CN104196015B - 一种长螺旋钻孔压灌桩空孔的施工方法 - Google Patents

一种长螺旋钻孔压灌桩空孔的施工方法 Download PDF

Info

Publication number
CN104196015B
CN104196015B CN201410502164.4A CN201410502164A CN104196015B CN 104196015 B CN104196015 B CN 104196015B CN 201410502164 A CN201410502164 A CN 201410502164A CN 104196015 B CN104196015 B CN 104196015B
Authority
CN
China
Prior art keywords
guide rod
special
stake
stake machine
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410502164.4A
Other languages
English (en)
Other versions
CN104196015A (zh
Inventor
马春根
曹开伟
熊小林
曹端全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGXI ZHONGHENG UNDERGROUND SPACE TECHNOLOGY CO., LTD.
Original Assignee
JIANGXI ZHONGHENG GEOTECHNICAL ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGXI ZHONGHENG GEOTECHNICAL ENGINEERING TECHNOLOGY Co Ltd filed Critical JIANGXI ZHONGHENG GEOTECHNICAL ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201410502164.4A priority Critical patent/CN104196015B/zh
Publication of CN104196015A publication Critical patent/CN104196015A/zh
Application granted granted Critical
Publication of CN104196015B publication Critical patent/CN104196015B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

本发明涉及一种长螺旋钻孔压灌桩空孔的施工方法,包括以下步骤:测放桩位,采用桩机二的专用振动器夹住套管,将其振入至空孔底部50公分处后移开;桩机一就位,钻至预定桩孔深度后进行压灌混凝土,同时缓慢提起长螺旋钻杆直至压灌到空孔底部,并将长螺旋钻杆提出桩孔,把桩机一移开;采用桩机二的专用振动器夹住专用导杆,将其振入至混凝土表面下部20公分处,开启专用导杆的清污装置,然后向上提起专用导杆到桩孔口外;采用桩机二的专用振动器和导杆将钢筋笼振插至设计深度,然后提出专用导杆;最后通过桩机二的专用振动器夹住套管,振动拔起。实现了在不开挖基坑的条件下,桩基的一体化作业,填补了长螺旋钻孔压灌桩技术的一项空白。

Description

一种长螺旋钻孔压灌桩空孔的施工方法
技术领域
本发明涉及建筑施工领域,具体涉及一种长螺旋钻孔压灌桩空孔的施工方法。
背景技术
目前,有地下室的建筑物施工中,需要先将基坑内泥土挖走后,再进行桩基施工,浪费了大量的时间,延长了施工周期,严重制约了长螺旋桩基行业的发展。
发明内容
本发明要解决的技术问题是提供一种施工速度快、工程质量高的长螺旋钻孔压灌桩空孔的施工方法。
为解决以上技术问题,本发明的技术方案是:一种长螺旋钻孔压灌桩空孔的施工方法,其特征在于包括以下步骤:
第1步:测放桩位,采用桩机二的专用振动器夹住套管,将其振入至空孔底部50公分处后移开;
第2步:桩机一就位,钻至预定桩孔深度后,通过长螺旋钻杆向桩孔底部进行压灌混凝土,同时缓慢提起长螺旋钻杆直至压灌到空孔底部,停止压灌混凝土,并将长螺旋钻杆提出桩孔,把桩机一移开;
第3步:采用桩机二的专用振动器夹住专用导杆,将其振入至混凝土表面下部20公分处,开启专用导杆的清污装置,然后向上提起专用导杆将污染的混凝土排在桩孔口外;
第4步:采用桩机二的专用振动器和专用导杆将钢筋笼振插至设计深度,然后提出专用导杆;
第5步:通过桩机二的专用振动器夹住套管,振动拔起。
所述专用振动器通过可滑动导向支架固定在机架上,所述机架上还设置有可展开的滑动导向套。
所述专用振动器包括振动装置,所述振动装置顶部设置有与桩机顶部的鹤嘴滑轮相连的起吊绳,两侧设置有加压轮,底部中间设置有导杆夹具,所述导杆夹具两侧设置有可变径套管夹具。
所述振动装置为液压或电动驱动方式。
所述导杆夹具内包括液压油缸和夹紧装置。
所述可变径套管夹具包括液压油缸和可移动夹紧装置。
所述加压轮上设置有与桩机上卷扬机相连的加压绳。
所述专用导杆由不同直径可自伸缩的导杆从内到外套接构成,其中直径最小的导杆通过转动部件一和钢丝绳与桩机顶部的鹤嘴滑轮相连,所述直径最小的导杆底部设置有月牙刀,所述月牙刀上可装有清污装置。
所述清污装置由圆环、多个锥形活瓣叶片、支架构成,所述支架设置在圆环中间,并通过螺栓固定在月牙刀两端,所述锥形活瓣叶片尾部通过转动部件二固定在圆环的外缘上,头部设置有与桩机顶部的鹤嘴滑轮相连的拉绳。
所述多个锥形活瓣叶片合拢后成圆锥体。
本发明改写了长螺旋钻孔压灌桩不能用于空孔施工的落后历史,实现了在不开挖基坑的条件下,进行桩基的钻孔、灌注、后插钢筋笼、成桩一体化作业,大幅提高了施工速度和效益,填补了长螺旋钻孔压灌桩技术的一项空白。
附图说明
图1是本发明专用振动器结构示意图;
图2是本发明专用导杆结构示意图;
图3是本发明专用导杆清污时的使用状态图;
图4是本发明专用振动器安装在桩机上用于振入套管的使用状态图;
图5是本发明专用导杆安装在专用振动器上用于***钢筋笼的使用状态图。
具体实施方式
一种长螺旋钻孔压灌桩空孔的施工方法,如附图4、5所示,其特征在于包括以下步骤:
第1步:测放桩位,采用桩机二的专用振动器夹住套管,将其振入至空孔底部50公分处后移开;
第2步:桩机一就位,钻至预定桩孔深度后,通过长螺旋钻杆向桩孔底部进行压灌混凝土,同时缓慢提起长螺旋钻杆直至压灌到空孔底部,停止压灌混凝土,并将长螺旋钻杆提出桩孔,把桩机一移开;
第3步:采用桩机二的专用振动器夹住专用导杆,将其振入至混凝土表面下部20公分处,开启专用导杆的清污装置,然后向上提起专用导杆将污染的混凝土排在桩孔口外;
第4步:采用桩机二的专用振动器和专用导杆将钢筋笼振插至设计深度,然后提出专用导杆;
第5步:通过桩机二的专用振动器夹住套管,振动拔起;
所述专用振动器12通过可滑动导向支架24固定在机架上,所述机架上还设置有可展开的滑动导向套25。
所述专用振动器12,如附图1所示,包括液压或电动驱动振动装置2,所述振动装置2顶部通过起吊绳1与桩机顶部的鹤嘴相连,振动装置两侧设置有加压轮3,其通过加压绳8与桩机上卷扬机相连,底部中间设置有导杆夹具5,所述导杆夹具5两侧设置有可变径套管夹具9。
所述导杆夹具5内包括液压油缸10和夹紧装置11。
所述可变径套管夹具9包括液压油缸6和可移动夹块7。
如图2、3所示,所述专用导杆13由不同直径可自伸缩的导杆14从内到外套接构成,其中直径最小的导杆15通过转动部件一16和钢丝绳17与桩机顶部的鹤嘴滑轮相连,所述直径最小的导杆15底部焊接有月牙刀18,所述月牙刀18上可装有清污装置19,所述清污装置19由圆环20、多个锥形活瓣叶片21、支架26构成,所述支架26设置在圆环20中间,并通过螺栓固定在月牙刀18两端,每个所述锥形活瓣叶片21尾部通过转动部件二22固定在圆环20的外缘上,头部设置有与桩机顶部的鹤嘴滑轮相连的拉绳23,当每个所述锥形活瓣叶片21的拉绳23拉紧时梯形叶片21合拢形成圆锥体清污装置19。
根据桩基的设计深入在利用专用导杆将钢筋笼振插至设计深度时,可利用固定销26延长自伸缩导杆14的长度,同时利用本申请人发明的钢筋笼快速紧固工具延长钢筋笼的长度,已达到施工要求。
以上所述,仅为本发明较佳的具体实施方式,但本发明保护范围并不局限于此,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。

Claims (10)

1.一种长螺旋钻孔压灌桩空孔的施工方法,其特征在于包括以下步骤:
第1步:测放桩位,采用桩机二的专用振动器夹住套管,将其振入至空孔底部50公分处后移开;
第2步:桩机一就位,钻至预定桩孔深度后,通过长螺旋钻杆向桩孔底部进行压灌混凝土,同时缓慢提起长螺旋钻杆直至压灌到空孔底部,停止压灌混凝土,并将长螺旋钻杆提出桩孔,把桩机一移开;
第3步:采用桩机二的专用振动器夹住专用导杆,将其振入至混凝土表面下部20公分处,开启专用导杆的清污装置,然后向上提起专用导杆将污染的混凝土排在桩孔口外;
第4步:采用桩机二的专用振动器和专用导杆将钢筋笼振插至设计深度,然后提出专用导杆;
第5步:通过桩机二的专用振动器夹住套管,振动拔起。
2.根据权利要求1所述的施工方法,其特征在于:所述专用振动器(12)通过可滑动导向支架(24)固定在机架上,所述机架上还设置有可展开的滑动导向套(25)。
3.根据权利要求2所述的施工方法,其特征在于:所述专用振动器(12)包括振动装置(2),所述振动装置(2)顶部设置有与桩机顶部的鹤嘴滑轮相连的起吊绳(1),两侧设置有加压轮(3),底部中间设置有导杆夹具(5),所述导杆夹具(5)两侧设置有可变径套管夹具(9)。
4.根据权利要求3所述的施工方法,其特征在于:所述振动装置(2)为液压或电动驱动方式。
5.根据权利要求3所述的施工方法,其特征在于:所述导杆夹具(5)内包括液压油缸(10)和夹紧装置(11)。
6.根据权利要求3所述的施工方法,其特征在于:所述可变径套管夹具(9)包括液压油缸(6)和可移动夹紧装置(7)。
7.根据权利要求3所述的施工方法,其特征在于:所述加压轮(3)上设置有与桩机上卷扬机相连的加压绳(8)。
8.根据权利要求2所述的施工方法,其特征在于:所述专用导杆(13)由不同直径可自伸缩的导杆(14)从内到外套接构成,其中直径最小的导杆(15)通过转动部件一(16)和钢丝绳(17)与桩机顶部的鹤嘴滑轮相连,所述直径最小的导杆(15)底部设置有月牙刀(18),所述月牙刀(18)上可装有清污装置(19)。
9.根据权利要求8所述的施工方法,其特征在于:所述清污装置(19)由圆环(20)、多个锥形活瓣叶片(21)、支架(26)构成,所述支架(26)设置在圆环(20)中间,并通过螺栓固定在月牙刀(18)两端,所述锥形活瓣叶片(21)尾部通过转动部件二(22)固定在圆环(20)的外缘上,头部设置有与桩机顶部的鹤嘴滑轮相连的拉绳(23)。
10.根据权利要求9所述的施工方法,其特征在于:所述多个锥形活瓣叶片(21)合拢后成圆锥体。
CN201410502164.4A 2014-09-28 2014-09-28 一种长螺旋钻孔压灌桩空孔的施工方法 Active CN104196015B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410502164.4A CN104196015B (zh) 2014-09-28 2014-09-28 一种长螺旋钻孔压灌桩空孔的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410502164.4A CN104196015B (zh) 2014-09-28 2014-09-28 一种长螺旋钻孔压灌桩空孔的施工方法

Publications (2)

Publication Number Publication Date
CN104196015A CN104196015A (zh) 2014-12-10
CN104196015B true CN104196015B (zh) 2016-01-13

Family

ID=52081368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410502164.4A Active CN104196015B (zh) 2014-09-28 2014-09-28 一种长螺旋钻孔压灌桩空孔的施工方法

Country Status (1)

Country Link
CN (1) CN104196015B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780763B (zh) * 2015-12-08 2018-08-21 河南锦源基础工程有限公司 中孔振动套管护壁长螺旋钻孔压灌桩的施工方法
CN106120782B (zh) * 2016-08-05 2018-07-31 李健 组合式螺杆桩施工方法
CN106759334A (zh) * 2017-03-17 2017-05-31 顾东东 一种多节旋转植桩机
CN108265724B (zh) * 2018-03-30 2023-09-15 中铁北京工程局集团第一工程有限公司 一种钻桩孔混凝土二次封底灌注装置
CN113062309A (zh) * 2021-03-31 2021-07-02 李明成 一种建筑钻孔灌桩机械及方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06136745A (ja) * 1992-04-28 1994-05-17 J D F:Kk 中空拡底場所打コンクリート杭の施工法
CN1227300A (zh) * 1998-02-27 1999-09-01 中国建筑科学研究院地基基础研究所 长螺旋钻孔振动灌注桩施工工艺及设备
CN101725146A (zh) * 2009-12-02 2010-06-09 江守慈 管内螺旋引孔与静压沉桩交替分段渐进的静压沉桩施工工艺

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080131211A1 (en) * 2004-07-13 2008-06-05 Nesmith Willie M Installation effort deep foudnation method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06136745A (ja) * 1992-04-28 1994-05-17 J D F:Kk 中空拡底場所打コンクリート杭の施工法
CN1227300A (zh) * 1998-02-27 1999-09-01 中国建筑科学研究院地基基础研究所 长螺旋钻孔振动灌注桩施工工艺及设备
CN101725146A (zh) * 2009-12-02 2010-06-09 江守慈 管内螺旋引孔与静压沉桩交替分段渐进的静压沉桩施工工艺

Also Published As

Publication number Publication date
CN104196015A (zh) 2014-12-10

Similar Documents

Publication Publication Date Title
CN104196015B (zh) 一种长螺旋钻孔压灌桩空孔的施工方法
CN105569560B (zh) 全套管式长螺旋钻孔桩机及利用该桩机施工的方法
CN102587380A (zh) 一种钻孔桩桩头整体破除施工方法
CN103835287B (zh) 一种挤密变径桩的施工方法
CN104563118B (zh) 全套管振动取土预制灌注组合桩施工方法
CN109083591B (zh) 一种钻孔灌注桩桩身与桩帽一体化钻进成孔方法
CN102605788A (zh) 一种沉双管拔内管成孔灌注桩工法及应用
CN104250970A (zh) 一种新型可视化智能超流态混凝土灌注桩装置及施工方法
CN1963044A (zh) 拔出废桩的施工方法
CN101838988A (zh) 一种抽拔锚索的综合施工方法
CN106593398B (zh) 一种压入式隔离建井方法
CN206512718U (zh) 一种可调向多功能振动植桩装置
CN205387708U (zh) 全套管一次性旋切式清桩装置
CN206348165U (zh) 一种水土一体化采样装置
CN105926594A (zh) 一种静压沉管载体灌注桩的双管施工方法
CN202530447U (zh) 一种沉双管拔内管成孔灌注桩结构
CN107036841A (zh) 一种水土一体化采样装置
CN204080794U (zh) 一种带自清污功能的可伸缩导杆
CN109944238A (zh) 全套管全回转内夯桩施工方法
CN201896313U (zh) 一种多节双护壁套管筒桩成孔装置
CN102758434B (zh) 中掘预应力离心管桩沉桩装置及其沉桩法
CN202577303U (zh) 一种桩基础施工组件分离装置
CN104005411A (zh) 一种筒桩的施工方法及其桩筒结构
CN202323934U (zh) 用于现浇三角形复合地基桩的成孔器
CN106567386A (zh) 一种浇筑式打桩机及其打桩方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 1211 No. 330200 Jiangxi city of Nanchang province Toyama Blue Road Economic Development Zone

Patentee after: JIANGXI ZHONGHENG UNDERGROUND SPACE TECHNOLOGY CO., LTD.

Address before: 1211 No. 330200 Jiangxi city of Nanchang province Toyama Blue Road Economic Development Zone

Patentee before: JIANGXI ZHONGHENG GEOTECHNICAL ENGINEERING TECHNOLOGY CO., LTD.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Construction method for empty hole through long spiral drilled press-grouting pile

Effective date of registration: 20160704

Granted publication date: 20160113

Pledgee: Bank of Beijing, Limited by Share Ltd, Nanchang branch

Pledgor: JIANGXI ZHONGHENG UNDERGROUND SPACE TECHNOLOGY CO., LTD.

Registration number: 2016360000009

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20190212

Granted publication date: 20160113

Pledgee: Bank of Beijing, Limited by Share Ltd, Nanchang branch

Pledgor: JIANGXI ZHONGHENG UNDERGROUND SPACE TECHNOLOGY CO., LTD.

Registration number: 2016360000009

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Construction method for empty hole through long spiral drilled press-grouting pile

Effective date of registration: 20190711

Granted publication date: 20160113

Pledgee: Eighty-one Banks of Jiujiang Bank Co., Ltd.

Pledgor: JIANGXI ZHONGHENG UNDERGROUND SPACE TECHNOLOGY CO., LTD.

Registration number: 2019360000020

PE01 Entry into force of the registration of the contract for pledge of patent right