CN104296609A - Different-hardness-degree rock stratum blasting control method used in deep-hole bench blasting - Google Patents

Different-hardness-degree rock stratum blasting control method used in deep-hole bench blasting Download PDF

Info

Publication number
CN104296609A
CN104296609A CN201410414296.1A CN201410414296A CN104296609A CN 104296609 A CN104296609 A CN 104296609A CN 201410414296 A CN201410414296 A CN 201410414296A CN 104296609 A CN104296609 A CN 104296609A
Authority
CN
China
Prior art keywords
rock stratum
blasting
hole
rock
hardness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410414296.1A
Other languages
Chinese (zh)
Other versions
CN104296609B (en
Inventor
冷振东
卢文波
刘博文
陈明
严鹏
谢理想
李继超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University WHU
Original Assignee
Wuhan University WHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University WHU filed Critical Wuhan University WHU
Priority to CN201410414296.1A priority Critical patent/CN104296609B/en
Publication of CN104296609A publication Critical patent/CN104296609A/en
Application granted granted Critical
Publication of CN104296609B publication Critical patent/CN104296609B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention discloses a different-hardness-degree rock stratum blasting control method used in deep-hole bench blasting. The positions and number of detonation points are finely designed, two-point or multiple-point simultaneous detonation is adopted in the drilling blasting design, and detonation wave frontal collision is utilized to improve pressure of wave front, so that energy is centralized to break locally-hard and difficultly-blasted rock stratums, the different-hardness-degree rock stratum blasting problem in the deep-hole bench blasting is solved, the boulder yield in the hard rock stratum blasting is reduced, the safety of a detonating network is improved, and the different-hardness-degree rock stratum blasting control method is efficient, convenient and fast and facilitates quick construction.

Description

Containing the controlled blasting method of different hardness rock stratum in Deep hole bench balsting
Technical field
The invention belongs to controlled blasting method and technology field, the controlled blasting method of different hardness rock stratum is contained specifically in a kind of Deep hole bench balsting, be applicable to have along big gun hole axial direction the Deep hole bench balsting carried out in the rock stratum of some different hardness, concentrate hard tough shooting rock stratum, local in the broken big gun hole of energy.
Background technology
In recent years, along with updating of gun drilling equipment and loading conveyor tool, Deep hole bench balsting unit boring amount is little and explosive specific charge is low, production efficiency is high and be convenient to adopt the superiority of the aspects such as comprehensive mechanization construction to be day by day subject to people's attention, and Deep hole bench balsting is used in slope excavating, mining and foundation excavation more and more widely.When column charge, the position of fire point and quantity determine detonation direction of wave travel and demolition effect to a certain extent.But in Long-hole Bench Blasting, big gun aperture often can pass the hardness various rocks different with structure, and tomography, crushed zone, soft layer etc.Such as, in iron ore exploitation, iron ore rock stratum concentrates on certain one deck in the middle part of big gun hole usually, and the intensity of this one deck ore deposit rock is very high, this layer be the relatively weak common rocks of intensity up and down.If adopt traditional single fire point to detonate (direct initiation, indirect initiation, centre detonate), the energy of explosive detonation ripple often concentrates at the bottom of hole, near aperture or fire point, consequently competent bed is not by abundant fragmentation, cause boulder yield too high, the rock stratum of contrary weakness, but by overcrushing, wastes a large amount of explosive energy.Visible, traditional single-point detonation mode is often difficult to reach desirable crushing effect, the propagation of explosion process of powder column even may be made to be adversely affected and cause putting out quick-fried.
Summary of the invention
The present invention is directed to the defect of prior art, propose a kind of controlled blasting method containing different hardness rock stratum in Deep hole bench balsting, utilize detonation wave normal impact to improve the pressure of wave surface, powder column 2 or Multi-point simultaneous initiation is adopted in drillhole blasting design, synchronous detonation makes the shock wave of booster gains to converging near the point of impingement, superposing, thus greatly increase local assault wave pressure, make detonation wave collide the rock breaking capacity improving local artificially.
According to detonation waves, after large detonation wave generation normal impact in opposite directions such as two grades, reflected-shock wave pressure is
P 2 = 5 k + 1 + 17 k 2 + 2 k + 1 4 k P CJ
The density of reflected shock wave is
ρ 2 = 4 k 2 + k + 1 + 17 k 2 + 2 k + 1 4 k 2 + 2 k - 2 ρ CJ
With in above formula, P cJ, ρ cJbe respectively the detonation pressure under C-J state, density, k is the adiabatic exponent of detonation product.
Under normal circumstances, the adiabatic exponent k of detonation product gets 3, so has
Reflected-shock wave pressure is P 2=2.39P cJ
The density of reflected shock wave is ρ 2=1.32 ρ cJ
Above theory analysis shows, after the detonation wave generation normal impact of intensity, make high pressure detonation product be subject to further compression, its pressure is increased to 2.39 times of C-J detonation pressure, and detonation product density is increased to original 1.32 times.Visible, detonation wave normal impact can be made full use of to improve the pressure of wave surface, in drillhole blasting design, adopt powder column 2 or Multi-point simultaneous initiation, utilize detonation wave to collide the rock breaking capacity improving local artificially.
Containing the controlled blasting method of different hardness rock stratum in Deep hole bench balsting of the present invention, comprise the steps:
1, blast hole is drilled with, to rock dust, landwaste with enter drilling speed degree and observe and record;
2, by early stage to rock dust, landwaste and the record entering drilling speed degree, according to these indexs differentiate hole pass through rock stratum, ore body and correlation thereof and thickness, draw the rock stratum distribution map vertically of big gun hole through region;
3, according to step 2 draw rock stratum distribution map and to make rational planning for the number of fire point and position, when there is n layer competent bed middle part vertically, big gun hole (n≤3, n is integer), arrange n+1 fire point in this competent bed bilateral symmetry; Because the blast hole depth of usual Deep hole bench balsting is generally at 8-20 rice, seldom have more than 20 meters, so big gun hole generally can not through the competent bed of more than 3; In addition, for the hard formation (thickness is less than 15cm) of very thin thickness, negligible, this layer is put under soft rock or secondary hard formation processes;
4, powder charge, arranges detonating capsule, and blocking, controls each fire point and detonate simultaneously.
The advantage of the controlled blasting method containing different hardness rock stratum in Deep hole bench balsting of the present invention is:
1) technological means of traditional acquisition formation geology information beats geology to bore, but geology rig is bulky, and operation is wasted time and energy, and boring coverage rate is little, and cost is high.The application bores without the need to additionally adopting geology, directly utilize some information of hidden hole drilling poration process (rock dust, landwaste and enter drilling speed degree), just can judge the distribution of rock stratum, and due to the number of the boring hole in burst region many, the accuracy of the rock stratum distribution map of a large amount of big gun holes data plotting apparently higher than the geotechnical boring of only a few, such accelerating construction progress;
2) position by Fine design fire point and quantity is only needed, just adjustable explosive is along the Energy distribution of big gun hole axis, concentrates hard tough shooting rock stratum, local in the broken big gun hole of energy, efficient quick, reduce the boulder yield of competent bed, decrease the cost of second-time breakage and consuming time;
3) compared with the detonation mode of traditional single fire point, 2 can improve the security of initiation net with the mode of Multi-point simultaneous initiation, can effectively avoid powder column be adversely affected in propagation of explosion process and cause putting out quick-fried phenomenon.
Accompanying drawing explanation
Fig. 1 is that middle part vertically, big gun hole has fire point during one deck competent bed to arrange schematic diagram.
Fig. 2 is that middle part vertically, big gun hole has fire point during two-layer competent bed to arrange schematic diagram.
In figure, 1 is soft rock or secondary hard formation; 2 is competent bed; 3 is detonator; 4 is blocking section; 5 is detonating capsule; 6 is explosive.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is further described.
Embodiment one
As shown in Figure 1, there is one deck competent bed middle part vertically, big gun hole, arranges the situation of two fire points.
Certain rock carries out Exploitation in grade burden, and building stones field material source lithology is basalt, and part is granite, and basalt rock is weak weathering, and in the middle part of rock mass, the degree of depth is that 4 ~ 6m place has a layer thickness to be about the hard sial of 2.0m, and this rock stratum rock matter densification is hard.Blasthole diameter 100mm, blast hole depth 10m, stemming length 1.0m, pitch of holes is 2.5m, array pitch 2.2m, adopts mixed explosive coupling charging.
Specifically comprise the steps:
1, cloth hole, boring, to rock dust, landwaste with enter drilling speed degree and observe and record.
In the stock ground rock mass needing Blasting Excavation, labor cleaning is carried out to big gun bore region, and blows face with high-pressure air hose, in quick-fried district, carry out cloth hole, big gun hole in strict accordance with explosion design.Bore blast hole to be of a size of: blasthole diameter 100mm, blast hole depth 10m, pitch of holes is 2.5m, array pitch 2.2m.In hidden hole drilling boring procedure, the rock dust produced when drilling depth is entered to difference, landwaste and enter drilling speed degree and observe, and carry out record in time.
2, the rock stratum distribution map of big gun hole through region is drawn.
By early stage to rock dust, landwaste and the record entering drilling speed degree, draw the rock stratum distribution map of big gun hole through region.When holing into brill 0 ~ 4m, it is comparatively easy to enter to bore, and illustrates that this layer of rock strength is general; When being bored into 4 ~ 6m, find obviously to slow into brill, landwaste color has significant change.Enter to get into 6m to find to be easier to into brill ratio later, similar when landwaste color and 0 ~ 4m degree of depth.Above record declaration, has a competent bed at 4 ~ 6m place, and 0 ~ 4m and 6 ~ 10m place rock relative intensity lower.Then the rock stratum distribution map vertically of big gun hole through region is drawn according to these indexs.
3, according to step 2 draw rock stratum distribution map and to make rational planning for the number of fire point and position.
Can arrange 2 fire points in this competent bed bilateral symmetry, the position of two fire points can be arranged in distance aperture 2.0m and 8.0m place.
4, powder charge, arranges detonating capsule, and blocking, detonates.
In big gun hole, inject explosive, simultaneously arrange detonating capsule according to the planning fire point position of step 3 and quantity, detonating capsule can adopt electric detonator or high accuracy non-electrical plastics to lead quick-fried detonator, to guarantee that each fire point detonates simultaneously.After powder charge completes, block aperture with stemming, check blasting circuit, detonate after confirming safety.
Embodiment two
As shown in Figure 2, there is two-layer competent bed middle part vertically, big gun hole, arranges the situation of three fire points.
The mine tailing of certain copper mine carries out blasting excavation, and mine tailing mining site has two-layer copper mine vein, and be 6.0 ~ 8.5m place and 12.5 ~ 15.5m place in the degree of depth respectively, copper mine intensity is high, and other rocks are the more weak diabase of intensity.Blasthole diameter 120mm, blast hole depth 20.0m, stemming length 2.0m, pitch of holes is 4.0m,
Array pitch 3.2m, adopts mixed explosive coupling charging.
Specifically comprise the steps:
1, cloth hole, boring, to rock dust, landwaste with enter drilling speed degree and observe and record.
Carry out labor cleaning to by burst region, and blow face with high-pressure air hose, in quick-fried district, carry out cloth hole, big gun hole in strict accordance with explosion design.Bore blast hole to be of a size of: blasthole diameter 120mm, blast hole depth 20.0m, stemming length 2.0m, pitch of holes is 4.0m, array pitch 3.2m.In hidden hole drilling boring procedure, the rock dust produced when drilling depth is entered to difference, landwaste and enter drilling speed degree and observe, and carry out record in time.
2, the rock stratum distribution map of big gun hole through region is drawn.
By early stage to rock dust, landwaste and the record entering drilling speed degree, draw the rock stratum distribution map of big gun hole through region.When holing into brill 0 ~ 6.0m, it is comparatively easy to enter to bore; When being bored into 6.0 ~ 8.5m, find obviously to slow into brill, landwaste color has obvious metallic luster; Enter to bore than being easier between 8.5 ~ 12.5m, similar when landwaste color and 0 ~ 6.0m degree of depth; Enter to bore significant difficulties between 12.5 ~ 15.5m, landwaste has metallic luster; Enter to bore than being easier between 15.5 ~ 20.0m.Above record declaration, has two-layer hard copper mine vein between about 6.0 ~ 8.5m and 12.5 ~ 15.5m.Then the rock stratum distribution map vertically of big gun hole through region is drawn according to these indexs.
3, according to step 2 draw rock stratum distribution map and to make rational planning for the number of fire point and position.
There are 2 layers of competent bed middle part vertically, big gun hole, and need layout 3 fire points, each competent bed is positioned at the centre position of adjacent two fire points as far as possible, and the position of 3 fire points can be arranged in distance 4.0m, 10.5m and 17.5m place, aperture.
4, powder charge, arranges detonating capsule, and blocking, detonates.
In big gun hole, inject explosive, simultaneously arrange detonating capsule according to the planning fire point position of step 3 and quantity, detonating capsule can adopt electric detonator or high accuracy non-electrical plastics to lead quick-fried detonator, to guarantee that each fire point detonates simultaneously.After powder charge completes, block aperture with stemming, check blasting circuit, detonate after confirming safety.

Claims (1)

1. contain the controlled blasting method of different hardness rock stratum in Deep hole bench balsting, it is characterized in that comprising the steps:
(1) be drilled with blast hole, to rock dust, landwaste with enter drilling speed degree and observe and record;
By early stage to rock dust, landwaste and the record entering drilling speed degree, according to these indexs differentiate hole pass through rock stratum, ore body and correlation thereof and thickness, draw the rock stratum distribution map vertically of big gun hole through region;
According to step (2) drawn rock stratum distribution map to make rational planning for the number of fire point and position, when there is n layer competent bed middle part vertically, big gun hole (n≤3, n is integer), arrange n+1 fire point in this competent bed bilateral symmetry;
(4) powder charge, arranges detonating capsule, and blocking, controls each fire point and detonate simultaneously.
CN201410414296.1A 2014-08-21 2014-08-21 Containing the controlled blasting method of different hardness rock stratum in Deep hole bench balsting Active CN104296609B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410414296.1A CN104296609B (en) 2014-08-21 2014-08-21 Containing the controlled blasting method of different hardness rock stratum in Deep hole bench balsting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410414296.1A CN104296609B (en) 2014-08-21 2014-08-21 Containing the controlled blasting method of different hardness rock stratum in Deep hole bench balsting

Publications (2)

Publication Number Publication Date
CN104296609A true CN104296609A (en) 2015-01-21
CN104296609B CN104296609B (en) 2016-04-27

Family

ID=52316445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410414296.1A Active CN104296609B (en) 2014-08-21 2014-08-21 Containing the controlled blasting method of different hardness rock stratum in Deep hole bench balsting

Country Status (1)

Country Link
CN (1) CN104296609B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104596870A (en) * 2015-02-12 2015-05-06 西安近代化学研究所 Device and method for measuring pressure of shock waves in concrete medium
CN105387775A (en) * 2015-11-20 2016-03-09 中国矿业大学(北京) Method and device for treating crossing fault of fully mechanized mining work face
CN106288994A (en) * 2016-08-18 2017-01-04 福建省新华都工程有限责任公司 A kind of differential charge constitution controlled blasting reduces the method for loss and dilution
CN109556470A (en) * 2018-12-24 2019-04-02 中国矿业大学 Coal mine thick and hard roof based on detonation wave collision Mohaupt effect is layered fracturing method
CN109737846A (en) * 2019-02-28 2019-05-10 武汉大学 A kind of anti-blasting method of miss-firing of low angle stratified rockmass
CN112361910A (en) * 2020-10-27 2021-02-12 新疆雪峰***工程有限公司 Mining method for accurate delay in-situ blasting and crushing of layered rock mass

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06174400A (en) * 1992-12-02 1994-06-24 Kazuhiko Atsuta Bench blasting method
CN1419102A (en) * 2002-10-10 2003-05-21 游宝健 Blasting hole construction method for ladder section deep hole blasting
RU2285897C1 (en) * 2005-04-28 2006-10-20 Общество с ограниченной ответственностью Научно-техническая фирма "Взрывтехнология" Explosive charge initiation system
CN102322294A (en) * 2011-05-31 2012-01-18 中铁二十局集团第一工程有限公司 Comprehensive geological prediction method for karst tunnel construction
CN103591860A (en) * 2013-11-29 2014-02-19 武汉大学 Water coupling gunpowder filling and ignition method for improving small-particle-size material content of rock-fill dam transition material

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06174400A (en) * 1992-12-02 1994-06-24 Kazuhiko Atsuta Bench blasting method
CN1419102A (en) * 2002-10-10 2003-05-21 游宝健 Blasting hole construction method for ladder section deep hole blasting
RU2285897C1 (en) * 2005-04-28 2006-10-20 Общество с ограниченной ответственностью Научно-техническая фирма "Взрывтехнология" Explosive charge initiation system
CN102322294A (en) * 2011-05-31 2012-01-18 中铁二十局集团第一工程有限公司 Comprehensive geological prediction method for karst tunnel construction
CN103591860A (en) * 2013-11-29 2014-02-19 武汉大学 Water coupling gunpowder filling and ignition method for improving small-particle-size material content of rock-fill dam transition material

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104596870A (en) * 2015-02-12 2015-05-06 西安近代化学研究所 Device and method for measuring pressure of shock waves in concrete medium
CN105387775A (en) * 2015-11-20 2016-03-09 中国矿业大学(北京) Method and device for treating crossing fault of fully mechanized mining work face
CN106288994A (en) * 2016-08-18 2017-01-04 福建省新华都工程有限责任公司 A kind of differential charge constitution controlled blasting reduces the method for loss and dilution
CN109556470A (en) * 2018-12-24 2019-04-02 中国矿业大学 Coal mine thick and hard roof based on detonation wave collision Mohaupt effect is layered fracturing method
CN109737846A (en) * 2019-02-28 2019-05-10 武汉大学 A kind of anti-blasting method of miss-firing of low angle stratified rockmass
CN109737846B (en) * 2019-02-28 2021-04-16 武汉大学 Anti-explosion blasting method for gentle dip angle stratified rock mass
CN112361910A (en) * 2020-10-27 2021-02-12 新疆雪峰***工程有限公司 Mining method for accurate delay in-situ blasting and crushing of layered rock mass

Also Published As

Publication number Publication date
CN104296609B (en) 2016-04-27

Similar Documents

Publication Publication Date Title
CN104296609B (en) Containing the controlled blasting method of different hardness rock stratum in Deep hole bench balsting
CN108643910A (en) A method of controlling caving for coal mine stope tight roof Advance presplitting
CN101266123B (en) Crushing station pit digging method
CN109209472A (en) The coal seam pressure relief anti-burst method that a kind of punching, explosion, water filling intercouple
CN104913696A (en) Side slope excavation smooth-surface blasting-method construction method
CN105674816A (en) Medium-length hole blasting one-time shaft-forming method used for non-coal mine mountain
CN205537381U (en) Deep hole blasting simultaneous shaft -sinking's big gun hole arrangement structure in non - colliery mountain
CN103306679A (en) '|'-shaped free surface holing one-step well completion technology
CN101338999A (en) Method for blasting seepage enhancement for low infiltration sandrock -type uranium deposit
CN107328327A (en) The soft or hard blast hole loading structure and its method for being mingled with beded rock mass Long-hole Bench Blasting
CN103206903A (en) Hard roof directional pressure-bearing blasting control method
CN102817633B (en) The device drawing out methane and the pre-splitting method of the controlled blasting of deep hole crack
CN102967191A (en) Blasting method for treatment of gob
CN110173238A (en) The anti-reflection extraction of high seam three-dimensional roadway layout networking explosion thick gas method entirely
CN105021096A (en) Five-segment-type millisecond electric detonator secondary blasting construction method applied to blasting of high-gas large-section tunnel
CN106643355B (en) A kind of overhead caving method of the huge thick tight roof of deep coalmine
CN111238329A (en) Method for performing geometric forming blasting on semi-coal rock roadway by adopting instantaneous bursting device
CN209230424U (en) A kind of compound burn cut
CN102620614B (en) Cave depot is slagged tap the construction method of funnel
CN109737846A (en) A kind of anti-blasting method of miss-firing of low angle stratified rockmass
CN107036495B (en) Hyperboloid of one sheet reaming chock blasting method from the bottom of one's heart
CN103233739A (en) Mining method for thick and large ore pillar under filling body package
CN109025999B (en) One-field three-purpose top coal weakening method
CN109188507B (en) Based on CO2Mine earthquake advanced detection method of cannon
CN114993125A (en) Deep high-stress rock roadway medium-deep hole efficient cut blasting method based on ground stress induction effect

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant