CN104408557B - A kind of flood season water power enrichment power network saves balancing power plant electric quantity of power supply distribution method - Google Patents

A kind of flood season water power enrichment power network saves balancing power plant electric quantity of power supply distribution method Download PDF

Info

Publication number
CN104408557B
CN104408557B CN201410653107.6A CN201410653107A CN104408557B CN 104408557 B CN104408557 B CN 104408557B CN 201410653107 A CN201410653107 A CN 201410653107A CN 104408557 B CN104408557 B CN 104408557B
Authority
CN
China
Prior art keywords
power
electricity
balancing
power plant
power station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410653107.6A
Other languages
Chinese (zh)
Other versions
CN104408557A (en
Inventor
李刚
苗树敏
李秀峰
程春田
蔡华祥
陈孚
廖胜利
武新宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUNNAN ELECTRIC POWER DISPATCH CONTROL CENTER
Dalian University of Technology
Original Assignee
YUNNAN ELECTRIC POWER DISPATCH CONTROL CENTER
Dalian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN ELECTRIC POWER DISPATCH CONTROL CENTER, Dalian University of Technology filed Critical YUNNAN ELECTRIC POWER DISPATCH CONTROL CENTER
Priority to CN201410653107.6A priority Critical patent/CN104408557B/en
Publication of CN104408557A publication Critical patent/CN104408557A/en
Application granted granted Critical
Publication of CN104408557B publication Critical patent/CN104408557B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention relates to Electric Power Network Planning and management and running field, disclose a kind of flood season water power enrichment power network and save balancing power plant electric quantity of power supply distribution method, dispatching of power netwoks fairness and economy objectives can be taken into account, for the problem that flood season rich water electricity grid generation ability is increased sharply, realize flood season each power supply, the reasonable distribution of power station electricity volume, it is ensured that desalinate benefits of different parties contradiction on the basis of power grid electric balance.Its solution is:Using the fairness and economy of dispatching of power netwoks as Optimized Operation target, the generation schedule for reporting is adjusted to determine each power plants generating electricity ability and same day actual load demand by various regions, it is determined that plan day the whole network electric quantity balancing situation, processed according to different situations classification, and the electricity volume of each power supply and station is distributed based on this, weight coefficient is introduced in assigning process and embodies preference of the policymaker between each sub-goal, finally provide the multiobjective decision-making collection based on different weight coefficients.The beneficial effects of the invention are as follows prediction power network future development, take into account the factors such as fairness, economy, operability, it is ensured that flood season dispatching of power netwoks it is reasonable effectively, with the important meaning of setting an example that takes the lead in.

Description

A kind of flood season water power enrichment power network saves balancing power plant electric quantity of power supply distribution method
Technical field
The present invention relates to Electric Power Network Planning and management and running field, more particularly to a kind of flood season water power enrichment power network saves balancing Power plant's electric quantity of power supply distribution method.
Technical background
Hydroelectric generation has operation costs are cheap, cleaning is renewable, scheduling is flexible etc. compared to other conventional power generation usage modes Advantage, and it is more stable compared to the novel renewable energy generated energy such as solar energy, wind energy.During " 12 ", to pass through Thorough energy-saving and emission-reduction binding character target, alleviates resource environment constraint, tackles Global climate change, makes full use of cleaning renewable energy Source, China has gone into operation many Large Hydropower Plants, the especially domestic Wujiang River, Hongsuihe River, the Lancang River, Yalongjiang River, Dadu River etc. successively The completion successively in especially big Basin Hydropower base is gone into operation, and promotes Southwestern China area to form rich hydropower grid in large scale.Cloud Used as typical rich hydropower grid, system water transfer thermoelectricity generator installation ratio is close to 2 for south, Sichuan:1.The quick hair of extensive water power Exhibition, makes power network face the electric energy consumption problem of sternness, in addition the limitation such as the passage limit and market environment, increased dispatching of power netwoks difficult Degree.Particularly flood season come water it is larger when, electric energy consumption contradiction is especially prominent.
Yunnan Province is used as typical richness hydropower grid, the whole province total installed capacity 60154.77MW, wherein include province's balancing installation holding Amount 50988.6MW.Include in province's balancing installation, water power 36218.6MW accounts for the 71.03% of total installed capacity;Thermoelectricity 12400MW, accounts for The 24.32% of total installed capacity;Wind-powered electricity generation 2190MW, accounts for the 4.3% of total installed capacity;Photovoltaic 180MW, accounts for the 0.35% of total installed capacity.It is different from Power network based on coal electric energy, water power proportion is larger in rich hydropower grid so that the whole network generating capacity to climate change and Thus the water fluctuation for bringing is more sensitive, flood season come water it is larger when, the limitation such as most of modulated ability in hydroelectric power plant needs Increasing is exerted oneself or is completely sent out, and causes thermoelectricity to be run by minimum mode, new energy all shuts down electricity, the water power situation about largely sending outside of allowing Under, generating capacity still exceeds actual need for electricity, forms electricity more than needed on a large scale.Under above-mentioned background, how in each power supply, each stream It is rational between domain, each plant stand to distribute electricity volume, avoid interests contradiction, it is the important of rich hydropower grid power generation in the flood seasons scheduling Task.
Achievement of the present invention is looked forward to the prospect power network future development, regarding to the issue above country's correlative study achievement and document report at present It is mostly focused on several aspects:Introduce tou power price improve water power bid ability, based on the centralized dispatching under bulk power grid platform, excellent Change industrial structure raising workload demand and strengthen rack construction raising and send electricity outside.But in Practical Project, for origin water not Certainty, passage send out the inevitably more than needed of the limitation formation such as ability, Contract generation performance and actual market demand Electricity, lacks a set of effective electricity volume distribution method.This achievement is in Southwestern China area, especially southwestern rich water electricity In regional dispatching operational management, with the important meaning of setting an example that takes the lead in.
The content of the invention
The purpose of the present invention is directed to not enough problem set forth above, there is provided a kind of flood season water power enrichment power network saves balancing Power plant's electric quantity of power supply distribution method, can take into account the fairness and economy in dispatching of power netwoks, realize flood season each power supply, power station online The reasonable distribution of electricity, it is ensured that desalinate benefits of different parties contradiction on the basis of power network conveying balance.
Regarding to the issue above, the present invention proposes following solution:A kind of flood season water power enrichment power network saves balancing electricity Factory's electric quantity of power supply distribution method, takes into account scheduling fairness principle and economy principle, and method includes step (1)-(9), describes in detail such as Under:
(1) determine that method target is:It is each to participate in calculating the equal minf of province balancing power plant's installation utilization rate1=D (r) and each Participate in calculating and save the total purchases strategies minimum of balancing power plantWherein N is the province's balancing electricity for participating in calculating Stand number, r=[r1,r2,…,rN] balancing power plant installation utilization rate sequence is saved for participation is calculated, D (r) is that power station installation is utilized The variance of rate sequence;CiIt is the electricity price in i power stations, PFiIt is the electricity volume in i power stations;
(2) adjust and report time daily trading planning and regional power load to saving tune;Save and adjust dispatcher base area tune to report meter Draw and determine each power station generating capacity, power load E inside the province is determined according to next day actual conditions, power supply architecturepAnd send electricity need outside Seek Eo
(3) first to saving tune thermal power plant, arranged according to installation utilization rate descending, to wait installation utilization rate as target, successively Each thermal power plant's generated energy is reduced, until meeting electric quantity balancing constraint, step (9) is gone to;If each thermal power plant is transported by minimum mode During row, electric quantity balancing constraint can not be still met, then arrange new energy power plant in addition to water power to shut down and allow electricity, if meet electricity putting down Weighing apparatus condition, goes to step (9);If generating capacity is still greater than need for electricity, the online electricity that step (4) adjusts each hydroelectric power plant is gone to Amount;
(4) according to the last platform unit operation time of balancing hydroelectric power plant of each province, power station of classifying is divided to province balancing power plant to be two Class:It is new to throw power station Ωnew, thrown power station Ωold;According to each power station electricity price respectively to ΩnewAnd ΩoldPower station in set is dropped Sequence is arranged, and determines each hydroelectric power plant's energy curtlaiment order;
(5) preference according to policymaker between fairness and economy determines weight α, and is divided according to weight α Net electricity is two parts:Based on the total electricity volume E of fairnessh′;Based on the total electricity volume E of economyh″;
(6) for based on the total electricity volume E of fairnessh', to wait installation utilization rate as target, using etc. load proportion point Method of completing the square is solved, and obtains the electricity volume P that each power station is based on fairness Target AssignmentCi(i=1,2 ..., N), judges PCiWhether The upper limit of exerting oneself is reached, not up to then the power station enters step (7), the otherwise power station terminates distribution electricity;
(7) for based on the total electricity volume E of economyh", it is relative using electricity price with the minimum target of overall purchases strategies Ordering strategy and linear programming optimize the electricity volume P that each power station is based on economy objectives distributionFi(i=1,2 ..., N);For Combine Ω in power stationnew, introduce experience distribution reduction coefficient ε (0<ε<1), adjustment Xin Tou power plant ΩnewElectricity volume;On checking is exerted oneself Lower limit is constrained, and electricity is redistributed in the power station for destruction constraint;
(8) add up each hydroelectric power plant's segment assignments electricity, obtains the total distribution electricity P in each power stationi, save and adjust according to allocation result Each power supply and station distribution electricity are integrated, balancing power plant of each province plan day total score power distributing amount is issued;
(9) adjust dispatcher according to allocation result, formulate the generation schedule that day is planned in local each power station.
Present invention contrast prior art has the advantages that:The present invention is that a kind of flood season water power enrichment power network that solves saves tune The technical method of balance power plant electricity volume assignment problem, it is complete for origin water uncertainty, passage submitting ability, Contract generation Into the electricity inevitably more than needed that the limitation such as situation and actual market demand is formed, there is provided a set of effective distribution side Method.The present invention takes into account the fair principle and economy principle in dispatching of power netwoks, realizes electricity volume between each power supply, each station Reasonable distribution.The beneficial effects of the invention are as follows prediction power network future development, the factors such as fairness, economy, operability are taken into account, Ensure the reasonable effective of flood season dispatching of power netwoks, with the important meaning of setting an example that takes the lead in.
Brief description of the drawings
Fig. 1 is the overall solution that a kind of flood season water power enrichment power network of the invention saves balancing power plant electric quantity of power supply distribution method Flow chart;
Fig. 2 is the power energy allocation flow chart based on fairness target in the present invention;
