CN104192681B - A kind of building hoist integration actuating device - Google Patents

A kind of building hoist integration actuating device Download PDF

Info

Publication number
CN104192681B
CN104192681B CN201410431758.0A CN201410431758A CN104192681B CN 104192681 B CN104192681 B CN 104192681B CN 201410431758 A CN201410431758 A CN 201410431758A CN 104192681 B CN104192681 B CN 104192681B
Authority
CN
China
Prior art keywords
actuating device
bracing frame
cage
building hoist
integration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410431758.0A
Other languages
Chinese (zh)
Other versions
CN104192681A (en
Inventor
杨健
李丽华
潘健
朱毅文
覃先主
黄忆军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING TAIJIN ALUMINUM ALLOY PROCESSING Co Ltd
Original Assignee
NANJING TAIJIN ALUMINUM ALLOY PROCESSING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING TAIJIN ALUMINUM ALLOY PROCESSING Co Ltd filed Critical NANJING TAIJIN ALUMINUM ALLOY PROCESSING Co Ltd
Priority to CN201410431758.0A priority Critical patent/CN104192681B/en
Publication of CN104192681A publication Critical patent/CN104192681A/en
Application granted granted Critical
Publication of CN104192681B publication Critical patent/CN104192681B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The present invention relates to a kind of building hoist integration actuating device, including tower body, control chamber, cage and actuating device, described actuating device has two, two described actuating devices can slide up and down the both sides being in described tower body respectively, described cage is connected to the lower end of described actuating device, and described cage can move up and down along tower body under the drive of described actuating device, and described control chamber controls to adjust the sliding speed of described actuating device by VFC.A kind of building hoist integration actuating device that the present invention provides, has the most a little: using two driving gear structures, the bearing capacity of cage is big;Actuating device major part parts are completed the most on the ground, maintenance and easy accessibility;Actuating device uses two motor driving type formulas, makes tooth bar uniform force, safety and steady;Control chamber uses VFC regulation, and circuit is simply easy to handle and maintenance;The subsidiary loading bar bar of actuating device and operation platform, it is simple to the standard knot in installation or removal elevator.

Description

A kind of building hoist integration actuating device
Technical field
The present invention relates to building machinery field, be specifically related to a kind of building hoist integration actuating device.
Background technology
During construction, by building hoist delivery workman and construction material.Construction lifting Owner to be divided into greatly three major types;First it is structure class, next to that machine driving class, the most automatically controlled class. And existing building hoist manufacturing firm remaining drive mechanism and electricity in addition to structure class produces voluntarily Each parts of Ore-controlling Role are all from different manufacturing firm's buyings, install voluntarily, debug.Due to Some manufacturing enterprises lack the comprehensive talent of electromechanical integration having practical experience.Therefore to properties of product Perfect, integrate and innovate delayed, the comprehensive cost performance of product is low.The building site many difficulties of installation and debugging problem are big, Manufacture simultaneously as elevator various piece is all different producer, too increase the difficulty of subsequent maintenance work Degree.
Summary of the invention
For solving the problems referred to above, the technical problem to be solved is to provide a kind of building hoist one Body gasifying device.
It is collection drive mechanism, electric-control system, mounting or dismounting system that the present invention solves the technical scheme of above-mentioned technical problem Mechanism's design that system is integrated.As follows: a kind of building hoist integration actuating device, including tower body, Control chamber, cage and actuating device, described actuating device has two, and two described actuating devices respectively can Sliding up and down the both sides being in described tower body, described cage is connected to the lower end of described actuating device, in institute State cage and be provided with support seat, and described cage can be along on tower body under the drive of described actuating device Lower motion, described control chamber is in the left side of described actuating device, right side or upper position, described control Case regulates the sliding speed of described actuating device by VFC;
Described actuating device includes transmission framework, dockboard, motor, reduction box, the first bracing frame, dress Unloading bar and the second bracing frame, described transmission framework is vertically arranged, and can slide up and down and be connected to described tower With, described transmission framework is provided with described motor and described reduction box, subtracts described in described motor process Slided up and down along described tower body by transmission framework described in gear and chain-driving after speed case output, described First bracing frame is vertical with one end of described second bracing frame to be fixedly connected on described transmission framework, in institute State the first gripper shoe and described second gripper shoe and be vertically provided with described dress away from one end of described transmission framework Unload bar, and described support seat is in the underface of described loading bar, at described first bracing frame and described Between two bracing frames, also level is provided with described dockboard.
Further, described motor and described reduction box have two respectively, each described motor through with Correspondence the output of described reduction box after slided by transmission framework described in gear and chain-driving.
Further, described cage is connected to the lower end of described transmission framework by hydraulic cylinder assembly.
Further, it is provided around guardrail at described dockboard.
Further, the most vertical on described first bracing frame at described loading bar and described second bracing frame It is provided with the stair towards described dockboard.
Further, described second bracing frame is provided with through hole, is provided with iron ring in described through hole, described One end of loading bar is locked on described first bracing frame by screw snap close, the other end of described loading bar Through described iron ring.
The invention has the beneficial effects as follows: a kind of building hoist integration actuating device that the present invention provides, Have the most a little:
1, using two driving gear structures, the bearing capacity of cage is big;
2, attachment device consolidates, safe and reliable;Stable drive, vibrate little, ride comfort.
3, actuating device major part parts are completed the most on the ground, light structure, keep in repair and dismount Convenient;
4, actuating device uses two motor driving type formulas, makes tooth bar uniform force, safety and steady;
5, control chamber uses VFC regulation, and circuit is simply easy to handle and maintenance, and reliably;
6, the subsidiary loading bar bar of actuating device and operation platform, it is simple to voluntarily in installation or removal elevator Standard knot.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram of the present invention;
Fig. 2 is the side view of Fig. 1;
In accompanying drawing, the list of parts representated by each label is as follows:
1, tower body, 2, transmission framework, 3, stair, 4, dockboard, 5, motor, 6, reduction box, 7, gripper shoe, 8, loading bar, 9, control chamber, 10, oil cylinder, 11, cage, 12, actuating device, 13, fixed plate, 14, fence, 15, support seat.
Detailed description of the invention
Being described principle and the feature of the present invention below in conjunction with accompanying drawing, example is served only for explaining this Invention, is not intended to limit the scope of the present invention.
As illustrated in fig. 1 and 2, a kind of building hoist integration actuating device, including tower body 1, control Case 9, cage 11 and actuating device 12, described actuating device 12 has two, two described actuating devices 12 can slide up and down the both sides being in described tower body 1 respectively, and described cage 11 is connected to described transmission dress Put the lower end of 12, described cage 11 is provided with support seat 15, and described cage 11 can be described Moving up and down along tower body 1 under the drive of actuating device 12, cage 11 is used for loading goods.Described control Case 9 processed is in left side, right side or the upper position of described actuating device 12, and described control chamber 9 passes through VFC regulates the sliding speed of described actuating device 12, and control chamber 9 uses converter technique to control to adjust Saving, circuit is simply easy to handle and maintenance, and reliably.
Described actuating device 12 includes transmission framework 2, dockboard 4, motor 5, reduction box 6, first Bracing frame 7, loading bar 8, control chamber 9 and the second bracing frame 13, described cage 11 passes through hydraulic cylinder assembly 10 lower ends being connected to described transmission framework 2, it is ensured that it is safe and reliable that cage 11 moves.Described transmission Framework 2 is vertically arranged, and can slide up and down and be connected on described tower body 1, at described transmission framework 2 Being provided with described motor 5 and described reduction box 6, described motor 5 passes through after described reduction box 6 exports Transmission framework 2 described in gear and chain-driving slides up and down along described tower body 1, and described motor 5 Having two respectively with described reduction box 6, each described motor 5 is through described in corresponding one Slided by transmission framework 2 described in gear and chain-driving after reduction box 6 output.Use two driving gears Structure so that the bearing capacity of cage 11 is bigger, uses two motor driving type formulas simultaneously, makes tooth bar stress Uniformly, safety and steady so that whole stable drive, vibrate little, workmen's ride comfort.
Described first bracing frame 7 is vertical with one end of described second bracing frame 13 is fixedly connected on described biography On moving frame structure 2, in described first gripper shoe 7 and described second gripper shoe 13 away from described transmission framework 2 One end be vertically provided with described loading bar 8, and described support seat (15) is in described loading bar (8) Underface.Between described first bracing frame 13 and described second bracing frame 7, also level is provided with described dress Unload plate 4.Actuating device 12 major part parts are completed the most on the ground, and light structure is keeped in repair and torn open Dress is convenient.
During construction, the handling of building hoist guide rail standard knot are requisite links, Standard knot handling are typically all passed through to install a suspension rod on loading bar 8, and loading bar 8 is arranged on support seat On 15, standard knot sling in cage 11 installation or dismounting in hanging in cage 11 by suspension rod.Existing Have in technology on cage 11, be mounted directly loading bar 8, owing to cage roof construction is thin, on boom support Play weight heavier, easily damage cage top;And workmen stands in and works on cage, at weight of slinging During cage easily swing, there is the biggest potential safety hazard.The present invention is at described first bracing frame 7 Described loading bar 8 vertically it is provided with away from one end of described transmission framework 1 with described second bracing frame 13, Described second bracing frame 13 is provided with through hole, is provided with iron ring in described through hole, described loading bar 8 One end is locked on described first bracing frame 7 by screw snap close, and the other end of described loading bar 8 passes Described iron ring, building hoist guide rail standard knot dismounts when, releasing screw snap close, by loading bar 8 are installed to support on seat 15, consolidate loading bar 8 by supporting so that handling at seat 15 and iron ring two Bar 8 is more safe and reliable when lifting construction elevator guide rails standard knot, need not use loading bar The when of 8, pull down loading bar 8 from supporting seat 15, be locked on the first bracing frame 7 by screw snap close Just can, very convenient fast.The first bracing frame 7 at described loading bar 8 and described second bracing frame 13 are provided with the stair 3 towards described dockboard 4, by stair about 3 dockboard 4, at dockboard Tearing transduction rail standard knot on 4 open and control boom motion, the most described dockboard 4 is provided around guardrail 14, Being easy to workmen install and dismounting, parts are easily changed, and improve work efficiency, and suspension rod peace Dress is reliable, and safety is high, is hardly damaged.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all in the present invention Spirit and principle within, any modification, equivalent substitution and improvement etc. made, should be included in this Within bright protection domain.

Claims (6)

1. a building hoist integration actuating device, it is characterised in that: include tower body (1), control Case processed (9), cage (11) and actuating device (12), described actuating device (12) has two, Two described actuating devices (12) can slide up and down the both sides being in described tower body (1) respectively, described Cage (11) is connected to the lower end of described actuating device (12), is provided with and props up on described cage (11) Support seat (15), and described cage (11) can be along tower under the drive of described actuating device (12) Body (1) moves up and down, and described control chamber (9) is in the left side of described actuating device (12), right side Or upper position, described control chamber (9) regulates the cunning of described actuating device (12) by VFC Dynamic speed;
Described actuating device (12) include transmission framework (2), dockboard (4), motor (5), Reduction box (6), the first bracing frame (7), loading bar (8) and the second bracing frame (13), described Transmission framework (2) is vertically arranged, and can slide up and down and be connected on described tower body (1), described Transmission framework (2) is provided with described motor (5) and described reduction box (6), described motor (5) warp Transmission framework (2) described in gear and chain-driving is passed through along described after crossing described reduction box (6) output Tower body (1) slides up and down, described first bracing frame (7) and one end of described second bracing frame (13) Vertically it is fixedly connected on described transmission framework (2), described first gripper shoe (7) and described second Gripper shoe (13) is vertically provided with described loading bar (8) away from one end of described transmission framework (2), and And described support seat (15) is in the underface of described loading bar (8), described first bracing frame (7) With also level is provided with described dockboard (4) between described second bracing frame (13).
A kind of building hoist integration actuating device the most according to claim 1, its feature exists In: described motor (5) and described reduction box (6) have two respectively, each described motor (5) By transmission described in gear and chain-driving after a corresponding described reduction box (6) output Framework (2) slides.
A kind of building hoist integration actuating device the most according to claim 1, its feature exists In: described cage (11) is connected to the lower end of described transmission framework (2) by hydraulic cylinder assembly (10).
A kind of building hoist integration actuating device the most according to claim 1, its feature exists In: it is provided around guardrail (14) at described dockboard (4).
A kind of building hoist integration actuating device the most according to claim 1, its feature exists In: at described first bracing frame (7) and described second bracing frame (13) at described loading bar (8) place On be the most vertically provided with the stair (3) towards described dockboard (4).
6. according to a kind of building hoist integration actuating device described in any one of claim 1 to 5, It is characterized in that: on described second bracing frame (13), be provided with through hole, be provided with iron ring in described through hole, One end of described loading bar (8) is locked on described first bracing frame (7) by screw snap close, described dress Unload the other end of bar (5) through described iron ring.
CN201410431758.0A 2014-08-28 2014-08-28 A kind of building hoist integration actuating device Expired - Fee Related CN104192681B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410431758.0A CN104192681B (en) 2014-08-28 2014-08-28 A kind of building hoist integration actuating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410431758.0A CN104192681B (en) 2014-08-28 2014-08-28 A kind of building hoist integration actuating device

Publications (2)

Publication Number Publication Date
CN104192681A CN104192681A (en) 2014-12-10
CN104192681B true CN104192681B (en) 2016-08-24

Family

ID=52078109

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410431758.0A Expired - Fee Related CN104192681B (en) 2014-08-28 2014-08-28 A kind of building hoist integration actuating device

Country Status (1)

Country Link
CN (1) CN104192681B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106429738A (en) * 2016-08-24 2017-02-22 无锡科通工程机械制造有限公司 Bottom frame structure used for lifting device
CN106744193B (en) * 2016-12-27 2019-05-21 廖忠民 Support the rack-and-pinion lifting device of enroute maintenance
CN112723226B (en) * 2021-01-19 2022-04-05 湖南翰坤实业有限公司 Assembled material platform that changes
CN112897282A (en) * 2021-01-19 2021-06-04 湖南翰坤实业有限公司 Equipment for building construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006232541A (en) * 2005-02-28 2006-09-07 Mitsubishi Electric Building Techno Service Co Ltd Movable landing hall device of elevator for base isolation construction
CN2892780Y (en) * 2006-01-11 2007-04-25 王晓越 Overload detection protector for rack and pinion driving construction lifting machine
CN201045111Y (en) * 2007-03-10 2008-04-09 颜家倦 Traction type construction elevator
CN102826429A (en) * 2012-09-12 2012-12-19 佛山市南海裕华建筑机械有限公司 Construction elevator capable of operating at modulated frequency and power frequency
CN204022222U (en) * 2014-08-28 2014-12-17 南宁泰进铝合金加工有限公司 The integrated driving device of a kind of building hoist

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006232541A (en) * 2005-02-28 2006-09-07 Mitsubishi Electric Building Techno Service Co Ltd Movable landing hall device of elevator for base isolation construction
CN2892780Y (en) * 2006-01-11 2007-04-25 王晓越 Overload detection protector for rack and pinion driving construction lifting machine
CN201045111Y (en) * 2007-03-10 2008-04-09 颜家倦 Traction type construction elevator
CN102826429A (en) * 2012-09-12 2012-12-19 佛山市南海裕华建筑机械有限公司 Construction elevator capable of operating at modulated frequency and power frequency
CN204022222U (en) * 2014-08-28 2014-12-17 南宁泰进铝合金加工有限公司 The integrated driving device of a kind of building hoist

Also Published As

Publication number Publication date
CN104192681A (en) 2014-12-10

Similar Documents

Publication Publication Date Title
CN104192681B (en) A kind of building hoist integration actuating device
CN106064798A (en) A kind of electric power overhaul hoistable platform
CN207328233U (en) A kind of lift work trailer for power equipment installation
CN208235351U (en) A kind of bridge combination guardrail Fast Installation plate device
CN107298388A (en) Bridge crane with suspender maintenance rig
CN203699606U (en) Lifter and iron tower
CN101413387A (en) Tower rack type combined transmission oil pumping machine
CN104453201A (en) Automatic ascending and descending type material platform
CN205170212U (en) Semi -portal crane
CN102530733A (en) Large radial gate lifting equipment and lifting method thereof
CN104870358A (en) Maintenance method for a lift
CN103539020B (en) Novel hoisting construction method and special hanging device
CN204022222U (en) The integrated driving device of a kind of building hoist
CN207061690U (en) Bridge crane with suspender maintenance rig
CN105173983A (en) People and goods dual-purpose vertical-transportation building construction elevator
CN204897140U (en) Guide -car's wheel is changed and is used hoisting accessory
CN206273951U (en) The hoisting apparatus of attachment type raise scaffold
CN201810014U (en) One-machine multi-plate three-layer lifting traversing parking equipment with one layer of bottom pit
CN205222495U (en) Dynamic brake equipment's of hoist link gear
CN104401887A (en) Miniature crane
CN209193350U (en) A kind of refractory material feeds intake jumbo bag lifting device
CN203319620U (en) Portable jack
CN203569874U (en) Self-lifting type material platform
CN106365058A (en) Portal crane for assembling motor with weight being above 100T
CN208037866U (en) A kind of Architectural Equipment hanging apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824