after: STATE GRID JIANGSU ELECTRIC POWER Co. Applicant after: STATE GRID JIANGSU ECONOMIC RESERCH INSTITUTE Applicant after: FIVE-C SMART POWER GRID TECHNOLOGY Co.,Ltd. Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant before: State Grid Corporation of China Applicant before: JIANGSU ELECTRIC POWER Co. Applicant before: JIANGSU ELECTRIC POWER COMPANY ECONOMIC Research Institute Applicant before: FIVE-C SMART POWER GRID TECHNOLOGY Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20170523 Address after: 210008 Gulou District, Jiangsu, Zhongshan Road, No. 251, No. Applicant after: STATE GRID JIANGSU ECONOMIC RESERCH INSTITUTE Applicant after: STATE GRID JIANGSU ELECTRIC POWER Co. Applicant after: State Grid Corporation of China Applicant after: FIVE-C SMART POWER GRID TECHNOLOGY Co.,Ltd. Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant before: State Grid Corporation of China Applicant before: STATE GRID JIANGSU ELECTRIC POWER Co. Applicant before: STATE GRID JIANGSU ECONOMIC RESERCH INSTITUTE Applicant before: FIVE-C SMART POWER GRID TECHNOLOGY Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |