CN104234385A - Mounting and construction method for terrace large-size steel plate embedded part - Google Patents

Mounting and construction method for terrace large-size steel plate embedded part Download PDF

Info

Publication number
CN104234385A
CN104234385A CN201410417780.XA CN201410417780A CN104234385A CN 104234385 A CN104234385 A CN 104234385A CN 201410417780 A CN201410417780 A CN 201410417780A CN 104234385 A CN104234385 A CN 104234385A
Authority
CN
China
Prior art keywords
steel plate
terrace
embedded steel
steel slab
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410417780.XA
Other languages
Chinese (zh)
Other versions
CN104234385B (en
Inventor
江国栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201410417780.XA priority Critical patent/CN104234385B/en
Publication of CN104234385A publication Critical patent/CN104234385A/en
Application granted granted Critical
Publication of CN104234385B publication Critical patent/CN104234385B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention discloses a mounting and construction method for a terrace large-size steel plate embedded part. The method comprises the following steps: manufacturing and mounting a reinforcing bar and welding an independent fixing bracket; 2) manufacturing an embedded steel plate; 3) pouring terrace concrete; 4) mounting the embedded steel plate; 5) filling a grouting funnel with high-strength contract-free grouting material. The method has the advantages that the concrete pouring is convenient, the vibration is compact and the construction efficiency is increased; if bias is detected after the embedded steel plate is mounted, an adjusting bolt can be timely used for finely leveling and the construction smoothness is ensured; the high-strength grouting material is injected through the grouting hole and the self-flowing and self-sealing properties of the grouting material are utilized to compensate the concrete bleeding shrinking gap, so that the embedded part is prevented from bulging in large area; an ash-draining vibrating hole is not formed and welded in the embedded steel plate, so that the steel plate welding is prevented from being heated and deformed; the embedded steel plate is wholly mounted, so that the bearing capability is increased, the quality is ensured and the cost is reduced.

Description

Construction method of installation after a kind of terrace heavy steel plate built-in fitting
Technical field
The present invention relates to a kind of construction techniques, in particular, relate to construction method of installation after a kind of terrace heavy steel plate built-in fitting.
Background technology
The construction method that in building engineering construction, pre-embedded steel slab is conventional is first welding embedded element fixed mount, and relocate and install fixing embedded part, last concreting is shaping.Industrial Plant Ground large area pre-embedded steel slab embedded part adopts this kind of method construction, there will be blanking in concreting process and has some setbacks, reduce efficiency of construction; Vibrate in construction insufficient, concrete water bleeding shrinks all can cause pre-embedded steel slab large area hollowing; Lower grey hole is offered, repair welding time pre-embedded steel slab can be caused to be out of shape, readjust and need waste time and energy; Embedded part steel plate off normal can be caused in casting process to adjust difficulty, and revising or doing over again needs at substantial manpower and materials, and quality not easily ensures.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, and concreting convenience, vibration compacting, raising efficiency of construction are provided, construction method of installation after a kind of terrace heavy steel plate built-in fitting of avoiding embedded part large area hollowing to occur.
Construction method of installation after a kind of terrace heavy steel plate built-in fitting of the present invention, comprises the steps:
A, according to drawing requirement installing bottom layer reinforced mesh, adopt angle steel vertically anchor into below terrace, anchor into the degree of depth and be not less than 500mm, be welded and fixed support;
B, according to the specification of pre-embedded steel slab and steel plate raw material measure, four corners of pre-embedded steel slab offer locating hole, and an injected hole is respectively offered on the center line both sides of pre-embedded steel slab length direction, and described pre-embedded steel slab is fixedly connected with anchoring claw;
C, according to pre-embedded steel slab position of center line measurement and positioning, the whole bolt of smart Heibei provincial opera and adjusting nut are installed in the position that independent fixed support is corresponding with locating hole, adjustment pre-embedded steel slab essence is flat, and after passed examination, concreting is to higher than adjusting nut upper end 2-4mm and vibration compacting;
Complete the installation of pre-embedded steel slab before D, concrete initial set, and adjust absolute altitude, planeness, after passed examination, whole for smart Heibei provincial opera bolt and locating hole spot welding are fixed, then pre-embedded steel slab periphery concrete floor is filled and compacting receipts light and maintenance;
E, at injected hole place, slip casting funnel fill grouting material is installed, by with grouting material gravity flow, utilize grouting material to fill compensating concrete bleeding from close performance to shrink gap, avoid embedded part large area hollowing to occur;
Described fixed support is independent rack.Described pre-embedded steel slab installs 4 hoisting rings.In described injected hole, perfusion is the shrinkage-free grouting material of high strength.Described pre-embedded steel slab blanking adopts mechanical shearing or plasma cut, avoids hot-working to produce steel plate deformed.The center line of described two injected holes distance pre-embedded steel slab length direction is all 500mm.Described injected hole 4 diameter is 30 mm.Described locating hole diameter is 20mm.
The invention has the beneficial effects as follows: (1) concreting is convenient, and vibration compacting, can improve efficiency of construction; (2) pre-embedded steel slab finds deviation after installing, can be flat by adjustment bolt essence in time, ensure that construction planeness; (3) pour into high strength grout by injected hole, by flowing automatically with grouting material, utilizing, grouting material shrinks gap from close performance compensation concrete water bleeding, and embedded part large area hollowing can be avoided to occur; (4) pre-embedded steel slab does not need to offer, ash vibrates hole under repair welding, avoids Plate Welding temperature distortion; (5) pre-embedded steel slab integral installation improves bearing capacity, ensures the quality of products, cost-saving.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
In figure: the whole bolt 7 of pre-embedded steel slab 1, anchoring claw 2, locating hole 3, injected hole 4, slip casting funnel 5, hoisting ring 6, smart Heibei provincial opera, fixed support 8.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
Construction method of installation after a kind of terrace heavy steel plate built-in fitting of the present invention, comprises the steps:
A, according to drawing requirement installing bottom layer reinforced mesh, adopt angle steel vertically anchor into below terrace, anchor into the degree of depth and be not less than 500mm, be welded and fixed support 8, fixed support 8 is independent rack;
B, according to the specification of pre-embedded steel slab 1 and steel plate raw material measure, pre-embedded steel slab 1 blanking adopts mechanical shearing or plasma cut, hot-working is avoided to produce steel plate deformed, four corners of pre-embedded steel slab 1 offer the locating hole 3 that diameter is 20mm, the injected hole 4 of a diameter 30mm is respectively offered on the center line both sides of pre-embedded steel slab 1 length direction, injected hole 4 is 500mm apart from the center line of pre-embedded steel slab 1 length direction, described pre-embedded steel slab 1 is fixedly connected with anchoring claw 2, after pre-embedded steel slab 1 completes, install 4 hoisting rings 6;
C, according to pre-embedded steel slab 1 position of center line measurement and positioning, the whole bolt 7 of smart Heibei provincial opera and adjusting nut are installed in the position that independent fixed support 8 is corresponding with locating hole 3, adjustment pre-embedded steel slab 1 essence is flat, and after passed examination, concreting 9 is to higher than adjusting nut upper end about 3mm and vibration compacting;
Complete the installation of pre-embedded steel slab 1 before D, concrete 9 initial set, and adjust absolute altitude, planeness, after passed examination, whole for smart Heibei provincial opera bolt 7 is fixed with locating hole 3 spot welding, then pre-embedded steel slab 1 periphery concrete 9 terrace is filled and compacting receipts light and maintenance;
E, at injected hole 4 place, slip casting funnel 5 be installed and fill the shrinkage-free grouting material of high strength, by with grouting material gravity flow, utilize grouting material to fill compensating concrete bleeding from close performance to shrink gap, avoid embedded part large area hollowing to occur.
Described steps A is fixed independent rack and is adopted angle steel welding, and frame bottom anchors in the following soil layer of terrace and forms independent system, the whole bolt 7 of the cradle top adjustable smart Heibei provincial opera of welding, and puts down whole for smart Heibei provincial opera bolt 7 essence to pre-embedded steel slab 1 bottom position.
Described step B pre-embedded steel slab can carry out blanking according to embedded part size or convenient size of installing, and stagger reinforced mesh position welding embedded element anchoring claw 2, offers locating hole 3 and injected hole 4.
Described step C, D build terrace concrete, complete pre-embedded steel slab and install after abundant vibration compacting before concrete initial set, and carry out inspections adjustment to the planeness of pre-embedded steel slab 1, horizontal level, adjustment bolt and locating hole spot welding are fixed after qualified.
Described step e installs slip casting funnel 5 on pre-embedded steel slab 1 injected hole 4, and fills high strength contraction-free grouting concrete.

Claims (8)

1. a construction method of installation after terrace heavy steel plate built-in fitting, is characterized in that, comprises following construction sequence:
A, according to drawing requirement installing bottom layer reinforced mesh, adopt angle steel vertically anchor into below terrace, anchor into the degree of depth and be not less than 500mm, be welded and fixed support (8);
B, according to the specification of pre-embedded steel slab (1) and steel plate raw material measure, four corners of pre-embedded steel slab (1) offer locating hole (3), an injected hole (4) is respectively offered on the center line both sides of pre-embedded steel slab (1) length direction, and described pre-embedded steel slab (1) is fixedly connected with anchoring claw (2);
C, according to pre-embedded steel slab (1) position of center line measurement and positioning, in the position that independent fixed support (8) is corresponding with locating hole (3), the whole bolt of smart Heibei provincial opera (7) and adjusting nut are installed, adjustment pre-embedded steel slab (1) essence is flat, after passed examination, concreting (9) is to higher than adjusting nut upper end 2-4mm and vibration compacting;
The installation of pre-embedded steel slab (1) is completed before D, concrete (9) initial set, and adjust absolute altitude, planeness, after passed examination, whole for smart Heibei provincial opera bolt (7) and locating hole (3) spot welding are fixed, then pre-embedded steel slab (1) periphery concrete (9) terrace is filled and compacting receipts light and maintenance;
E, at injected hole (4) place, slip casting funnel (5) fill grouting material is installed, by with grouting material gravity flow, utilize grouting material to fill compensating concrete bleeding from close performance to shrink gap, avoid embedded part large area hollowing to occur.
2. construction method of installation after a kind of terrace heavy steel plate built-in fitting according to claim 1, it is characterized in that, described fixed support (8) is independent rack.
3. construction method of installation after a kind of terrace heavy steel plate built-in fitting according to claim 1, is characterized in that, upper installation 4 hoisting rings (6) of described pre-embedded steel slab (1).
4. construction method of installation after a kind of terrace heavy steel plate built-in fitting according to claim 1, is characterized in that, in described injected hole (3), perfusion is the shrinkage-free grouting material of high strength.
5. construction method of installation after a kind of terrace heavy steel plate built-in fitting according to claim 1, is characterized in that, described pre-embedded steel slab (1) blanking adopts mechanical shearing or plasma cut, avoids hot-working to produce steel plate deformed.
6. construction method of installation after a kind of terrace heavy steel plate built-in fitting according to claim 1, is characterized in that, the center line of described two injected holes (4) distance pre-embedded steel slab (1) length direction is all 500mm.
7. construction method of installation after a kind of terrace heavy steel plate built-in fitting according to claim 1, it is characterized in that, described injected hole (4) diameter is 30mm.
8. construction method of installation after a kind of terrace heavy steel plate built-in fitting according to claim 1, it is characterized in that, described locating hole (3) diameter is 20mm.
CN201410417780.XA 2014-08-25 2014-08-25 Construction method of installation after a kind of terrace heavy steel plate built-in fitting Active CN104234385B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410417780.XA CN104234385B (en) 2014-08-25 2014-08-25 Construction method of installation after a kind of terrace heavy steel plate built-in fitting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410417780.XA CN104234385B (en) 2014-08-25 2014-08-25 Construction method of installation after a kind of terrace heavy steel plate built-in fitting

Publications (2)

Publication Number Publication Date
CN104234385A true CN104234385A (en) 2014-12-24
CN104234385B CN104234385B (en) 2016-08-10

Family

ID=52223209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410417780.XA Active CN104234385B (en) 2014-08-25 2014-08-25 Construction method of installation after a kind of terrace heavy steel plate built-in fitting

Country Status (1)

Country Link
CN (1) CN104234385B (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831731A (en) * 2015-04-15 2015-08-12 广东省建筑工程集团有限公司 Method for pouring cements at bottom layer of substrate
CN105040982A (en) * 2015-07-05 2015-11-11 宜昌三峡送变电工程有限责任公司 Reserve embedded postposition construction method of switch gear room of transformer substation
CN105040826A (en) * 2015-08-05 2015-11-11 中国电建集团贵阳勘测设计研究院有限公司 Standardized pre-buried assembly for structural concrete construction and construction method thereof
CN105908944A (en) * 2016-04-20 2016-08-31 湖北永益金属地板有限公司 Construction method of metal floor product
CN105926899A (en) * 2016-05-13 2016-09-07 陕西柴油机重工有限公司 Preparation technique for steel plate terrace of industrial workshop
CN107386455A (en) * 2017-07-19 2017-11-24 陕西建工安装集团有限公司 A kind of shock isolating pedestal and its construction method of installation
CN108005349A (en) * 2017-11-30 2018-05-08 中建六局第三建筑工程有限公司 Leveling method for super large ultra-flat terrace built-in fitting
CN108193702A (en) * 2017-12-28 2018-06-22 中国核工业二四建设有限公司 Embedded part bottom grouting material merges construction method with concrete
CN109340510A (en) * 2018-10-18 2019-02-15 杭州杭氧化医工程有限公司 Air separation cooling box basis foot anchor mounting structure and its installation method
CN109441111A (en) * 2018-12-20 2019-03-08 北京首钢建设集团有限公司 A kind of superduty embedded part mounting and fixing support method of conticaster
CN111395386A (en) * 2020-04-22 2020-07-10 五冶集团上海有限公司 Installation and construction method of grinding roller base of raw material mill
CN111980153A (en) * 2020-08-18 2020-11-24 杭州江南建筑设计院有限公司 Construction method for embedded column base in ground beam
CN112282072A (en) * 2020-10-20 2021-01-29 中国建筑第八工程局有限公司 Embedding method of group heavy-duty embedded parts
CN112282073A (en) * 2020-10-20 2021-01-29 中国建筑第八工程局有限公司 Embedded part of vertical actuator and construction method thereof
CN112663899A (en) * 2021-01-22 2021-04-16 郭智霖 Manufacturing method of self-leveling mortar terrace
CN113152693A (en) * 2021-01-26 2021-07-23 中国化学工程第三建设有限公司 Flatness-controllable long embedded assembly and method
CN113323433A (en) * 2021-05-20 2021-08-31 浙江宝盛建设集团有限公司 Construction method for reinforcing indoor hollowing terrace by adopting common scaffold and adopting reverse jacking and grouting
CN114033087A (en) * 2021-11-02 2022-02-11 郑州祥和集团有限公司 Construction method of embedded part of transformer substation

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2625956A1 (en) * 1976-06-10 1977-12-15 Fraunhofer Ges Forschung Welding tubes into tube plastes by explosion plating - using steel plug to prevent bulging of the tube near the tube plate
CN101307605A (en) * 2008-06-06 2008-11-19 中冶天工上海十三冶建设有限公司 High precision apparatus foundation mounting method
CN201560432U (en) * 2009-11-17 2010-08-25 武汉一冶钢结构有限责任公司 Elevation and levelness adjusting device of pre-embedded steel sheet
CN202194289U (en) * 2011-07-29 2012-04-18 沈阳远大铝业工程有限公司 Flat embedded part
CN102619235A (en) * 2012-04-17 2012-08-01 中国建筑第五工程局有限公司 Concrete foundation embedded bolt bracket and embedding method for concrete foundation embedded bolts
CN103790377A (en) * 2012-10-29 2014-05-14 五冶集团上海有限公司 Heavy embedded part ultrahigh mounting precision control method
CN103835308A (en) * 2012-11-23 2014-06-04 江西昌河航空工业有限公司 Method for installing embedded base plate of machine tool

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2625956A1 (en) * 1976-06-10 1977-12-15 Fraunhofer Ges Forschung Welding tubes into tube plastes by explosion plating - using steel plug to prevent bulging of the tube near the tube plate
CN101307605A (en) * 2008-06-06 2008-11-19 中冶天工上海十三冶建设有限公司 High precision apparatus foundation mounting method
CN201560432U (en) * 2009-11-17 2010-08-25 武汉一冶钢结构有限责任公司 Elevation and levelness adjusting device of pre-embedded steel sheet
CN202194289U (en) * 2011-07-29 2012-04-18 沈阳远大铝业工程有限公司 Flat embedded part
CN102619235A (en) * 2012-04-17 2012-08-01 中国建筑第五工程局有限公司 Concrete foundation embedded bolt bracket and embedding method for concrete foundation embedded bolts
CN103790377A (en) * 2012-10-29 2014-05-14 五冶集团上海有限公司 Heavy embedded part ultrahigh mounting precision control method
CN103835308A (en) * 2012-11-23 2014-06-04 江西昌河航空工业有限公司 Method for installing embedded base plate of machine tool

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831731A (en) * 2015-04-15 2015-08-12 广东省建筑工程集团有限公司 Method for pouring cements at bottom layer of substrate
CN105040982A (en) * 2015-07-05 2015-11-11 宜昌三峡送变电工程有限责任公司 Reserve embedded postposition construction method of switch gear room of transformer substation
CN105040826A (en) * 2015-08-05 2015-11-11 中国电建集团贵阳勘测设计研究院有限公司 Standardized pre-buried assembly for structural concrete construction and construction method thereof
CN105040826B (en) * 2015-08-05 2018-03-13 中国电建集团贵阳勘测设计研究院有限公司 Standardized pre-buried assembly for structural concrete construction and construction method thereof
CN105908944A (en) * 2016-04-20 2016-08-31 湖北永益金属地板有限公司 Construction method of metal floor product
CN105926899A (en) * 2016-05-13 2016-09-07 陕西柴油机重工有限公司 Preparation technique for steel plate terrace of industrial workshop
CN107386455A (en) * 2017-07-19 2017-11-24 陕西建工安装集团有限公司 A kind of shock isolating pedestal and its construction method of installation
CN108005349A (en) * 2017-11-30 2018-05-08 中建六局第三建筑工程有限公司 Leveling method for super large ultra-flat terrace built-in fitting
CN108193702B (en) * 2017-12-28 2020-07-10 中国核工业二四建设有限公司 Combined construction method of grouting material and concrete at bottom of embedded part
CN108193702A (en) * 2017-12-28 2018-06-22 中国核工业二四建设有限公司 Embedded part bottom grouting material merges construction method with concrete
CN109340510A (en) * 2018-10-18 2019-02-15 杭州杭氧化医工程有限公司 Air separation cooling box basis foot anchor mounting structure and its installation method
CN109441111A (en) * 2018-12-20 2019-03-08 北京首钢建设集团有限公司 A kind of superduty embedded part mounting and fixing support method of conticaster
CN111395386A (en) * 2020-04-22 2020-07-10 五冶集团上海有限公司 Installation and construction method of grinding roller base of raw material mill
CN111980153A (en) * 2020-08-18 2020-11-24 杭州江南建筑设计院有限公司 Construction method for embedded column base in ground beam
CN112282072A (en) * 2020-10-20 2021-01-29 中国建筑第八工程局有限公司 Embedding method of group heavy-duty embedded parts
CN112282073A (en) * 2020-10-20 2021-01-29 中国建筑第八工程局有限公司 Embedded part of vertical actuator and construction method thereof
CN112663899A (en) * 2021-01-22 2021-04-16 郭智霖 Manufacturing method of self-leveling mortar terrace
CN113152693A (en) * 2021-01-26 2021-07-23 中国化学工程第三建设有限公司 Flatness-controllable long embedded assembly and method
CN113323433A (en) * 2021-05-20 2021-08-31 浙江宝盛建设集团有限公司 Construction method for reinforcing indoor hollowing terrace by adopting common scaffold and adopting reverse jacking and grouting
CN114033087A (en) * 2021-11-02 2022-02-11 郑州祥和集团有限公司 Construction method of embedded part of transformer substation

Also Published As

Publication number Publication date
CN104234385B (en) 2016-08-10

Similar Documents

Publication Publication Date Title
CN104234385A (en) Mounting and construction method for terrace large-size steel plate embedded part
CN204040056U (en) A kind of location and installation support of pre-embedded anchoring bolts
CN102758445B (en) Foundation forming method for wind driven generator tower
CN105133655A (en) Construction method of well lid of road surface inspection well and auxiliary installation device
CN205443946U (en) Connected system of bridge prefabrication roof beam and pier
CN203403438U (en) Inspection well cover with protective construction die ring
CN210216479U (en) Positioning device for pre-embedding large foundation bolt group
CN104141318A (en) Installation and construction method of column base of large-diameter steel pipe column
CN204001428U (en) A kind of Large-diameter Steel tubing string suspension column is installed pre-buried location structure and suspension column structure thereof
CN108930224A (en) Punching stick method bent cap supports regulating system construction method
CN101538858B (en) Method and device for jointing reinforcement and vibration readjustment construction of pre-embedded bolt
CN204001429U (en) A kind of Large-diameter Steel tubing string suspension column structure and suspension column absolute altitude adjustment fixing structure thereof
CN105908752B (en) Formwork supporting and stripping system for pouring concrete on side wall and working process of formwork supporting and stripping system
CN103132538B (en) Auxiliary device for alignment and leveling of slope foundation sand mound with mat iron and mat iron placing method
CN103174165A (en) Full diameter embedded bolt positioning method
CN110578300A (en) Large-volume concrete pouring process for special-shaped bridge pier column
CN106381810A (en) Beam-and-column type bracket and method for casting-in-place cantilever perfusion beam with beam-and-column type bracket
CN102653947B (en) Underground embedded steel component limiting straightening construction method
CN103362152B (en) Method for transforming roller way foundation
CN212271401U (en) Independent suspension type anchor bolt-free circular tube steel column mounting tool
CN206052565U (en) A kind of beam-column type bracket
CN104878926A (en) Suspended template system construction method and turnover brackets
CN205476528U (en) Precast pile device of taking one's place fast
CN102182320B (en) Method for mounting steel reinforced concrete steel skeleton of large metallurgical industry factory building
CN105887922B (en) A kind of method that inwall construction is carried out using truss support device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant