CN104453085B - A kind of line box installation method of light aggregate concrete hollow partition board - Google Patents

A kind of line box installation method of light aggregate concrete hollow partition board Download PDF

Info

Publication number
CN104453085B
CN104453085B CN201410588560.3A CN201410588560A CN104453085B CN 104453085 B CN104453085 B CN 104453085B CN 201410588560 A CN201410588560 A CN 201410588560A CN 104453085 B CN104453085 B CN 104453085B
Authority
CN
China
Prior art keywords
line box
partition plate
spool
holes
plate body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410588560.3A
Other languages
Chinese (zh)
Other versions
CN104453085A (en
Inventor
谢惠庆
李苏铭
汪卫军
吴贵君
康清泉
李熊飞
雷峰雪
贾鹏坤
罗佳
罗颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu No4 Construction Engineering Co
Original Assignee
Chengdu No4 Construction Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu No4 Construction Engineering Co filed Critical Chengdu No4 Construction Engineering Co
Priority to CN201410588560.3A priority Critical patent/CN104453085B/en
Publication of CN104453085A publication Critical patent/CN104453085A/en
Application granted granted Critical
Publication of CN104453085B publication Critical patent/CN104453085B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses the line box installation method of a kind of light aggregate concrete hollow partition board, including following step: step a, several partition plate plate body spellings are become body of wall: a side of described partition plate plate body is provided with groove, another side of described partition plate plate body is provided with projection, the groove of adjacent two partition plate plate bodys and projection are mutually inserted, and described partition plate plate body is provided with several vertical through holes extended vertically through; Step b, bullet horizontal line setting-out location: determine absolute altitude, and eject horizontal line at surface of wall, carry out line box absolute altitude location; According to this horizontal line, the position measuring line box to be installed with tape measure, and the position of this line box is illustrated; There is metope tick slot few, produce to build slag, airborne dust few, be beneficial to environmental conservation and safety construction; Later stage mends groove and plasters few, saves the advantages such as cost.

Description

A kind of line box installation method of light aggregate concrete hollow partition board
Technical field
The present invention relates to a kind of hollow isolating wire board line box installation method, especially a kind of light aggregate concrete hollow partition board.
Background technology
Concrete hollow partition suture holding box installation method common at present, is cut out a whole piece wire casing from top to bottom to put electric piping in brief, and the globality of body of wall is not good, and there is certain potential safety hazard.
In existing concrete hollow partition plate, light aggregate concrete hollow partition board as disclosed in Chinese utility model patent " hollow partition board " that application number is CN201020121866.5, it has characteristic lightweight, that constructing operation is simple, heat-insulation noise-reduction is effective, is applied to widely in practice of construction.
Existing concrete hollow partition board construction method approximately as:
First, it is directly pick to dig out line box and install hole and install on hollow partition board that line box is installed, then it is fixed with cement mortar filleting, line box installation carries out pipe arrangement construction later, concrete grammar is to cut out a whole piece wire casing on hollow partition board from top to bottom to carry out electric piping, pipe arrangement is fixed by cement mortar after completing again, specifically includes following step:
1, horizontal line location is played: according to engineering drawing designing requirement, it is determined that absolute altitude ejects horizontal line on metope and carries out line box absolute altitude location, surveys accurate location the designated size of outlet box with tape measure according to the horizontal line ejected.
2, the installation of line box is fixed: find out the accurate location of box according to engineering drawing position, and then grooving picks hole, and picked hole should be more slightly larger than box, and hole, groove after picking are cleaned out foreign material in hole. First institute's hookup wire box position being watered moistening, then by cement mortar, line box is consolidated, cement mortar is full, and line box periphery to be tamped, floating together, line box goes out wall size will according to coat of plaster and whitewash thickness and determine, the installation of line box to be accomplished smooth vertical and horizontal.
3, grooving pipe arrangement: after line box is firm, passes through reserved spool in short tube access case after metope carries out grooving process the reserved spool needing lead-in box again, and locks locknut, and mouth of pipe pipe cap blocks up.
4, mend groove to process: first mended grooving is watered moistening, then tamp with cement mixing mortar, and with wood floated, as and show the spool of two and more than two, should have the gap of more than 1 between spool. Tamp floating if any slightly larger hole pea gravel concreten. Wet curing is carried out again, it is to avoid contraction fissure after initial set.
But, said method has the following disadvantages in work progress:
1, when tick slot punches, it is easy to because overexerting, causing around metope broken, hole is picked too much, wide owing to exerting oneself uneven, causes the globality of concrete hollow partition plate;
When 2, carrying out firm by cement mortar to line box, owing to cement mortar is filled not full, line box periphery is not easily tamped, and the phenomenons such as crooked, cracking, hollowing easily occurs in the line box installed after cement mortar initial set;
3, needing the cement mortar around by line box to weed out again to build again and fall centering with line again into appropriate cement mortar, then tamped in gap around line box by cement mortar, so increase working procedure and Master Cost, installation cost is higher.
Summary of the invention
It is an object of the invention to: for above-mentioned weak point, it is provided that a kind of metope tick slot is few, produce to build slag, airborne dust few, be conducive to the line box installation method of the light aggregate concrete hollow partition board of strength of wall body and environmental conservation.
In order to realize foregoing invention purpose, the invention provides techniques below scheme:
A kind of line box installation method of light aggregate concrete hollow partition board, including following step:
Step a, several partition plate plate body spellings are become body of wall: a side of described partition plate plate body is provided with groove, another side of described partition plate plate body is provided with projection, the groove of adjacent two partition plate plate bodys and projection are mutually inserted, and described partition plate plate body is provided with several vertical through holes extended vertically through;
Step b, bullet horizontal line setting-out location: determine absolute altitude, and eject horizontal line at surface of wall, carry out line box absolute altitude location; According to this horizontal line, the position measuring line box to be installed with tape measure, and the position of this line box is illustrated;
Step c, positional dissection perforate: cutting out the line box mounting groove for hookup wire box, described line box mounting groove connects with the vertical through holes of partition plate plate body;
Step d, hookup wire box, spool: be first fixed in line box mounting groove by described line box, then install spool, inside one end tie-in line box of described spool, described spool extends to predeterminated position after vertical through holes.
Preferably, in described step d, the lower end of described spool is by passing below the vertical through holes of partition plate plate body and being connected with the PVC joint defaulting in ground floor plate upper surface, before spool docks with PVC joint, the partition plate plate body of cutting PVC joint, and the stripping and slicing cut down is taken off, forms the opening being used for docking operation, after treating that spool has docked with PVC joint, described stripping and slicing is reinstalled opening part and again blocks. Adopt such structure, it is possible to be easy to spool and the pre-buried pvc pipe defaulting on floor connects, after partition plate plate body stripping and slicing being taken off, it is possible to construction space and sight line are provided for operator, be conducive to the attended operation between pre-buried pvc pipe and spool.
Preferably, in described step c, when line box mounting groove is positioned at the sidepiece of vertical through holes of partition plate plate body, being additionally provided with pipe arrangement groove between described line box mounting groove and the vertical through holes of partition plate plate body, line box mounting groove is connected by described pipe arrangement groove with the vertical through holes of partition plate plate body. Adopt such structure, by pipe arrangement groove, line box mounting groove is connected with the vertical through holes carried on partition plate plate body, in order to connect spool, there is constructing operation simplicity, the cutting beneficial effects such as quantities is little.
Preferably, in described step c, first measuring the spacing between line box mounting groove and adjacent two vertical through holes, described pipe arrangement groove is arranged at the side that line box mounting groove is less with vertical through holes spacing, and line box mounting groove is connected by described pipe arrangement groove with a vertical through holes from its nearest neighbours. Adopt such structure, there is constructing operation simplicity, the cutting beneficial effects such as quantities is little.
Preferably, in described step d, described line box is connected with line box mounting groove by bolt. Adopt such structure, there is the beneficial effect of stable connection.
Preferably, in described step d, the body of wall of screw Yu line box periphery is fixed by described line box air nail gun. Adopt such structure, have that bonding strength is good, the convenient beneficial effect of installation.
Preferably, before described step d, with air compressor, spool is carried out block clearing. Adopt in such a way, be conducive to pipe arrangement construction to smoothly complete.
Preferably, after described step d, carry out mending groove and process, first pipe arrangement groove to be mended and line box mounting groove are watered moistening, then be in harmonious proportion cement or cement mortar, pea gravel concreten with the light logging material of body of wall in small, broken bits and tamp, and use wood floated.
Owing to have employed technique scheme, the invention has the beneficial effects as follows: when pipe arrangement, utilize the vertical through holes in partition plate plate body to lay spool, mode hookup wire box in conjunction with positional dissection, ensure that the globality of body of wall well, as far as possible few wall cutting, there is metope tick slot few, it is few that slag, airborne dust are built in generation, is beneficial to environmental conservation and safety construction; Later stage mends groove and plasters few, saves the advantages such as cost.
Accompanying drawing explanation
Fig. 1 is the structural representation of mid-board plate plate body of the present invention;
Fig. 2 is the structural representation offering line box mounting groove on mid-board plate plate body of the present invention;
Fig. 3 connects the structural representation of poling after vertical through holes and line box mounting groove in the present invention;
Fig. 4 is the online structural representation arranging pipe arrangement groove between box mounting groove and the vertical through holes of close together in the present invention;
Fig. 5 is the structural representation after stripping and slicing being taken off in the present invention.
Labelling in figure: partition plate plate body 1; Groove 1a; Protruding 1b; Vertical through holes 2; Line box 3; Line box mounting groove 4; Spool 5; Pipe arrangement groove 6; Ground floor plate 7; PVC joint 8; Stripping and slicing 9.
Detailed description of the invention
Below in conjunction with test example and detailed description of the invention, the present invention is described in further detail. But this should not being interpreted as, the scope of the above-mentioned theme of the present invention is only limitted to below example, and all technology realized based on present invention belong to the scope of the present invention.
As shown in Figures 1 to 5, the line box installation method of the present embodiment light aggregate concrete hollow partition board, including following step:
Step a, several partition plate plate body 1 spellings are become body of wall: the structure of partition plate plate body 1 is as shown in Figure 1, partition plate plate body 1 is rectangle bulk, one side of partition plate plate body 1 is provided with groove 1a, another side of partition plate plate body 1 is provided with protruding 1b, the groove 1a of adjacent two partition plate plate bodys 1 is mutually inserted with protruding 1b, partition plate plate body 1 is provided with several and extends vertically through, namely the vertical through holes 2 run through along partition plate plate body 1 length direction, vertical through holes 2 in the present embodiment is to default in the structure on partition plate plate body 1, several partition plate plate bodys 1 are spliced to form body of wall side by side along its width,
Step b, bullet horizontal line setting-out location: determine absolute altitude, and eject horizontal line at surface of wall, carry out line box 3 absolute altitude location; According to this horizontal line, the position measuring line box 3 to be installed with tape measure, and the position of this line box 3 is illustrated;
Step c, positional dissection perforate: cutting out the line box mounting groove 4 for hookup wire box 3 with portable cutters, line box mounting groove 4 connects with the vertical through holes 2 of partition plate plate body 1. It should be noted that in this step, a kind of embodiment is as in figure 2 it is shown, line box mounting groove 4 is positioned at the dead ahead of vertical through holes 2, it may be assumed that the directly surface of through-thickness cutting partition plate plate body 1, can form the line box mounting groove 4 being communicated to vertical through holes 2.
And in another embodiment, as shown in Figure 4, when line box mounting groove 4 is positioned at the sidepiece of vertical through holes 2 of partition plate plate body 1, now, in step c, being additionally provided with pipe arrangement groove 6 between line box mounting groove 4 and the vertical through holes 2 of partition plate plate body 1, line box mounting groove 4 is connected by pipe arrangement groove 6 with the vertical through holes 2 of partition plate plate body 1. Adopt such structure, by pipe arrangement groove 6, line box mounting groove 4 is connected with the vertical through holes 2 carried on partition plate plate body 1, in order to connect spool 5, there is constructing operation simplicity, the cutting beneficial effects such as quantities is little, in step c, first measuring the spacing between line box mounting groove 4 and adjacent two vertical through holes 2, pipe arrangement groove 6 is arranged at the side that line box mounting groove 4 is less with vertical through holes 2 spacing, and line box mounting groove 4 is connected by pipe arrangement groove 6 with a vertical through holes 2 from its nearest neighbours. Adopt such structure, there is constructing operation simplicity, the cutting beneficial effects such as quantities is little.
Step d, hookup wire box 3, spool 5: as it is shown on figure 3, be first fixed in line box mounting groove 4 by line box 3, then install spool 5, one end tie-in line box 3 of spool 5 is internal, and spool 5 extends to predeterminated position after vertical through holes 2.
In the step d of the present embodiment, line box 3 is connected with line box mounting groove 4 by bolt. Adopt such structure, there is the beneficial effect of stable connection; In step d, the body of wall of screw Yu line box 3 periphery is fixed by line box 3 air nail gun. Adopt such structure, have that bonding strength is good, the convenient beneficial effect of installation; Before step d, with air compressor, spool 5 is carried out block clearing. Adopt in such a way, be conducive to pipe arrangement construction to smoothly complete; After step d, carry out mending groove and process, first pipe arrangement groove to be mended 6 and line box mounting groove 4 are watered moistening, then be in harmonious proportion cement or cement mortar, pea gravel concreten with the light logging material of body of wall in small, broken bits and tamp, and use wood floated.
As shown in Figure 4 and Figure 5, the present embodiment is in step d, the lower end of spool 5 is by passing below the vertical through holes 2 of partition plate plate body 1 and being connected with the PVC joint 8 defaulting in ground floor plate 7 upper surface, before spool 5 docks with PVC joint 8, the partition plate plate body 1 at cutting PVC joint 8 place, and the stripping and slicing 9 cut down is taken off, formed the opening being used for docking operation, after treating that spool 5 has docked with PVC joint 8, stripping and slicing 9 is reinstalled opening part and again blocks. Adopt such structure, it is possible to be easy to spool 5 and the pre-buried pvc pipe defaulting on floor connects, after partition plate plate body 1 stripping and slicing 9 being taken off, it is possible to construction space and sight line are provided for operator, be conducive to the attended operation between pre-buried pvc pipe and spool 5.
Owing to have employed technique scheme, when pipe arrangement, utilize the vertical through holes 2 in partition plate plate body 1 to lay spool 5, mode hookup wire box 3 in conjunction with positional dissection, ensure that the globality of body of wall well, as far as possible few wall cutting, there is metope tick slot few, it is few that slag, airborne dust are built in generation, is beneficial to environmental conservation and safety construction;Later stage mends groove and plasters few, saves the advantages such as cost.
The invention is not limited in aforesaid detailed description of the invention. The present invention expands to any new feature disclosed in this manual or any new combination, and the step of the arbitrary new method disclosed or process or any new combination.

Claims (8)

1. the line box installation method of a light aggregate concrete hollow partition board, it is characterised in that include following step:
Step a, several partition plate plate body spellings are become body of wall: a side of described partition plate plate body is provided with groove, another side of described partition plate plate body is provided with projection, the groove of adjacent two partition plate plate bodys and projection are mutually inserted, and described partition plate plate body is provided with several vertical through holes extended vertically through;
Step b, bullet horizontal line setting-out location: determine absolute altitude, and eject horizontal line at surface of wall, carry out line box absolute altitude location; According to this horizontal line, the position measuring line box to be installed with tape measure, and the position of this line box is illustrated;
Step c, positional dissection perforate: cutting out the line box mounting groove for hookup wire box, described line box mounting groove connects with the vertical through holes of partition plate plate body;
Step d, hookup wire box, spool: first described line box is fixed in line box mounting groove, spool is installed again, inside one end tie-in line box of described spool, described spool extends to predeterminated position after sequentially passing through pipe arrangement groove and connecting the vertical through holes of this pipe arrangement groove;
The lower end of described spool is by passing below the vertical through holes of partition plate plate body and being connected with the PVC joint defaulting in ground floor plate upper surface, before spool docks with PVC joint, the partition plate plate body of cutting PVC joint, and the stripping and slicing cut down is taken off, forms the opening being used for docking operation, after treating that spool has docked with PVC joint, described stripping and slicing is reinstalled opening part and again blocks.
2. the line box installation method of light aggregate concrete hollow partition board according to claim 1, it is characterized in that: in described step c, when line box mounting groove is positioned at the sidepiece of vertical through holes of partition plate plate body, being additionally provided with pipe arrangement groove between described line box mounting groove and the vertical through holes of partition plate plate body, described spool extends to predeterminated position after vertical through holes.
3. the line box installation method of light aggregate concrete hollow partition board according to claim 2, it is characterized in that: in described step c, first the spacing between line box mounting groove and adjacent two vertical through holes is measured, described pipe arrangement groove is arranged at the side that line box mounting groove is less with vertical through holes spacing, and line box mounting groove is connected by described pipe arrangement groove with a vertical through holes from its nearest neighbours.
4. the line box installation method of light aggregate concrete hollow partition board according to claim 3, it is characterized in that: in described step d, the upper end of described spool is by passing above the vertical through holes of partition plate plate body and being connected with the PVC joint of the PVC joint defaulting in attic plate lower surface or back timber lower surface, before spool docks with PVC joint, the partition plate plate body of cutting PVC joint, and the stripping and slicing cut down is taken off, forms the opening being used for docking operation, after treating that spool has docked with PVC joint, described stripping and slicing is reinstalled opening part and again blocks.
5. the line box installation method of light aggregate concrete hollow partition board according to claim 4, it is characterised in that: in described step d, described line box is connected with line box mounting groove by bolt.
6. the line box installation method of light aggregate concrete hollow partition board according to claim 4, it is characterised in that: in described step d, the body of wall of screw Yu line box periphery is fixed by described line box air nail gun.
7. the line box installation method of light aggregate concrete hollow partition board according to claim 4, it is characterised in that: before described step d, with air compressor, spool is carried out block clearing.
8. the line box installation method of light aggregate concrete hollow partition board according to claim 4, it is characterized in that: after described step d, carry out mending groove to process, first pipe arrangement groove to be mended and line box mounting groove are watered moistening, tamp with body of wall light-weight aggregate mediation cement in small, broken bits again, or tamp by body of wall light-weight aggregate mediation cement mortar in small, broken bits, or tamp with body of wall light-weight aggregate mediation pea gravel concreten in small, broken bits, and use wood floated.
CN201410588560.3A 2014-10-28 2014-10-28 A kind of line box installation method of light aggregate concrete hollow partition board Active CN104453085B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410588560.3A CN104453085B (en) 2014-10-28 2014-10-28 A kind of line box installation method of light aggregate concrete hollow partition board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410588560.3A CN104453085B (en) 2014-10-28 2014-10-28 A kind of line box installation method of light aggregate concrete hollow partition board

Publications (2)

Publication Number Publication Date
CN104453085A CN104453085A (en) 2015-03-25
CN104453085B true CN104453085B (en) 2016-06-15

Family

ID=52899775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410588560.3A Active CN104453085B (en) 2014-10-28 2014-10-28 A kind of line box installation method of light aggregate concrete hollow partition board

Country Status (1)

Country Link
CN (1) CN104453085B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106149971A (en) * 2016-08-25 2016-11-23 邰仁记 A kind of fast assembling wall slab with default line pipeline box and body of wall
CN106786266B (en) * 2016-12-13 2018-08-31 上海市建工设计研究总院有限公司 Prefabrication and assembly construction steel house cable and wire laying system and its construction method
CN107328330A (en) * 2017-08-21 2017-11-07 张�浩 Finishing water power is told somebody what one's real intentions are chi and operating method
CN108130963A (en) * 2018-01-24 2018-06-08 有利华建筑预制件(深圳)有限公司 A kind of light partition wall and its installation method
CN110173070A (en) * 2019-06-27 2019-08-27 浙江宝业幕墙装饰有限公司 A kind of hollow lattice plate of high-strength fabric cement and installing mechanism
CN110593434A (en) * 2019-08-26 2019-12-20 南通通博设备安装工程有限公司 Mounting structure and construction method for power distribution cabinet of light wall of building
CN116480034A (en) * 2023-04-23 2023-07-25 华川建设集团有限公司 Fireproof heat-insulating building wall and construction method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1125287A (en) * 1994-05-07 1996-06-26 林宜宗 Facade transverse and longitudinal hollow member and its construction method
CN2527620Y (en) * 2002-02-09 2002-12-25 莱芜钢铁集团有限公司 Cement light thermal insulation water-proof monolithic external wallboard
CN201962828U (en) * 2011-01-31 2011-09-07 赵生亮 Assembly-type non-bearing finished wall body
CN103061515B (en) * 2012-12-29 2015-10-14 陕西省第三建筑工程公司 Concrete hollow block infilled wall pre-buried PVC conduit poling mounting method
CN103321436B (en) * 2013-07-10 2015-07-15 成都市第八建筑工程公司 Pre-installation construction method for wire box on building bricked body and pre-installation supporting frame thereof
CN203684509U (en) * 2014-01-28 2014-07-02 浙江国泰建设集团有限公司 Grooved block masonry wall

Also Published As

Publication number Publication date
CN104453085A (en) 2015-03-25

Similar Documents

Publication Publication Date Title
CN104453085B (en) A kind of line box installation method of light aggregate concrete hollow partition board
CN204089102U (en) The spool of light aggregate concrete hollow partition board and floor built-in pipe syndeton
CN110486023B (en) Tunnel defect treatment method
CN104314204B (en) Non-form stripping lightweight internal partition board and overall grouting construction method thereof
CN103321436B (en) Pre-installation construction method for wire box on building bricked body and pre-installation supporting frame thereof
CN109057385B (en) Grouting repairing method for filling port fixing pin parts of ceramic tiles and stones on hollow inner and outer walls
CN110617084A (en) Method for reinforcing tunnel by spraying steel fiber concrete on tunnel net
CN104100013A (en) Space-saving type construction method for indoor efficient sound insulation system
CN103808488A (en) Simulation experiment device for airborne dust transportation and control of tunneling roadways
CN103061515A (en) Method for perforating and pre-burying polyvinyl chloride (PVC) wiring tubes in concrete hollow block filled walls
CN109025344B (en) Method for comprehensive grouting repair of filling port fixing pins of ceramic tiles and stones on hollow inner and outer walls
CN105019651A (en) High efficient installation construction method for rowed cable boxes in hollow brick filled wall
CN204174830U (en) A kind of light aggregate concrete hollow batardeau printed line box is installed and matched tube structure
CN105888084A (en) Whole outer wall internal thermal insulation system construction method by using enhanced composite thermal insulation material
CN204691302U (en) Ancient building blue bricks exterior wall repair structure
CN208056395U (en) Unit assembled integration facing light steel keel partition structure
CN105275206A (en) A construction method of an external wall of a building
CN101654957B (en) Method for maintaining cement-based material in early stages
CN204983356U (en) Compound interior wall building block of pre -buried threading pipe
CN108086593B (en) Construction method for constructing decorative column
CN110259144A (en) A kind of novel energy-saving environment-friendly ash concrete lightweight wall plate construction method
CN203559586U (en) PVC (Polyvinyl chloride) electric wire pipe embedded direct connector for concrete
CN108894498A (en) A kind of building filling wall integrated construction technique
CN205259443U (en) External wall board
CN209521053U (en) A kind of gunite concrete test block production mold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant