CN104184152B - Demand adjusts system, demand adjusting apparatus and consumes machine handing device - Google Patents
Demand adjusts system, demand adjusting apparatus and consumes machine handing device Download PDFInfo
- Publication number
- CN104184152B CN104184152B CN201410210415.1A CN201410210415A CN104184152B CN 104184152 B CN104184152 B CN 104184152B CN 201410210415 A CN201410210415 A CN 201410210415A CN 104184152 B CN104184152 B CN 104184152B
- Authority
- CN
- China
- Prior art keywords
- machine
- demand
- priority
- control
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05F—SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- G05F1/00—Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
- G05F1/66—Regulating electric power
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/10—The network having a local or delimited stationary reach
- H02J2310/12—The local stationary network supplying a household or a building
- H02J2310/14—The load or loads being home appliances
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/50—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
- H02J2310/66—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads one of the loads acting as master and the other or others acting as slaves
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/242—Home appliances
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Automation & Control Theory (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides a kind of demand adjust system, demand adjusting apparatus and consume machine handing device.Demand adjusts system to be possessed: operational part, adjust multiple control object machines of the object controlled selected as the demand that the consumption of resource is cut down from multiple consumption machines, 1st control instruction is sent to comprise the subscriber equipment of multiple control object machine, would indicate that the actual achievement information of the 1st control instruction is saved in storage part;Control portion, performs demand based on the 1st control instruction and adjusts control;Input unit, accept the 1st operation of user, the 1st solicited message of the change of the priority of multiple control object machine is asked to be sent to operational part according to the 1st operation by being used for, operational part determines multiple control object machine, the priority of the multiple control object machines in change precedence information when receiving 1 solicited message based on the 1st solicited message and actual achievement information.Thus user can easily change, by shirtsleeve operation, the priority that the demand adjustment of machine controls.
Description
Technical field
The present invention relates to a kind of technology that the demand of resource is adjusted.
Background technology
The known DSM (Demand Side Management) that the demand of electric power is managed.Example
As, it is known that in the subscriber equipment with multiple load, the use electric power of on-stream load exceedes
In the case of the electric power that can use, being less than, to the use electric power loaded, the electric power that can use,
From the load that preferential precedence is low, select the load in operating successively and cut off, and according to load
Use electric power less than the mode of electric power that can use, select successively from the load that preferential precedence is high
Select the load being cut off the technology (patent documentation 1) making it recover.
Citation
Patent documentation
Patent documentation 1: Japanese Unexamined Patent Publication 2008-125295 publication
Due to the preferential precedence of the multiple machines in subscriber equipment become unsuitable in the case of, user
Demand respectively specify that each machine to change preferential precedence, therefore the burden of user becomes big.
Summary of the invention
In order to solve above-mentioned problem, the demand adjustment system as a mode of the present invention possesses: deposit
Storage portion, precedence information stores by it, and this precedence information represents providing from offer equipment
Resource carries out the multiple respective priority of consumption machine consumed;Operational part, it receives and represents multiple disappearing
The metrical information of the measurement result of the consumption of the resource of consumption machine, calculates resource based on metrical information
The adjustment amount of demand, based on adjustment amount and precedence information, select to make from multiple consumption machines
Demand for cutting down the consumption of resource adjusts multiple control object machines of the object controlled,
Instruction demand is adjusted the 1st control instruction controlled and is sent to comprise the user of multiple control object machine
Equipment, and would indicate that the actual achievement information of the 1st control instruction is saved in storage part;Control portion, it is set
It is placed in subscriber equipment, receives the 1st control instruction, and perform demand adjustment based on the 1st control instruction
Control;And input unit, it is arranged at subscriber equipment, accepts the 1st operation of user, and according to the
1 operation to send the 1st solicited message to operational part, and the 1st solicited message is used for asking multiple control
The change of the priority of subject machine, operational part in the case of receiving the 1st solicited message, based on
1st solicited message and actual achievement information determine multiple control object machine, and in precedence information
The priority of multiple control object machines change.
(invention effect)
A mode according to the present invention, user can easily change machine by shirtsleeve operation
Demand adjust control priority.
Accompanying drawing explanation
Fig. 1 represents that the electricity needs of embodiments of the invention adjusts the structure of system.
Fig. 2 represents an example in priority data storehouse 0104.
Fig. 3 represents an example of actual achievement data base 0106.
Fig. 4 represents an example of the display of machine tool.
Fig. 5 represents an example of the display of handset.
Fig. 6 is an example of solicited message.
Fig. 7 represents that priority change processes.
Symbol description:
0100: arithmetic unit, 0101: starting detection unit, 0102: adjustment amount calculating part, 0103:
Machine choice portion, 0104: priority data storehouse, 0105: instruction output unit, 0106: actual achievement data
Storehouse, 0107: control portion, 0108: equipment machine, 0109: electric lines of force, 0110: power equipment,
0111: measurement apparatus, 0112: input unit, 0113: priority change portion, 0114: timing unit,
0120: subscriber equipment, 0401: machine tool monitor picture, 0402: all releasing buttons that controls, 0403:
All priority change buttons, 0404: handset monitor picture, 0405: unit control releases button,
0406: indivedual priority change buttons
Detailed description of the invention
Below, use accompanying drawing that embodiments of the invention are illustrated.
Fig. 1 represents that the electricity needs of embodiments of the invention adjusts the structure of system.
In the present embodiment, the electricity needs applying the present invention is adjusted system to illustrate.It addition,
The present invention can be applied not only to electric power, apply also for combustion gas, tap water etc. from supply arrangement to
The system that the demand of the resource of family equipment supply is adjusted.The electricity needs of the present embodiment adjusts system
There is arithmetic unit 0100, subscriber equipment 0120.
Arithmetic unit 0100 is realized by such as computer.This computer has such as: CPU (Central
Processing Unit), memorizer, bus, hard disk etc..The program performed by CPU is stored in
In the medium that computer can read, it is also possible to be installed to computer from this medium.Arithmetic unit 0100
Have: start detection unit 0101, adjustment amount calculating part 0102, machine choice portion 0103, priority
Data base 0104, instruction output unit 0105, actual achievement data base 0106, timing unit 0114.Computing fills
Set to 0 100 and be not limited in 1 computer, it is also possible to be multiple stage computer.Now, arithmetic unit
Each portion of 0100 can also be arranged on any one of multiple stage computer.
Subscriber equipment 0120 is the equipment that user holds.Subscriber equipment 0120 has: control portion 0107,
Input unit 0112, equipment machine 0108, electric lines of force 0109, power equipment 0110, measurement apparatus 0111.
Subscriber equipment 0120 is family, building, factory, area etc..
Equipment machine 0108 (a), 0108 (b), 0108 (c) be general family electric heater,
The household electrical appliance such as air-conditioning, the complete air-conditioning (package air conditioner) in office building, work
The work mechanisms of factory etc. carry out the machine of action by electric power.In the following description, need not
By being connected on the back of numeral as equipment machine 0108 (a), 0108 (b), 0108 (c)
Letter carry out distinctive elements in the case of, omit letter sometimes.Equipment machine 0108 is from electric lines of force
0109 reception electric power is gone forward side by side to take action and is made.Although illustrating 3 equipment machines of existence in the present embodiment
The example of 0108, but number of units is not limited to 3.It addition, applying the present invention to other money
When the demand in source adjusts system, equipment machine 0108 is to use this resource to carry out the machine of action.
Electric lines of force 0109 is the equipment supplying electric power to equipment machine 0108, joining of such as power system
Wiring in electric wire, the wiring of premises, building, the wiring in factory etc. transmit all of electric power and set
For being equivalent to this electric lines of force 0109.It addition, adjust system in the demand applying the present invention to other resources
In the case of system, the transmission equipment transmitting this resource can be used to substitute electric lines of force 0109.
Power equipment 0110 is the distribution transformer station of such as power system, the distribution board of house, big
The distribution board in building, the subsidiary equipment of the electric lines of force 0109 such as distribution board of factory.Power equipment 0110 with
Power system connects, and supplies electric power from power system.It addition, applying the present invention to other resources
Demand adjustment system in the case of be the subsidiary equipment of transmission equipment.Alternatively, it is also possible to for one
Power equipment 0110, connects multiple subscriber equipment 0120 by electric lines of force 0109.
Measurement apparatus 0111 is connected with arithmetic unit 0100 by network.This network is for the most automatically to look into
Table network.The size of the electrical load of power equipment 0110 is measured by measurement apparatus 0111,
And measured value (metrical information) is sent to arithmetic unit 0100.Measurement apparatus 0111 for example, merit
Rate meter.It addition, when the demand applying the present invention to other resources adjusts system, measurement apparatus 0111
It is the equipment that measures of the values relevant to usage amount such as the flow to this resource, pressure.
Below, each several part of arithmetic unit 0100 is described in detail.
Start detection unit 0101 and received the measured value of measurement apparatus 0111 by network, it is determined whether
The electricity needs of power equipment 0110 is suppressed.In this judgement, start detection unit 0101 right
The such as measured value from measurement apparatus 0111 compares with predetermined measurement threshold value.Then, exist
In the case of measured value exceedes measurement threshold value, start detection unit 0101 by the identification of measurement apparatus 0111
Information and measured value, expression currently for what day week information, represent moment in current moment
Information exports adjustment amount calculating part 0102.
Adjustment amount calculating part 0102 obtains the identification of measurement apparatus 0111 from starting detection unit 0101
Information and measured value, week information and time information.Additionally, adjustment amount calculating part 0102 is right
The place capacity of predetermined power equipment 0110 stores.It addition, the equipment of power equipment 0110
Capacity can also be stored in the storage device of outside.Adjustment amount calculating part 0102 is according to measurement apparatus
The measured value of 0111, the place capacity value of power equipment 0110, calculate the adjustment amount of electricity needs.
Such as, adjustment amount calculating part 0102 is by the measured value of measurement apparatus 0111 and power equipment 0110
The difference of place capacity value calculates as the adjustment amount of electricity needs.Further, adjustment amount calculating part
0102 by the adjustment amount of electricity needs, from starting the week information that gets of detection unit 0101 with in time
Quarter, information exported machine choice portion 0103.
Machine choice portion 0103 obtains the adjustment amount of electricity needs, star from adjustment amount calculating part 0102
Phase information and time information.Further, machine choice portion 0103 according to the adjustment amount of electricity needs,
Priority data storehouse 0104, comes selected as the equipment machine 0108 setting change object.
Fig. 2 represents an example in priority data storehouse 0104.
Priority data storehouse 0104 has numbering 0201, ID 0202, machine ID 0203, disappears
Power consumption power 0204, what day 0205, the time period 0206, priority 0207 is as detailed catalogue.Numbering
0201 is the numbering of the record (record) of priority level initializing, is the serial number from 1.User
ID0202 is the numbering being assigned to the user as this priority level initializing object, is to adjust in electricity needs
Uniquely number in whole system.Machine ID 0203 is for the equipment as this priority level initializing object
The numbering of machine 0108 distribution, is uniquely to number in subscriber equipment 0120.It is to say, set
Standby host device 0108 is determined with the combination of machine ID 0203 by ID 0202.Consume electric power
0204 is the consumption of the equipment machine 0108 of the object determined with machine ID 0203 by ID 0202
The representative value of electric power (kW).What day of this priority level initializing object what day 0205 be, represents
Any one of Monday/Tuesday/Wednesday/Thursday/Friday/Saturday/Sunday.It addition,
What day 0205 can also be working day and other forms such as day off.Time period 0206 is that this is preferential
Level sets the time period of object, has the time width with 1 hour as scale.It addition, the time period 0206
The other times width such as can also have with 30 minutes as scale.It is to say, consume electric power 0204
Illustrate by what day in 0205 the moment determined with the combination of time period 0206 by ID 0202
The representative of the equipment machine 0108 that combination with machine ID 0203 determines consumes electric power.
Priority 0207 in machine choice portion 0103 in order to eliminate the overload shape of power equipment 0110
State and select to be used during the equipment machine 0108 making consumption electric power reduce.Priority 0207 can base
In at the shadow to comfortableness when consuming electric power being controlled equipment machine 0108 by arithmetic unit 0100
Ring and be set by user.Such as, even if being controlled equipment machine by arithmetic unit 0100
0108 consume electric power on the impact of comfortableness the least in the case of, priority 0207 is set to greatly
Value, in the case of big on the impact of comfortableness, priority 0207 is set to little value.Separately
Outward, the priority 0207 of the present embodiment is represented by 5 grades (5,4,3,2,1).If
The value of the priority 0207 of standby host device 0108 is the biggest, and this equipment machine 0108 is more preferred.
It addition, priority is not necessary to be defined to 5 grades.
Machine choice portion 0103 extracts and from adjustment amount calculating part from priority data storehouse 0104
0102 week information got and the consistent record of time information.Then, machine choice portion 0103
The order from big to small of the value according to priority 0207 that records extracted is ranked up.Then,
The consumption electric power 0204 of record is added up to and counts according to the order after sequence by machine choice portion 0103
Calculate and consume current control mode, choose and consume current control mode and begin to exceed the adjustment amount of electricity needs
Record till the record of size, to the ID 0202 and the machine that are recorded in selected record
ID0203 stores.Then, machine choice portion 0103 is by defeated with machine ID for the ID of storage
Go out to instruction output unit 0105.
Instruction output unit 0105 is according to the ID got from machine choice portion 0103 and machine
Device ID determines equipment machine 0108, generates the control instruction for this equipment machine 0108, and will
This control instruction exports control portion 0107.Then, output unit 0105 is instructed by output to control portion
The content of the control instruction of 0107 is recorded actual achievement data base 0106.
Fig. 3 represents an example of actual achievement data base 0106.
Actual achievement data base 0106 have as detailed catalogue numbering 0301, the date 0302, what day 0303,
Time period 0304, ID 0305, machine ID 0306, control content 0307.Numbering 0301 is
The numbering of the record of the actual achievement of control instruction, is the serial number from 1.Date 0302, what day
0303, the time period 0304 stores instruction output unit 0105 respectively and exports this control to control portion 0107
The date of instruction, what day, time period.ID 0305 and machine ID 0306 are to refer to this control
The value that the equipment machine 0108 of the control object of order is determined.Controlling content 0307 is that this control refers to
Order control content, here as one example and describe stopping (OFF).It addition, in controlling
Appearance 0307 can also be its of the consumption electric power minimizing of the equipment machine 0108 for making this control object
His content.Such as, in the case of the equipment machine 0108 of this control object is air-conditioning, in controlling
Hold 0307 to represent the design temperature for making the temperature of air-cooling system rise or make heating installation set
The design temperature that standby temperature reduces.Additionally, the equipment machine 0108 in this control object is illumination
In the case of, control content 0307 and can also represent the lightness making lightness reduce.Actual achievement data
Storehouse 0106 is for these detailed catalogues, each control instruction output unit 0105 exported to control portion 0107
The record of system instruction is recorded according to the order of output.
Here, each several part of subscriber equipment 0120 is illustrated.
Control portion 0107 to be connected with instruction output unit 0105, from instruction output unit 0105 by network
Receive control instruction.This network is such as the Internet.Control portion 0107 prestore ID and
The combination of machine ID and the additional condition information of equipment machine 0108.Control portion 0107 is according to by controlling
Make the ID and the combination of machine ID, additional condition information specified, determine control object
Equipment machine 0108.Then, control portion 0107 according to the control content specified by control instruction,
The equipment machine 0108 of control object is controlled.Such as, content is being controlled for stopping (OFF)
In the case of, stop the equipment machine 0108 of (OFF) control object.
By the process in control portion 0107, the consumption electric power of equipment machine 0108 reduces, electric lines of force 0109
Power transmission amount reduce, be applied to power equipment 0110 load reduce.Additionally, arithmetic unit 0100
Owing to the equipment machine 0108 the highest to priority more carries out priority acccess control, therefore give to user
Comfortableness impact diminish.
But, the impact of comfortableness user experienced because of the control of equipment machine 0108 big
Little according to the moment, user process thing and become big, it is also contemplated that be recorded in priority data storehouse 0104
The value of priority be not associated with the situation of practical situation.In such a case, it is possible to by shown below
Input unit 0112 change the control of equipment machine 0108.
Input unit 0112 is for by the control of equipment machine 0108, the comfortableness of user is damaged
In the case of having done harm to, the value of user's priority to being recorded in priority data storehouse 0104 carry out more
New input terminal.If input unit 0112 receives input operation from user, then by network by base
Solicited message in input operation is sent to priority change portion 0113.Can also be at a subscriber equipment
0120 arranges multiple input unit 0112.In the present embodiment, will be as in a subscriber equipment 0120
The input unit 0112 (a) of one of multiple input units 0112 as machine tool, by other input unit
0112 (b) is as handset.Alternatively, it is also possible to only arrange input unit 0112 at a subscriber equipment 0120
(a)。
In the present embodiment, input unit 0112 (a) is arranged together with control portion 0107, input unit
0112 (b) is arranged together with equipment machine 0108 (a).It addition, input unit 0112 (a) is also
May be embodied in control portion 0107, input unit 0112 (b) can also be included in equipment machine 0108
In (a).Control portion 0107 and input unit 0112 (a) can also be by home energy management
System, plant capacity management system homenergic management system realizes.Input unit 0112 (b) can also
Carry out the display etc. of the state of the input to equipment machine 0108 (a), equipment machine 0108 (a).
Fig. 4 represents an example of the display of machine tool.
The input unit 0112 of the present embodiment has for input and the touch panel of display.It addition,
Input unit 0112 can also have the HMI in addition to touch panel such as button and display
(Human Machine Interface).Input unit 0112 (a) display machine tool monitor picture 0401.
Machine tool monitor picture 0401 has all control and releases button 0402, all priority change buttons
0403.All control to release button 0402 represent for the equipment machine 0108 of this user accept to
The operation of the releasing of the executory whole controls of equipment machine 0108 in family equipment 0120, be in order to
The button carrying out this releasing and touched by user.Such as, if input unit 0112 (a) is according to user couple
All control releases the touch (the 2nd operation) of button 0402 and (the 2nd asks letter by solicited message
Breath) be sent to arithmetic unit 0100, then arithmetic unit 0100 stops in this subscriber equipment 0120
The executory whole controls of equipment machine 0108.Process for comprising this control change processed
Describe below.Thereby, it is possible to complete to the equipment machine 0108 in this subscriber equipment 0120
Portion controls to release.All priority change buttons 0403 represent the arithmetic unit accepted later
In the selection of the control object that 0100 electricity needs performed adjusts control makes this subscriber equipment 0120
The operation of priority step-down of equipment machine 0108, be in order to carry out this change and to be touched by user
Button.Such as, if input unit 0112 (a) according to user to all priority change buttons 0403
Touch (the 1st operation) and solicited message (the 1st solicited message) is sent to arithmetic unit 0100,
Then arithmetic unit 0100 becomes electricity needs last time in this subscriber equipment 0120 and adjusts the control controlled
The priority step-down of the armamentarium machine 0108 of object processed.For comprising this control processed
Change processes and describes below.Thus, the electric power that arithmetic unit 0100 later performs needs
Ask in adjustment control, the armamentarium machine of control object in this subscriber equipment 0120, can be become
0108 is not easy to be chosen as control object.
At machine tool monitor picture 0401, input unit 0112 (a) shows that all priority changes are pressed often
Button 0403, and accept the input of all priority change buttons 0403.Electric power is needed by control portion 0107
The execution adjusting control is asked to notify to input unit 0112 (a).Input unit 0112 (a) needs at electric power
Ask and adjust in the execution controlled, show that all control releases button at machine tool monitor picture 0401
0402, and accept all inputs controlling to release button 0402.It addition, input unit 0112 (a) is also
Starting of controlling can be adjusted play electricity needs adjust after control terminates and through necessarily from electricity needs
Till period, show all priority change buttons 0403 at machine tool monitor picture 0401.
Fig. 5 represents an example of the display of handset.
Here, the situation that input unit 0112 (b) is arranged at washing machine illustrates.Input unit
0112 (b) shows handset monitor picture 0404.Handset monitor picture 0404 has unit control
Release button 0405, indivedual priority change button 0406.Unit control releases button 0405 and represents
Accept the operation of the releasing to this executory control of equipment machine 0108, be to release this control
And the button touched by user.Such as, when this washing machine adjusts control by electricity needs and stops,
If input unit 0112 (b) releases the touch (the 4th operation) of button 0405 according to user to unit control
And solicited message (the 4th solicited message) is sent to arithmetic unit 0100, then arithmetic unit 0100
Release the stopping to this washing machine to control.Process below for the control change comprising this process
Describe.Thus, this washing machine can be again turned on washing function.Indivedual priority change buttons
0406 represents that the electricity needs that the arithmetic unit 0100 accepted later performs adjusts the control in controlling
The selection of object makes the operation of the priority step-down of this equipment machine 0108, is to carry out this change
The button more and by user touched.Such as, adjust control at this washing machine by electricity needs and stop
Time, or after this electricity needs adjusts the end controlled, if input unit 0112 (b) is according to user
Touch (the 3rd operation) to indivedual priority change buttons 0406, by solicited message, (the 3rd please
Seek information) be sent to arithmetic unit 0100, then arithmetic unit 0100 becomes electricity needs tune last time
The priority step-down of this washing machine of the control object of whole control.For comprise this process control
Change processes and describes below.Thus, the electric power that arithmetic unit 0100 later performs needs
Asking in adjustment control, this washing machine is not easy to be chosen as control object.
At handset monitor picture 0404, input unit 0112 (b) shows that indivedual priority change is pressed often
Button 0406, and accept the input of indivedual priority change button 0406.Equipment machine 0108 (a)
The electricity needs of equipment machine 0108 (a) is adjusted the execution controlled notify to input unit 0112 (b).
Input unit 0112 (b) is in electricity needs adjusts the execution controlled, at handset monitor picture 0404
Display unit control releases button 0405, and accepts the input of unit control releasing button 0405.Separately
Outward, input unit 0112 (b) also can adjust control from the electricity needs of equipment machine 0108 (a)
Start to play after electricity needs adjusts the end controlled and till certain period, at handset monitor
Picture 0404 shows indivedual priority change button 0406.
By input unit 0112, it is possible to according to the operation of user, at any time transmission becomes up-to-date
Electricity needs adjust control control object equipment machine 0108 priority reduce request.
And then, in electricity needs adjusts the execution controlled, it is possible to according to the operation of user, send execution
In electricity needs adjust and control to carry out the request that releases.Additionally, user can pass through operation inputting part
0112 (a), sends for becoming multiple equipment machines that electricity needs adjusts the control object of control
The request of 0108, and operation inputting part 0112 (b) can be passed through, send for input unit 0112
The request of the equipment machine 0108 corresponding to (b).
Fig. 6 is an example of solicited message.
Solicited message have numbering 0501, the date 0502, what day 0503, the time period 0504, use
Family ID0505, machine ID 0506, request kind 0507 are as detailed catalogue.Numbering 0501 is this request
The numbering of the record in information, is the serial number from 1.Date 0502, what day 0503,
Time period 0504 represents that input unit 0112 receives the moment of the input from user.ID 0505
It is the ID of user in the subscriber equipment 0120 that is set of input unit 0112.
Machine ID 0506 be carried out in the releasing of control, request the setting of object of change of priority
The ID of standby host device 0108.It addition, request to as if such as control executory armamentarium machine 0108,
Can become in subscriber equipment 0120 as the armamentarium machine 0108 of control object multiple sets
In the case of standby host device 0108, machine ID 0506 is blank.It is to say, be that user touches mother
The situation of the button in machine monitor picture 0401.
Request kind 0507 is the value of the function representing the button being easily selected by a user in input unit 0112.
In the present embodiment, it is being for equipment machine 0108 being released the releasing of executory control request
In the case of, the value of request kind 0507 is " 1 ".It is being for electricity needs next time is adjusted control
In control object selection in the priority priority change request that carries out changing in the case of, please
The value seeking kind 0507 is " 2 ".It is touched it is to say, control to release button 0402 in entirety
In the case of solicited message in, machine ID 0506 is blank, and the value of request kind 0507 is 1.
In solicited message in the case of all priority change buttons 0403 have been touched, machine
ID0506 is blank, and the value of request kind 0507 is 2.Release button 0405 at unit control to be touched
In solicited message in the case of having touched, the value of machine ID 0506 is set, request kind 0507
Value is 1.In solicited message in the case of indivedual priority change buttons 0406 have been touched, machine
The value of device ID0506 is set, and the value of request kind 0507 is 2.
It addition, solicited message can not have any detailed catalogue.Such as, solicited message can only have use
Family ID.
Here, the priority change portion 0113 in arithmetic unit 0100 is illustrated.
Priority change portion 0113 is to the priority corresponding to the solicited message from subscriber equipment 0120
Record in data base 0104 is determined, and makes priority 0207 step-down of this record.Below, right
Priority change based on priority change portion 0113 processes and illustrates.
Fig. 7 represents that priority change processes.
Priority change portion 0113 execution priority change repeatedly processes.
In S0601, priority change portion 0113 connects the solicited message from input unit 0112
Take in row confirmation.
In S0602, priority change portion 0113 determines whether it has received solicited message.Judging
In the case of not receiving solicited message, priority change portion 0113 makes process return to S0601.
On the other hand, in the case of being judged to receive solicited message, priority change portion 0113 makes place
Reason enters into S0603.
In S0603, the content of the priority change portion 0113 solicited message to receiving is known
Not.It is to say, date 0502 in the solicited message that priority change portion 0113 is to receiving,
What day 0503, the time period 0504, ID 0505, machine ID 0506, request kind 0507
Content be identified.
In S0604, the actual achievement corresponding to solicited message that priority change portion 0113 will receive
The record of data base 0106 is defined as actual achievement record.Here, priority change portion 0113 will identify that
The specific detailed catalogue of solicited message compare with the specific detailed catalogue of actual achievement data base 0106.Such as, asking
In the case of asking information to represent all inputs controlling to release button 0402, priority change portion 0113
By the date 0302 of the record in actual achievement data base 0106, what day 0303, the time period 0304, use
All records consistent with the content of solicited message for family ID0305 are defined as actual achievement record.At request letter
In the case of breath represents the input of all priority change buttons 0403, priority change portion 0113 is right
All notes that the ID 0305 of the record in actual achievement data base 0106 is consistent with the content of solicited message
Record is extracted, and the record up-to-date date 0302 is defined as in the record extracted actual achievement note
Record.It addition, in this case, priority change portion 0113 can also be to actual achievement data base 0106
In record what day 0303, the time period 0304, the content one of ID 0305 and solicited message
The all records caused extract, and by true for the record up-to-date date 0302 in the record extracted
It is set to actual achievement record.In the case of solicited message represents the input that unit control releases button 0405,
Priority change portion 0113 from actual achievement data base 0106, by the date 0302, what day 0303,
All notes that time period 0304, ID 0305, machine ID 0306 are consistent with the content of solicited message
Record is defined as actual achievement record.The input of indivedual priority change button 0406 is represented in solicited message
In the case of, priority change portion 0113 is from actual achievement data base 0106, to ID 0305, machine
All records consistent with the content of solicited message for ID0306 extract, and in the record extracted
The record up-to-date date 0302 is defined as actual achievement record.It addition, in this case, priority
Changing unit 0113 can also from actual achievement data base 0106, to what day 0303, the time period 0304,
All records that ID 0305, machine ID 0306 are consistent with the content of solicited message extract,
And in the record extracted, the record up-to-date date 0302 is defined as actual achievement record.
In S0605, priority change portion 0113, from priority data storehouse 0104, determines user
ID0202, machine ID 0203, what day 0205, the ID 0305 of time period 0206 and actual achievement record,
Machine ID 0306, what day 0303, time period 0304 consistent record.Then, priority change
Portion 0113 makes priority 0207 step-down of the record in the priority data storehouse 0104 determined.Such as,
The priority 0207 of the record in priority data storehouse 0104 that priority change portion 0113 will determine
Become 1.It addition, priority change portion 0113 can also be in the range of the value of priority, from determining
The priority 0207 of the record in the priority data storehouse 0104 gone out deducts setting.
In S0606, priority change portion 0113 judges that the solicited message received indicates whether to solve
Except request.That is, represent that all control releases button 0402 or unit control releases and presses in solicited message
In the case of the input of button 0405, priority change portion 0113 is judged to that solicited message represents that releasing please
Ask (S0606: yes), make process enter S0607.And represent that all priority becomes in solicited message
In the case of the input of more button 0403 or indivedual priority change button 0406, priority change portion
0113 is judged to that solicited message does not represents releasing request (S0606: no), terminates this flow process.
In S0607, priority change portion 0113 by the date 0302 of actual achievement record, what day 0303,
Time period 0304, ID 0305, machine ID 0306, control content 0307 information notify to
Instruction output unit 0105, terminates this flow process.Now, instruction output unit 0105 is according to from priority
The ID of changing unit 0113, machine ID determine equipment machine 0108, and by network by
The control instruction releasing the control of the equipment machine 0108 determined is sent to control portion 0107.
The control portion 0107 receiving this control instruction releases the control of this equipment machine 0108.
More than process for priority change.It addition, in priority change processes, priority change portion
0113 can also replace performing S0605 after S0604, and is determining the situation that S0606 is no
Under (S0606: no) perform S0605 process.Additionally, priority change portion 0113 can also be
The solicited message received comprises ID and the demand to this user that is in adjusts in the execution controlled
In the case of, it is determined that represent releasing request for this solicited message.
ID, machine ID and priority are set up association correspondence and are come by priority data storehouse 0104
Storing, ID and the machine ID of control object are stored by actual achievement data base 0106, please
Asking information to comprise ID, thus, priority change portion 0113 can determine the equipment of control object
The priority of machine 0108.Additionally, priority data storehouse 0104 to ID, machine ID, time
Between section and priority set up association correspondence and store, actual achievement data base 0106 to control instruction time
Between section, the ID of control object and machine ID set up association correspondence and store, thus, preferentially
Level changing unit 0113 can determine the time period of the control instruction of the equipment machine 0108 of control object
Priority.Additionally, priority change portion 0113 can be from the control stored by actual achievement data base 0106
In instruction, the up-to-date control instruction to control object selects, and thus, user is without specifying the time period
And the priority reduction of the time period of up-to-date control instruction can be made by shirtsleeve operation.
Process according to priority change, it is possible to determine equipment machine 0108 corresponding with the operation of user,
And make the priority of the equipment machine 0108 determined reduce.Additionally, the operation user represents solution
In the case of request, it is possible to determine equipment machine 0108 corresponding with this operation, and to determining
The demand of equipment machine 0108 adjusts control and releases.
Here, the timing unit 0114 in arithmetic unit 0100 is illustrated.
Timing unit 0114 in the case of priority 0207 step-down in priority data storehouse 0104, warp
The value making this priority after spending certain time improves, and makes priority revert to original value, or makes excellent
First level to original value close to stated number.By timing unit 0114, it is possible to prevent priority from maintaining and reduce
State constant.Furthermore it is possible to make the value change corresponding to the life style of this user of priority.
According to the present embodiment, controlling and user feels the most in good time owing to electricity needs adjusts, it is possible to
The priority of multiple equipment machines 0108 in subscriber equipment 0120, energy is changed by once-through operation
Enough reduce the time of the priority change of user.
It addition, the present invention is not limited only to the above embodiments, also comprise various variation.Above-mentioned reality
Executing example is the embodiment described in detail for the present invention easy to understand, and the present invention is not limited to possess
The scheme of the entire infrastructure of bright mistake.
In above embodiment, the technology of explanation also is able to show as follows.
(performance 1)
A kind of demand adjusts system, possesses:
Storage part, precedence information stores by it, and this precedence information represents from offer equipment
The resource provided carries out the multiple respective priority of consumption machine consumed;
Operational part, the measurement of its consumption receiving the described resource representing the plurality of consumption machine is tied
The metrical information of fruit, calculates the adjustment amount of the demand of described resource based on described metrical information, based on
Described adjustment amount and described precedence information, selected as to described from the plurality of consumption machine
The demand that the consumption of resource carries out cutting down adjusts multiple control object machines of the object controlled, and will refer to
Show that described demand adjusts the 1st control instruction controlled and is sent to comprise the plurality of control object machine
Subscriber equipment, and would indicate that the actual achievement information of described 1st control instruction is saved in described storage part;
Control portion, it is arranged at described subscriber equipment, receives described 1st control instruction, and based on
Described 1st control instruction performs described demand and adjusts control;With
Input unit, it is arranged at described subscriber equipment, accepts the 1st operation of user, and according to institute
Stating the 1st operation to send the 1st solicited message to described operational part, the 1st solicited message is used for asking
The change of the priority of the plurality of control object machine,
Described operational part is in the case of receiving described 1st solicited message, based on described 1st request
Information and described actual achievement information determine the plurality of control object machine, and believe described priority
The priority of the plurality of control object machine in breath changes.
(performance 2)
System is adjusted according to the demand described in performance 1, it is characterised in that
Described operational part comes from the plurality of consumption machine according to described priority order from high to low
Middle selection the plurality of control object machine, in the case of receiving described 1st solicited message, makes
The priority of the plurality of control object machine in described precedence information reduces.
(performance 3)
System is adjusted according to the demand described in performance 2, it is characterised in that
Described input unit accepts the 2nd operation of described user, and comes to described according to described 2nd operation
Operational part sends the 2nd solicited message, and the 2nd solicited message controls for asking described demand to adjust
Release,
Described operational part is in the case of receiving described 2nd solicited message, based on described 2nd request
Information and described actual achievement information determine the plurality of control object machine, and would indicate that described demand
The 2nd control instruction adjusting the releasing controlled is sent to described control portion,
Described control portion receives described 2nd control instruction, and releases based on described 2nd control instruction
Described demand adjusts and controls.
(performance 4)
System is adjusted according to the demand described in performance 3, it is characterised in that
The display of described input unit accepts described 1st input, and comes to described fortune according to described 1st input
Calculation portion sends described 1st solicited message,
Described demand is adjusted the execution controlled and notifies to described input unit by described control portion,
In described demand adjusts the execution controlled, the display of described input unit accepts described 2nd input,
And to send described 2nd solicited message to described operational part according to described 2nd input.
(performance 5)
System is adjusted according to the demand described in performance 4, it is characterised in that
Excellent from the plurality of control object machine made in described precedence information of described operational part
In the case of first level has reduced and have passed through the stipulated time, make the plurality of control in described precedence information
The priority of subject machine processed improves.
(performance 6)
System is adjusted according to the demand described in performance 5, it is characterised in that
It is each that described precedence information comprises the identification information of described user, the plurality of control object machine
From identification information, association between the plurality of respective priority of control object machine corresponding,
Described actual achievement information comprises the identification information of described user, the knowledge of the plurality of control object machine
Association between other information, described 1st control instruction is corresponding,
Described 1st solicited message comprises the identification information of described user,
Described operational part determines the plurality of based on described 1st solicited message and described actual achievement information
Control object machine, and the priority to the plurality of control object machine in described precedence information
Change.
(performance 7)
System is adjusted according to the demand described in performance 6, it is characterised in that
Described precedence information comprises the priority of each time period,
Described actual achievement information comprises the information that the moment to described 1st control instruction is indicated,
Described operational part determines the plurality of based on described 1st solicited message and described actual achievement information
Control object machine and the time period of described 1st control instruction, and in described precedence information
The priority of the described time period determined of the plurality of control object machine changes.
(performance 8)
System is adjusted according to the demand described in performance 7, it is characterised in that
Described operational part determines described user based on described 1st solicited message, believes based on described actual achievement
Breath selects the up-to-date control instruction for described user, to selected go out described control instruction right
Elephant consume machine and selected by time period of described control instruction of going out be identified, and to described
The described time period identified of the described consumption machine identified in precedence information excellent
First level changes.
(performance 9)
System is adjusted according to the demand described in performance 8, it is characterised in that
Being also equipped with particular machine input unit, this particular machine input unit is arranged at described subscriber equipment,
Establish association in advance with the particular machine as one of the plurality of control object machine corresponding, accept
3rd operation of described user, and to send the 3rd request to described operational part according to described 3rd operation
Information, the 3rd solicited message is used for asking the change of the priority of described particular machine,
Described operational part is in the case of receiving described 3rd solicited message, based on described 3rd request
Information and described actual achievement information determine described particular machine, and to the institute in described precedence information
The priority stating particular machine changes.
(performance 10)
System is adjusted according to the demand described in performance 9, it is characterised in that
Described particular machine input unit accepts the 4th operation of described user, and according to described 4th operation
To send the 4th solicited message to described operational part, the 4th solicited message is used for asking described specific machine
The demand of device adjusts the releasing controlled,
Described operational part is in the case of receiving described 4th solicited message, based on described 4th request
Information and described actual achievement information determine described particular machine, would indicate that the demand of described particular machine
The 3rd control instruction adjusting the releasing controlled is sent to described control portion,
Described control portion receives described 3rd control instruction, and releases based on described 3rd control instruction
The demand of described particular machine adjusts and controls.
(performance 11)
The demand described in any one according to performance 1 to 10 adjusts system, it is characterised in that
Described resource is electric power.
(performance 12)
A kind of demand adjusting apparatus, possesses:
Storage part, precedence information stores by it, and this precedence information represents from offer equipment
The resource provided carries out the multiple respective priority of consumption machine consumed;With
Operational part, the measurement of its consumption receiving the described resource representing the plurality of consumption machine is tied
The metrical information of fruit, calculates the adjustment amount of the demand of described resource based on described metrical information, based on
Described adjustment amount and described precedence information, selected as to described from the plurality of consumption machine
The demand that the consumption of resource carries out cutting down adjusts multiple control object machines of the object controlled, and will refer to
Show that described demand adjusts the 1st control instruction controlled and is sent to comprise the plurality of control object machine
Subscriber equipment, and would indicate that the actual achievement information of described 1st control instruction is saved in described storage part,
Described operational part is receiving for asking the plurality of control object machine from described subscriber equipment
In the case of 1st solicited message of the change of the priority of device, based on described 1st solicited message and
Described actual achievement information determines the plurality of control object machine, and to the institute in described precedence information
The priority stating multiple control object machine changes.
(performance 13)
A kind of consumption machine handing device, possesses:
Control portion, it receives the 1st control instruction from demand adjusting apparatus, and controls based on the described 1st
Instruction performs the demand of multiple control object machine and adjusts control, wherein, described demand adjusting apparatus
Storage represents that the multiple consumption machines consuming the resource provided from offer equipment are respective preferentially
The precedence information of level, receives the measurement of the consumption of the described resource representing the plurality of consumption machine
The metrical information of result, calculates the adjustment amount of the demand of described resource, base based on described metrical information
In described adjustment amount and described precedence information, selected as to institute from the plurality of consumption machine
The plurality of control that the described demand that the consumption stating resource carries out cutting down adjusts the object controlled is right
As machine, it is sent to comprise described many by indicating described demand to adjust described 1st control instruction controlled
The subscriber equipment of individual control object machine, storage represents the actual achievement information of described 1st control instruction;With
Input unit, it accepts the 1st operation of user, and comes to described computing according to described 1st operation
Portion sends the 1st solicited message, and the 1st solicited message is for asking the plurality of control object machine
The change of priority,
Described arithmetic unit, please based on the described 1st in the case of receiving described 1st solicited message
Ask information and described actual achievement information to determine the plurality of control object machine, and to described priority
The priority of the plurality of control object machine in information changes.
Term in above performance is illustrated.Offer equipment corresponds to power system, power equipment
0110, electric lines of force 0109 etc..Resource is corresponding to electric power, combustion gas and water etc..Consumption machine corresponds to
Equipment machine 0108 etc..Storage part corresponds to priority data storehouse 0104 and actual achievement data base 0106
Deng.Precedence information is corresponding to priority data storehouse 0104 etc..Actual achievement information corresponds to actual achievement data
Storehouse 0106 etc..Operational part is corresponding to starting detection unit 0101, adjustment amount calculating part 0102, machine choosing
Select portion 0103, instruction output unit 0105, timing unit 0114 etc..Input unit corresponds to input unit 0112
(a) etc..Particular machine input unit is corresponding to input unit 0112 (b) etc..Particular machine is corresponding to setting
Standby host device 0108 (a) etc..The identification information of user is corresponding to ID etc..Multiple control object machines
Each of device identifies that information is corresponding to machine ID etc..Demand adjusting apparatus corresponds to arithmetic unit 0100
Deng.Consume machine handing device corresponding to control portion 0107 and input unit 0112 (a) etc..
Claims (12)
1. demand adjusts a system, possesses:
Storage part, precedence information stores by it, and this precedence information represents from offer equipment
The resource provided carries out the multiple respective priority of consumption machine consumed;
Operational part, the measurement of its consumption receiving the described resource representing the plurality of consumption machine is tied
The metrical information of fruit, calculates the adjustment amount of the demand of described resource based on described metrical information, based on
Described adjustment amount and described precedence information, selected as to described from the plurality of consumption machine
The demand that the consumption of resource carries out cutting down adjusts multiple control object machines of the object controlled, and will refer to
Show that described demand adjusts the 1st control instruction controlled and is sent to comprise the plurality of control object machine
Subscriber equipment, and would indicate that the actual achievement information of described 1st control instruction is saved in described storage part;
Control portion, it is arranged at described subscriber equipment, receives described 1st control instruction, and based on
Described 1st control instruction performs described demand and adjusts control;With
Input unit, it is arranged at described subscriber equipment, accepts the 1st operation of user, and according to institute
Stating the 1st operation to send the 1st solicited message to described operational part, the 1st solicited message is used for asking
The change of the priority of the plurality of control object machine,
Described operational part is in the case of receiving described 1st solicited message, based on described 1st request
Information and described actual achievement information determine the plurality of control object machine, and believe described priority
The priority of the plurality of control object machine in breath changes,
Described operational part comes from the plurality of consumption machine according to described priority order from high to low
Middle selection the plurality of control object machine, in the case of receiving described 1st solicited message, makes
The priority of the plurality of control object machine in described precedence information reduces.
Demand the most according to claim 1 adjusts system, it is characterised in that
Described input unit accepts the 2nd operation of described user, and comes to described according to described 2nd operation
Operational part sends the 2nd solicited message, and the 2nd solicited message controls for asking described demand to adjust
Release,
Described operational part is in the case of receiving described 2nd solicited message, based on described 2nd request
Information and described actual achievement information determine the plurality of control object machine, and would indicate that described demand
The 2nd control instruction adjusting the releasing controlled is sent to described control portion,
Described control portion receives described 2nd control instruction, and releases based on described 2nd control instruction
Described demand adjusts and controls.
Demand the most according to claim 2 adjusts system, it is characterised in that
The display of described input unit accepts described 1st operation, and comes to described fortune according to described 1st operation
Calculation portion sends described 1st solicited message,
Described demand is adjusted the execution controlled and notifies to described input unit by described control portion,
In described demand adjusts the execution controlled, the display of described input unit accepts described 2nd operation,
And to send described 2nd solicited message to described operational part according to described 2nd operation.
Demand the most according to claim 3 adjusts system, it is characterised in that
Excellent from the plurality of control object machine made in described precedence information of described operational part
In the case of first level has reduced and have passed through the stipulated time, make the plurality of control in described precedence information
The priority of subject machine processed improves.
Demand the most according to claim 4 adjusts system, it is characterised in that
It is each that described precedence information comprises the identification information of described user, the plurality of control object machine
From identification information, association between the plurality of respective priority of control object machine corresponding,
Described actual achievement information comprises the identification information of described user, the knowledge of the plurality of control object machine
Association between other information, described 1st control instruction is corresponding,
Described 1st solicited message comprises the identification information of described user,
Described operational part determines the plurality of based on described 1st solicited message and described actual achievement information
Control object machine, and the priority to the plurality of control object machine in described precedence information
Change.
Demand the most according to claim 5 adjusts system, it is characterised in that
Described precedence information comprises the priority of each time period,
Described actual achievement information comprises the information that the moment to described 1st control instruction is indicated,
Described operational part determines the plurality of based on described 1st solicited message and described actual achievement information
Control object machine and the time period of described 1st control instruction, and in described precedence information
The priority of the described time period determined of the plurality of control object machine changes.
Demand the most according to claim 6 adjusts system, it is characterised in that
Described operational part determines described user based on described 1st solicited message, believes based on described actual achievement
Breath selects the up-to-date control instruction for described user, to selected go out described control instruction right
Elephant consume machine and selected by time period of described control instruction of going out be identified, and to described
The described time period identified of the described consumption machine identified in precedence information excellent
First level changes.
Demand the most according to claim 7 adjusts system, it is characterised in that
Being also equipped with: particular machine input unit, it is arranged at described subscriber equipment, in advance with as institute
State the particular machine of one of multiple control object machine and establish association correspondence, accept the of described user
3 operation, and according to described 3rd operation come to described operational part send the 3rd solicited message, the 3rd
Solicited message is used for asking the change of the priority of described particular machine,
Described operational part is in the case of receiving described 3rd solicited message, based on described 3rd request
Information and described actual achievement information determine described particular machine, and to the institute in described precedence information
The priority stating particular machine changes.
Demand the most according to claim 8 adjusts system, it is characterised in that
Described particular machine input unit accepts the 4th operation of described user, and according to described 4th operation
To send the 4th solicited message to described operational part, the 4th solicited message is used for asking described specific machine
The demand of device adjusts the releasing controlled,
Described operational part is in the case of receiving described 4th solicited message, based on described 4th request
Information and described actual achievement information determine described particular machine, and would indicate that the need of described particular machine
The 3rd control instruction adjusting the releasing controlled is asked to be sent to described control portion,
Described control portion receives described 3rd control instruction, and releases based on described 3rd control instruction
The demand of described particular machine adjusts and controls.
Demand the most according to claim 1 adjusts system, it is characterised in that
Described resource is electric power.
11. 1 kinds of demand adjusting apparatus, possess:
Storage part, precedence information stores by it, and this precedence information represents from offer equipment
The resource provided carries out the multiple respective priority of consumption machine consumed;With
Operational part, the measurement of its consumption receiving the described resource representing the plurality of consumption machine is tied
The metrical information of fruit, calculates the adjustment amount of the demand of described resource based on described metrical information, based on
Described adjustment amount and described precedence information, selected as to described from the plurality of consumption machine
The demand that the consumption of resource carries out cutting down adjusts multiple control object machines of the object controlled, and will refer to
Show that described demand adjusts the 1st control instruction controlled and is sent to comprise the plurality of control object machine
Subscriber equipment, and would indicate that the actual achievement information of described 1st control instruction is saved in described storage part,
Described operational part is receiving for asking the plurality of control object machine from described subscriber equipment
In the case of 1st solicited message of the change of the priority of device, based on described 1st solicited message and
Described actual achievement information determines the plurality of control object machine, and to the institute in described precedence information
The priority stating multiple control object machine changes,
Described operational part comes from the plurality of consumption machine according to described priority order from high to low
Middle selection the plurality of control object machine, in the case of receiving described 1st solicited message, makes
The priority of the plurality of control object machine in described precedence information reduces.
12. 1 kinds consume machine handing device, possess:
Control portion, it receives the 1st control instruction from demand adjusting apparatus, and controls based on the described 1st
Instruction performs the demand of multiple control object machine and adjusts control, wherein, described demand adjusting apparatus
Storage represents that the multiple consumption machines consuming the resource provided from offer equipment are respective preferentially
The precedence information of level, receives the measurement of the consumption of the described resource representing the plurality of consumption machine
The metrical information of result, calculates the adjustment amount of the demand of described resource, base based on described metrical information
In described adjustment amount and described precedence information, selected as to institute from the plurality of consumption machine
The plurality of control that the described demand that the consumption stating resource carries out cutting down adjusts the object controlled is right
As machine, it is sent to comprise described many by indicating described demand to adjust described 1st control instruction controlled
The subscriber equipment of individual control object machine, storage represents the actual achievement information of described 1st control instruction;With
Input unit, it accepts the 1st operation of user, and comes to described demand according to described 1st operation
Adjusting apparatus sends the 1st solicited message, and the 1st solicited message is used for asking the plurality of control object
The change of the priority of machine,
Described demand adjusting apparatus is in the case of receiving described 1st solicited message, based on described
1 solicited message and described actual achievement information determine the plurality of control object machine, and to described excellent
The priority of the plurality of control object machine in first level information changes,
Described demand adjusting apparatus disappears from the plurality of according to described priority order from high to low
Consumption machine selects the plurality of control object machine, in the situation receiving described 1st solicited message
Under, make the priority of the plurality of control object machine in described precedence information reduce.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013-108348 | 2013-05-22 | ||
JP2013108348A JP6080686B2 (en) | 2013-05-22 | 2013-05-22 | Demand adjustment system, demand adjustment device, and consumer equipment management device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104184152A CN104184152A (en) | 2014-12-03 |
CN104184152B true CN104184152B (en) | 2017-01-04 |
Family
ID=50735995
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410210415.1A Active CN104184152B (en) | 2013-05-22 | 2014-05-19 | Demand adjusts system, demand adjusting apparatus and consumes machine handing device |
Country Status (5)
Country | Link |
---|---|
US (1) | US9651972B2 (en) |
EP (1) | EP2806522B1 (en) |
JP (1) | JP6080686B2 (en) |
CN (1) | CN104184152B (en) |
IN (1) | IN2014DE01188A (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6348096B2 (en) | 2015-11-17 | 2018-06-27 | ファナック株式会社 | Selection device and network system for selecting an electric motor system |
WO2018182035A1 (en) * | 2017-03-31 | 2018-10-04 | ダイキン工業株式会社 | Management device |
US11239660B2 (en) * | 2017-05-10 | 2022-02-01 | Korea Electronics Technology Institute | Demand response system and method for controlling devices to participate in demand response automatically |
CN107240917B (en) * | 2017-05-16 | 2020-02-07 | 沃太能源南通有限公司 | Management method of off-network household load intelligent management system |
CN107395397B (en) * | 2017-06-23 | 2020-09-04 | 深圳市盛路物联通讯技术有限公司 | Power consumption control method and device based on Internet of things |
JP6816059B2 (en) * | 2018-04-20 | 2021-01-20 | ファナック株式会社 | Selection support system and selection support method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1584895A (en) * | 2003-08-22 | 2005-02-23 | 台湾积体电路制造股份有限公司 | Method and system of matching customer demand with production capacity, recording medium and management system |
CN101419435A (en) * | 2007-10-24 | 2009-04-29 | Lg电子株式会社 | Demand controller for electric system |
CN101681951A (en) * | 2006-08-08 | 2010-03-24 | Pvt太阳能有限公司 | Be used to control layout, the system and method for solar energy supply systems |
US7958316B2 (en) * | 2008-02-01 | 2011-06-07 | International Business Machines Corporation | Dynamic adjustment of prefetch stream priority |
CN102474131A (en) * | 2009-09-08 | 2012-05-23 | 株式会社东芝 | Comprehensive monitoring and control system for smart grid and microgrid |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2685942B2 (en) * | 1989-12-21 | 1997-12-08 | 株式会社東芝 | How to limit the peak value of power consumption |
US5572438A (en) * | 1995-01-05 | 1996-11-05 | Teco Energy Management Services | Engery management and building automation system |
JP2008125295A (en) | 2006-11-14 | 2008-05-29 | Central Res Inst Of Electric Power Ind | Method and device for selecting/interrupting load in consumer |
JP4931656B2 (en) * | 2007-03-19 | 2012-05-16 | 三洋電機株式会社 | COOLING DEVICE CONTROL DEVICE AND COOLING DEVICE CONTROL METHOD |
JP2010075015A (en) | 2008-09-22 | 2010-04-02 | Mitsubishi Electric Corp | Demand control system for household electric appliance |
JP5255462B2 (en) | 2009-01-13 | 2013-08-07 | 株式会社日立製作所 | Power supply and demand operation management server and power supply and demand operation management system |
JP4910020B2 (en) | 2009-08-05 | 2012-04-04 | 株式会社日立製作所 | Consumer energy management system |
JP2011055622A (en) * | 2009-09-01 | 2011-03-17 | Panasonic Corp | Ih cooking heater, method for controlling the ih cooking heater and program |
JP5520118B2 (en) * | 2010-04-02 | 2014-06-11 | パナソニック株式会社 | Equipment control system |
US8410633B2 (en) * | 2010-06-03 | 2013-04-02 | Briggs & Stratton Corporation | Dynamic load shedding system for a standby generator |
JP5204819B2 (en) | 2010-08-31 | 2013-06-05 | 株式会社日立製作所 | Energy management system and energy management method |
JP2012151992A (en) | 2011-01-19 | 2012-08-09 | Hitachi Ltd | Power demand adjustment device, power adjustment network system, and power adjustment method |
JP5117625B1 (en) | 2011-06-24 | 2013-01-16 | 株式会社東芝 | DR countermeasure proposal device and method thereof |
JP5457407B2 (en) | 2011-08-23 | 2014-04-02 | 株式会社日立製作所 | Power system load leveling system |
-
2013
- 2013-05-22 JP JP2013108348A patent/JP6080686B2/en active Active
-
2014
- 2014-05-01 IN IN1188DE2014 patent/IN2014DE01188A/en unknown
- 2014-05-19 CN CN201410210415.1A patent/CN104184152B/en active Active
- 2014-05-20 US US14/281,971 patent/US9651972B2/en active Active
- 2014-05-22 EP EP14169471.1A patent/EP2806522B1/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1584895A (en) * | 2003-08-22 | 2005-02-23 | 台湾积体电路制造股份有限公司 | Method and system of matching customer demand with production capacity, recording medium and management system |
CN101681951A (en) * | 2006-08-08 | 2010-03-24 | Pvt太阳能有限公司 | Be used to control layout, the system and method for solar energy supply systems |
CN101419435A (en) * | 2007-10-24 | 2009-04-29 | Lg电子株式会社 | Demand controller for electric system |
US7958316B2 (en) * | 2008-02-01 | 2011-06-07 | International Business Machines Corporation | Dynamic adjustment of prefetch stream priority |
CN102474131A (en) * | 2009-09-08 | 2012-05-23 | 株式会社东芝 | Comprehensive monitoring and control system for smart grid and microgrid |
Non-Patent Citations (2)
Title |
---|
考虑需求侧管理的调峰权交易研究;刘扬洋,等;《电力***保护与控制》;20110501;第39卷(第9期);第38-43,64页 * |
需求侧负荷管理中最优错峰计划的生成;刘健,等;《电力***自动化》;20060425;第30卷(第8期);第47-51页 * |
Also Published As
Publication number | Publication date |
---|---|
US20140350741A1 (en) | 2014-11-27 |
US9651972B2 (en) | 2017-05-16 |
CN104184152A (en) | 2014-12-03 |
EP2806522B1 (en) | 2021-02-17 |
JP2014230402A (en) | 2014-12-08 |
JP6080686B2 (en) | 2017-02-15 |
EP2806522A3 (en) | 2015-12-30 |
IN2014DE01188A (en) | 2015-06-05 |
EP2806522A2 (en) | 2014-11-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104184152B (en) | Demand adjusts system, demand adjusting apparatus and consumes machine handing device | |
JP5999148B2 (en) | Server apparatus and program | |
JP6140201B2 (en) | CONTROL DEVICE, CONTROL DEVICE CONTROL METHOD, CONTROL SYSTEM, AND CONTROL PROGRAM | |
US20140316599A1 (en) | Consumer energy management system and consumer energy management method | |
CN109240117A (en) | Intelligent household appliance control method and device | |
US9946288B2 (en) | Energy management system, terminal device, display control method, and program | |
JP6277537B2 (en) | Energy management apparatus, energy management system, energy management method, and program | |
US9964930B2 (en) | Control device for controlling facility equipment | |
CN103891203A (en) | Apparatus and method for managing electric devices, and mobile device and system adapted to the method | |
Lee et al. | Electricity usage scheduling in smart building environments using smart devices | |
KR20110114437A (en) | Demand response method and demand response system | |
US10268171B2 (en) | Demand response control result presentation apparatus | |
CN107729112A (en) | Control method and device for household appliance, storage medium and household appliance | |
JP2013236529A (en) | Electric control device and power consumption control system | |
JP6697769B2 (en) | Energy management device and energy management method | |
KR102286994B1 (en) | Customized energy management device and method | |
WO2018020711A1 (en) | Energy management device and energy management method | |
JP6264700B2 (en) | Energy management apparatus, energy management system, energy management method, and program | |
JP6783630B2 (en) | Equipment control devices, equipment control methods, and programs | |
WO2016186069A1 (en) | Incentive prediction amount presenting device | |
JP5935003B2 (en) | Power control apparatus, power management system and program | |
US10444719B2 (en) | Energy management device and energy management method | |
US8726059B2 (en) | Systems and methods for use in controlling energy consumption within a building | |
JP2018207709A (en) | Display processor, display processing method and display processing program | |
JP6098026B2 (en) | Power control system, program, and power control apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |