CN104405441A - Detachable filling and retaining wall - Google Patents

Detachable filling and retaining wall Download PDF

Info

Publication number
CN104405441A
CN104405441A CN201410658272.0A CN201410658272A CN104405441A CN 104405441 A CN104405441 A CN 104405441A CN 201410658272 A CN201410658272 A CN 201410658272A CN 104405441 A CN104405441 A CN 104405441A
Authority
CN
China
Prior art keywords
holddown groove
tunnel
fixed part
filling
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410658272.0A
Other languages
Chinese (zh)
Other versions
CN104405441B (en
Inventor
兰建强
付建新
宋均平
宋卫东
石建华
羊羽翔
王西兵
毛少波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wugang Resource Group Chengchao Mining Industry Co ltd
Original Assignee
Wuhan Iron and Steel Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Group Corp filed Critical Wuhan Iron and Steel Group Corp
Priority to CN201410658272.0A priority Critical patent/CN104405441B/en
Publication of CN104405441A publication Critical patent/CN104405441A/en
Application granted granted Critical
Publication of CN104405441B publication Critical patent/CN104405441B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/02Supporting means, e.g. shuttering, for filling-up materials
    • E21F15/04Stowing mats; Goaf wire netting; Partition walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a detachable filling and retaining wall. The detachable filling and retaining wall comprises a plurality of sand bags, a first fixing part and a second fixing part, wherein the sand bags are internally filled and wrapped with tailing sand; the plurality of sand bags are vertically stacked and used for packing the vertical section of a whole roadway; the first fixing part comprises a first fixing plate and a first folding plate; the first fixing plate stretches into a first fixing slot; the first fixing part is fixed in the first fixing slot by pouring concrete; the second fixing part comprises a second fixing plate and a second folding plate; the second fixing plate stretches into a second fixing slot; the second fixing part is fixed in the second fixing slot by pouring the concrete; a plurality of steel channels are vertically arranged side by side; the top ends and the bottom ends of the steel channels are fixedly connected with end plates respectively; the end plate on the top is fixedly connected with the first folding plate; the end plate on the bottom is fixedly connected with the second folding plate. The filling and retaining wall is convenient to mount and demount, simple and convenient to construct, and low in cost.

Description

A kind of detachable filling counterfort
Technical field
The present invention relates to mining technical field, particularly the detachable filling counterfort of one.
Background technology
Along with the development of mining technique, the proportion shared by cut and fill increases day by day, and filling method not only farthest can reduce the loss and dilution of ore, effectively can also reduce the impact on ecological environment, and timely process for producing barren rock and tailings, realize exploration without waster.Filling counterfort construction is requisite link in filling method, and the installation filling counterfort of fast, economical not only can improve filling mining efficiency, ensures filling safety, can also effectively control to supplement cost with money.Cheng chao Iron Mine is one of largest at present iron ore mine, is in the critical period changed to filling method by Caving Method with Large Space, how smooth transition control production cost is the major issue faced at present.
The technical problems such as it is complicated that filling counterfort of the prior art exists construction, needs to repeat construction, with high costs.
Summary of the invention
For solving the problem, the invention provides a kind of easy disassembly, easy construction, detachable filling counterfort with low cost.
The detachable filling counterfort of one provided by the invention, for filling tunnel, described filling counterfort comprises:
Sandbag stopping, described sandbag stopping comprises:
Multiple sand pocket, described sand pocket is solid and wrap up tailings; The vertical section filling up whole described tunnel vertically stacked by described multiple sand pocket;
First fixed part, the first holddown groove of arc is offered at the top in described tunnel; Described first holddown groove is positioned at the vertical section in described tunnel; Described first fixed part comprises: the first fixed head and the first flap; Described first fixed head stretches into described first holddown groove; By concreting, described first fixed part is fixed in described first holddown groove;
Second fixed part, the second holddown groove is offered in the bottom in described tunnel; Described second holddown groove is positioned at the vertical section in described tunnel; Described second fixed part comprises: the second fixed head and the second flap; Described second fixed head stretches into described second holddown groove; By concreting, described second fixed part is fixed in described second holddown groove;
Supporting component, described supporting component comprises:
Many channel-section steels, described many channel-section steels are vertically arranged side by side; The top of described channel-section steel and bottom are connected end plate respectively; End plate and described first flap at described channel-section steel top are connected; End plate bottom described channel-section steel and described second flap are connected.
As preferably, described sandbag stopping also comprises:
Filling paste, the gap between described multiple sand pocket and described tunnel inwall is filled up by described filling paste;
Two drainage layers, are separately positioned on the two ends of described multiple sand pocket; Described two drainage layers are parallel to the vertical section in described tunnel.
As preferably, described filling counterfort also comprises:
3rd fixed part, the 3rd holddown groove is offered in side, described tunnel; Described 3rd holddown groove is positioned at the vertical section in described tunnel; Described 3rd fixed part comprises: the 3rd fixed head and the 3rd flap; Described 3rd fixed head stretches into described 3rd holddown groove; By concreting, described 3rd fixed part is fixed in described 3rd holddown groove;
4th fixed part, described tunnel opposite side offers the 4th holddown groove; Described 4th holddown groove is positioned at the vertical section in described tunnel; Described 4th fixed part comprises: the 4th fixed head and the 4th flap; Described 4th fixed head stretches into described 4th holddown groove; By concreting, described 4th fixed part is fixed in described 4th holddown groove.
As preferably, described supporting component also comprises:
Multiple stiffener, horizontal interval is arranged; Described multiple stiffener and described many channel-section steels are connected.
As preferably, described filling counterfort also comprises:
Multiple diagonal support, described multiple diagonal support and described supporting component are connected, and the vertical section interval along described tunnel is arranged side by side;
Multiple treatment hole, is arranged on the bottom of described filling barricade, through described sandbag stopping and supporting component.
The detachable filling counterfort of one provided by the invention is by arranging sandbag stopping, first fixed part, second fixed part, supporting component, multiple diagonal support and multiple treatment hole, wherein the first fixed part and the second fixed part are fixed in the holddown groove in tunnel by concreting, a firmly wall frame structure is formed after first fixed part and the second fixed part and supporting component and multiple diagonal support being connected again, this wall frame structure and sandbag stopping form filling counterfort, realize the filling completely in tunnel, ensure this filling counterfort sound construction, easy construction, easy accessibility, low production cost.
Accompanying drawing explanation
Fig. 1 is the structural front view of the detachable filling counterfort that the embodiment of the present invention provides.
Fig. 2 is the structure left view of the detachable filling counterfort that the embodiment of the present invention provides.
(parts of wherein each label representative are followed successively by: 1 first fixed head, 2 first flaps, 3 the 3rd flaps, 4 the 3rd fixed heads, 5 the 4th flaps, 6 the 4th fixed heads, 7 channel-section steels, 8 stiffeners, 9 second flaps, 10 second fixed heads, 11 treatment holes, 12 sand pockets, 13 diagonal supports, 14 drainage layers)
Detailed description of the invention
In order to understand the present invention in depth, below in conjunction with drawings and the specific embodiments, the present invention is described in detail.
See attached Fig. 1 and 2, the detachable filling counterfort of one provided by the invention, for filling tunnel, this filling counterfort comprises: sandbag stopping, the first fixed part, the second fixed part and supporting component.Sandbag stopping comprises: multiple sand pocket 12, and sand pocket 12 is solid and wrap up tailings, as a kind of preferred embodiment, fills and encapsulates tailings form sand pocket 12 with gunnysack or woven bag.The vertical section filling up whole tunnel vertically stacked by multiple sand pocket 12, the desired location of construction filling counterfort is stacked in by multiple sand pocket 12, compacting as far as possible in process of banking up, avoid there is larger space between each sand pocket 12, until pile with the vertical section in whole tunnel, namely the end face in tunnel pressed close to by the sand pocket 12 at top, and the side in tunnel pressed close to by the sand pocket 12 of both sides.
The first holddown groove of arc is offered at the top in tunnel, and the first holddown groove is positioned at the vertical section in tunnel.First fixed part comprises: the first fixed head 1 and the first flap 2, first fixed head 1 stretch into the first holddown groove; By concreting, the first fixed part is fixed in the first holddown groove.By the first fixed part processing in the arc corresponding with the first holddown groove, first fixed part is vertically stretched into the first holddown groove, make the arcwall face of the first flap 2 parallel with the arcwall face at top, tunnel, then by external equipment by filling concrete in the first holddown groove, after concrete setting, the first fixed head 1 is fixed in first holddown groove at top, tunnel.As a kind of preferred embodiment, the width of the first holddown groove is less than 100mm, the degree of depth is 200 ~ 300mm, and the thickness of the first fixed part is greater than 10mm, is L shape steel plate, the width of the first fixed head 1 is 300 ~ 400mm, on the first flap 2, multiple bolt hole is offered at interval, and position and the quantity of the position of bolt hole and quantity and multiple channel-section steel top end plate are corresponding, as a kind of preferred embodiment, this bolt hole is High-strength bolt hole, and specification is M10 ~ M12.
The second holddown groove is offered in the bottom in tunnel, and the second holddown groove is positioned at the vertical section in tunnel.Second fixed part comprises: the second fixed head 10 and the second flap 9, second fixed head 10 stretch into the second holddown groove, are fixed in the second holddown groove by the second fixed part by concreting.As a kind of preferred embodiment, the width of the second holddown groove is less than 100mm, and the degree of depth is 200 ~ 300mm, and the thickness of the second fixed part is greater than 10mm, and be L shape steel plate, the width of the second fixed head 10 is 300 ~ 400mm.By the second fixed part processing in the shape corresponding with the second holddown groove, second fixed part is vertically stretched into the first holddown groove, the second flap 9 is made to be vertically set on bottom tunnel in the second holddown groove, then by external equipment by filling concrete in the second holddown groove, be fixed in second holddown groove at top, tunnel by the second fixed head 10 after concrete setting, now the second flap 9 is positioned at the horizontal level higher than bottom surface, tunnel.On the second flap 9, multiple bolt hole is offered at interval, and position and the quantity of the position of bolt hole and quantity and multiple channel-section steel 7 top end plate are corresponding, and as a kind of preferred embodiment, this bolt hole is High-strength bolt hole, and specification is M10 ~ M12; On first flap 2 and the second flap 9, interval 280mm arranges a high-strength bolt hole.
Supporting component comprises: many channel-section steels 7, many channel-section steels 7 are vertically arranged side by side, and the end plate that is connected is welded respectively in top and the bottom of channel-section steel 7, and top end plate is identical with the steel plate thickness of bottom end plate, end plate and first flap 2 at top are connected, and end plate and second flap 9 of bottom are connected.Bolt hole is offered respectively in every top end plate of root channel-section steel 7 and the center of bottom end plate, and the bolt hole of each channel-section steel 7 top end plate is corresponding with the bolt hole on the first flap 2 respectively, is then connected by high-strength bolt.The bolt hole of each channel-section steel 7 bottom end plate is corresponding with the bolt hole on the second flap 9 respectively, is then connected by high-strength bolt.Channel-section steel 7 web of supporting component side offers multiple bolt hole at vertical direction interval, and channel-section steel 7 web of supporting component opposite side offers multiple bolt hole at vertical direction interval.As a kind of preferred embodiment, the specification of this high-strength bolt is M10 ~ M12.Be bolted and many channel-section steels 7 and the first fixed part and the second fixed part are fixed, the top of many channel-section steels 7 and tunnel body of wall and bottom are fixed, channel-section steel 7 can bear larger longitudinal loading, ensures that this filling counterfort has stronger vertical bearing capacity.
As preferably, this filling counterfort also comprises: multiple diagonal support 13 and multiple treatment hole 11.Multiple diagonal support 13, multiple diagonal support 13 is connected with supporting component, vertical section interval along tunnel is arranged side by side, vertical section width according to tunnel arranges a diagonal support 13 every 500mm, as a kind of preferred embodiment, diagonal support 13 selects steel work, and diagonal support 13 and ground-angle are not more than 45 °, the ability making this filling counterfort bear moment of flexure strengthens, and the sound construction protecting this filling counterfort is reliable.
Multiple treatment hole 11, is arranged on the bottom of filling barricade, through sand pocket 12 partition wall and supporting component, the water filtering performance of this filling counterfort can be improved, prevent the rear spalling of sand pocket 12 immersion for a long time, or structural failure after each steel part chance aqueous corrosion, cause the damage of this filling counterfort.
As preferably, sandbag stopping also comprises: filling paste and two drainage layers 14.Gap between multiple sand pocket 12 and tunnel inwall is filled up by filling paste.Two drainage layers 14 are separately positioned on the two ends of multiple sand pocket 12, and two drainage layers 14 are parallel to the vertical section in tunnel.
As preferably, filling counterfort also comprises: the 3rd fixed part and the 4th fixed part.The 3rd holddown groove is offered in side, tunnel, and the 3rd holddown groove is positioned at the vertical section in tunnel, and the 3rd fixed part comprises: the 3rd fixed head 4 and the 3rd flap 3.3rd fixed head 4 stretches into the 3rd holddown groove, is fixed in the 3rd holddown groove by the 3rd fixed part by concreting.Tunnel opposite side offers the 4th holddown groove, and the 4th holddown groove is positioned at the vertical section in tunnel, and the 4th fixed part comprises: the 4th fixed head 6 and the 4th flap 5.4th fixed head 6 stretches into the 4th holddown groove, is fixed in the 4th holddown groove by the 4th fixed part by concreting.As a kind of preferred embodiment, the width of the 3rd holddown groove and the 4th holddown groove is less than 100mm, the degree of depth is 200 ~ 300mm, the thickness of the 3rd fixed part and the 4th fixed part is greater than 10mm, for L shape steel plate, the width of the 3rd fixed head 4 and the 4th fixed head 6 is 300 ~ 400mm, and on the 3rd flap 3, multiple bolt hole is offered at interval, and position and the quantity of the position of bolt hole and quantity and the channel-section steel 7 web bolt hole of supporting component side are corresponding.On the 4th flap 5, multiple bolt hole is offered at interval, and position and the quantity of the position of bolt hole and quantity and the channel-section steel 7 web bolt hole of opposite side are corresponding; Be bolted and the channel-section steel 7 of supporting component side and the 3rd fixed part are fixed, be bolted simultaneously and the channel-section steel 7 of supporting component opposite side and the 4th fixed part are fixed, the both sides of supporting component and tunnel body of wall are fixed.As a kind of preferred embodiment, this bolt hole is High-strength bolt hole, and specification is M10 ~ M12; On 3rd flap 3 and the 4th flap 5, interval 150mm arranges a high-strength bolt hole.
As preferably, supporting component also comprises: multiple stiffener 8, and horizontal interval is arranged, multiple stiffener 8 welds with many channel-section steels 7 and is connected, and makes many channel-section steels 7 can bear larger transverse load, ensures that this filling counterfort has stronger horizontal bearing capacity.As a kind of preferred embodiment, 5 stiffeners 8 are welded and fixed with many channel-section steels 7, and stiffener 8 is horizontally disposed with, and width equals the width of tunnel vertical section.The middle part of channel-section steel 7 is welded and fixed three stiffeners 8, and the top and bottom of channel-section steel 7 are welded and fixed a stiffener 8 respectively.
The detachable filling counterfort of one provided by the invention is by arranging sandbag stopping, first fixed part, second fixed part, 3rd fixed part, 4th fixed part, supporting component, multiple diagonal support 13 and multiple treatment hole 11, wherein the first fixed part, second fixed part, 3rd fixed part and the 4th fixed part are fixed in the holddown groove in tunnel by concreting, again by the first fixed part, second fixed part, a firmly steel body frame construction is formed after 3rd fixed part and the 4th fixed part and supporting component are connected by bolt, this steel body frame construction and sandbag stopping and multiple diagonal support 13 form filling counterfort, realize the filling completely in tunnel, this filling counterfort is enable to bear larger horizontal and vertical load, bolted this filling counterfort of mode easy disassembly simultaneously.This filling counterfort sound construction, water filtering performance is better, easy construction, easy accessibility, low production cost.
Above-described detailed description of the invention; object of the present invention, technical scheme and beneficial effect are further described; be understood that; the foregoing is only the specific embodiment of the present invention; be not limited to the present invention; within the spirit and principles in the present invention all, any amendment made, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (5)

1. a detachable filling counterfort, for filling tunnel, is characterized in that, described filling counterfort comprises:
Sandbag stopping, described sandbag stopping comprises:
Multiple sand pocket, described sand pocket is solid and wrap up tailings; The vertical section filling up whole described tunnel vertically stacked by described multiple sand pocket;
First fixed part, the first holddown groove of arc is offered at the top in described tunnel; Described first holddown groove is positioned at the vertical section in described tunnel; Described first fixed part comprises: the first fixed head and the first flap; Described first fixed head stretches into described first holddown groove; By concreting, described first fixed part is fixed in described first holddown groove;
Second fixed part, the second holddown groove is offered in the bottom in described tunnel; Described second holddown groove is positioned at the vertical section in described tunnel; Described second fixed part comprises: the second fixed head and the second flap; Described second fixed head stretches into described second holddown groove; By concreting, described second fixed part is fixed in described second holddown groove;
Supporting component, described supporting component comprises:
Many channel-section steels, described many channel-section steels are vertically arranged side by side; The top of described channel-section steel and bottom are connected end plate respectively; End plate and described first flap at described channel-section steel top are connected; End plate bottom described channel-section steel and described second flap are connected.
2. filling counterfort according to claim 1, is characterized in that, described sandbag stopping also comprises:
Filling paste, the gap between described multiple sand pocket and described tunnel inwall is filled up by described filling paste;
Two drainage layers, are separately positioned on the two ends of described multiple sand pocket; Described two drainage layers are parallel to the vertical section in described tunnel.
3. filling counterfort according to claim 1, is characterized in that, described filling counterfort also comprises:
3rd fixed part, the 3rd holddown groove is offered in side, described tunnel; Described 3rd holddown groove is positioned at the vertical section in described tunnel; Described 3rd fixed part comprises: the 3rd fixed head and the 3rd flap; Described 3rd fixed head stretches into described 3rd holddown groove; By concreting, described 3rd fixed part is fixed in described 3rd holddown groove;
4th fixed part, described tunnel opposite side offers the 4th holddown groove; Described 4th holddown groove is positioned at the vertical section in described tunnel; Described 4th fixed part comprises: the 4th fixed head and the 4th flap; Described 4th fixed head stretches into described 4th holddown groove; By concreting, described 4th fixed part is fixed in described 4th holddown groove.
4. filling counterfort according to claim 1, is characterized in that, described supporting component also comprises:
Multiple stiffener, horizontal interval is arranged; Described multiple stiffener and described many channel-section steels are connected.
5. filling counterfort according to claim 1, is characterized in that, described filling counterfort also comprises:
Multiple diagonal support, described multiple diagonal support and described supporting component are connected, and the vertical section interval along described tunnel is arranged side by side;
Multiple treatment hole, is arranged on the bottom of described filling barricade, through described sandbag stopping and supporting component.
CN201410658272.0A 2014-11-18 2014-11-18 Detachable filling and retaining wall Active CN104405441B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410658272.0A CN104405441B (en) 2014-11-18 2014-11-18 Detachable filling and retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410658272.0A CN104405441B (en) 2014-11-18 2014-11-18 Detachable filling and retaining wall

Publications (2)

Publication Number Publication Date
CN104405441A true CN104405441A (en) 2015-03-11
CN104405441B CN104405441B (en) 2017-01-18

Family

ID=52643097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410658272.0A Active CN104405441B (en) 2014-11-18 2014-11-18 Detachable filling and retaining wall

Country Status (1)

Country Link
CN (1) CN104405441B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105464699A (en) * 2015-12-01 2016-04-06 马钢(集团)控股有限公司 Drift-and-fill sealing device
CN106194251A (en) * 2016-08-31 2016-12-07 安徽开发矿业有限公司 A kind of steel construction filling counterfort of reusable edible
CN106555608A (en) * 2015-09-25 2017-04-05 冉福锋 A kind of cage bar mesh sheet of mine filling recoverable filters decompression type board wall
CN109252892A (en) * 2018-11-20 2019-01-22 贵州大学 A kind of filling-up hydraulically barricade convenient for shrinking transport
CN111894669A (en) * 2020-07-09 2020-11-06 中南大学 Novel purification barrier structure and rapid construction method
CN112922668A (en) * 2021-03-01 2021-06-08 中色国际矿业股份有限公司帕鲁特金矿 Underground filling retaining wall for mine and construction method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881181A (en) * 2010-06-23 2010-11-10 华唯金属矿产资源高效循环利用国家工程研究中心有限公司 Mine goaf tailing-filled concrete enclosing wall
CN202431302U (en) * 2011-12-22 2012-09-12 铜陵有色金属集团控股有限公司 Filling retaining wall device for high large-scale mining stope in roadway
CN202544923U (en) * 2011-12-02 2012-11-21 淄博市王庄煤矿 Mobile hydraulic seal filling device
CN203248192U (en) * 2013-04-10 2013-10-23 山西晋城煤业集团勘察设计院有限公司 Connecting old lane filling framework of underground coal mine
CN203383851U (en) * 2013-07-17 2014-01-08 安徽理工大学 Gob-side entry retaining flexible filling wall body structure
CN103696803A (en) * 2013-12-06 2014-04-02 西北矿冶研究院 Be used for mine underground tailings cemented filling barricade device
CN103711518A (en) * 2014-01-03 2014-04-09 山东汇发矿业科技有限公司 Portable mine filling retaining wall
CN203531955U (en) * 2013-09-25 2014-04-09 安徽理工大学 Gob-side entry retaining three-dimensional reinforced filling wall body structure
CN104088662A (en) * 2014-06-25 2014-10-08 中国矿业大学 Construction method of gob-side entry retaining wall of solid filling coal mining

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881181A (en) * 2010-06-23 2010-11-10 华唯金属矿产资源高效循环利用国家工程研究中心有限公司 Mine goaf tailing-filled concrete enclosing wall
CN202544923U (en) * 2011-12-02 2012-11-21 淄博市王庄煤矿 Mobile hydraulic seal filling device
CN202431302U (en) * 2011-12-22 2012-09-12 铜陵有色金属集团控股有限公司 Filling retaining wall device for high large-scale mining stope in roadway
CN203248192U (en) * 2013-04-10 2013-10-23 山西晋城煤业集团勘察设计院有限公司 Connecting old lane filling framework of underground coal mine
CN203383851U (en) * 2013-07-17 2014-01-08 安徽理工大学 Gob-side entry retaining flexible filling wall body structure
CN203531955U (en) * 2013-09-25 2014-04-09 安徽理工大学 Gob-side entry retaining three-dimensional reinforced filling wall body structure
CN103696803A (en) * 2013-12-06 2014-04-02 西北矿冶研究院 Be used for mine underground tailings cemented filling barricade device
CN103711518A (en) * 2014-01-03 2014-04-09 山东汇发矿业科技有限公司 Portable mine filling retaining wall
CN104088662A (en) * 2014-06-25 2014-10-08 中国矿业大学 Construction method of gob-side entry retaining wall of solid filling coal mining

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106555608A (en) * 2015-09-25 2017-04-05 冉福锋 A kind of cage bar mesh sheet of mine filling recoverable filters decompression type board wall
CN105464699A (en) * 2015-12-01 2016-04-06 马钢(集团)控股有限公司 Drift-and-fill sealing device
CN106194251A (en) * 2016-08-31 2016-12-07 安徽开发矿业有限公司 A kind of steel construction filling counterfort of reusable edible
CN109252892A (en) * 2018-11-20 2019-01-22 贵州大学 A kind of filling-up hydraulically barricade convenient for shrinking transport
CN111894669A (en) * 2020-07-09 2020-11-06 中南大学 Novel purification barrier structure and rapid construction method
CN112922668A (en) * 2021-03-01 2021-06-08 中色国际矿业股份有限公司帕鲁特金矿 Underground filling retaining wall for mine and construction method thereof

Also Published As

Publication number Publication date
CN104405441B (en) 2017-01-18

Similar Documents

Publication Publication Date Title
CN104405441A (en) Detachable filling and retaining wall
CN102661169B (en) Gob-side entry retaining method for anchor bolt network gangue bag wall body for coal mining without pillars
CN102418539B (en) The quick support process crossed in structure driving of soft rock subgrade
CN109209490B (en) Working face withdrawing method for gangue filling auxiliary end mining stage
CN102383794B (en) Cross side dumping arrangement coordinated mode of rear conveyer of fully mechanized working face and support structure
CN100353029C (en) Panel Unloading Layered Filling Mining Method
CN102720498B (en) Gob-side entry retaining mining process for coal face
CN204455801U (en) A kind of bridge abutment structure
CN109612839A (en) A kind of geotechnical model test device
CN202360122U (en) Small-stage sublevel caving coal bracket
CN207813629U (en) A kind of strong dynamic load anti-impact supporting new structure in tunnel
CN205400744U (en) Utilize along empty supporting construction who realizes closely coal seam exploitation in lane that protects
CN203035204U (en) Large-section tunnel second lining grouping formwork trolley
CN205532618U (en) Closely inclined coal seam protects tunnel secure architecture in lane along sky
CN206092056U (en) Steel structure for circulated profit
CN204253052U (en) A kind of lattice steel reinforced concrete antiarch support
CN106640146A (en) Three-dimensional steel bar net rack and concrete combined lining structure
CN205477640U (en) Safety support device to collecting space area roof cutting release
CN102996142B (en) Construction method of mine tunnel supporting structure with fixed hanging rings
CN205445623U (en) Along empty facility of strutting of mineing coal seam closely in lane that protects
CN101871354A (en) Large-step continuous supporting type forepole and forepole moving method thereof
CN207161129U (en) Back timber
CN206545513U (en) Three-dimensional bar frame and Combined concrete liner structure
CN203546740U (en) Riverway closure dike structure
CN203834485U (en) Upheaval resisting earth pressure balance device for foundation pit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181115

Address after: 430083 No. 107 Construction Sixth Road, Qingshan District, Wuhan City, Hubei Province

Patentee after: Wugang Resources Group Co., Ltd.

Address before: No. 999 Friendship Avenue, Wuhan, Hubei Province

Patentee before: Wuhan Iron & Steel (Group) Corp.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210628

Address after: 436050 Chengchao Iron Mine, No.1, Chengchao street, Zelin Town, Echeng District, Ezhou City, Hubei Province

Patentee after: WUGANG RESOURCE GROUP CHENGCHAO MINING INDUSTRY Co.,Ltd.

Address before: 430083 No. 107 Construction Sixth Road, Qingshan District, Wuhan City, Hubei Province

Patentee before: WUGANG RESOURCE GROUP Co.,Ltd.

TR01 Transfer of patent right