CN104298530B - Measure the method and data processing system of portable electronic devices available machine time length - Google Patents

Measure the method and data processing system of portable electronic devices available machine time length Download PDF

Info

Publication number
CN104298530B
CN104298530B CN201410539322.3A CN201410539322A CN104298530B CN 104298530 B CN104298530 B CN 104298530B CN 201410539322 A CN201410539322 A CN 201410539322A CN 104298530 B CN104298530 B CN 104298530B
Authority
CN
China
Prior art keywords
portable electronic
electronic devices
time point
computer
point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410539322.3A
Other languages
Chinese (zh)
Other versions
CN104298530A (en
Inventor
柯雅萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qisda Suzhou Co Ltd
Qisda Corp
Original Assignee
Qisda Suzhou Co Ltd
Qisda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qisda Suzhou Co Ltd, Qisda Corp filed Critical Qisda Suzhou Co Ltd
Priority to CN201410539322.3A priority Critical patent/CN104298530B/en
Publication of CN104298530A publication Critical patent/CN104298530A/en
Application granted granted Critical
Publication of CN104298530B publication Critical patent/CN104298530B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measurement Of Unknown Time Intervals (AREA)
  • Electric Clocks (AREA)

Abstract

The invention discloses the method and data processing system that measure portable electronic devices available machine time length.Data processing system includes portable electronic devices and computer.Computer sends start-up command to portable electronic devices by first path, and records available machine time point.After portable electronic devices receive start-up command, start to be loaded into boot program and data line program.When boot program is loaded into be completed, portable electronic devices record start deadline point.When data line program is loaded into be completed, the connection of the second path, portable electronic devices and record material line time point are set up between portable electronic devices and the computer.When the connection of the second path is set up between portable electronic devices and computer, computer record connection setup time point.According to available machine time point, connection setup time point, start deadline point and data line time point, portable electronic devices available machine time length is calculated.

Description

Measure the method and data processing system of portable electronic devices available machine time length
Technical field
The invention discloses it is a kind of measure portable electronic devices available machine time length method and data processing system, espespecially A kind of data processing system for measuring portable electronic devices available machine time length.
Background technology
As science and technology is maked rapid progress, portable electronic devices miscellaneous are applied among life, such as intelligent Mobile phone (Smart Phone) and panel computer (Tablet) etc..These portable electronic devices due to specification and model not Together, its Electronic Performance, reaction time and available machine time also differ.Even if being filled in the portable electronic of same specification and model In putting, due to the otherness of its processing procedure, every electrical performance index also will not be just the same.However, in portable electronic devices When dispatching from the factory, it is necessary to which the Electronic Performance after many testing processes are so as to dispatch from the factory meets its specification, and efficiency quality is as far as possible Reach consistent.
During these detections, the length of available machine time needed for portable electronic devices is a critically important efficiency Index.In general, the length of available machine time needed for portable electronic devices is defined as being performed by portable electronic devices and opens After machine instruction, the time to needed for being completely loaded boot program.Intuitively, the available machine time needed for measuring portable electronic devices is long The method of degree is, using the display time of portable electronic devices, with unification timer or code table, to observe its execution start and refer to Make the time needed for being completely loaded boot program.However, the mode of this manual measurement there is measures inaccurate wind Danger.If additionally, completely in accordance with the display measuring time value available machine time length of portable electronic devices, can be because of performing start In a period of time after instruction, time-program(me) is not yet completely loaded and causes the display time of portable electronic devices to be forbidden Really, ultimately result in measured available machine time length and have very big error.
Therefore, develop a data processing system, can efficiently and accurately measure the available machine time of portable electronic devices Length is very important.
The content of the invention
It is an object of the invention to provide kind of the method for measurement portable electronic devices available machine time length and data treatment System, accurately to measure the available machine time length of portable electronic devices.
To reach above-mentioned purpose, the present invention proposes a kind of method for measuring portable electronic devices available machine time length, should Portable electronic devices are connected to computer with first path, and the method is included:
The computer sends start-up command to the portable electronic devices by the first path, and records available machine time point;
After the portable electronic devices receive the start-up command, start to be loaded into boot program and data line program;
When the boot program is loaded into be completed, portable electronic devices record start deadline point;
When the data line program is loaded into be completed, the second path company is set up between the portable electronic devices and the computer Connect, the portable electronic devices and record material line time point;
When second path connection is set up between the portable electronic devices and the computer, computer record connection is set up Time point;And
According to the available machine time point and the connection setup time point for being recorded in the computer, and it is recorded in this and can takes The start deadline point and the data line time point in formula electronic installation, when calculating the start of the portable electronic devices Between length.
Preferably, according to the available machine time point and the connection setup time point being recorded in the computer, and record In the start deadline point in the portable electronic devices and the data line time point, the portable electronic devices are calculated The available machine time length the step of include:
Calculate the time difference at data line time point and the start deadline point;
The connection setup time point is subtracted into the time difference and obtains estimating time point;
The estimation time point is subtracted the available machine time point to produce the available machine time length of the portable electronic devices.
Preferably, the first path is connected as wireline pathway connection.
Preferably, second path connection is set up between the portable electronic devices and the computer and refers to the portable electricity Wirelessly or non-wirelessly path connection is set up between sub-device and the computer.
Preferably, the method for the measurement portable electronic devices available machine time length is also included:When portable electronic dress Put after receiving the start-up command, be loaded into time-program(me);The time point that wherein time-program(me) is loaded into completion is completed in the start Before time point.
Preferably, the available machine time point and the connection setup time point are recorded in the message database in the computer, The start deadline point and the data line time point are recorded in the message database in the portable electronic devices.
To reach above-mentioned purpose, the invention allows for a kind of data processing system, comprising:
Portable electronic devices;And
Computer, the computer is connected to the portable electronic devices;
Wherein the computer sends start-up command to the portable electronic devices by first path, and records the available machine time Point, after the portable electronic devices receive the start-up command, starts to be loaded into boot program and data line program, when the start journey Sequence is loaded into when completing, portable electronic devices record start deadline point, when the data line program is loaded into be completed, should The connection of the second path, the portable electronic devices and record material line time are set up between portable electronic devices and the computer Point, when second path connection is set up between the portable electronic devices and the computer, the computer record connection setup time Point, and according to the available machine time point and the connection setup time point being recorded in the computer, and be recorded in this and can take The start deadline point and the data line time point in formula electronic installation, calculate the portable electronic devices available machine time Length.
Preferably, the available machine time point and the connection setup time point are recorded in the message database in the computer, The start deadline point and the data line time point are recorded in the message database in the portable electronic devices.
Preferably, the first path is connected as wireline pathway connection.
Preferably, second path is connected as wired or wireless path connection.
Compared with prior art, a kind of data processing system proposed by the present invention and measurement portable electronic devices are started shooting The method of time span, using the start deadline point for being recorded in portable electronic devices and the time at data line time point Difference, at the anti-corresponding time point pushed away on computer, further estimates portable electronic devices available machine time length exactly.Additionally, Because the present invention is to estimate portable electronic devices available machine time length using the concept of time difference, therefore when portable electronic dress When there are the error of side-play amount time for putting and the time of computer, when its time difference is calculated, this side-play amount can disappear because subtracting each other Remove.Therefore, the method for measuring portable electronic devices available machine time length of the invention has accuracy very high.
Brief description of the drawings
Fig. 1 is the block diagram of the data processing system of the embodiment of the present invention.
Fig. 2 is the schematic diagram of the measurement portable electronic devices available machine time length of Fig. 1 embodiments.
Fig. 3 is the flow chart of the measurement portable electronic devices available machine time length of Fig. 1 embodiments.
Specific embodiment
Fig. 1 is the block diagram of the data processing system 100 of the embodiment of the present invention.As shown in figure 1, data processing system 100 Comprising computer 10 and portable electronic devices 20.Computer 10 is coupled to portable electronic devices 20.Computer 10 in the present embodiment Can be general home computer, work station or measurement platform etc..Portable electronic devices 20 can be intelligent or non-intelligent hand Machine, panel computer or any electronic installation with communication function.The mode that computer 10 is coupled to portable electronic devices 20 can It is connected thereto by wired or wireless transmission port.Computer 10 and portable electronic devices 20 respectively have independent time-program(me), Therefore the time can all be shown.However, computer 10 and the time shown by portable electronic devices 20 may not be synchronous.Such as computer Time shown by 10 is " PM 1:05 ", the time shown by portable electronic devices 20 may be " PM 1:07」.And this reality Apply example data processing system 100 how to measure portable electronic devices 20 available machine time length detailed step, will in Lower paragraph explanation.
Fig. 2 is the schematic diagram that portable electronic devices 20 measure available machine time length.In fig. 2, machine time axle X is represented Time in computer 10, portable electronic devices time shaft Y represents the time in portable electronic devices 20.Machine time Axle X may not be synchronous with the time shown by portable electronic devices time shaft Y, may there is a time offset.Time point t1, Time point t2, time point t3 are corresponding to the time on machine time axle X.Time point ta, time point tb, time point tc are correspondence Time on portable electronic devices time shaft Y.In the present embodiment, it is considered to 3 journeys being loaded into by portable electronic devices 20 Sequence, respectively time-program(me), boot program and data line program.The primary condition of data processing system 100 is, computer 10 It is to be already powered on and time accurate device, and portable electronic devices 20 and is not keyed up.To below be described such as with an example What measures the flow of 20 available machine time of portable electronic devices length.
In data processing system 100, computer 10 is connected to portable electronic devices 20 with first path, and first path It is wired path, and first path can only be used to transmission start-up command.Computer 10 sends start-up command by first path To portable electronic devices 20, and will now carve and be recorded as available machine time point t1.Now, with portable electronic devices time shaft Y For, corresponding time point is ta.However, because portable electronic devices 20 are not yet loaded into time-program(me), therefore time point is Ta cannot be recorded (unknown) by portable electronic devices 20.After portable electronic devices 20 receive start-up command, start to be loaded into Boot program, time-program(me) and data line program.During to time point tb, the boot program of portable electronic devices 20 has been loaded into Into now, portable electronic devices 20 will now be carved and be recorded as deadline point tb of starting shooting.In the present embodiment, portable electricity It is therefore start deadline before start deadline point tb that the time-program(me) of sub-device 20 is loaded into the time point for completing Point tb can be recorded in portable electronic devices 20 exactly.Now, for machine time axle X, corresponding time point It is t2.However, because the data line program in portable electronic devices 20 is not loaded into completing, computer 10 is filled with portable electronic Between putting 20 and do not set up data connection, computer 10 is at time point for t2 cannot learn whether portable electronic devices 20 are already powered on Complete, therefore time point in computer 10 is for t2 and cannot learn (unknown).Next, during to time point tc, portable electricity The data line program of sub-device 20 is loaded into and completes, and now, portable electronic devices 20 will be carved now when being recorded as data line Between point tc, and set up between portable electronic devices 20 and computer 10 second path connection.Here so-called second path connection To connect in a wired or wireless manner, and portable electronic devices 20 can carry out any data with computer 10 by the second path Transmission.When set up between portable electronic devices 20 and computer 10 second path connect when, computer 10 will this moment the time record It is connection setup time point t3.Therefore, the moment that data line time point tc is recorded with connection setup time point t3 will be non- Very close to (almost simultaneously).At this time, computer 10 have recorded available machine time point t1 and connection setup time point t3, can take Formula electronic installation 20 have recorded start deadline point tb and data line time point tc.It is foregoing to refer to machine time axle X may not be synchronous with the time shown by portable electronic devices time shaft Y, may there is a time offset.Therefore, if directly Start deadline point tb recorded in portable electronic devices 20 is subtracted into the available machine time point t1 recorded in computer 10, Then can the true problem of yield indeterminacy.Hereinafter will be described the start how present invention measures portable electronic devices 20 exactly Time span.
For with machine time axle X, as shown in Fig. 2 the available machine time length of portable electronic devices 20 should be by starting shooting The time span of time point t1 to time point t2.However, time point t2 is unknown time point, and connection setup time point t3 is then It has been recorded in computer 10.Therefore, if unknown time point t2 can be released by known connection setup time point t3, start shooting Time span will be represented by t2-t1.Although the time shown by machine time axle X and portable electronic devices time shaft Y is not Must be identical, time point t2 on the computer 10 corresponding time on portable electronic devices 20 is start deadline point tb, and Connection setup time point t3 on the computer 10 corresponding time on portable electronic devices 20 is data line time point tc.And The time difference of data line time point tc and start deadline point tb, just for connection setup time point t3 and time point t2 when Between it is poor, that is, this time difference meet the formula of t3-t2=tc-tb.Due to connection setup time point t3, data line time point Tc and start deadline point tb are, it is known that therefore unknown time point t2 can be calculated as the numerical value of t3- (tc-tb).Change Yan Zhi, unknown time point t2 can be equal to and for connection setup time point t3 cut data line time point tc with the start deadline The time difference of point tb.Next, because time point t2 has been computed, time point t2 is cut into table by available machine time point t1 It is shown as the available machine time length of portable electronic devices 20.
Fig. 3 is the flow chart for measuring 20 available machine time of portable electronic devices length.As shown in figure 3, measuring portable electricity 20 available machine time of sub-device length is performed using 5 steps, for lower shown:
Step S100:Computer 10 sends start-up command to portable electronic devices 20 by first path, and records start Time point t1;
Step S101:After portable electronic devices 20 receive the start-up command, start to be loaded into boot program and data line Program;
Step S102:When boot program is loaded into be completed, record start deadline point tb of portable electronic devices 20;
Step S103:When data line program is loaded into be completed, portable electronic devices 20 set up the second tunnel with computer 10 Footpath connects, the record material line time point tc of portable electronic devices 20, while record connection setup time point t3 of computer 10;
Step S104:According to the available machine time point t1 and connection setup time point t3, Yi Jiji that are recorded in computer 10 Record in the start deadline point tb in portable electronic devices 20 and data line time point tc, calculate portable electronic devices 20 available machine time.
During step S100 to step S104, available machine time point t1 and connection setup time point t3 are recorded in In message database (Message Log Data) in computer 20, deadline point tb and data line time point tc is equal for start It is recorded in the message database in portable electronic devices 20.However, the invention is not restricted to this, in other embodiments, institute The record for having time point can be deposited in any element with memory function or device.And available machine time point t1, time point t2, Connection setup time point t3, relative to start deadline point tb and data line time point tc can be absolute time or phase It can also be the time on timer to the time.Although the present invention describes the available machine time length of portable electronic devices 20 The step of and method, but the present invention is not limited.In other embodiments, it is any in portable electronic devices 20 to wait to measure The loading time span of program can be computed according to similar idea, and condition is to treat that measuring program is loaded into what is completed Time is had to after time-program(me) is loaded into completion, and thus the record of portable electronic devices 20 treats that measuring program has been loaded into Into time be only the correct time.For example, represented by the time point t2 of above-described embodiment cuts available machine time point t1 It is the available machine time length of portable electronic devices 20, and time point t2 can be calculated as the numerical value of t3- (tc-tb).If being intended to estimate Meter treats the time span that measuring program is loaded into, as long as the deadline point tb that starts shooting is changed into treating that measuring program is loaded into the time for completing Point, calculates time point t2, and time point t2 is cut into start using the time difference of time point tc and time point tb afterwards The step of time point t1 is in the hope for the treatment of time span that measuring program is loaded into all is same as foregoing, therefore is repeated no more in this.
In sum, the present invention describes a kind of data processing system and measures portable electronic devices available machine time length Method, its idea is using the start deadline point and time at data line time point for being recorded in portable electronic devices Difference, at the anti-corresponding time point pushed away on computer, further estimates portable electronic devices available machine time length exactly.Additionally, Because the present invention is to estimate portable electronic devices available machine time length using the concept of time difference, therefore when portable electronic dress When there are the error of side-play amount time for putting and the time of computer, when its time difference is calculated, this side-play amount can disappear because subtracting each other Remove.Therefore, the method for measuring portable electronic devices available machine time length of the invention has accuracy very high.
The foregoing is only presently preferred embodiments of the present invention, all impartial changes done according to the claims in the present invention with repair Decorations, should all belong to covering scope of the invention.

Claims (9)

1. it is a kind of measure portable electronic devices available machine time length method, the portable electronic devices with first path connect In computer, it is characterised in that the method is included:
The computer sends start-up command to the portable electronic devices by the first path, and records available machine time point;
After the portable electronic devices receive the start-up command, start to be loaded into boot program and data line program;
When the boot program is loaded into be completed, portable electronic devices record start deadline point;
When the data line program is loaded into be completed, the connection of the second path is set up between the portable electronic devices and the computer, The portable electronic devices and record material line time point;
When second path connection is set up between the portable electronic devices and the computer, the computer record connection setup time Point;And
According to the available machine time point and the connection setup time point for being recorded in the computer, and it is recorded in the portable electricity The start deadline point and the data line time point in sub-device, the available machine time for calculating the portable electronic devices are long Degree;
Wherein according to being recorded in the available machine time point and the connection setup time point in the computer, and it is recorded in this and can takes The start deadline point and the data line time point in formula electronic installation, calculate the start of the portable electronic devices The step of time span, includes:
Calculate the time difference at data line time point and the start deadline point;
The connection setup time point is subtracted into the time difference and obtains estimating time point;
The estimation time point is subtracted the available machine time point to produce the available machine time length of the portable electronic devices.
2. the method for claim 1, it is characterised in that the first path is connected as wireline pathway connection.
3. the method for claim 1, it is characterised in that set up between the portable electronic devices and the computer this second Path connection refers to being set up between the portable electronic devices and the computer wirelessly or non-wirelessly path connection.
4. the method for claim 1, it is characterised in that also include:
After the portable electronic devices receive the start-up command, time-program(me) is loaded into;
The time point that wherein time-program(me) is loaded into completion is before the start deadline point.
5. the method for claim 1, it is characterised in that the available machine time point and the connection setup time point are recorded in In message database in the computer, the start deadline point and the data line time point are recorded in the portable electronic In message database in device.
6. a kind of data processing system, it is characterised in that include:
Portable electronic devices;And
Computer, the computer is connected to the portable electronic devices;
Wherein the computer sends start-up command to the portable electronic devices by first path, and records available machine time point, should After portable electronic devices receive the start-up command, start to be loaded into boot program and data line program, when the boot program is carried When entering to complete, portable electronic devices record start deadline point, when the data line program is loaded into be completed, this can take The connection of the second path, the portable electronic devices and record material line time point are set up between formula electronic installation and the computer, When second path connection is set up between the portable electronic devices and the computer, the computer record connection setup time point, And according to the available machine time point and the connection setup time point being recorded in the computer, and it is recorded in the portable electricity The start deadline point and the data line time point in sub-device, calculate the portable electronic devices available machine time long Degree;The portable electronic devices available machine time length is obtained according to following steps:First calculate data line time point and be somebody's turn to do The time difference of start deadline point, then the connection setup time point is subtracted into the time difference and obtains estimating time point, finally The estimation time point is subtracted the available machine time point to produce the available machine time length of the portable electronic devices.
7. system as claimed in claim 6, it is characterised in that the available machine time point and the connection setup time point are recorded in In message database in the computer, the start deadline point and the data line time point are recorded in the portable electronic In message database in device.
8. system as claimed in claim 6, it is characterised in that the first path is connected as wireline pathway connection.
9. system as claimed in claim 6, it is characterised in that second path is connected as wired or wireless path connection.
CN201410539322.3A 2014-10-13 2014-10-13 Measure the method and data processing system of portable electronic devices available machine time length Expired - Fee Related CN104298530B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410539322.3A CN104298530B (en) 2014-10-13 2014-10-13 Measure the method and data processing system of portable electronic devices available machine time length

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410539322.3A CN104298530B (en) 2014-10-13 2014-10-13 Measure the method and data processing system of portable electronic devices available machine time length

Publications (2)

Publication Number Publication Date
CN104298530A CN104298530A (en) 2015-01-21
CN104298530B true CN104298530B (en) 2017-06-16

Family

ID=52318270

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410539322.3A Expired - Fee Related CN104298530B (en) 2014-10-13 2014-10-13 Measure the method and data processing system of portable electronic devices available machine time length

Country Status (1)

Country Link
CN (1) CN104298530B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107168839B (en) * 2017-05-18 2020-10-30 浙江红绿蓝纺织印染有限公司 Method for detecting starting time length of mobile terminal
CN107179992B (en) * 2017-05-18 2021-12-14 浙江欣欣仪器股份有限公司 Method for detecting shutdown time length of mobile terminal
CN107193746B (en) * 2017-05-26 2020-07-03 长乐智高生物科技有限公司 Method for evaluating starting performance of mobile terminal
CN106941552B (en) * 2017-05-26 2020-07-03 长乐智高生物科技有限公司 Mobile terminal shutdown performance evaluation method
CN107635048A (en) * 2017-09-22 2018-01-26 苏州惠邦科信息技术有限公司 The method of testing of handset switch machine

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102111668A (en) * 2009-12-25 2011-06-29 康佳集团股份有限公司 Television and method for performing statistics on time for turning on television
CN102646066A (en) * 2012-02-22 2012-08-22 腾讯科技(深圳)有限公司 Method and device for obtaining starting-up time
CN103488557A (en) * 2013-08-28 2014-01-01 北京奇虎科技有限公司 Method and device for obtaining boot time of computer operating system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7987336B2 (en) * 2008-05-14 2011-07-26 International Business Machines Corporation Reducing power-on time by simulating operating system memory hot add

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102111668A (en) * 2009-12-25 2011-06-29 康佳集团股份有限公司 Television and method for performing statistics on time for turning on television
CN102646066A (en) * 2012-02-22 2012-08-22 腾讯科技(深圳)有限公司 Method and device for obtaining starting-up time
CN103488557A (en) * 2013-08-28 2014-01-01 北京奇虎科技有限公司 Method and device for obtaining boot time of computer operating system

Also Published As

Publication number Publication date
CN104298530A (en) 2015-01-21

Similar Documents

Publication Publication Date Title
CN104298530B (en) Measure the method and data processing system of portable electronic devices available machine time length
CN104569688B (en) A kind of distribution terminal automatization test system and method
CN104793581A (en) Process controller and updating method thereof
WO2009048275A2 (en) Apparatus of analizing the construction productivity using rfid based on the wireless communication and method thereof
CN103713271A (en) BMS current detection unit automatic calibration device and calibration method
US20160252949A1 (en) Power Consumption Measurement Arrangement and Method
WO2013036058A3 (en) Method and apparatus for channel estimation in a distributed multi-node system
DE60237593D1 (en) Parameter estimation for power supply network
CN104502854A (en) Remaining electricity quantity display method and remaining electricity quantity display device for terminal
CN104423317A (en) Data acquisition device for acquiring cause of stoppage of drive axis and information relating thereto
DE60209513D1 (en) METHOD FOR THE AUTOMATIC CORRECTION OF SYSTEMATIC ERRORS OF MEASURING AND MACHINING MACHINES AND DEVICE THEREFOR
CN107479367A (en) Control method, system and the vehicle of motor
CN110076626B (en) Machining time prediction device
US11251990B2 (en) Control device, control system, control method, and non-transitory storage medium storing control program
CN104717093B (en) Method for managing an electrical device and a system for managing such a device
CN114367978B (en) Movement control method and device for chip transmission mechanical arm
CN111817820B (en) Equipment coding method and device and coding system based on two buses
US20150149107A1 (en) Loopback test of the proper operation of technical devices in an industrial process automation system
CN109714703B (en) Method, device and system for measuring positioning accuracy of vehicle-mounted terminal based on cloud platform
JP2012019639A (en) Information recording apparatus and program
CN109459724B (en) One-key real-time calibration system and method based on-site ranging information
TWI546664B (en) Data processing system
MX2020013137A (en) Tire building method and tire building system, in particular for strip-winding.
CN109902023A (en) A kind of test code handoffs control method and device
CN103377315B (en) The probabilistic method and apparatus of aerial survety of flexible evaluation of free space

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170616

Termination date: 20201013