CN104533468A CN201410814477.3A CN201410814477A CN104533468A CN 104533468 A CN104533468 A CN 104533468A CN 201410814477 A CN201410814477 A CN 201410814477A CN 104533468 A CN104533468 A CN 104533468A
Authority
CN
China
Prior art keywords
metal tube
hole
ball valve
grouting
aperture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410814477.3A
Other languages
Chinese (zh)
Other versions
CN104533468B (en
Inventor
韩勋
周峥
柴子龙
孙健华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Rail Transit Maintenance Support Co ltd
Original Assignee
WORKS BRANCH SHANGHAI SUBWAY MAINTENANCE GUARANTEE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WORKS BRANCH SHANGHAI SUBWAY MAINTENANCE GUARANTEE Co Ltd filed Critical WORKS BRANCH SHANGHAI SUBWAY MAINTENANCE GUARANTEE Co Ltd
Priority to CN201410814477.3A priority Critical patent/CN104533468B/en
Publication of CN104533468A publication Critical patent/CN104533468A/en
Application granted granted Critical
Publication of CN104533468B publication Critical patent/CN104533468B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention provides a small-diameter backfill grouting method for a subway tunnel with automatic hole distribution. The method is used for governing seepage diseases of standard blocks and an arch bottom block of a segment of the subway tunnel. The grouting method includes the steps that drill holes are distributed in the standard blocks and the arch bottom block of the segment first, a primary hole is drilled, anchoring adhesives are injected into the primary hole, a hollow metal tube is inserted into the primary hole, a ball valve is installed at one end of the hollow metal tube, the other end of the hollow metal tube is closed through cement, and the metal tube is fixed in the primary hole after being cured and formed; a secondary hole is then drilled into the ball valve and the primary hole in the radial direction; finally, high molecule size is injected into the metal tube and the secondary hole. An automatic hole distribution method is adopted, leakage water of the segment of the subway tunnel can be governed in a targeted mode, and especially, leakage water of longitudinal joints which are far away from a reserved hole and located between the standard blocks and the arch bottom block of the segment can be governed. A small numerical range is stipulated for grouting hole diameters, and the probability that stirrups with higher laying density of the segment are cut or rubbed during hole drilling is greatly lowered.