Fig. 3 is the power energy allocation flow chart based on economy objectives in the present invention;
Fig. 4 is the multiobjective decision-making collection for corresponding to different reduction coefficients in the present invention;
Fig. 5 is the comparison diagram of different weight schemes in the present invention;
Fig. 6 is that fairness weight is 0.4 in the present invention, new throw power station to cut down coefficient be each power station distribution electricity under 0.85 scheme Amount;
It in the present invention with 0.4 is the distribution electricity volume curve and actual online electric quantity curve pair of fairness weight that Fig. 7 is Than figure;
Specific embodiment
The invention will be further described with reference to the accompanying drawings and examples.
The fast development of extensive water power, makes power network face the electric energy consumption problem of sternness, in addition the passage limit and market Environment etc. is limited, and increased dispatching of power netwoks difficulty.Particularly flood season come water it is larger when, contradiction of dissolving is especially prominent, is taking Increase electric power to send outside, implement power plant for self-supply's substitute generation, Direct Purchase of Electric Energy by Large Users, Generation Rights Trade, wet season electricity more than needed and dissolve In the case that the measures such as policy increasing water power is dissolved, electricity of largely having more than needed is still suffered from.How reasonably to distribute each under above-mentioned background Electricity volume between power supply and station is the key issue of flood season rich water electricity dispatching of power netwoks.Mainly used in current actual schedule etc. Ratio cuts down the dispatching distribution method of each power station electricity volume and experience tentative calculation, but with following limitation:(1) sacrificing economy Target guarantees fairness for cost, but the fact that have ignored non-with the sacrifice of the economy proportional relation of the increase of fairness;(2) Sense datum is occupied an leading position, it is impossible to ensure the fairness target in scheduling process well.
Fairness and economy of the present invention from scheduling, it is considered to energy-conserving and environment-protective dispatching principle, to wait installation utilization rate With overall purchases strategies to solve target, the total electricity volume of each power supply is determined;Using weight embodied in combination decisionmaker's preference, and draw Divide network load;Using etc. installation utilization rate distribution method distribute the total capacity requirement that each power station is based on fairness;Purchased with minimum Electric cost is target, and the total capacity requirement that each power station is based on economy is distributed using linear programming method;Cumulative two methods are given Electricity is finally distributed in each power station for going out.
Accompanying drawing 1 is the overall solution flow chart for taking into account fairness and economy, as can be seen that specific step of the invention in figure Suddenly it is:
(1) adjust and report time daily trading planning and regional power load to saving tune;Save and adjust dispatcher base area tune to report meter Draw and determine each power station generating capacity, power load E inside the province is determined according to next day actual conditions, power supply architecturepAnd send electricity need outside Seek Eo
(2) compare to participate in plan day calculating and save balancing power plant total generating capacity and the total need for electricity of the whole network, if Meet electric quantity balancing condition, without adjustment, can be generated electricity by original plan, go to step (9);If generating capacity is needed more than electricity consumption Ask, according to installation utilization rate descending arrangement, each thermal power plant's generated energy reduced successively, until meet demand electricity or each thermal power plant by Minimum mode is run, if meeting electric quantity balancing condition, goes to step (9);If generating capacity is still greater than need for electricity, arrange New energy power plant shuts down and allows electricity, if meeting electric quantity balancing condition, go to step (9);If can not still be matched with need for electricity, The electricity volume of each hydroelectric power plant is cut down, step (4) is gone to;
(3) according to the last platform unit operation time of balancing power plant of each province, power station of classifying is divided to province balancing power plant to be two Class:It is new to throw power station Ωnew, thrown power station Ωold;According to each power station electricity price respectively to ΩnewAnd ΩoldPower station in set is dropped Sequence is arranged, and determines that each hydroelectric power plant cuts down order;
(4) it is two to embody preference of the policymaker between fairness and economy according to weight α and divide electricity volume Part:Based on the total electricity volume E of fairnessh'=α × (Ep+Eo), based on the total electricity volume E of economyh"=(1- α) × (Ep+ Eo);
(5) to wait installation utilization rate as target, using etc. load proportion distribution method solve each power station and be based on fairness mesh Mark the electricity volume P of distributionCi(i=1,2 ..., N), judges whether distribution electricity reaches the upper limit of exerting oneself, not up to the then power station Into step (7), the otherwise power station terminates distribution electricity;
(6) with the minimum target of overall purchases strategies, each power station is optimized using electricity price relative order strategy and linear programming Electricity volume P based on economy objectives distributionFi(i=1,2 ..., N);Ω is combined for power stationnew, due to electricity price relatively Height, to ensure economy principle, coefficient ε is cut down in the experience distribution of introducing;Bound constraint of exerting oneself is verified, for the electricity of destruction constraint Redistribute electricity in station;
(7) according to each hydroelectric power plant's distribution electricity of target weight weighted sum, the total distribution electricity P in each power station is obtainedi, save and adjust Each power supply and station distribution electricity are integrated according to allocation result, balancing power plant of each province plan day total score power distributing amount is issued;
(8) adjust dispatcher according to allocation result, day of making a plan local each power station generation schedule.
Accompanying drawing 2 is the power energy allocation flow chart based on fairness target, is concretely comprised the following steps:
(1) the known total electricity E based on fairness targeth' and water power total installed capacity I, try to achieve the total installed capacity utilization in power station Rate r;
(2) each power station electricity volume P is distributed by average utilization rCi, PCi=r × Ii×24;
(3) judge whether each power station distribution electricity meets generating capacity requirement, satisfaction is transferred to step (6), is otherwise transferred to step Suddenly (4);
(4) i power stations electricity volume is arranged by generating capacity, and rejects i power stations in the assignment procedure;
(5) the corresponding total electricity E based on fairness target is adjusted according to current plant seth' and water power total installed capacity I,
In formula,The total electricity based on fairness after for adjustment;It is the water power total installed capacity after adjustment.
(6) enter next iteration, and judge whether to reach end condition, reach into step (7), otherwise return to (2);
(7) terminate to calculate, and output result.
Accompanying drawing 3 is the power energy allocation flow chart based on economy objectives, is concretely comprised the following steps:
(1) give Xin Tou power plant experience and cut down coefficient ε;
(2) electricity E is distributed between Xin Tou power plant and Yi Tou power plant according to installation ratioh",In formula Pnew、PoldRespectively the total score power distributing amount of Xin Tou power plant and Yi Tou power plant, knew、koldRespectively Xin Tou power plant and Yi Tou power plant Installation ratio;
(3) coefficient ε is cut down according to Xin Tou power plant experience and cuts down the total distribution electricity in new throwing power station,
(4) gather for Xin Tou power plant, PnewIt is total electricity, with total purchases strategies as target, is asked using linear programming Solution;
(5) gather for Yi Tou power plant, PoldIt is total electricity, with total purchases strategies as target, is asked using linear programming Solution;
(6) the distribution electricity P that each power station is based on economy objectives is exportedFi(i=1,2 ..., n);
The constraints expression formula considered in method solution procedure is as follows:
A () generating capacity is constrained:
In formula, PCiIt is that i power plant distribute electricity, MWh by the online for waiting installation utilization rate to distribute;PFiPurchased by water is abandoned for i power plant The online distribution electricity of electric cost minimization distribution, MWh;NiIt is the generating capacity of i power plant, MWh;Ni,tIt is the hair of i power plant t periods Electric planned value, MW.
B () electric quantity balancing is constrained:Et+En+Eh=E
In formula, EtIt is total thermoelectricity need for electricity, MWh;EnIt is new energy need for electricity, MWh beyond total water power;EhFor Total water power need for electricity, MWh;E is plan day the whole network workload demand, MWh.
C () channel capacity is constrained:NLk≤NLk,max
In formula, k is circuit grade, is incremented by step by step from low pressure to high pressure;NLkIt is the conveying electricity of kth level circuit, MWh; NLk,maxIt is the channel capacity of kth level circuit, MWh.
By taking typical case's day Yunnan Power System flood season as an example, province balancing installed capacity 46750.6MW, wherein water power are included 36218.6MW, thermoelectricity 12400M, wind-powered electricity generation and other new energy 2370MW, proportion is respectively 68.4%, 26.5%, 5.1%.Balancing hydroelectric power plant 98 is saved, after being split by the unit operation time, hydroelectric power plant's number is 100, wherein newly throwing water power 5, factory, Yi Tou hydroelectric power plants 95.Consider need for electricity inside the province and send electrical demand outside, determine overall load demand.Arrange thermoelectricity Run with minimum start-up mode;Other energy power stations generate electricity by original plan;Calculate water power it is total can electricity volume;According to being based on The flood season electric quantity of power supply distribution method of fairness and economy tries to achieve the electricity volume of each power station distribution.Fig. 4 is different new throwing electricity Stand and cut down the corresponding multiobjective decision-making collection of coefficient.
As shown in Figure 4, coefficient ε is cut down smaller, new power station overall power generation amount of throwing is fewer, the smaller (f of purchases strategies2(E)<f2 (D)<f2(A)), be actually consistent.Under identical purchases strategies, new power station reduction coefficient of throwing is smaller, each power station generating ratio Closer to the smaller (f of each power station installation utilization rate variance1(A)>f1(B)>f1(C)).Cut down under coefficient in same new throwing power station, respectively Utilization rate variance is smaller for power station installation, decision-making more tends to that fairness, purchases strategies are bigger, sacrifice dispatching of power netwoks economy; Conversely, purchases strategies are smaller, each power station installation utilization rate variance is bigger, decision-making more tends to economy, sacrifices dispatching of power netwoks Fairness.
Table 1 is each power station electricity volume allocation result under 3 kinds of different schemes, and only to consider fairness, scheme 2 is scheme 1 Only consider economy, scheme 3 is that economy and fairness weight respectively account for 50%.Under 3 kinds of schemes, each power station electricity volume curve becomes Gesture is basically identical, and is satisfied by generating capacity constraint;For the scheme for only considering fairness, each power station generates electricity by equal proportion, Meet under the premise of constraint, electricity volume size is proportionate with installed capacity;For the scheme for only considering economy, meeting about Under the premise of beam, each power station electricity volume is only related to electricity price, the electricity volume of electricity price power station high distribution is less, part power station almost It is 0, the electricity volume that low electricity price power station is distributed is more, its generating capacity is approached in part power station, curve fluctuation is larger;For justice Property and economy respectively account for 50% scheme, under the premise of constraint is met, the electricity volume of each power station distribution with install and electricity price is equal There is correlation, it is ensured that each power station can be assigned to electricity volume, and curve has fluctuation, but fluctuation relative plan 2 is smaller.Respectively Scheme target function value is listed in table 1:Contrast understands that compared to scheme 1, installation utilization rate variance increases by 4%, overall purchase to scheme 3 Electric cost reduces 4,260,000 yuan;The utilization rate variance of being installed compared with scheme 3 of scheme 2 increases by 3.9%, and overall purchases strategies reduce 121 Wan Yuan, installation utilization rate variance is in non-linear relation with purchases strategies variable quantity.
Table 1
Scheme Installation utilization rate variance Purchases strategies (ten thousand yuan)
Scheme 1 0 13169.4
Scheme 2 0.0789 12622.3
Scheme 3 0.0400 12743.4
Fig. 6 is that fairness weight is that 0.4, new power station of throwing is each power station distribution electricity comparison diagram under 0.85 scheme.In justice Property allocated phase, each power station installation utilization rate is equal, and electricity volume is proportional with installation, relative to install more that high score power distributing amount is more It is many;In economy allocated phase, each power station electricity volume is in inverse ratio with electricity price, and electricity price is higher, and stage distribution electricity is fewer.
Fig. 7 is that fairness weight is that each power station electricity volume curve and the same day when coefficient is 0.85 are cut down in 0.4, new power station of throwing Actual online electric quantity curve contrast:Practical solution uses each power station electricity volume of proportional allocations, each power station online under the program Electric quantity curve is basically identical with actual online electric quantity curve trend, only exists in the of a relatively high and relatively low power station of electricity price inclined Difference.Table 2 is that fairness weight is 0.4, the new desired value for throwing the scheme of coefficient 0.85 and practical solution, and keeping, total electricity is consistent On the basis of, relative to actual plan, 0.4/0.85 schemes variance reduces by 0.9%, day purchases strategies and reduces 21.5 ten thousand yuan, and benefit shows Write.Table 3 is fairness weight for 0.4, economy weight is that coefficient is cut down finally to be provided under 0.85 scheme in 0.6, new power station of throwing Each power station electricity volume allocation result.
Table 2
Scheme Deng installation utilization rate variance Purchases strategies (ten thousand yuan)
0.4/0.85 0.047 12691.9
It is actual 0.056 12713.4
Table 3

Claims (1)

1. a kind of flood season water power enrichment power network saves balancing power plant electric quantity of power supply distribution method, and its feature comprises the following steps:
(1) determine that method target is:It is each to participate in calculating the equal min f of province balancing power plant's installation utilization rate1=D (r) and each participation Calculate and save the total purchases strategies minimum of balancing power plantWherein N is the province's balancing power stations number for participating in calculating Mesh, r=[r1,r2,…,rN] balancing power plant installation utilization rate sequence is saved for participation is calculated, D (r) is power station installation utilization rate sequence The variance of row;CiIt is the electricity price in i power stations, PFiIt is the electricity volume in i power stations;
(2) adjust and report time daily trading planning and regional power load to saving tune;Save and adjust dispatcher base area tune to report plan true Fixed each power station generating capacity, power load E inside the province is determined according to next day actual conditions, power supply architecturepAnd send electrical demand E outsideo
(3) first to saving tune thermal power plant, according to the descending arrangement of installation utilization rate, to wait installation utilization rate as target, reduce successively Each thermal power plant's generated energy, until meeting electric quantity balancing constraint, goes to step (9);If each thermal power plant is run by minimum mode, Electric quantity balancing constraint can not still be met, then arranged new energy power plant in addition to water power to shut down and allowed electricity, if meeting electric quantity balancing bar Part, goes to step (9);If generating capacity is still greater than need for electricity, the electricity volume that step (4) adjusts each hydroelectric power plant is gone to;
(4) according to the last platform unit operation time of balancing hydroelectric power plant of each province, power station of classifying is divided to province balancing power plant to be two classes: It is new to throw power station Ωnew, thrown power station Ωold;According to each power station electricity price respectively to ΩnewAnd ΩoldPower station in set carries out descending Arrangement, determines each hydroelectric power plant's energy curtlaiment order;
(5) preference according to policymaker between fairness and economy determines weight α, and divides online electricity according to weight α It is two parts to measure:Based on the total electricity volume E of fairnessh′;Based on the total electricity volume E of economyh″;
(6) for based on the total electricity volume E of fairnessh', with wait installation utilization rate as target, using etc. load proportion distribution method Solve, obtain the electricity volume P that each power station is based on fairness Target AssignmentCi, i=1,2 ..., N;Judge PCiWhether reach The power upper limit, not up to then the power station enters step (7), and the otherwise power station terminates distribution electricity;
(7) for based on the total electricity volume E of economyh", with the minimum target of overall purchases strategies, using electricity price relative order plan Slightly optimize each power station and be based on the electricity volume P that economy objectives are distributed with linear programmingFi, i=1,2 ..., N;For power station group Close Ωnew, introduce experience distribution reduction coefficient ε, 0 < ε < 1;Adjustment Xin Tou power plant ΩnewElectricity volume;Verify bound of exerting oneself Redistribute electricity in constraint, the power station for destruction constraint;
(8) add up each hydroelectric power plant's segment assignments electricity, obtains the total distribution electricity P in each power stationi, save to adjust and integrated according to allocation result Each power supply and station distribution electricity, issue balancing power plant of each province plan day total score power distributing amount;
(9) adjust dispatcher according to allocation result, formulate the generation schedule that day is planned in local each power station.
CN201410653107.6A 2014-11-17 2014-11-17 A kind of flood season water power enrichment power network saves balancing power plant electric quantity of power supply distribution method Active CN104408557B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410653107.6A CN104408557B (en) 2014-11-17 2014-11-17 A kind of flood season water power enrichment power network saves balancing power plant electric quantity of power supply distribution method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410653107.6A CN104408557B (en) 2014-11-17 2014-11-17 A kind of flood season water power enrichment power network saves balancing power plant electric quantity of power supply distribution method

Publications (2)

Publication Number Publication Date
CN104408557A CN104408557A (en) 2015-03-11
CN104408557B true CN104408557B (en) 2017-06-06

Family

ID=52646186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410653107.6A Active CN104408557B (en) 2014-11-17 2014-11-17 A kind of flood season water power enrichment power network saves balancing power plant electric quantity of power supply distribution method

Country Status (1)

Country Link
CN (1) CN104408557B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105427017B (en) * 2015-10-29 2019-08-09 大连理工大学 A kind of water power enrichment power grid imperial scale station group short-term plan preparation method
CN105260801B (en) * 2015-10-29 2020-08-21 大连理工大学 Long-term power and electricity balance analysis method for large-scale power station group of hydropower enrichment power grid

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008309405A (en) * 2007-06-15 2008-12-25 Kawasaki Plant Systems Ltd Control method of plasma type ash melting furnace and plasma type ash melting furnace
CN102298731A (en) * 2010-06-25 2011-12-28 华东电网有限公司 Cascade reservoir short-term electricity generation optimal dispatching method considering comprehensive requirements of tide stemming water supply
CN103065206A (en) * 2012-12-27 2013-04-24 大连理工大学 Hydropower station group modulation scale optimal scheduling method under complex time interval coupling type restriction
CN103580063A (en) * 2013-11-13 2014-02-12 国家电网公司 Large-scale grid-connected wind power consumption method based on demander response
CN103942728A (en) * 2014-04-11 2014-07-23 武汉大学 Cascade hydropower station group daily power generation plan making method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008309405A (en) * 2007-06-15 2008-12-25 Kawasaki Plant Systems Ltd Control method of plasma type ash melting furnace and plasma type ash melting furnace
CN102298731A (en) * 2010-06-25 2011-12-28 华东电网有限公司 Cascade reservoir short-term electricity generation optimal dispatching method considering comprehensive requirements of tide stemming water supply
CN103065206A (en) * 2012-12-27 2013-04-24 大连理工大学 Hydropower station group modulation scale optimal scheduling method under complex time interval coupling type restriction
CN103580063A (en) * 2013-11-13 2014-02-12 国家电网公司 Large-scale grid-connected wind power consumption method based on demander response
CN103942728A (en) * 2014-04-11 2014-07-23 武汉大学 Cascade hydropower station group daily power generation plan making method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
云南电网日调度计划编制***;李刚等;《大连理工大学学报》;20060131;全文 *

Also Published As

Publication number Publication date
CN104408557A (en) 2015-03-11

Similar Documents

Publication Publication Date Title
Chen et al. Energy trading and market equilibrium in integrated heat-power distribution systems
Zhou et al. Distributionally robust co-optimization of energy and reserve for combined distribution networks of power and district heating
Yao et al. Residential demand side management under high penetration of rooftop photovoltaic units
Zou et al. Evaluating the contribution of energy storages to support large-scale renewable generation in joint energy and ancillary service markets
Tushar et al. Three-party energy management with distributed energy resources in smart grid
Reddy et al. Realistic and transparent optimum scheduling strategy for hybrid power system
Wang et al. A demand response and battery storage coordination algorithm for providing microgrid tie-line smoothing services
Crampes et al. Water resource and power generation
US20170372438A1 (en) Power grid system and method of consolidating power injection and consumption in a power grid system
CN106655246A (en) Method of solving robust two-layer optimization model based on wind power prediction and demand response
Xie et al. Two-stage compensation algorithm for dynamic economic dispatching considering copula correlation of multiwind farms generation
Wang et al. Chance constrained unit commitment considering comprehensive modelling of demand response resources
Yuan et al. Cross-regional integrated transmission of wind power and pumped-storage hydropower considering the peak shaving demands of multiple power grids
CN106682810A (en) Method for operating cross-basin cascade hydropower station groups under condition of dynamic commissioning of giant hydropower stations for long term
CN103578047B (en) A kind of electric power system source net load interaction control method
Peikherfeh et al. Active management of distribution networks in presence of distributed generations
Peng et al. Bilateral coordinated dispatch of multiple stakeholders in deep peak regulation
Huuki et al. Flexible demand and supply as enablers of variable energy integration
Ali Development and Improvement of Renewable Energy Integrated with Energy Trading Schemes based on Advanced Optimization Approaches
Hui et al. Coupon-based demand response for consumers facing flat-rate retail pricing
CN104408557B (en) A kind of flood season water power enrichment power network saves balancing power plant electric quantity of power supply distribution method
CN109800906A (en) Distributing net and power distribution network Joint economics dispatching method towards new energy consumption
Zalzar et al. An incentive-based settlement mechanism for participation of flexible demands in day-ahead markets
CN114548609B (en) Water resource collaborative allocation method for ecological power generation and water supply
Li et al. Real-time scheduling of time-shiftable loads in smart grid with dynamic pricing and photovoltaic power generation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant