CN104192681A - Integrated transmission device of construction lifter - Google Patents
Integrated transmission device of construction lifter Download PDFInfo
- Publication number
- CN104192681A CN104192681A CN201410431758.0A CN201410431758A CN104192681A CN 104192681 A CN104192681 A CN 104192681A CN 201410431758 A CN201410431758 A CN 201410431758A CN 104192681 A CN104192681 A CN 104192681A
- Authority
- CN
- China
- Prior art keywords
- driving device
- transmission device
- bracing frame
- tower body
- cage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 42
- 238000010276 construction Methods 0.000 title abstract description 8
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 7
- 230000033001 locomotion Effects 0.000 claims description 4
- 238000012423 maintenance Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 3
- 239000000725 suspension Substances 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000026683 transduction Effects 0.000 description 1
- 238000010361 transduction Methods 0.000 description 1
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The invention relates to an integrated transmission device of a construction lifter. The integrated transmission device of the construction lifter comprises a tower body, a control box, lifting cages and transmission device bodies, wherein the number of the transmission device bodies is two, the two transmission device bodies can vertically slide and are located on two sides of the tower body, each lifting cage is connected with the lower end of the corresponding transmission device body and can move vertically along the tower body when driven by the corresponding transmission device body, and the control box adjusts the sliding speed of the transmission device bodies in a variable-frequency control mode. The integrated transmission device of the construction lifter is characterized in that two driving gear structures are adopted, and the bearing capacity of the lifting cages is large; most components of the transmission device bodies are assembled on the ground, so that the transmission device bodies are convenient to repair, dismount and mount; the transmission device bodies adopt a two-motor driving mode, and racks are stressed evenly and are safe and stable; the control box adopts a variable-frequency control adjustment mode, and a circuit is simple and convenient to operate and maintain; the transmission device bodies are provided with detachment rods and construction platforms, so that standard joints on the lifter are convenient to mount or dismount.
Description
Technical field
The present invention relates to vehicle for construction field, be specifically related to the integrated driving device of a kind of building hoist.
Background technology
In the process of building operation, deliver workman and building materials by building hoist.Building hoist is mainly divided into greatly three major types; First being structure class, is secondly mechanical drive class, automatically controlled class besides.And existing building hoist manufacturing firm remaining transmission device except structure class is produced is voluntarily all from different manufacturing firm's buyings from each parts of electric-control system, installs voluntarily, debug.Because some manufacturing enterprises lack the comprehensive talent of electromechanical integration who has practical experience.Therefore to properties of product perfect, integrate and innovation hysteresis, the comprehensive cost performance of product is low.The many difficulties of building site installation and debugging problem are large, because elevator various piece is all different producer to be manufactured, also increased the difficulty of follow-up maintenance work simultaneously.
Summary of the invention
For addressing the above problem, technical matters to be solved by this invention is to provide a kind of building hoist integrated apparatus.
The technical scheme that the present invention solves the problems of the technologies described above is the mechanism design that integrates transmission device, electric-control system, mounting or dismounting system.As follows: the integrated driving device of a kind of building hoist, comprise tower body, control box, cage and driving device, described driving device has two, two described drivings device can slide up and down respectively the both sides in described tower body, described cage is connected to the lower end of described driving device, on described cage, be provided with supporting seat, and described cage can be along tower body up-and-down movement under the drive of described driving device, the left side of described control box in described driving device, right side or upper position, described control box regulates the sliding velocity of described driving device by variable frequency control,
Described driving device comprises transmission framework, dockboard, motor, drop-gear box, the first bracing frame, loading bar and the second bracing frame, described transmission framework vertically arranges, and can slide up and down and be connected on described tower body, on described transmission framework, be provided with described motor and described drop-gear box, described motor slides up and down along described tower body by transmission framework described in gear and chain-driving after described drop-gear box output, vertical being fixedly connected on described transmission framework in one end of described the first bracing frame and described the second bracing frame, vertically be provided with described loading bar at described the first stay bearing plate and described the second stay bearing plate away from one end of described transmission framework, and described support seat is under described loading bar, between described the first bracing frame and described the second bracing frame, also level is provided with described dockboard.
Further, described motor and described drop-gear box have respectively two, and described in each, motor slides by transmission framework described in gear and chain-driving after a corresponding with it described drop-gear box output.
Further, described cage is connected to the lower end of described transmission framework by hydraulic cylinder assembly.
Further, around described dockboard, be provided with guardrail.
Further, described first bracing frame at described loading bar place with on described the second bracing frame also vertical being provided with lead to the stair of described dockboard.
Further, on described the second bracing frame, be provided with through hole, be provided with iron ring in described through hole, one end of described loading bar is by screw lock padlock on described the first bracing frame, and other one end of described loading bar is through described iron ring.
The invention has the beneficial effects as follows: the integrated driving device of a kind of building hoist provided by the invention, has as follows a little:
1, adopt two driven wheel structures, the bearing capacity of cage is large;
2, attachment device is firm, safe and reliable; Stable drive, vibrate little, ride comfort.
3, the most of parts of driving device have all been assembled on the ground, and structure is light and handy, maintenance and easy accessibility;
4, driving device adopts two motor driving type formulas, makes tooth bar stressed evenly, safety and steady;
5, control box adopts variable frequency control to regulate, and circuit is simply convenient to handle and maintenance, and reliable;
6, the subsidiary loading bar bar of driving device and operation platform, is convenient to the standard knot on installation or removal elevator voluntarily.
Brief description of the drawings
Fig. 1 is integral structure schematic diagram of the present invention;
Fig. 2 is the lateral plan of Fig. 1;
In accompanying drawing, the list of parts of each label representative is as follows:
1, tower body, 2, transmission framework, 3, stair, 4, dockboard, 5, motor, 6, drop-gear box, 7, stay bearing plate, 8, loading bar, 9, control box, 10, oil cylinder, 11, cage, 12, driving device, 13, adapter plate, 14, fence, 15, supporting seat.
Detailed description of the invention
Below in conjunction with accompanying drawing, principle of the present invention and feature are described, example, only for explaining the present invention, is not intended to limit scope of the present invention.
As illustrated in fig. 1 and 2, the integrated driving device of a kind of building hoist, comprise tower body 1, control box 9, cage 11 and driving device 12, described driving device 12 has two, two described drivings device 12 can slide up and down respectively the both sides in described tower body 1, and described cage 11 is connected to the lower end of described driving device 12, on described cage 11, are provided with supporting seat 15, and described cage 11 can be along tower body 1 up-and-down movement under the drive of described driving device 12, and cage 11 is for lade.Left side, right side or the upper position of described control box 9 in described driving device 12, described control box 9 regulates the sliding velocity of described driving device 12 by variable frequency control, control box 9 adopts converter technique control and regulation, and circuit is simply convenient to handle and maintenance, and reliable.
Described driving device 12 comprises transmission framework 2, dockboard 4, motor 5, drop-gear box 6, the first bracing frame 7, loading bar 8, control box 9 and the second bracing frame 13, described cage 11 is connected to the lower end of described transmission framework 2 by hydraulic cylinder assembly 10, ensure that cage 11 moves safe and reliable.Described transmission framework 2 vertically arranges, and can slide up and down and be connected on described tower body 1, on described transmission framework 2, be provided with described motor 5 and described drop-gear box 6, described motor 5 slides up and down along described tower body 1 by transmission framework 2 described in gear and chain-driving after described drop-gear box 6 outputs, and described motor 5 and described drop-gear box 6 have respectively two, described in each, motor 5 slides by transmission framework 2 described in gear and chain-driving after corresponding with it described drop-gear box 6 outputs.Adopt two driven wheel structures, make the bearing capacity of cage 11 larger, adopt two motor driving type formulas simultaneously, make tooth bar stressed evenly, safety and steady, make whole stable drive, vibrate little, workmen's ride comfort.
Vertical being fixedly connected on described transmission framework 2 in one end of described the first bracing frame 7 and described the second bracing frame 13, vertically be provided with described loading bar 8 at described the first stay bearing plate 7 and described the second stay bearing plate 13 away from one end of described transmission framework 2, and described support seat (15) is under described loading bar (8).Between described the first bracing frame 13 and described the second bracing frame 7, also level is provided with described dockboard 4.The most of parts of driving device 12 have all been assembled on the ground, and structure is light and handy, maintenance and easy accessibility.
In the process of building operation, building hoist guide rail standard knot loads and unloads the link that is absolutely necessary, standard knot loads and unloads generally all by a suspension rod is installed on loading bar 8, loading bar 8 is arranged on supporting seat 15, by suspension rod, the interior dismounting of cage 11 is installed or hung in to standard knot from slinging in cage 11.Loading bar 8 is directly installed in prior art on cage 11, and because cage roof construction is thin, the weight on boom support is heavier, very easily damages cage top; And workmen stands on cage and work, in the process of weight of slinging, cage easily swings, and has very large potential safety hazard.The present invention is vertically provided with described loading bar 8 at described the first bracing frame 7 and described the second bracing frame 13 away from one end of described transmission framework 1, on described the second bracing frame 13, be provided with through hole, be provided with iron ring in described through hole, screw lock padlock is passed through on described the first bracing frame 7 in one end of described loading bar 8, other one end of described loading bar 8 is through described iron ring, in the dismounting of building hoist guide rail standard knot, loosen screw snap close, loading bar 8 is installed on supporting seat 15, by supporting seat 15 and the iron ring two firm loading bars 8 in place, make loading bar 8 more safe and reliable in the time of lifting construction elevator guide rails standard knot, in not needing to use loading bar 8, pull down loading bar 8 from supporting seat 15, just can on the first bracing frame 7 by screw lock padlock, very convenient quick.On first bracing frame 7 at described loading bar 8 places and described the second bracing frame 13, be provided with the stair 3 that lead to described dockboard 4, by stair dockboard 4 Shang Xia 3, on dockboard 4, tear transduction rail standard knot open and control suspension rod motion, simultaneously described dockboard 4 is provided with guardrail 14 around, and constructability personnel install and dismounting, and parts are easy to change, improve work efficiency, and hanger erection is reliable, safe, not fragile.
The foregoing is only preferred embodiment of the present invention, in order to limit the present invention, within the spirit and principles in the present invention not all, any amendment of doing, be equal to replacement, improvement etc., within all should being included in protection scope of the present invention.
Claims (6)
1. the integrated driving device of building hoist, it is characterized in that: comprise tower body (1), control box (9), cage (11) and driving device (12), described driving device (12) has two, two described drivings device (12) can slide up and down respectively the both sides in described tower body (1), described cage (11) is connected to the lower end of described driving device (12), on described cage (11), be provided with supporting seat (15), and described cage (11) can be along tower body (1) up-and-down movement under the drive of described driving device (12), the left side of described control box (9) in described driving device (12), right side or upper position, described control box (9) regulates the sliding velocity of described driving device (12) by variable frequency control,
Described driving device (12) comprises transmission framework (2), dockboard (4), motor (5), drop-gear box (6), the first bracing frame (7), loading bar (8) and the second bracing frame (13), described transmission framework (2) vertically arranges, and can slide up and down and be connected on described tower body (1), on described transmission framework (2), be provided with described motor (5) and described drop-gear box (6), described motor (5) slides up and down along described tower body (1) by transmission framework (2) described in gear and chain-driving after described drop-gear box (6) output, vertical being fixedly connected on described transmission framework (2) in one end of described the first bracing frame (7) and described the second bracing frame (13), vertically be provided with described loading bar (8) at described the first stay bearing plate (7) and described the second stay bearing plate (13) away from one end of described transmission framework (2), and described support seat (15) is under described loading bar (8), between described the first bracing frame (7) and described the second bracing frame (13), also level is provided with described dockboard (4).
2. the integrated driving device of a kind of building hoist according to claim 1, it is characterized in that: described motor (5) and described drop-gear box (6) have respectively two, motor described in each (5) slides by transmission framework (2) described in gear and chain-driving after a corresponding with it described drop-gear box (6) output.
3. the integrated driving device of a kind of building hoist according to claim 1, is characterized in that: described cage (11) is connected to the lower end of described transmission framework (2) by hydraulic cylinder assembly (10).
4. the integrated driving device of a kind of building hoist according to claim 1, is characterized in that: around described dockboard (4), be provided with guardrail (14).
5. the integrated driving device of a kind of building hoist according to claim 1, is characterized in that: described the first bracing frame (7) of locating at described loading bar (8) with on described the second bracing frame (13) also vertical being provided with lead to the stair (3) of described dockboard (4).
6. according to the integrated driving device of a kind of building hoist described in claim 1 to 5 any one, it is characterized in that: on described the second bracing frame (13), be provided with through hole, be provided with iron ring in described through hole, one end of described loading bar (8) is upper at described the first bracing frame (7) by screw lock padlock, and other one end of described loading bar (5) is through described iron ring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410431758.0A CN104192681B (en) | 2014-08-28 | 2014-08-28 | A kind of building hoist integration actuating device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410431758.0A CN104192681B (en) | 2014-08-28 | 2014-08-28 | A kind of building hoist integration actuating device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104192681A true CN104192681A (en) | 2014-12-10 |
CN104192681B CN104192681B (en) | 2016-08-24 |
Family
ID=52078109
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410431758.0A Expired - Fee Related CN104192681B (en) | 2014-08-28 | 2014-08-28 | A kind of building hoist integration actuating device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104192681B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106429738A (en) * | 2016-08-24 | 2017-02-22 | 无锡科通工程机械制造有限公司 | Bottom frame structure used for lifting device |
CN106744193A (en) * | 2016-12-27 | 2017-05-31 | 廖忠民 | Support the rack-and-pinion jacking equipment of enroute maintenance |
CN112723226A (en) * | 2021-01-19 | 2021-04-30 | 湖南翰坤实业有限公司 | Assembled material platform that changes |
CN112897282A (en) * | 2021-01-19 | 2021-06-04 | 湖南翰坤实业有限公司 | Equipment for building construction |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006232541A (en) * | 2005-02-28 | 2006-09-07 | Mitsubishi Electric Building Techno Service Co Ltd | Movable landing hall device of elevator for base isolation construction |
CN2892780Y (en) * | 2006-01-11 | 2007-04-25 | 王晓越 | Overload detection protector for rack and pinion driving construction lifting machine |
CN201045111Y (en) * | 2007-03-10 | 2008-04-09 | 颜家倦 | Traction type construction elevator |
CN102826429A (en) * | 2012-09-12 | 2012-12-19 | 佛山市南海裕华建筑机械有限公司 | Construction elevator capable of operating at modulated frequency and power frequency |
CN204022222U (en) * | 2014-08-28 | 2014-12-17 | 南宁泰进铝合金加工有限公司 | The integrated driving device of a kind of building hoist |
-
2014
- 2014-08-28 CN CN201410431758.0A patent/CN104192681B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006232541A (en) * | 2005-02-28 | 2006-09-07 | Mitsubishi Electric Building Techno Service Co Ltd | Movable landing hall device of elevator for base isolation construction |
CN2892780Y (en) * | 2006-01-11 | 2007-04-25 | 王晓越 | Overload detection protector for rack and pinion driving construction lifting machine |
CN201045111Y (en) * | 2007-03-10 | 2008-04-09 | 颜家倦 | Traction type construction elevator |
CN102826429A (en) * | 2012-09-12 | 2012-12-19 | 佛山市南海裕华建筑机械有限公司 | Construction elevator capable of operating at modulated frequency and power frequency |
CN204022222U (en) * | 2014-08-28 | 2014-12-17 | 南宁泰进铝合金加工有限公司 | The integrated driving device of a kind of building hoist |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106429738A (en) * | 2016-08-24 | 2017-02-22 | 无锡科通工程机械制造有限公司 | Bottom frame structure used for lifting device |
CN106744193A (en) * | 2016-12-27 | 2017-05-31 | 廖忠民 | Support the rack-and-pinion jacking equipment of enroute maintenance |
CN112723226A (en) * | 2021-01-19 | 2021-04-30 | 湖南翰坤实业有限公司 | Assembled material platform that changes |
CN112897282A (en) * | 2021-01-19 | 2021-06-04 | 湖南翰坤实业有限公司 | Equipment for building construction |
CN112723226B (en) * | 2021-01-19 | 2022-04-05 | 湖南翰坤实业有限公司 | Assembled material platform that changes |
Also Published As
Publication number | Publication date |
---|---|
CN104192681B (en) | 2016-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104192681A (en) | Integrated transmission device of construction lifter | |
CN103303810A (en) | Motorized height access device for tower cranes | |
WO2017071053A1 (en) | Automatic leveling device and method for variable-slope obliquely-running container | |
CN107416720B (en) | A kind of high-altitude building material lifting device | |
CN202220665U (en) | Wind power generator wheel hub component maintaining and changing device and wind power generator thereof | |
CN105537898A (en) | Tool for assembling reinforcing steel mesh cages | |
CN205713147U (en) | A kind of quick positioning apparatus of precast floor slab | |
CN204022222U (en) | The integrated driving device of a kind of building hoist | |
CN102311052A (en) | Multifunctional self-localization multi-supports electric cucurbit twin-beam suspending crane | |
CN103803422B (en) | A kind of hoisting device for nuclear station and installation method thereof | |
CN202754754U (en) | Material lifter | |
CN201850076U (en) | Gate-shaped stand rod hoist of contact network | |
CN205170212U (en) | Semi -portal crane | |
CN107030869B (en) | Rail-changeable movable turnover vibration integrated machine for concrete prefabricated part production | |
CN202390106U (en) | Lifting hook portal crane easy to maintain | |
CN202912586U (en) | Slewing crane for nuclear power plant | |
CN204897140U (en) | Guide -car's wheel is changed and is used hoisting accessory | |
CN101934929A (en) | Automatic elevation rotating platform assembled on van | |
CN101723254A (en) | Device for moving equipment in container | |
CN202038820U (en) | Spare tire hoisting device | |
CN211255177U (en) | Municipal works electromechanical device's salvagees device | |
CN202201650U (en) | Four-supporting-column combined hoisting device for ultra-high voltage serial compensation platform | |
CN202296889U (en) | Multifunctional self-localization multi-fulcrum electric hoist double-girder overhang crane | |
CN203794462U (en) | Economical bridge crane | |
CN102765651A (en) | People-goods dual-purpose construction lifter provided with driving mechanism on top of suspension coops and forming integral structure with suspension coop |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160824 |