Description

A kind of subway tunnel drill hole wall post-grouting method
Technical field
The present invention relates to a kind of subway tunnel maintenance technology, particularly relating to a kind of drill hole wall post-grouting method for administering subway tunnel section of jurisdiction percolating water.
Background technology
District of Shanghai belongs to soft foundation, high-moisture, high-voidage ratio, high sensitive, low intensive rheological characteristic soft stratum, along with the growth of metro operation time, due to the soil nature of bottom around tunnel, the earth sedimentation, neighboring buildings construction activities, in train operation the impact of the factor such as vibrating load easily cause operation tunnel entirety to there is uneven relative settlement.This differential settlement easily causes the longitudinal joint of tunnel duct piece and circumferential weld to produce percolating water, and water leakage defect increase the development exacerbating tunnel Differential Settlement Disease, the particularly percolating water of calibrated bolck and the arch bottom ring longitudinal joint generation gap, junction of also causing railway roadbed and section of jurisdiction to cast, brings major hidden danger if administered not in time safely to the operation security of subway and tunnel structure.
At present after administering main employing wall, polyurethane slurry is noted to section of jurisdiction calibrated bolck, arch bottom water leakage defect; the gap of the characteristic of polyurethane material water-swellable to section of jurisdiction upstream face is utilized to fill; outside section of jurisdiction, form topping, intercept underground water to the infiltration of section of jurisdiction.But in work progress, find that the method for former grouting behind shaft or drift lining carries out grouting behind shaft or drift lining mainly through the hole of punching calibrated bolck or arch bottom reserved.Because the position of section of jurisdiction preformed hole is fixed; for the percolating water of the ring longitudinal joint of local; adopt " with face get ready " mode, consume lot of materials; and the trend that after wall, topping is formed is difficult to manipulation; can not remove completely the water leakage defect of some positions, a slip casting cycle completes, and the longitudinal joint position between the section of jurisdiction calibrated bolck distant from preformed hole and arch bottom still has infiltration or face, section of jurisdiction to have continuity to wet mark phenomenon; disease management effect often repeatedly, has a strong impact on efficiency of construction.
Summary of the invention
The present invention solves the aforementioned problems in the prior proposition.
The invention provides the pipe with small pipe diameter grouting behind shaft or drift lining method in the autonomous cloth hole of a kind of subway tunnel.
For achieving the above object, the present invention is by the following technical solutions:
The invention provides a kind of subway tunnel drill hole wall post-grouting method, for administering subway tunnel section of jurisdiction calibrated bolck and arch bottom water leakage defect, this grouting method comprises the steps:
Step 1: bore position of arranging on described section of jurisdiction;
Step 2: once hole, pours into anchoring adhesive after clearing up this secondary aperture, the preferred 100-200ml of the amount of pouring into, about such as 150ml;
Step 3: the hollow metal pipe producing an end mounting ball valve, the other end cement seal in advance, by in the secondary aperture described in one end inserting step 2 of this metal tube cement seal, described anchoring adhesive rises along this metal tube outer wall, and with a described hole wall curing molding, this metal tube is fixed in a described secondary aperture;
Step 4: secondary drilling, the ball valve on the metal tube described in opening steps 3, through this ball valve and a described aperture to the secondary pore that spuds in;
Step 5: inject high molecule size in described metal tube and secondary pore;
Step 6: the ball valve of described metal tube is removed, with epoxy mortar shutoff grouting port after completing at least one month, such as half a year by slip casting.
In a preferred embodiment of the present invention, described step 1 adopts the mode in autonomous cloth hole, and autonomous cloth hole must ensure the case of Structural Test of Tunnel Segments, and the main muscle in section of jurisdiction must be avoided in cloth hole site, to guarantee that tunnel segment structure is not damaged.
In another preferred embodiment, the aperture of a described secondary aperture is larger than the aperture of described secondary pore, the aperture of a described secondary aperture is unsuitable excessive, if aperture is excessive, when significantly can promote boring, cutting or grazing are to the probability of the larger stirrup of section of jurisdiction laying density, thus the preferred 15-45mm in aperture of a described secondary aperture, more preferably 20-30mm.Section of jurisdiction thickness is 350mm, and first time boring can not drill section of jurisdiction, reserved about 150mm, and therefore the drilling depth of a described secondary aperture is preferably 150-250mm, such as 200mm; Second time borehole drilling poling sheet, the degree of depth of described secondary pore is preferably 350-450mm.Twice boring is preferably perpendicular to section of jurisdiction.
The anchoring adhesive adopted in grouting method step 2 of the present invention is the macromolecular adhesive material being suitable for being anchored at by metal material in concrete, such as like sharp HIT-RE500, this adhesive needs time of 10-20 hour from construction to solidification completely, therefore in described step 3, metal tube is inserted a secondary aperture to described step 4 secondary drilling between the time interval be at least 12 hours, such as 24 hours.
The slurry poured in grouting method of the present invention is high molecule size, and preferred dual-component polyurethane slurry, is known in the art technology.
In a preferred embodiment of the present invention, the grouting method of described step 5 comprises the steps:
Step a, access in slurry by the pulp-absorbing pipe and return duct that are connected with mashing pump, described mashing pump is by Frequency Converter Control rotating speed;
Step b: the other end of mashing pump is connected Grouting Pipe, and this Grouting Pipe is inserted in the ball valve of metal tube, close ball valve;
Step c: opening power, start the rotating speed of Frequency Converter Control mashing pump at 500-700rpm, closing volume tube valve, slurry enters gear pump, then opens the ball valve of described metal tube, makes slurry by Grouting Pipe and ball valve injection hole;
Steps d: after slip casting terminates, closes the ball valve of metal tube, opens return duct valve, then opens metal tube ball valve and carry out release.
Preferably, every hole grouting amount is 20-40kg.Grouting sequence is preferably: on tunnel is longitudinal, " doing a jumping two ", i.e. every septum secundum holes slip casting one hole; And " getting on, get off ", namely according to injected hole distribution situation, slip casting successively from bottom to top.
The present invention adopts technique scheme, compared with prior art, has following technique effect:
1, the present invention adopts autonomous bore distribution method can administer subway tunnel section of jurisdiction percolating water pointedly, especially to the percolating water from the longitudinal joint position between the distant section of jurisdiction calibrated bolck of preformed hole and arch bottom.
2, slip casting aperture of the present invention defines a little number range, and when significantly reducing boring, cutting or grazing are to the probability of the larger stirrup of section of jurisdiction laying density.
Accompanying drawing explanation
Fig. 1 is subway tunnel section of jurisdiction sectional drawing;
Fig. 2 a is the decomposing section of section of jurisdiction calibrated bolck 11 and 12;
Fig. 2 b is the decomposing section of section of jurisdiction arch bottom 21;
Fig. 3 is the downward projection cloth hole plan view of Fig. 2 a;
Fig. 4 is the schematic diagram of step 3 in grouting method of the present invention;
Fig. 5 is the boring contrast block diagram that in present pre-ferred embodiments, 2 writing brush caliber metal tubes and 1 deposit caliber metal tube.
In figure, 1-section of jurisdiction, 11-calibrated bolck 1,12-calibrated bolck 2,21-arch bottom, 31-adjacent block 1,32-adjacent block 2,41-binds block, 2-metal tube, 3-ball valve, 4-cement end-blocking, 5-anchoring adhesive.
Detailed description of the invention
Carry out detailed and concrete introduction below by specific embodiment to the present invention, to make better to understand the present invention, but following embodiment does not limit the scope of the invention.
Present embodiments provide the pipe with small pipe diameter grouting behind shaft or drift lining method in the autonomous cloth hole of a kind of subway tunnel, for administering subway tunnel section of jurisdiction calibrated bolck and arch bottom water leakage defect.Fig. 1 shows subway tunnel section of jurisdiction sectional drawing, and as seen from the figure, subway tunnel section of jurisdiction 1 comprises calibrated bolck 11 and the calibrated bolck 12 of two lower portion, the adjacent block 31 of arch bottom 21, two upper portion of bottom and adjacent block 32, the block 41 that binds at top.Decompose calibrated bolck 11, calibrated bolck 12 and arch bottom 21 out to show in Fig. 2 a and Fig. 2 b respectively, these three pieces is the position in the present embodiment autonomous cloth hole in subway tunnel.
Described grouting method carries out in accordance with the following steps:
Step 1: bore position that the calibrated bolck 11 in described section of jurisdiction, calibrated bolck 12 and arch bottom 21 are arranged, Fig. 3 shows the downward projection cloth hole plan view of calibrated bolck 11 or calibrated bolck 12, figure medium square line is the main muscle in section of jurisdiction, the main muscle in section of jurisdiction must be avoided during cloth hole, to guarantee that tunnel segment structure is not damaged, square frame interior zone in prioritizing selection figure, wherein category-A region is more preferably region, and category-B region is less preferred region.
Step 2: use TE-YX35/570 drill bit (active length 400mm with electric hammer, #35 drill bit) once to hole, drilling depth, must perpendicular to section of jurisdiction during boring generally at about 200mm, first time boring can not drill the thick section of jurisdiction of 350mm, reserved about 150mm; To hole this secondary aperture of rear cleaning, with inflator, dust blowout in hole has been cleared up with water; Then sharp the HIT-RE500 anchoring adhesive of happiness is poured into, the amount of pouring into about 150ml.
The aperture of a described secondary aperture is unsuitable excessive, if aperture is excessive, when significantly can promote boring, cutting or grazing are to the probability of the larger stirrup of section of jurisdiction laying density.As shown in Figure 5, adopt the metal tube in 1 writing brush footpath to punch 10 times, cutting occurs or touches the number of times only 1 time of stirrup; Adopt the metal tube in 2 writing brush footpaths to punch 3 times, cutting all occurs for 3 times or touches stirrup accident.Thus select the metal tube in 1 writing brush footpath, the preferred 15-45mm in aperture of a described secondary aperture, more preferably 20-30mm, the aperture of described secondary pore is less than the aperture of a described secondary aperture.
Step 3: as shown in Figure 4, produce the hollow metal pipe 2 of an end mounting ball valve 3, the other end cement seal 4 in advance, this metal tube 2 is used in the secondary aperture described in one end 4 inserting step 2 of cement seal, due to metal tube 2 bottom lock in insertion process, anchoring adhesive 5 rises along this metal tube 2 outer wall, and with a described hole wall curing molding, so that this metal tube 2 is fixed in a described secondary aperture; Then the gap place between ball valve 3 and metal tube 2 is secured solid with fast water shutoff mud, install to complete ball valve, and close ball valve 3.
Step 4: after spending 24 hours, open the ball valve 3 on injected hole, uses TE-YX16/920 drill bit (active length 800mm with electric hammer, 16# drill bit) through this ball valve 3 and a described aperture to the secondary pore that spuds in, the degree of depth of secondary pore is 350-450mm, extracts drill bit out, and closes ball valve 3;
Step 5: inject polyurethane slurry in described metal tube and secondary pore;
Step 5.1: assemble frequency converter, slurry gear pump, Grouting Pipe, pulp-absorbing pipe and return duct, the secondary agent adding 6%-8% in polyurethane host is stirred, and the pulp-absorbing pipe of slurry gear pump and return duct are accessed in the slurry be stirred;
Step 5.2: Grouting Pipe is accessed ball valve and fastening;
Step 5.3: opening power, start the rotating speed of Frequency Converter Control slurry gear pump between 500 to 700 turns, the Stress control of slurry gear pump is at 0.3MPa, the closing volume tube valve when slurry enters slurry gear pump, and open the valve of Grouting Pipe and ball valve, after making slurry inject section of jurisdiction wall by Grouting Pipe and ball valve simultaneously; After slip casting terminates, close the valve of ball valve and Grouting Pipe simultaneously, open return duct valve, then open Grouting Pipe valve and carry out release;
Step 5.4: removal Grouting Pipe, removes the residue on section of jurisdiction, ball valve after urethane cures, cleaning slurry gear pump, Grouting Pipe, pulp-absorbing pipe and return duct, in order to avoid residual slurry solidification blocking pipe.
Step 6: the ball valve of described metal tube is removed after completing half a year by slip casting, with epoxy mortar shutoff grouting port, screws on silently.
Every hole grouting amount should control at 20-40kg, suitably can adjust grouting amount according to field condition.
Grouting sequence principle: on tunnel is longitudinal, " doing a jumping two ", i.e. every septum secundum two ring slip casting one ring; " get on, get off ", namely according to injected hole distribution situation, slip casting successively from bottom to top.
The present invention adopts autonomous bore distribution method can administer subway tunnel section of jurisdiction percolating water pointedly, especially to the percolating water from the longitudinal joint position between the distant section of jurisdiction calibrated bolck of preformed hole and arch bottom; Slip casting aperture of the present invention defines a little number range, and when significantly reducing boring, cutting or grazing are to the probability of the larger stirrup of section of jurisdiction laying density.
application examples:
Road-back beach up accident section in Shanghai Rail Line 7 line Longhua is once because by-pass base plate emits silt that dangerous situation occurred, 30 mitron sheets near by-pass and railway roadbed because of tunnel subsidence cause calibrated bolck and arch bottom ring longitudinal joint percolating water situation more serious, comprise gutter and even railway roadbed has ponding, wet mark is had continuously bottom continuous print calibrated bolck section of jurisdiction, these diseases cause further infringement to the accident section tunnel duct piece sustained damage again, and simultaneously moist tunnel environment and ponding all cause corrosion and infringement to the rail on railway roadbed and fastener.
Obvious according to the situation calibrated bolck section of jurisdiction ring longitudinal joint percolating water at scene, the percolating water of arch bottom and calibrated bolck seam crossing causes the suitable humidity of railway roadbed and gutter and surface, section of jurisdiction even to have ponding, has the draining of a certain amount of station to flow into the collecting well of by-pass in gutter.Therefore improvement judges that the water that this section of ponding humidity not only has tunnel to extravasate into also has part to infiltrate the gap with section of jurisdiction bottom gutter from station draining, if can affect connecting of railway roadbed and section of jurisdiction not in time.
Adopt three step constructions from outside to inside:
First stage first carries out polyurethane slip casting after the wall of continuous section of jurisdiction to calibrated bolck preformed hole and arch bottom preformed hole (having arch bottom preformed hole near about 20 meters, by-pass), side calibrated bolck grouting amount controls at 50kg, arch bottom grouting amount controls at 100kg, adopt " doing a jumping two " i.e. every septum secundum two ring slip casting one ring, the order of first arch bottom calibrated bolck again.Substantially to be eliminated by the infiltration phenomenon of a slip casting cycle railway roadbed and calibrated bolck ring longitudinal joint but surface, section of jurisdiction also has continuously wet mark and gutter and arch bottom seam crossing still have infiltration.
Second stage adopts grouting method of the present invention, autonomous cloth hole pipe with small pipe diameter polyurethane slip casting bottom the calibrated bolck of both sides, and grouting amount controls 20 kilograms, same employing " doing a jumping two " i.e. every septum secundum two ring slip casting one ring.Water leakage defect after second stage completes outside tunnel is eliminated substantially.
Phase III carries out borehole inspection to railway roadbed and gutter, find closely knit bottom railway roadbed and bottom gutter, have space, adopt epoxy resin grout liquid grout, utilize epoxy resin adhesion strong, shrinkage is low, the characteristics such as cure cycle is short, to carrying out structural strengthening bottom gutter, to guarantee that the water that station enters Interval Set well does not infiltrate bottom gutter, guarantee that railway roadbed is not encroached on.After three stages completed, the tunnel environment of the humidity of During Initial Stage Construction and serious water leakage defect are thoroughly renovated.
Be described in detail specific embodiments of the invention above, but it is just as example, the present invention is not restricted to specific embodiment described above.To those skilled in the art, any equivalent modifications that the present invention is carried out and substituting also all among category of the present invention.Therefore, equalization conversion done without departing from the spirit and scope of the invention and amendment, all should contain within the scope of the invention.

Claims (10)

1. a subway tunnel drill hole wall post-grouting method, is characterized in that, for administering subway tunnel section of jurisdiction calibrated bolck and arch bottom water leakage defect, this grouting method comprises the steps:
Step 1: bore position of arranging on described section of jurisdiction;
Step 2: once hole, pours into anchoring adhesive after clearing up this secondary aperture;
Step 3: the hollow metal pipe producing an end mounting ball valve, the other end cement seal in advance, by this metal tube by the secondary aperture described in one end inserting step 2 of cement seal, and keep described ball valve to be positioned at outside a secondary aperture, described anchoring adhesive rises along this metal tube outer wall, and with a described hole wall curing molding, this metal tube is fixed in a described secondary aperture;
Step 4: secondary drilling, the ball valve on the metal tube described in opening steps 3, through this ball valve and a described aperture to the secondary pore that spuds in;
Step 5: inject high molecule size in described metal tube and secondary pore;
Step 6: the ball valve of described metal tube is removed after completing at least one month by slip casting, shutoff grouting port.
2. grouting method according to claim 1, is characterized in that, in described step 1, the bore position of arrangement avoids section of jurisdiction reinforcing bar.
3. grouting method according to claim 1, it is characterized in that, the aperture of a described secondary aperture is larger than the aperture of described secondary pore, and the aperture of a described secondary aperture is 15-45mm, the degree of depth of a described secondary aperture is 150-250mm, and the degree of depth of described secondary pore is 350-450mm.
4. grouting method according to claim 1, is characterized in that, a described secondary aperture and secondary pore are perpendicular to described section of jurisdiction.
5. grouting method according to claim 1, is characterized in that, in described step 2, the amount of pouring into of anchoring adhesive is 100-200ml.
6. grouting method according to claim 1, is characterized in that, is separated by least 12 hours between described step 3 and step 4.
7. grouting method according to claim 1, is characterized in that, the high molecule size in described step 5 is dual-component polyurethane slurry.
8. grouting method according to claim 1, is characterized in that, the grouting method of described step 5 comprises: step a, and access in slurry by the pulp-absorbing pipe and return duct that are connected with mashing pump, described mashing pump is by Frequency Converter Control rotating speed;
Step b: the other end of mashing pump is connected Grouting Pipe, and this Grouting Pipe is inserted in the ball valve of metal tube, close ball valve;
Step c: opening power, start the rotating speed of Frequency Converter Control mashing pump at 500-700rpm, closing volume tube valve, slurry enters gear pump, then opens the ball valve of described metal tube, makes slurry by Grouting Pipe and ball valve injection hole;
Steps d: after slip casting terminates, closes the ball valve of metal tube, opens return duct valve, then opens metal tube ball valve and carry out release.
9. grouting method according to claim 8, is characterized in that, every hole grouting amount is 20-40kg.
10. grouting method according to claim 1, is characterized in that, in described step 6, with epoxy mortar shutoff grouting port.
CN201410814477.3A 2014-12-19 2014-12-19 A kind of subway tunnel the wall of a borehole post-grouting method Active CN104533468B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410814477.3A CN104533468B (en) 2014-12-19 2014-12-19 A kind of subway tunnel the wall of a borehole post-grouting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410814477.3A CN104533468B (en) 2014-12-19 2014-12-19 A kind of subway tunnel the wall of a borehole post-grouting method

Publications (2)

Publication Number Publication Date
CN104533468A true CN104533468A (en) 2015-04-22
CN104533468B CN104533468B (en) 2018-07-10

Family

ID=52849068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410814477.3A Active CN104533468B (en) 2014-12-19 2014-12-19 A kind of subway tunnel the wall of a borehole post-grouting method

Country Status (1)

Country Link
CN (1) CN104533468B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971642A (en) * 2016-06-30 2016-09-28 北京城建七建设工程有限公司 Water seepage treatment device and method for abutted seam of shield segments
CN107131001A (en) * 2017-06-28 2017-09-05 中铁第四勘察设计院集团有限公司 A kind of and water delivery and the Railway Tunnel of communication function
CN111878119A (en) * 2020-07-08 2020-11-03 上海地铁维护保障有限公司工务分公司 Subway tunnel ballast bed pipe piece wall post-grouting method
CN111927503A (en) * 2020-06-30 2020-11-13 上海地铁维护保障有限公司工务分公司 Subway tunnel wall back grouting method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002147198A (en) * 2000-11-15 2002-05-22 Sementetsukusu Corp:Kk Leakage preventing method for tunnel
JP2006057277A (en) * 2004-08-18 2006-03-02 Yasumasa Hayashi Rc segment, check boring method making use of the rc segment and core boring method
CN101864968A (en) * 2010-06-23 2010-10-20 广东华隧建设股份有限公司 Anti-spouting device for tunnel bottom stratum consolidation and construction method thereof
CN102758639A (en) * 2012-04-10 2012-10-31 中铁隧道集团三处有限公司 Anti-blowout long tube grouting method for limited-space tunnels
CN102979535A (en) * 2012-12-27 2013-03-20 西南交通大学 Drain-type pipe piece for tunnel lining
CN103422868A (en) * 2013-08-06 2013-12-04 同济大学 Structure and method for dissipating excess pore water pressure and reinforcing shield tunnel soil body

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002147198A (en) * 2000-11-15 2002-05-22 Sementetsukusu Corp:Kk Leakage preventing method for tunnel
JP2006057277A (en) * 2004-08-18 2006-03-02 Yasumasa Hayashi Rc segment, check boring method making use of the rc segment and core boring method
CN101864968A (en) * 2010-06-23 2010-10-20 广东华隧建设股份有限公司 Anti-spouting device for tunnel bottom stratum consolidation and construction method thereof
CN102758639A (en) * 2012-04-10 2012-10-31 中铁隧道集团三处有限公司 Anti-blowout long tube grouting method for limited-space tunnels
CN102979535A (en) * 2012-12-27 2013-03-20 西南交通大学 Drain-type pipe piece for tunnel lining
CN103422868A (en) * 2013-08-06 2013-12-04 同济大学 Structure and method for dissipating excess pore water pressure and reinforcing shield tunnel soil body

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
傅春兰等: "上海地铁10号线区间注浆加固技术", 《山西建筑》 *
杨井亮: "盾构隧道古河道下卧层注浆加固技术", 《铁道建筑技术》 *
王宁等: "卵石地区地下水位下隧道注浆新技术", 《四川建筑》 *
黄军: "浅谈软土富水地层隧道上浮控制措施", 《黑龙江科技信息》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971642A (en) * 2016-06-30 2016-09-28 北京城建七建设工程有限公司 Water seepage treatment device and method for abutted seam of shield segments
CN107131001A (en) * 2017-06-28 2017-09-05 中铁第四勘察设计院集团有限公司 A kind of and water delivery and the Railway Tunnel of communication function
CN107131001B (en) * 2017-06-28 2023-09-12 中铁第四勘察设计院集团有限公司 High-speed railway tunnel with water delivery and traffic functions
CN111927503A (en) * 2020-06-30 2020-11-13 上海地铁维护保障有限公司工务分公司 Subway tunnel wall back grouting method
CN111927503B (en) * 2020-06-30 2022-07-08 上海地铁维护保障有限公司工务分公司 Subway tunnel wall back grouting method
CN111878119A (en) * 2020-07-08 2020-11-03 上海地铁维护保障有限公司工务分公司 Subway tunnel ballast bed pipe piece wall post-grouting method
CN111878119B (en) * 2020-07-08 2022-03-18 上海地铁维护保障有限公司工务分公司 Subway tunnel ballast bed pipe piece wall post-grouting method

Also Published As

Publication number Publication date
CN104533468B (en) 2018-07-10

Similar Documents

Publication Publication Date Title
Chen et al. Long rectangular box jacking project: a case study
WO2021223573A1 (en) Construction structure for communication and connection between newly added mined channel and existing station hall layer
Jin-long et al. Repairing a shield tunnel damaged by secondary grouting
CN110821503B (en) Construction method for main body of ultra-deep shield section air shaft after tunnel advance
CN106837351A (en) Tunnel karst water detection and treatment method
CN205172598U (en) Pipe curtain spouts a supporting construction soon
CN106437726A (en) Ground fracture crushed zone passing construction method for shallow-buried tunnel excavation
CN105525619A (en) Occlusive pipe curtain for bored tunnel in water-rich stratum and construction method of occlusive pipe curtain
CN108915691B (en) Waterproof impervious concrete single-layer lining construction method in water-containing bedrock environment
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN108166486A (en) Deep layer buried tube type prefabrication type energy pile pile and its construction technology
CN104533468A (en) Drill hole backfill grouting method for subway tunnel
CN113669073A (en) Water-rich sandy stratum tunnel-first and station-second construction method for controlling deformation of adjacent building
CN101538832B (en) Construction method for controlling two-dimension jacking of large-scale case
CN110512536A (en) Region of FuShui box culvert cracking comprehensive treatment construction
CN105604163A (en) Sewage pipeline internal plugging and external grouting construction method
CN110512594A (en) The simple and easy method of churning driven opportunity cavity pore-forming
Morey et al. Quality control of jet grouting on the Cairo metro
Huang et al. Analysis and strategies of the common tunnel problems
Nymann et al. Construction of the Copenhagen metro
Paulatto et al. Rock grouting in Copenhagen limestone–The Cityringen Experience
Lees Grouting–for groundwater control and mitigation of ground movements
Rutty et al. Jet grouting for tunnelling at London Victoria station
Daramalinggam et al. Overcoming Geotechnical Challenges in Rail and Metro Projects Using Ground Improvement
Lin et al. One technique for shield tail brushes' repair using liquid nitrogen freezing method in the artesian aquifer

Legal Events

Date Code Title Description
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230726

Address after: Room 1089, 6 / F, B1, 253 Jianguo West Road, Xuhui District, Shanghai 200031

Patentee after: SHANGHAI RAIL TRANSIT MAINTENANCE SUPPORT Co.,Ltd.

Address before: Room 1097, No. 6, B1 ground floor, No. 253, Jianguo West Road, Xuhui District, Shanghai, 200030

Patentee before: WORKS BRANCH, SHANGHAI SUBWAY MAINTENANCE GUARANTEE Co.,Ltd.