JP2018207709A - Display processor, display processing method and display processing program - Google Patents

Display processor, display processing method and display processing program Download PDF

Info

Publication number
JP2018207709A
JP2018207709A JP2017112641A JP2017112641A JP2018207709A JP 2018207709 A JP2018207709 A JP 2018207709A JP 2017112641 A JP2017112641 A JP 2017112641A JP 2017112641 A JP2017112641 A JP 2017112641A JP 2018207709 A JP2018207709 A JP 2018207709A
Authority
JP
Japan
Prior art keywords
display processing
power
power management
information
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2017112641A
Other languages
Japanese (ja)
Inventor
育美 松末
Ikumi Matsusue
育美 松末
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Electric Industries Ltd
Original Assignee
Sumitomo Electric Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Electric Industries Ltd filed Critical Sumitomo Electric Industries Ltd
Priority to JP2017112641A priority Critical patent/JP2018207709A/en
Publication of JP2018207709A publication Critical patent/JP2018207709A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

To provide a display processor, display processing method and display processing program, capable of achieving more appropriate management of a request destination concerning adjustment of power consumption.SOLUTION: The display processor includes: an acquisition part for acquiring control information showing control contents of apparatuses in a facility and power management information showing at least either one of a power supply amount from a system to the facility and electricity charge; a display processing part for executing mapping and displaying between a time series variation of the control contents and at least either one of a time series variation of the power supply amount and a time series variation of the electric charge, on the basis of the control information and the power management information acquired by the acquisition part.SELECTED DRAWING: Figure 7

Description

本発明は、表示処理装置、表示処理方法および表示処理プログラムに関する。   The present invention relates to a display processing device, a display processing method, and a display processing program.

従来、電力需給が逼迫している場合等に一般家庭およびオフィス等の電力需要施設における電力消費が抑制されるように、電力需要施設における電力消費を管理するシステムが開発されている。   2. Description of the Related Art Conventionally, a system for managing power consumption in a power demand facility has been developed so that power consumption in a power demand facility such as a general home and an office is suppressed when the power supply and demand is tight.

たとえば、特許文献1(特開2012−205358号公報)には、以下のような技術が開示されている。すなわち、電力管理システムは、予め登録された複数の参加者を含むコミュニティに関する参加者リストを保持する保持部と、電力削減制御の実行の要否を判定する判定部と、電力削減制御の実行が必要であると判定部が判定した場合に、参加者リストに含まれている複数の参加者の中から、電力削減制御の対象となる一以上の対象者を選定する選定部と、選定部によって選定された対象者に関して、電力削減制御を実行する制御部と、電力削減制御が実行された対象者に対して、削減電力に基づく特典を付与する付与部とを備える。   For example, Patent Document 1 (Japanese Patent Laid-Open No. 2012-205358) discloses the following technique. That is, the power management system includes a holding unit that holds a participant list related to a community including a plurality of registered participants, a determination unit that determines whether or not to execute power reduction control, and execution of power reduction control. When the determination unit determines that it is necessary, a selection unit that selects one or more target persons to be subjected to power reduction control from a plurality of participants included in the participant list, and a selection unit With respect to the selected target person, the control part which performs power reduction control, and the provision part which provides the privilege based on reduced power with respect to the target person by which power reduction control was performed are provided.

また、節電を目的として、家庭またはビル等の電力需要施設へのエネルギーマネジメントシステムxEMS(Energy Management System)の導入が行われている。   Further, for the purpose of power saving, an energy management system xEMS (Energy Management System) has been introduced into a power demand facility such as a home or a building.

xEMSとは、電力需要施設における消費電力量を監視し、電力需要施設における機器または設備等の運転状態を管理することによって、電力需要施設における電力消費の抑制を図るためのシステムである。xEMSは、家庭向けである場合、HEMS(Home Energy Management System)となり、ビル向けである場合、BEMS(Building Energy Management System)となる。   xEMS is a system for monitoring power consumption in a power demand facility and managing power consumption in the power demand facility by managing the operating state of equipment or equipment in the power demand facility. The xEMS is a Home Energy Management System (HEMS) when it is for a home, and a BEMS (Building Energy Management System) when it is for a building.

xEMSは、たとえばVPP(Virtual Power Plant)事業者すなわちアグリゲータと呼ばれる事業者と連携することによって電力需要の抑制を実現する。アグリゲータは、xEMSを導入した電力需要施設に対してエネルギー管理支援サービスを提供する。   xEMS realizes suppression of power demand by, for example, cooperating with a VPP (Virtual Power Plant) operator, that is, an operator called an aggregator. The aggregator provides an energy management support service to a power demand facility in which xEMS is introduced.

特開2012−205358号公報JP 2012-205358 A

送配電事業者および電力小売り事業者は、多くの電力需要施設にxEMSが導入されることにより、全体的な電力需要を広範囲に調整することが容易となる。   Power transmission / distribution operators and power retailers can easily adjust the overall power demand in a wide range by introducing xEMS in many power demand facilities.

たとえば、送配電事業者および電力小売り事業者は、電力需給の逼迫が予測される場合に、アグリゲータに対して予め節電依頼を行う。そして、アグリゲータは、節電依頼に従って、電力需要施設における機器の運転状態を管理する。   For example, a power transmission / distribution company and a power retailer make a power-saving request in advance to the aggregator when power supply and demand are expected to be tight. Then, the aggregator manages the operation state of the device in the power demand facility according to the power saving request.

しかしながら、依頼先における機器の管理内容が適切でない場合、電力需給が逼迫したり、電力の供給が需要を上回ったりし、系統における電力の需給バランスが崩れるため、好ましくない。このため、電力消費の調整の依頼先をより適切に管理することのできる技術が望まれる。   However, when the management content of the device at the request destination is not appropriate, the power supply and demand is tight, the power supply exceeds the demand, and the power supply and demand balance in the system is disrupted. For this reason, a technique capable of more appropriately managing a request destination for adjustment of power consumption is desired.

この発明は、上述の課題を解決するためになされたもので、その目的は、電力消費の調整に関する依頼先のより適切な管理を可能とする表示処理装置、表示処理方法および表示処理プログラムを提供することである。   The present invention has been made to solve the above-described problems, and an object of the present invention is to provide a display processing device, a display processing method, and a display processing program that enable more appropriate management of a request destination regarding adjustment of power consumption. It is to be.

(1)上記課題を解決するために、この発明のある局面に係わる表示処理装置は、施設における機器の制御内容を示す制御情報、ならびに系統から前記施設への電力供給量、および電気料金の少なくともいずれか一方を示す電力管理情報を取得する取得部と、前記取得部により取得された前記制御情報および前記電力管理情報に基づいて、前記制御内容の時系列変化と、前記電力供給量の時系列変化および前記電気料金の時系列変化の少なくともいずれか一方とを対応付けて表示する処理を行う表示処理部とを備える。   (1) In order to solve the above problem, a display processing apparatus according to an aspect of the present invention includes at least control information indicating control contents of equipment in a facility, a power supply amount from a system to the facility, and an electricity charge. An acquisition unit that acquires power management information indicating one of the above, a time series change of the control content, and a time series of the power supply amount based on the control information and the power management information acquired by the acquisition unit A display processing unit that performs a process of displaying the change and at least one of the time-series changes of the electricity price in association with each other.

(5)上記課題を解決するために、この発明のある局面に係わる表示処理方法は、表示処理装置における表示処理方法であって、施設における機器の制御内容を示す制御情報、ならびに系統から前記施設への電力供給量、および電気料金の少なくともいずれか一方を示す電力管理情報を取得するステップと、取得した前記制御情報および前記電力管理情報に基づいて、前記制御内容の時系列変化と、前記電力供給量の時系列変化および前記電気料金の時系列変化の少なくともいずれか一方とを対応付けて表示する処理を行うステップとを含む。   (5) In order to solve the above-described problem, a display processing method according to an aspect of the present invention is a display processing method in a display processing device, which includes control information indicating control contents of equipment in a facility and the facility from the system A step of acquiring power management information indicating at least one of a power supply amount and an electricity bill, a time-series change of the control content based on the acquired control information and the power management information, and the power Performing a process of displaying in association with at least one of the time-series change of the supply amount and the time-series change of the electricity rate.

(6)上記課題を解決するために、この発明のある局面に係わる表示処理プログラムは、表示処理装置において用いられる表示処理プログラムであって、コンピュータを、施設における機器の制御内容を示す制御情報、ならびに系統から前記施設への電力供給量、および電気料金の少なくともいずれか一方を示す電力管理情報を取得する取得部と、前記取得部により取得された前記制御情報および前記電力管理情報に基づいて、前記制御内容の時系列変化と、前記電力供給量の時系列変化および前記電気料金の時系列変化の少なくともいずれか一方とを対応付けて表示する処理を行う表示処理部、として機能させるためのプログラムである。   (6) In order to solve the above problems, a display processing program according to an aspect of the present invention is a display processing program used in a display processing device, and includes control information indicating control contents of equipment in a facility, And an acquisition unit that acquires power management information indicating at least one of a power supply amount from the grid to the facility and an electricity charge, and based on the control information and the power management information acquired by the acquisition unit, A program for functioning as a display processing unit that performs a process of displaying a time-series change of the control content in association with at least one of the time-series change of the power supply amount and the time-series change of the electricity bill. It is.

本発明は、このような特徴的な処理部を備える表示処理装置として実現することができるだけでなく、表示処理装置を備える表示処理システムとして実現することができる。また、本発明は、表示処理装置の一部または全部を実現する半導体集積回路として実現することができる。   The present invention can be realized not only as a display processing apparatus including such a characteristic processing unit but also as a display processing system including a display processing apparatus. Further, the present invention can be realized as a semiconductor integrated circuit that realizes part or all of the display processing device.

本発明によれば、電力消費の調整に関する依頼先のより適切な管理を可能とすることができる。   ADVANTAGE OF THE INVENTION According to this invention, the more suitable management of the request destination regarding adjustment of electric power consumption can be enabled.

図1は、本発明の実施の形態に係る電力管理システムの構成を示す図である。FIG. 1 is a diagram showing a configuration of a power management system according to an embodiment of the present invention. 図2は、本発明の実施の形態に係る電力管理システムにおける電力管理サーバの構成を示す図である。FIG. 2 is a diagram showing a configuration of the power management server in the power management system according to the embodiment of the present invention. 図3は、図1に示す電力管理サーバにより表示されたイベント画面の例を示す図である。FIG. 3 is a diagram showing an example of an event screen displayed by the power management server shown in FIG. 図4は、図1に示す電力管理サーバにより表示された全体実績画面の例を示す図である。FIG. 4 is a diagram illustrating an example of an overall performance screen displayed by the power management server illustrated in FIG. 1. 図5は、図1に示す電力管理サーバにより表示された個別実績画面の例を示す図である。FIG. 5 is a diagram illustrating an example of an individual performance screen displayed by the power management server illustrated in FIG. 1. 図6は、図1に示す電力管理サーバにより表示された制御内容画面の例を示す図である。FIG. 6 is a diagram showing an example of a control content screen displayed by the power management server shown in FIG. 図7は、図1に示す電力管理サーバにより表示された詳細画面の例を示す図である。FIG. 7 is a diagram illustrating an example of a detailed screen displayed by the power management server illustrated in FIG. 1. 図8は、本発明の実施の形態に係る電力管理システムにおけるDR実行前の各処理のシーケンスの一例を示す図である。FIG. 8 is a diagram showing an exemplary sequence of each process before DR execution in the power management system according to the embodiment of the present invention. 図9は、図8に示す表示処理における動作の流れを示すフローチャートの一例を示す図である。FIG. 9 is a diagram showing an example of a flowchart showing the flow of operations in the display process shown in FIG.

最初に、本発明の実施形態の内容を列記して説明する。   First, the contents of the embodiment of the present invention will be listed and described.

(1)本発明の実施の形態に係る表示処理装置は、施設における機器の制御内容を示す制御情報、ならびに系統から前記施設への電力供給量、および電気料金の少なくともいずれか一方を示す電力管理情報を取得する取得部と、前記取得部により取得された前記制御情報および前記電力管理情報に基づいて、前記制御内容の時系列変化と、前記電力供給量の時系列変化および前記電気料金の時系列変化の少なくともいずれか一方とを対応付けて表示する処理を行う表示処理部とを備える。   (1) The display processing apparatus according to the embodiment of the present invention is a power management that indicates at least one of control information indicating the control contents of equipment in a facility, a power supply amount from the system to the facility, and an electricity bill. An acquisition unit that acquires information, and a time-series change of the control content, a time-series change of the power supply amount, and the time of the electric charge based on the control information and the power management information acquired by the acquisition unit And a display processing unit that performs processing for displaying at least one of the series changes in association with each other.

このような構成により、機器が制御されることによる効果、すなわち電力供給量の変化および電気料金の変化のうちの少なくともいずれか一方を、視覚的に容易に把握することができる。したがって、電力消費の調整に関する依頼先のより適切な管理を可能とすることができる。   With such a configuration, it is possible to visually easily grasp at least one of the effect of controlling the device, that is, the change in the power supply amount and the change in the electricity bill. Accordingly, it is possible to more appropriately manage the request destination regarding adjustment of power consumption.

(2)好ましくは、前記表示処理部は、前記系統から要請される電力消費の抑制期間をさらに対応付けて表示する処理を行う。   (2) Preferably, the said display process part performs the process which further matches and displays the suppression period of the power consumption requested | required from the said system | strain.

このような構成により、たとえば、抑制期間における電力供給量と、抑制期間以外の期間における電力供給量とを比較したり、抑制期間における電気料金と、抑制期間以外の期間における電気料金とを比較したりすることが可能となる。これにより、抑制期間において機器が制御されることによる効果を明確に把握することができる。   With such a configuration, for example, the power supply amount during the suppression period is compared with the power supply amount during the period other than the suppression period, or the electricity charge during the suppression period is compared with the electricity charge during the period other than the suppression period. It becomes possible to do. Thereby, the effect by controlling an apparatus in the suppression period can be grasped clearly.

(3)好ましくは、前記表示処理部は、前記電力供給量の時系列変化の予測および前記電気料金の時系列変化の予測の少なくともいずれか一方を、さらに対応付けて表示する処理を行う。   (3) Preferably, the display processing unit performs a process of further displaying at least one of the prediction of the time series change of the power supply amount and the prediction of the time series change of the electricity rate in association with each other.

このような構成により、たとえば機器が制御されない場合における予測内容を把握することにより、機器が制御されることによる効果をより一層明確に把握することができる。   With such a configuration, for example, by grasping the predicted contents when the device is not controlled, the effect of controlling the device can be grasped more clearly.

(4)好ましくは、前記表示処理部は、前記電力供給量の時系列変化および前記電気料金の時系列変化の両方を表示する処理を行う。   (4) Preferably, the display processing unit performs a process of displaying both a time-series change in the power supply amount and a time-series change in the electricity rate.

このような構成により、たとえば、電気料金の時系列変化を、機器が制御されることによる変化であるのか、または時間帯に応じた電気料金の単価の推移による変化であるのかを区別することができるため、機器が制御されることによる効果をより正確に把握することができる。   With such a configuration, for example, it is possible to distinguish whether the time-series change of the electricity rate is a change due to the device being controlled or a change due to the unit price of the electricity rate according to the time zone. Therefore, it is possible to grasp the effect of controlling the device more accurately.

(5)本発明の実施の形態に係る表示処理方法は、表示処理装置における表示処理方法であって、施設における機器の制御内容を示す制御情報、ならびに系統から前記施設への電力供給量、および電気料金の少なくともいずれか一方を示す電力管理情報を取得するステップと、取得した前記制御情報および前記電力管理情報に基づいて、前記制御内容の時系列変化と、前記電力供給量の時系列変化および前記電気料金の時系列変化の少なくともいずれか一方とを対応付けて表示する処理を行うステップとを含む。   (5) A display processing method according to an embodiment of the present invention is a display processing method in a display processing device, and includes control information indicating control contents of equipment in a facility, a power supply amount from a system to the facility, and Acquiring power management information indicating at least one of the electricity charges, based on the acquired control information and the power management information, a time-series change of the control content, a time-series change of the power supply amount, and Performing a process of displaying in association with at least one of the time-series changes of the electricity rate.

このような方法により、機器が制御されることによる効果、すなわち電力供給量の変化および電気料金の変化のうちの少なくともいずれか一方を、視覚的に容易に把握することができる。したがって、電力消費の調整に関する依頼先のより適切な管理を可能とすることができる。   By such a method, it is possible to easily grasp visually the effect of controlling the device, that is, at least one of the change in the power supply amount and the change in the electricity bill. Accordingly, it is possible to more appropriately manage the request destination regarding adjustment of power consumption.

(6)本発明の実施の形態に係る表示処理プログラムは、表示処理装置において用いられる表示処理プログラムであって、コンピュータを、施設における機器の制御内容を示す制御情報、ならびに系統から前記施設への電力供給量、および電気料金の少なくともいずれか一方を示す電力管理情報を取得する取得部と、前記取得部により取得された前記制御情報および前記電力管理情報に基づいて、前記制御内容の時系列変化と、前記電力供給量の時系列変化および前記電気料金の時系列変化の少なくともいずれか一方とを対応付けて表示する処理を行う表示処理部、として機能させるためのプログラムである。   (6) A display processing program according to an embodiment of the present invention is a display processing program used in a display processing device, and controls a computer from control information indicating the control contents of equipment in a facility and from a system to the facility. An acquisition unit that acquires power management information indicating at least one of a power supply amount and an electricity charge, and a time-series change of the control content based on the control information and the power management information acquired by the acquisition unit And a display processing unit that performs a process of displaying in association with at least one of the time series change of the power supply amount and the time series change of the electricity bill.

このような構成により、機器が制御されることによる効果、すなわち電力供給量の変化および電気料金の変化のうちの少なくともいずれか一方を、視覚的に容易に把握することができる。したがって、電力消費の調整に関する依頼先のより適切な管理を可能とすることができる。   With such a configuration, it is possible to visually easily grasp at least one of the effect of controlling the device, that is, the change in the power supply amount and the change in the electricity bill. Accordingly, it is possible to more appropriately manage the request destination regarding adjustment of power consumption.

以下、本発明の実施の形態について図面を用いて説明する。なお、図中同一または相当部分には同一符号を付してその説明は繰り返さない。また、以下に記載する実施の形態の少なくとも一部を任意に組み合わせてもよい。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. In the drawings, the same or corresponding parts are denoted by the same reference numerals and description thereof will not be repeated. Moreover, you may combine arbitrarily at least one part of embodiment described below.

<構成および基本動作>
[全体構成]
図1は、本発明の実施の形態に係る電力管理システムの構成を示す図である。
<Configuration and basic operation>
[overall structure]
FIG. 1 is a diagram showing a configuration of a power management system according to an embodiment of the present invention.

図1を参照して、電力管理システム301は、電力管理サーバ(表示処理装置)101と、系統側サーバ121と、端末装置171と、3つの需要家装置202とを備える。   Referring to FIG. 1, a power management system 301 includes a power management server (display processing device) 101, a system server 121, a terminal device 171, and three customer devices 202.

図1では、3つの需要家装置202を代表的に示しているが、さらに多数または少数の需要家装置202が設けられてもよい。また、需要家装置202に対応して2つの負荷(機器)205を代表的に示しているが、さらに多数または少数の負荷205が需要家装置202に対応して設けられてもよい。   In FIG. 1, three customer devices 202 are representatively shown, but a larger or smaller number of customer devices 202 may be provided. In addition, two loads (devices) 205 are representatively shown corresponding to the consumer device 202, but a larger or smaller number of loads 205 may be provided corresponding to the consumer device 202.

電力管理システム301では、たとえば、電力の需給が逼迫する場合、または電力の需給が逼迫するおそれがある場合において、各需要家が消費電力を調整するための需要応答(DR:Demand Response)、すなわち各需要家が消費電力を抑制するためのDRを発行することが可能である。   In the power management system 301, for example, when the supply and demand of power is tight or when there is a possibility that the supply and demand of power may be tight, a demand response (DR: Demand Response) for each consumer to adjust power consumption, that is, It is possible for each consumer to issue a DR for suppressing power consumption.

電力管理システム301における系統側サーバ121は、電力系統側である送配電事業者または電力小売事業者等によって運用され、電力消費の調整に関する依頼を示す調整情報S1を電力管理サーバ101へ送信する。調整情報S1は、たとえば、電力系統側から要請される電力消費の抑制期間(以下、DR期間とも称する。)の開始タイミングおよびDR期間の長さ、ならびに電力消費の調整量を示す依頼電力R1を含む。   The system side server 121 in the power management system 301 is operated by a power transmission / distribution company or a power retail company on the power system side, and transmits adjustment information S1 indicating a request for adjustment of power consumption to the power management server 101. The adjustment information S1 includes, for example, request power R1 indicating the start timing of the power consumption suppression period (hereinafter also referred to as DR period) and the length of the DR period requested from the power system side, and the adjustment amount of power consumption. Including.

なお、調整情報S1には、DR期間の長さの代わりにDR期間の終了タイミングが含まれてもよい。また、依頼電力R1には、たとえば、DR期間を30分ごとの複数の分割期間に区分けした場合における、分割期間ごとの電力消費の調整量が含まれてもよい。   The adjustment information S1 may include the end timing of the DR period instead of the length of the DR period. The requested power R1 may include, for example, an adjustment amount of power consumption for each divided period when the DR period is divided into a plurality of divided periods every 30 minutes.

需要家装置202は、電力会社から電力の供給を受けるビル、工場または一般家庭等の電力需要施設において用いられる。需要家装置202は、電力需要施設ごとに1つ設けられてもよいし、電力需要施設ごとに複数設けられてもよい。電力会社は、たとえば発電事業者または電力小売り事業者である。   The consumer device 202 is used in a power demand facility such as a building, a factory, or a general household that receives power supply from an electric power company. One consumer device 202 may be provided for each power demand facility, or a plurality of customer devices 202 may be provided for each power demand facility. The power company is, for example, a power generation company or a power retailer.

需要家装置202は、電力需要施設における1または複数の負荷205を制御可能である。負荷205は、ヒートポンプ技術を利用して空気の熱により湯を沸かすことのできるエコキュート、二次電池をエネルギー源とする二次電池式電気自動車およびプラグインハイブリッドカー、ならびに照明、テレビ、蓄電池および空調装置等の電気機器である。   The consumer device 202 can control one or a plurality of loads 205 in the power demand facility. The load 205 is an eco-cute that can boil hot water using heat pump technology, a secondary battery type electric vehicle and a plug-in hybrid car that use a secondary battery as an energy source, and lighting, a television, a storage battery, and an air conditioner. It is an electrical device such as a device.

より詳細には、需要家装置202は、電気機器の動作を制御することによって消費電力の削減を図るためのxEMSにおいて用いられる装置であり、たとえばアグリゲータによって導入される。   More specifically, the consumer device 202 is a device used in xEMS for reducing power consumption by controlling the operation of electric equipment, and is introduced by, for example, an aggregator.

電力管理サーバ101は、たとえばアグリゲータによって運用され、1または複数の需要家装置202と通信を行うことにより、1または複数の電力需要施設における電力消費を管理する。電力管理サーバ101は、たとえば、需要家装置202が設けられる電力需要施設から遠隔の場所に設置されることが多い。   The power management server 101 is operated by, for example, an aggregator, and manages power consumption in one or more power demanding facilities by communicating with one or more consumer devices 202. The power management server 101 is often installed, for example, at a location remote from the power demand facility where the customer apparatus 202 is provided.

卸電力取引所サーバ111は、たとえば、1時間前契約および4時間前契約等の契約ごとの電力取引市場を提供する。   The wholesale power exchange server 111 provides, for example, a power trading market for each contract such as a one-hour contract and a four-hour contract.

端末装置171は、たとえば、パーソナルコンピュータであり、アグリゲータにおけるオペレータによって操作される。   The terminal device 171 is a personal computer, for example, and is operated by an operator in the aggregator.

[電力管理サーバ]
図2は、本発明の実施の形態に係る電力管理システムにおける電力管理サーバの構成を示す図である。
[Power management server]
FIG. 2 is a diagram showing a configuration of the power management server in the power management system according to the embodiment of the present invention.

図2を参照して、電力管理サーバ101は、通信部21と、表示処理部22と、記憶部23と、情報処理部(取得部)24とを含む。   With reference to FIG. 2, the power management server 101 includes a communication unit 21, a display processing unit 22, a storage unit 23, and an information processing unit (acquisition unit) 24.

電力管理サーバ101における通信部21は、他の装置と情報の送受信を行うことが可能である。この例では、通信部21は、卸電力取引所サーバ111、系統側サーバ121、端末装置171および需要家装置202と情報の送受信を行うことが可能である。   The communication unit 21 in the power management server 101 can transmit / receive information to / from other devices. In this example, the communication unit 21 can transmit / receive information to / from the wholesale power exchange server 111, the grid-side server 121, the terminal device 171, and the customer device 202.

記憶部23は、需要家情報、DR可能量情報、制御情報、電力管理情報、系統側サーバ121からの調整情報S1、および各種登録情報を保持する。   The storage unit 23 holds customer information, DR possible amount information, control information, power management information, adjustment information S1 from the system server 121, and various types of registration information.

需要家情報は、たとえば、アグリゲータの管理する各需要家の需要家IDと、需要家IDに対応する、契約内容、スケジュールおよび需要家装置202の装置IDとを含む。たとえば、需要家IDは、契約内容に応じたグループに属する。これらの契約には、電力消費の調整量に対するインセンティブがそれぞれ定められている。スケジュールは、たとえば需要家がDRに参加できない期間を示す。   The customer information includes, for example, a customer ID of each customer managed by the aggregator, a contract content corresponding to the customer ID, a schedule, and a device ID of the customer device 202. For example, the customer ID belongs to a group corresponding to the contract content. Each of these contracts has an incentive to adjust power consumption. A schedule shows the period when a consumer cannot participate in DR, for example.

制御情報は、たとえば、電力管理システム301に含まれる複数の負荷205の各々の制御内容を示す情報であり、電力管理サーバ101により作成される。   The control information is, for example, information indicating the control content of each of the plurality of loads 205 included in the power management system 301, and is created by the power management server 101.

電力管理情報は、各需要家のDRの実績を示す。具体的には、電力管理情報は、アグリゲータの管理する各需要家の需要家IDと、各需要家IDに対応する需要家施設においてDR期間に調整された電力消費量の実績値とを含む。   The power management information indicates the DR performance of each customer. Specifically, the power management information includes the customer ID of each customer managed by the aggregator and the actual value of the power consumption adjusted in the DR period in the customer facility corresponding to each customer ID.

また、電力管理情報は、さらに、系統から各需要家への電力供給量(以下、「実績受電量」とも称する。)、および需要家ごとの、受電量に応じて支払う電気料金である従量料金(以下、「実績料金」とも称する。)を示す。なお、電力管理情報は、実績受電量および実績料金のいずれか一方を含まない情報であってもよい。DR可能量情報および各種登録情報については、後述する。   In addition, the power management information further includes the amount of power supplied from the grid to each consumer (hereinafter also referred to as “actual power received amount”), and a metered fee that is an electric fee paid according to the amount of power received for each consumer. (Hereinafter also referred to as “actual fee”). The power management information may be information that does not include either the actual power reception amount or the actual fee. The DR possible amount information and various registration information will be described later.

情報処理部24は、たとえば、記憶部23に保存された電力管理情報に基づいて、需要家ごとに、翌日の受電量を予測する。そして、情報処理部24は、予測結果である需要家ごとの予測受電量を示す情報を、記憶部23に保存する。   For example, the information processing unit 24 predicts the amount of power received on the next day for each consumer based on the power management information stored in the storage unit 23. And the information processing part 24 preserve | saves the information which shows the prediction electric power reception amount for every consumer which is a prediction result in the memory | storage part 23. FIG.

また、情報処理部24は、需要家ごとの予測受電量に基づいて、需要家ごとに、翌日の従量料金を予測し、予測結果である需要家ごとの予測料金を示す情報を記憶部23に保存する。   In addition, the information processing unit 24 predicts a metered fee for the next day for each consumer based on the predicted power reception amount for each customer, and stores information indicating the prediction fee for each customer as a prediction result in the storage unit 23. save.

表示処理部22は、たとえば、記憶部23に保存された各種情報に基づいて、図示しない表示装置に画面を表示する表示処理を行う。以下、電力管理サーバ101による表示処理の詳細について説明する。   For example, the display processing unit 22 performs a display process for displaying a screen on a display device (not shown) based on various information stored in the storage unit 23. Hereinafter, details of the display processing by the power management server 101 will be described.

[電力管理サーバによる表示処理]
(イベント画面)
図3は、図1に示す電力管理サーバにより表示されたイベント画面の例を示す図である。
[Display processing by the power management server]
(Event screen)
FIG. 3 is a diagram showing an example of an event screen displayed by the power management server shown in FIG.

図1〜図3を参照して、たとえば、オペレータが所望の日付を入力する操作を端末装置171に対して行うと、端末装置171は、オペレータによる操作を示す操作情報を電力管理サーバ101へ送信する。電力管理サーバ101における情報処理部24は、端末装置171からの操作情報を通信部21経由で受信し、受信した操作情報に基づいて、オペレータにより入力された日付を把握し、把握した日付を表示処理部22に通知する。   With reference to FIGS. 1 to 3, for example, when the operator performs an operation of inputting a desired date on the terminal device 171, the terminal device 171 transmits operation information indicating an operation by the operator to the power management server 101. To do. The information processing unit 24 in the power management server 101 receives the operation information from the terminal device 171 via the communication unit 21, grasps the date input by the operator based on the received operation information, and displays the grasped date. Notify the processing unit 22.

そして、表示処理部22は、記憶部23に保存された調整情報S1を参照して、情報処理部24から通知された日付の0時〜24時の期間にDR期間が含まれる場合、当該日付の期間に含まれる1または複数のDR期間を示すイベント画面Sc1を表示する処理を行う。   The display processing unit 22 refers to the adjustment information S1 stored in the storage unit 23, and when the period from 0:00 to 24:00 of the date notified from the information processing unit 24 includes the DR period, the date The process which displays the event screen Sc1 which shows the 1 or several DR period included in this period is performed.

具体的には、イベント画面Sc1にはタイムスケジュール表Ts1が含まれ、タイムスケジュール表Ts1には、オペレータにより入力された日付における1または複数のDR期間が表示される。   Specifically, the event screen Sc1 includes a time schedule table Ts1, and the time schedule table Ts1 displays one or more DR periods on the date input by the operator.

たとえば、オペレータにより「2017年3月6日」の日付が入力されたとする。そして、2017年3月6日の10時〜12時をDR期間とするDRを「イベント1」とし、2017年3月6日の9時〜10時をDR期間とするDRを「イベント2」とすると、「イベント1」および「イベント2」の各々のDR期間を示す図形が、タイムスケジュール表Ts1の対応する位置にそれぞれ表示される。   For example, assume that the operator inputs a date of “March 6, 2017”. The DR having the DR period from 10:00 to 12:00 on March 6, 2017 is “event 1”, and the DR having the DR period from 9:00 to 10:00 on March 6, 2017 is “event 2”. Then, graphics indicating the DR periods of “event 1” and “event 2” are respectively displayed at corresponding positions in the time schedule table Ts1.

また、イベントごとに、DR期間の開始時刻および終了時刻、ならびにDR期間における目標調整量すなわち依頼電力R1が、タイムスケジュール表Ts1に表示される。   For each event, the start time and end time of the DR period, and the target adjustment amount in the DR period, that is, the requested power R1, are displayed in the time schedule table Ts1.

具体的には、「イベント1」では、対応するDR期間における依頼電力R1が100kWである場合、たとえば「イベント1」のDR期間を示す図形の内部に「100kW」の文字が表示される。また、「イベント2」では、対応するDR期間における依頼電力R1が150kWである場合、たとえば「イベント2」のDR期間を示す図形の内部に「150kW」の文字が表示される。   Specifically, in the “event 1”, when the requested power R1 in the corresponding DR period is 100 kW, for example, the characters “100 kW” are displayed inside the graphic indicating the DR period of “event 1”. In “event 2”, when the requested power R1 in the corresponding DR period is 150 kW, for example, the characters “150 kW” are displayed inside the graphic indicating the DR period of “event 2”.

なお、タイムスケジュール表Ts1には、DR期間における目標調整量が表示される代わりに、たとえば、分割期間ごとの目標調整量が表示されてもよい。   In the time schedule table Ts1, for example, the target adjustment amount for each divided period may be displayed instead of displaying the target adjustment amount in the DR period.

(全体実績画面)
図4は、図1に示す電力管理サーバにより表示された全体実績画面の例を示す図である。
(Overall results screen)
FIG. 4 is a diagram illustrating an example of an overall performance screen displayed by the power management server illustrated in FIG. 1.

図1〜図4を参照して、たとえば、図3に示すイベント画面Sc1が表示されている状況において、オペレータが、イベント画面Sc1における複数の上記図形のうちの1つを選択する操作を端末装置171に対して行うことにより、1つのDR期間を選択すると、端末装置171は、オペレータによる操作を示す操作情報を電力管理サーバ101へ送信する。電力管理サーバ101における情報処理部24は、端末装置171からの操作情報を通信部21経由で受信し、受信した操作情報に基づいて、オペレータにより選択されたDR期間を把握し、把握したDR期間を表示処理部22に通知する。   1 to 4, for example, in a situation where the event screen Sc1 shown in FIG. 3 is displayed, the operator performs an operation for selecting one of the plurality of figures on the event screen Sc1. When one DR period is selected by performing on 171, the terminal device 171 transmits operation information indicating an operation by the operator to the power management server 101. The information processing unit 24 in the power management server 101 receives the operation information from the terminal device 171 via the communication unit 21, grasps the DR period selected by the operator based on the received operation information, and grasps the grasped DR period. Is notified to the display processing unit 22.

そして、表示処理部22は、記憶部23に保存された電力管理情報に基づいて、情報処理部24から通知されたDR期間における、アグリゲータの管理する複数の需要家の各々の実績値の合計(以下、「全体調整量」とも称する。)を算出する。   The display processing unit 22 then sums the actual values of each of the plurality of consumers managed by the aggregator in the DR period notified from the information processing unit 24 based on the power management information stored in the storage unit 23 ( Hereinafter, it is also referred to as “total adjustment amount”).

そして、表示処理部22は、オペレータにより選択されたDR期間を示す図形、および当該DR期間における全体調整量を示す全体実績画面Sc2を表示する処理を行う。   And the display process part 22 performs the process which displays the figure which shows DR period selected by the operator, and the whole performance screen Sc2 which shows the whole adjustment amount in the said DR period.

具体的には、全体実績画面Sc2は、タイムスケジュール表Ts2を含む。たとえば、図3に示す「イベント1」に対応するDR期間がオペレータにより選択された場合、「イベント1」に対応するDR期間を示す図形、および当該DR期間における依頼電力R1である「100kW」の文字が、図4に示す全体実績画面Sc2におけるタイムスケジュール表Ts2に表示される。   Specifically, the overall performance screen Sc2 includes a time schedule table Ts2. For example, when the DR period corresponding to “event 1” shown in FIG. 3 is selected by the operator, the figure indicating the DR period corresponding to “event 1” and the requested power R1 “100 kW” in the DR period The characters are displayed in the time schedule table Ts2 in the overall performance screen Sc2 shown in FIG.

また、全体実績画面Sc2には、オペレータにより選択されたDR期間における全体調整量、および複数の需要家へのインセンティブの合計が含まれる。具体的には、当該DR期間における全体調整量が110kWであり、インセンティブの合計が10000円である場合、「全体調整量110kWh」および「インセンティブ10000円」の文字が全体実績画面Sc2に示される。   The overall performance screen Sc2 includes the total adjustment amount in the DR period selected by the operator and the total of incentives for a plurality of consumers. Specifically, when the total adjustment amount in the DR period is 110 kW and the total incentive is 10,000 yen, the characters “total adjustment amount 110 kWh” and “incentive 10000 yen” are displayed on the overall performance screen Sc2.

また、情報処理部24は、電力管理情報に基づいて、オペレータにより選択されたDR期間を含む日付の0時〜24時の期間における、複数の需要家の各々の実績受電量の合計を算出し、算出結果を表示処理部22に通知する。また、情報処理部24は、記憶部23に保存された登録情報の示す需要家ごとの予測受電量に基づいて、当該日付の期間における、複数の需要家の各々の予測受電量の合計を算出し、算出結果を表示処理部22に通知する。   In addition, the information processing unit 24 calculates the total amount of actual power received by each of the plurality of consumers in the period from 0:00 to 24:00 on the date including the DR period selected by the operator based on the power management information. The calculation result is notified to the display processing unit 22. In addition, the information processing unit 24 calculates the total predicted power reception amount of each of a plurality of consumers in the period of the date based on the predicted power reception amount for each consumer indicated by the registration information stored in the storage unit 23. Then, the calculation result is notified to the display processing unit 22.

また、情報処理部24は、電力管理情報に基づいて、当該日付の期間における、複数の需要家の実績料金の合計を算出し、算出結果を表示処理部22に通知する。さらに、情報処理部24は、記憶部23に保存された登録情報の示す需要家ごとの予測料金に基づいて、当該日付の期間における、複数の需要家の各々の予測料金の合計を算出し、算出結果を表示処理部22に通知する。   Further, the information processing unit 24 calculates the total of the actual charges of a plurality of consumers during the period of the date based on the power management information, and notifies the display processing unit 22 of the calculation result. Furthermore, the information processing unit 24 calculates the sum of the predicted charges of each of the plurality of consumers in the period of the date based on the predicted charge for each customer indicated by the registration information stored in the storage unit 23, The calculation result is notified to the display processing unit 22.

表示処理部22は、情報処理部24から通知された、実績受電量の合計の時系列変化、予測受電量の合計の時系列変化、実績料金の合計の時系列変化および予測料金の合計の時系列変化を含む全体実績画面Sc2を表示する処理を行う。   The display processing unit 22 is notified of the time series change of the total amount of actual received power, the time series change of the total amount of predicted power received, the time series change of the total of actual fee, and the total of the predicted fee notified from the information processing unit 24. A process of displaying the entire performance screen Sc2 including the series change is performed.

具体的には、全体実績画面Sc2では、たとえば、3月6日の0時〜24時の期間における、予測受電量の合計の時系列変化を示すグラフG21と、実績受電量の合計の時系列変化を示すグラフGr22とが対応付けて表示される。また、全体実績画面Sc2では、たとえば、3月6日の0時〜24時の期間における、予測料金の合計の時系列変化を示すグラフGr23と、実績料金の合計の時系列変化を示すグラフGr24とが対応付けて表示される。   Specifically, in the overall performance screen Sc2, for example, a graph G21 showing a time series change of the total predicted power reception amount in a period from 0:00 to 24:00 on March 6, and a time series of the total power reception amount A graph Gr22 indicating a change is displayed in association with each other. In addition, in the overall performance screen Sc2, for example, a graph Gr23 showing a time series change of the total predicted fee and a graph Gr24 showing a time series change of the total of the actual fee in the period from 0:00 to 24:00 on March 6. Are displayed in association with each other.

さらに、全体実績画面Sc2には、個別実績ボタンB1および制御内容ボタンB2が表示される。そして、オペレータが個別実績ボタンB1を選択した場合、後述する個別実績画面Sc3が表示され、オペレータが制御内容ボタンB2を選択した場合、後述する制御内容画面Sc4が表示される。   Further, an individual result button B1 and a control content button B2 are displayed on the overall result screen Sc2. When the operator selects the individual result button B1, an individual result screen Sc3 described later is displayed, and when the operator selects the control content button B2, a control content screen Sc4 described later is displayed.

(個別実績画面)
図5は、図1に示す電力管理サーバにより表示された個別実績画面の例を示す図である。
(Individual results screen)
FIG. 5 is a diagram illustrating an example of an individual performance screen displayed by the power management server illustrated in FIG. 1.

図1、図2、図4および図5を参照して、たとえば、図4に示す全体実績画面Sc2が表示されている状況において、オペレータが、全体実績画面Sc2における個別実績ボタンB1を選択する操作を端末装置171に対して行うと、端末装置171は、オペレータによる操作を示す操作情報を電力管理サーバ101へ送信する。電力管理サーバ101における情報処理部24は、端末装置171からの操作情報を通信部21経由で受信し、受信した操作情報に基づいて、オペレータにより個別実績ボタンB1が選択されたことを把握し、把握した内容を表示処理部22に通知する。   Referring to FIGS. 1, 2, 4, and 5, for example, in a situation where the overall performance screen Sc2 shown in FIG. 4 is displayed, the operator selects the individual performance button B1 on the overall performance screen Sc2. Is performed on the terminal device 171, the terminal device 171 transmits operation information indicating an operation by the operator to the power management server 101. The information processing unit 24 in the power management server 101 receives the operation information from the terminal device 171 via the communication unit 21, grasps that the individual result button B1 is selected by the operator based on the received operation information, The grasped content is notified to the display processing unit 22.

そして、表示処理部22は、記憶部23に保存された電力管理情報および需要家情報に基づいて、図5に示すように、アグリゲータの管理する需要家IDのリスト、ならびにオペレータにより選択されたDR期間における各需要家の、実績値、予測料金、実績料金およびインセンティブを示す個別実績画面Sc3を、表示装置に表示する処理を行う。   Then, the display processing unit 22, based on the power management information and customer information stored in the storage unit 23, as shown in FIG. 5, a list of customer IDs managed by the aggregator and the DR selected by the operator. A process of displaying the individual result screen Sc3 indicating the actual value, the predicted fee, the actual fee and the incentive of each customer in the period on the display device is performed.

具体的には、個別実績画面Sc3は、タイムスケジュール表Ts3を含む。タイムスケジュール表Ts3は、図4に示す全体実績画面Sc2におけるタイムスケジュール表Ts2と同様である。   Specifically, the individual performance screen Sc3 includes a time schedule table Ts3. The time schedule table Ts3 is the same as the time schedule table Ts2 in the overall performance screen Sc2 shown in FIG.

また、個別実績画面Sc3は、さらに、テーブルTa3を含む。テーブルTa3には、需要家IDのリストが示される。具体的には、需要家ID「1」,「2」,「3」,・・・にそれぞれ対応する需要家ボタンIDb1,IDb2,IDb3,・・・が、テーブルTa3に示される。   Further, the individual result screen Sc3 further includes a table Ta3. The table Ta3 shows a list of customer IDs. Specifically, customer buttons IDb1, IDb2, IDb3,... Corresponding to customer IDs “1”, “2”, “3”,.

たとえば、需要家ID「1」に対応する需要家の3月6日の10時〜12時の期間における実績値が40kWhであり、当該期間における予測料金が1200円であり、当該期間における実績料金が1100円であり、インセンティブが1000円であるとする。この場合、「実績値(kWh)」、「予測料金(円)」、「実績料金(円)」および「インセンティブ(円)」の各項目に対応する箇所に、それぞれ「40」、「1200」、「1100」および「1000」の文字が表示される。   For example, the actual value of the customer corresponding to the customer ID “1” in the period from 10:00 to 12:00 on March 6 is 40 kWh, the predicted charge in the period is 1200 yen, and the actual charge in the period Is 1100 yen, and the incentive is 1000 yen. In this case, “40” and “1200” are placed in the locations corresponding to the items “actual value (kWh)”, “predicted fee (yen)”, “actual fee (yen)”, and “incentive (yen)”, respectively. , “1100” and “1000” are displayed.

また、テーブルTa3では、各項目に、三角マークで表示されたソートボタンが設けられている。たとえば、オペレータが、これら複数のソートボタンのうちのいずれか1つを選択する操作を端末装置171に対して行うと、端末装置171は、オペレータによる操作を示す操作情報を作成し、作成した操作情報を電力管理サーバ101へ送信する。   In the table Ta3, each item is provided with a sort button displayed with a triangle mark. For example, when the operator performs an operation for selecting any one of the plurality of sort buttons on the terminal device 171, the terminal device 171 creates operation information indicating an operation by the operator, and the created operation Information is transmitted to the power management server 101.

電力管理サーバ101における表示処理部22は、通信部21を経由して端末装置171からの操作情報を受信し、受信した操作情報に基づいて、オペレータにより選択されたソートボタンを認識し、当該ソートボタンに対応する所定の基準に従って、テーブルTa3における表示をソートする。   The display processing unit 22 in the power management server 101 receives the operation information from the terminal device 171 via the communication unit 21, recognizes the sort button selected by the operator based on the received operation information, and performs the sort. The display in the table Ta3 is sorted according to a predetermined standard corresponding to the button.

具体的には、オペレータが「実績値」の項目に設けられたソートボタンを選択した場合、テーブルTa3では、実績値の大きい需要家から順番に各項目の内容が表示される。なお、図5に示すテーブルTa3では、一例として、需要家IDの番号順に各項目の内容が表示されている。   Specifically, when the operator selects a sort button provided in the “actual value” item, the contents of each item are displayed in order from the customer with the largest actual value in the table Ta3. In addition, in table Ta3 shown in FIG. 5, the content of each item is displayed as an example in order of the number of customer ID.

(制御内容画面)
図6は、図1に示す電力管理サーバにより表示された制御内容画面の例を示す図である。
(Control content screen)
FIG. 6 is a diagram showing an example of a control content screen displayed by the power management server shown in FIG.

図1、図2、図4および図6を参照して、たとえば、図4に示す全体実績画面Sc2が表示されている状況において、オペレータが、全体実績画面Sc2における制御内容ボタンB2を選択する操作を端末装置171に対して行うと、端末装置171は、オペレータによる操作を示す操作情報を電力管理サーバ101へ送信する。電力管理サーバ101における情報処理部24は、端末装置171からの操作情報を通信部21経由で受信し、受信した操作情報に基づいて、オペレータにより制御内容ボタンB2が選択されたことを把握し、把握した内容を表示処理部22に通知する。   Referring to FIGS. 1, 2, 4 and 6, for example, in a situation where the overall performance screen Sc2 shown in FIG. 4 is displayed, the operator selects the control content button B2 on the overall performance screen Sc2. Is performed on the terminal device 171, the terminal device 171 transmits operation information indicating an operation by the operator to the power management server 101. The information processing unit 24 in the power management server 101 receives the operation information from the terminal device 171 via the communication unit 21, grasps that the control content button B2 is selected by the operator based on the received operation information, The grasped content is notified to the display processing unit 22.

そして、表示処理部22は、記憶部23に保存された制御情報に基づいて、負荷205ごとの制御内容を示す制御内容画面Sc4を、表示装置に表示する処理を行う。   Then, based on the control information stored in the storage unit 23, the display processing unit 22 performs a process of displaying a control content screen Sc4 indicating the control content for each load 205 on the display device.

具体的には、制御内容画面Sc4は、タイムスケジュール表Ts41を含む。タイムスケジュール表Ts41は、図4に示す全体実績画面Sc2におけるタイムスケジュール表Ts2と同様である。   Specifically, the control content screen Sc4 includes a time schedule table Ts41. The time schedule table Ts41 is the same as the time schedule table Ts2 in the overall performance screen Sc2 shown in FIG.

また、制御内容画面Sc4は、さらに、タイムスケジュール表Ts42を含む。タイムスケジュール表Ts42には、需要家IDのリストが示される。具体的には、需要家ID「1」,「2」,「3」,・・・にそれぞれ対応する需要家ボタンIDb1,IDb2,IDb3,・・・が、タイムスケジュール表Ts42に示される。   Further, the control content screen Sc4 further includes a time schedule table Ts42. The time schedule table Ts42 shows a list of customer IDs. Specifically, customer buttons IDb1, IDb2, IDb3,... Corresponding to customer IDs “1”, “2”, “3”,... Are shown in the time schedule table Ts42.

また、タイムスケジュール表Ts42には、需要家IDごとに、対応する需要家施設に設けられた負荷205の制御内容が示される。たとえば、ある需要家施設に2つの負荷205が設けられている場合、これら2つの負荷205の各々の制御内容が示される。   In addition, the time schedule table Ts42 indicates the control contents of the load 205 provided in the corresponding customer facility for each customer ID. For example, when two loads 205 are provided in a certain customer facility, the control contents of each of these two loads 205 are shown.

ここでは、需要家ID「1」,「2」,「3」,・・・にそれぞれ対応する複数の需要家施設があり、各需要家施設には負荷205としてエコキュートが1つずつ設けられているとする。そして、「イベント1」のDR期間において、これら複数のエコキュートの動作が電力管理サーバ101により制御されたとする。この場合、各エコキュートの制御内容がタイムスケジュール表Ts42に示される。   Here, there are a plurality of customer facilities respectively corresponding to customer IDs “1”, “2”, “3”,..., And each customer facility is provided with one eco-cute as a load 205. Suppose that Then, it is assumed that the power management server 101 controls the operations of the plurality of ecocutes during the DR period of “event 1”. In this case, the control contents of each eco-cute are shown in the time schedule table Ts42.

具体的には、タイムスケジュール表Ts42には、需要家ID「1」に対応する需要家施設に設けられたエコキュートが、3月6日の0時〜10時の期間および11時〜24時の期間において、自動的に湯の沸き上げを行う「自動沸き上げ」モードで動作し、3月6日の10時〜11時の期間において動作を停止していたことが示される。   Specifically, in the time schedule table Ts42, the eco-cute provided in the customer facility corresponding to the customer ID “1” has a period of 0:00 to 10:00 on March 6 and 11:00 to 24:00. It is shown that the operation was performed in the “automatic boiling” mode in which boiling water is automatically heated during the period, and the operation was stopped during the period from 10:00 to 11:00 on March 6.

また、タイムスケジュール表Ts42には、たとえば、需要家ID「2」に対応する需要家施設に設けられたエコキュートが、3月6日の0時〜10時の期間および12時〜24時の期間において「自動沸き上げ」モードで動作し、3月6日の10時〜12時の期間において動作を停止していたことが示される。   In the time schedule table Ts42, for example, Ecocute provided in the customer facility corresponding to the customer ID “2” includes a period from 0:00 to 10:00 on March 6 and a period from 12:00 to 24:00. It is shown that the operation was performed in the “automatic boiling” mode and the operation was stopped in the period from 10:00 to 12:00 on March 6.

また、タイムスケジュール表Ts42には、たとえば、需要家ID「3」に対応する需要家施設に設けられたエコキュートが、3月6日の0時〜10時の期間および12時〜24時の期間において「自動沸き上げ」モードで動作し、3月6日の10時30分〜11時30分の期間において、ユーザの手動操作により湯の沸き上げを行う「手動沸き上げ」モードで動作し、3月6日の10時〜10時30分の期間および11時30分〜12時の期間において動作を停止していたことが示される。   Further, in the time schedule table Ts42, for example, Ecocute provided in the customer facility corresponding to the customer ID “3” includes a period from 0:00 to 10:00 on March 6 and a period from 12:00 to 24:00. In the “automatic boiling” mode, and in the period from 10:30 to 11:30 on March 6, it operates in the “manual boiling” mode in which hot water is heated by the user's manual operation. It is shown that the operation was stopped during the period from 10:00 to 10:30 on March 6 and from 11:30 to 12:00.

(詳細画面)
図7は、図1に示す電力管理サーバにより表示された詳細画面の例を示す図である。
(Detail screen)
FIG. 7 is a diagram illustrating an example of a detailed screen displayed by the power management server illustrated in FIG. 1.

図1、図2および図5〜図7を参照して、たとえば、図5に示す個別実績画面Sc3が表示されている状況において、オペレータが個別実績画面Sc3における複数の需要家ボタンIDb1,IDb2,IDb3,・・・のうちのいずれか1つを選択する操作を端末装置171に対して行うと、端末装置171は、オペレータによる操作を示す操作情報を電力管理サーバ101へ送信する。   With reference to FIGS. 1, 2, and 5 to 7, for example, in a situation where the individual results screen Sc <b> 3 shown in FIG. 5 is displayed, the operator selects a plurality of customer buttons IDb <b> 1, IDb <b> 2 on the individual results screen Sc <b> 3. When an operation for selecting any one of IDb3,... Is performed on the terminal device 171, the terminal device 171 transmits operation information indicating an operation by the operator to the power management server 101.

また、たとえば、図6に示す制御内容画面Sc4が表示されている状況において、オペレータが個別実績画面Sc3における複数の需要家ボタンIDb1,IDb2,IDb3,・・・のうちのいずれか1つを選択する操作を端末装置171に対して行う場合も同様に、端末装置171は、オペレータによる操作を示す操作情報を電力管理サーバ101へ送信する。   For example, in the situation where the control content screen Sc4 shown in FIG. 6 is displayed, the operator selects any one of the plurality of customer buttons IDb1, IDb2, IDb3,... On the individual performance screen Sc3. Similarly, when performing an operation to be performed on the terminal device 171, the terminal device 171 transmits operation information indicating an operation by the operator to the power management server 101.

電力管理サーバ101における情報処理部24は、端末装置171からの操作情報を通信部21経由で受信し、受信した操作情報に基づいて、オペレータにより選択された需要家IDを把握し、把握した需要家IDを表示処理部22に通知する。   The information processing unit 24 in the power management server 101 receives the operation information from the terminal device 171 via the communication unit 21, grasps the customer ID selected by the operator based on the received operation information, and grasps the grasped demand. The display processing unit 22 is notified of the house ID.

そして、表示処理部22は、記憶部23に保存された制御情報および電力管理情報に基づいて、当該需要家IDに対応する需要家施設に関する詳細を示す詳細画面Sc5を、表示装置に表示する処理を行う。   And the display process part 22 is a process which displays the detail screen Sc5 which shows the detail regarding the customer facility corresponding to the said consumer ID on a display apparatus based on the control information and power management information which were preserve | saved at the memory | storage part 23. I do.

具体的には、詳細画面Sc5は、タイムスケジュール表Ts5を含む。タイムスケジュール表Ts41は、図4に示す全体実績画面Sc2におけるタイムスケジュール表Ts2と同様である。   Specifically, the detail screen Sc5 includes a time schedule table Ts5. The time schedule table Ts41 is the same as the time schedule table Ts2 in the overall performance screen Sc2 shown in FIG.

また、詳細画面Sc5は、テーブルTa5を含む。テーブルTa5には、オペレータにより選択された需要家IDに対応する、DR期間における、実績値、予測料金、実績料金およびインセンティブが示される。   The detail screen Sc5 includes a table Ta5. Table Ta5 shows actual values, predicted charges, actual charges, and incentives in the DR period corresponding to the customer ID selected by the operator.

具体的には、オペレータにより選択された需要家IDが「1」である場合、テーブルTaには、需要家ID「1」に対応する需要家の、「実績値(kWh)」、「予測料金(円)」、「実績料金(円)」および「インセンティブ(円)」の各項目の内容が示される。   Specifically, when the customer ID selected by the operator is “1”, the table Ta includes “actual value (kWh)”, “predicted fee” of the customer corresponding to the customer ID “1”. “Yen”, “Actual fee (yen)”, and “Incentive (yen)” are shown.

また、詳細画面Sc5には、需要家ID「1」に対応する需要家施設における負荷205に関する詳細が示されている。   The details screen Sc5 shows details regarding the load 205 in the customer facility corresponding to the customer ID “1”.

たとえば、電力管理サーバ101における記憶部23には、登録情報として、各需要家施設における湯の利用パターンを示す情報が保存されている。そして、表示処理部22は、当該利用パターンに基づいて、オペレータにより選択された需要家IDに対応する需要家施設における、湯の利用パターンを示すグラフを表示する処理を行う。   For example, the storage unit 23 in the power management server 101 stores information indicating hot water usage patterns in each customer facility as registration information. And the display process part 22 performs the process which displays the graph which shows the usage pattern of hot water in the customer facility corresponding to the customer ID selected by the operator based on the said usage pattern.

具体的には、図7に示すように、需要家ID「1」に対応する需要家施設における湯の利用量の時系列変化を示すグラフGr51が表示される。また、たとえば、当該需要家施設における湯の利用パターンのタイプが、6時〜7時頃の期間および18時〜21時頃の期間において多く利用するタイプであることを示す文字「朝夕利用タイプ」が表示される。   Specifically, as shown in FIG. 7, a graph Gr <b> 51 is displayed that shows a time-series change in hot water usage at the customer facility corresponding to the customer ID “1”. In addition, for example, the letters “morning and evening use type” indicating that the type of hot water use pattern in the customer facility is a type that is frequently used in the period from 6:00 to 7:00 and from 18:00 to 21:00. Is displayed.

また、3月6日の0時〜24時の期間における、需要家ID「1」に対応する需要家施設の予測受電量の時系列変化を示すグラフGr52と、当該需要家施設の実績受電量の時系列変化を示すグラフGr53とが対応付けて表示される。   In addition, a graph Gr52 showing a time-series change of the predicted power reception amount of the customer facility corresponding to the customer ID “1” in the period from 0:00 to 24:00 on March 6, and the actual power reception amount of the customer facility Is displayed in association with a graph Gr53 indicating a time-series change.

また、3月6日の0時〜24時の期間における、当該需要家施設におけるエコキュートの制御内容、および当該制御内容に従って動作したエコキュートにより沸かされた湯の貯湯量の時系列変化を示すグラフGr54が、グラフGr51〜Gr53に対応付けて表示される。   In addition, the graph Gr54 showing the control contents of the eco cute in the customer facility and the time series change of the amount of hot water boiled by the eco cute operated according to the control contents in the period from 0:00 to 24:00 on March 6 Are displayed in association with the graphs Gr51 to Gr53.

さらに、3月6日の0時〜24時の期間における、1kWあたりの電気料金の時系列変化を示すグラフGr55、需要家ID「1」に対応する需要家施設の予測料金の時系列変化を示すグラフGr56、および当該需要家施設の実績料金の時系列変化を示すグラフGr57が、グラフGr51〜Gr54およびエコキュートの制御内容に対応付けて表示される。   Furthermore, graph Gr55 which shows the time series change of the electricity rate per kW in the period from 0:00 to 24:00 on March 6, and the time series change of the predicted charge of the customer facility corresponding to the customer ID “1”. A graph Gr56 to be displayed and a graph Gr57 to indicate a time-series change in the actual fee of the customer facility are displayed in association with the graphs Gr51 to Gr54 and the control content of the ecocute.

なお、図4に示す全体実績画面Sc2、図5に示す個別実績画面Sc3、図6に示す制御内容画面Sc4および図7に示す詳細画面Sc5は、いずれもDR期間を示す。しかしながら、表示処理部22は、DR期間を示さない画面を表示する処理を行ってもよい。たとえば、表示処理部22は、全体実績画面Sc2からDR期間を除いた画面を表示する処理を行ってもよい。   Note that the overall result screen Sc2 shown in FIG. 4, the individual result screen Sc3 shown in FIG. 5, the control content screen Sc4 shown in FIG. 6, and the detail screen Sc5 shown in FIG. 7 all indicate the DR period. However, the display processing unit 22 may perform processing for displaying a screen that does not indicate the DR period. For example, the display processing unit 22 may perform a process of displaying a screen obtained by removing the DR period from the overall performance screen Sc2.

また、表示処理部22は、たとえば、図4に示す全体実績画面Sc2または図7に示す詳細画面Sc5から、予測受電量の合計の時系列変化および予測料金の合計の時系列変化の少なくともいずれか一方を除いた画面を表示する処理を行ってもよい。   Further, the display processing unit 22, for example, at least one of the total time series change of the predicted power reception amount and the total time series change of the prediction charge from the overall performance screen Sc2 shown in FIG. 4 or the detailed screen Sc5 shown in FIG. You may perform the process which displays the screen except one.

また、表示処理部22は、たとえば、図4に示す全体実績画面Sc2または図7に示す詳細画面Sc5から、実績受電量の合計の時系列変化または実績料金の合計の時系列変化を除いた画面を表示する処理を行ってもよい。   Further, the display processing unit 22 is, for example, a screen obtained by removing the total time series change of the actual power reception amount or the total time series change of the actual charge from the overall result screen Sc2 shown in FIG. 4 or the detailed screen Sc5 shown in FIG. You may perform the process which displays.

[動作]
電力管理システム301における各装置は、コンピュータを備え、当該コンピュータにおけるCPU等の演算処理部は、以下のシーケンス図の各ステップの一部または全部を含むプログラムを図示しないメモリからそれぞれ読み出して実行する。これら複数の装置のプログラムは、それぞれ、外部からインストールすることができる。これら複数の装置のプログラムは、それぞれ、記録媒体に格納された状態で流通する。
[Operation]
Each device in the power management system 301 includes a computer, and an arithmetic processing unit such as a CPU in the computer reads and executes a program including a part or all of each step in the following sequence diagram from a memory (not shown). Each of the programs of the plurality of apparatuses can be installed from the outside. The programs of the plurality of apparatuses are distributed while being stored in a recording medium.

図8は、本発明の実施の形態に係る電力管理システムにおけるDR実行前の各処理のシーケンスの一例を示す図である。   FIG. 8 is a diagram showing an exemplary sequence of each process before DR execution in the power management system according to the embodiment of the present invention.

(DR実行前)
図8を参照して、まず、電力管理サーバ101は、需要家ごとの電力の利用パターンおよび必要となる受電量(以下、「必要受電量」とも称する。)を推定する。
(Before DR execution)
With reference to FIG. 8, first, the power management server 101 estimates a power usage pattern for each consumer and a required power reception amount (hereinafter also referred to as “necessary power reception amount”).

より詳細には、電力管理サーバ101における情報処理部24は、たとえば、複数の対象期間を設定し、記憶部23における電力管理情報の示す需要家ごとの受電量に基づいて、需要家ごとかつ対象期間ごとに、電力の利用パターンおよび必要受電量を推定する(ステップS101)。   More specifically, the information processing unit 24 in the power management server 101 sets, for example, a plurality of target periods, and based on the amount of power received for each consumer indicated by the power management information in the storage unit 23, for each consumer and for each target For each period, the power usage pattern and the required power reception amount are estimated (step S101).

次に、電力管理サーバ101における情報処理部24は、推定した電力の利用パターンおよび必要受電量に基づいて、需要家施設に設けられた負荷205ごとかつ対象期間ごとに、運転計画を立案する。たとえば、電力管理サーバ101は、エコキュートの「自動沸き上げ」モードで動作する期間、「手動沸き上げ」モードで動作する期間、および動作を停止する期間などを計画する(ステップS102)。   Next, the information processing unit 24 in the power management server 101 drafts an operation plan for each load 205 and for each target period provided in the customer facility, based on the estimated power usage pattern and the required power reception amount. For example, the power management server 101 schedules a period for operating in the eco-cute “automatic boiling” mode, a period for operating in the “manual boiling” mode, a period for stopping the operation, and the like (step S102).

次に、電力管理サーバ101における情報処理部24は、立案した負荷205ごとの運転計画に基づいて、グループごとかつ対象期間ごとに、当該グループに属する複数の需要家が対象期間において調整することのできる電力量をDR可能量として予測する。電力管理サーバ101は、予測結果に基づいて、記憶部23に保存されたDR可能量を示すDR可能量情報を更新する(ステップS103)。   Next, the information processing unit 24 in the power management server 101 adjusts the plurality of consumers belonging to the group in the target period for each group and for each target period based on the planned operation plan for each load 205. The amount of power that can be generated is predicted as a DR possible amount. The power management server 101 updates the DR possible amount information indicating the DR possible amount stored in the storage unit 23 based on the prediction result (step S103).

次に、電力管理サーバ101における情報処理部24は、予測したDR可能量に基づいて、市場登録情報を作成し、作成した市場登録情報の登録処理を行う。   Next, the information processing unit 24 in the power management server 101 creates market registration information based on the predicted DR possible amount, and performs registration processing of the created market registration information.

より詳細には、オペレータは、たとえば、アグリゲータがDRに参加する制御期間、制御期間において調整される電力量の目標である制御量、および電力消費の調整の依頼先の条件である制御条件を入力する操作を端末装置171に対して行う。端末装置171は、オペレータの操作を示す操作情報を作成し、作成した操作情報を電力管理サーバ101へ送信する。   More specifically, the operator inputs, for example, a control period during which the aggregator participates in DR, a control amount that is a target of the amount of power adjusted in the control period, and a control condition that is a request destination condition for adjustment of power consumption. To the terminal device 171. The terminal device 171 creates operation information indicating the operation of the operator, and transmits the created operation information to the power management server 101.

そして、電力管理サーバ101における情報処理部24は、記憶部23における需要家情報、電力管理情報、ならびに操作情報から得られた制御期間、制御量および制御条件に基づいて、電力消費の調整の依頼先および内容を示す候補情報を作成する。そして、情報処理部24は、作成した候補情報、ならびに制御期間および制御量を含む市場登録情報を作成し、作成した市場登録情報を記憶部23に保存する(ステップS104)。   Then, the information processing unit 24 in the power management server 101 requests adjustment of power consumption based on the control period, control amount, and control condition obtained from the customer information, power management information, and operation information in the storage unit 23. Candidate information indicating the destination and contents is created. Then, the information processing unit 24 creates market registration information including the created candidate information, a control period, and a control amount, and stores the created market registration information in the storage unit 23 (step S104).

次に、系統側サーバ121、卸電力取引所サーバ111および電力管理サーバ101間において落札処理が行われる。   Next, a successful bid process is performed among the grid-side server 121, the wholesale power exchange server 111, and the power management server 101.

より詳細には、電力管理サーバ101における情報処理部24は、保存した市場登録情報に基づいて、自己のIDおよび制御期間、ならびにコストおよび調整可能な電力の期待値を商品として卸電力取引所サーバ111に登録する。系統側サーバ121は、卸電力取引所サーバ111に登録された商品の中から、DR計画を満たすように商品を落札する(ステップS105)。   More specifically, the information processing unit 24 in the power management server 101 uses its own ID and control period, cost, and adjustable expected power value as a commodity based on the stored market registration information. 111 is registered. The system-side server 121 makes a successful bid for the product so as to satisfy the DR plan from the products registered in the wholesale power exchange server 111 (step S105).

次に、系統側サーバ121は、たとえば、落札した商品の内容に沿った、DR期間および依頼電力R1を含む調整情報S1を電力管理サーバ101へ送信する(ステップS106)。なお、系統側サーバ121は、落札した商品の内容に沿わない調整情報S1を電力管理サーバ101へ送信することもある。   Next, the system side server 121 transmits, for example, adjustment information S1 including the DR period and the requested power R1 to the power management server 101 according to the content of the successful bid product (step S106). The system-side server 121 may transmit adjustment information S1 that does not conform to the content of the successful bid product to the power management server 101.

次に、電力管理サーバ101における通信部21は、たとえば、他の装置、具体的には系統側サーバ121から調整情報S1を受信し、受信した調整情報S1を情報処理部24へ出力する。情報処理部24は、通信部21から調整情報S1を受けると、受けた調整情報S1を記憶部23に保存する調整情報登録処理を行う(ステップS107)。   Next, the communication unit 21 in the power management server 101 receives, for example, the adjustment information S1 from another device, specifically, the system side server 121, and outputs the received adjustment information S1 to the information processing unit 24. Upon receiving the adjustment information S1 from the communication unit 21, the information processing unit 24 performs an adjustment information registration process for storing the received adjustment information S1 in the storage unit 23 (step S107).

次に、電力管理サーバ101における情報処理部24は、ステップS104において登録した市場登録情報に基づく内容の制御情報を作成する。   Next, the information processing unit 24 in the power management server 101 creates control information having contents based on the market registration information registered in step S104.

より詳細には、情報処理部24は、作成した市場登録情報から、各需要家ID、および当該各需要家IDの示す需要家の調整可能な電力を把握する。そして、情報処理部24は、記憶部23に保存されている需要家情報から、取得した各需要家IDに対応する装置IDを制御情報の宛先として取得し、装置IDごとに、対応の宛先、DR期間、対応の調整可能な電力、および負荷205ごとの制御内容を含む制御情報を作成する。そして、情報処理部24は、作成した各制御情報を通信部21へ出力する(ステップS108)。   More specifically, the information processing unit 24 grasps each customer ID and the adjustable power of the customer indicated by each customer ID from the created market registration information. And the information processing part 24 acquires apparatus ID corresponding to each acquired customer ID as a destination of control information from the customer information preserve | saved at the memory | storage part 23, for each apparatus ID, a corresponding destination, Control information including the DR period, the corresponding adjustable power, and the control content for each load 205 is created. And the information processing part 24 outputs each produced control information to the communication part 21 (step S108).

次に、通信部21は、情報処理部24によって作成された制御情報を依頼先に通知する。より詳細には、通信部21は、情報処理部24から装置IDごとの制御情報を受けると、受けた各制御情報を、各々の制御情報に含まれる宛先の示す需要家装置202へ送信する(ステップS109)。   Next, the communication unit 21 notifies the request destination of the control information created by the information processing unit 24. More specifically, when receiving the control information for each device ID from the information processing unit 24, the communication unit 21 transmits the received control information to the customer device 202 indicated by the destination included in each control information ( Step S109).

次に、各需要家装置202は、電力管理サーバ101から制御情報を受信すると、受信した制御情報を登録する制御情報登録処理を行う(ステップS110)。   Next, when each consumer device 202 receives control information from the power management server 101, it performs control information registration processing for registering the received control information (step S110).

(DR実行中)
DR実行中において、まず、各需要家装置202は、自己のDRの実績を示す実績値情報を定期的または不定期に電力管理サーバ101へ送信する(ステップS201)。
(DR running)
During the execution of DR, first, each customer device 202 transmits performance value information indicating its own DR performance to the power management server 101 regularly or irregularly (step S201).

次に、電力管理サーバ101は、集計処理を行う。より詳細には、電力管理サーバ101における情報処理部24は、各需要家装置202からの実績値情報を通信部21経由で受信し、受信した複数の実績値情報がそれぞれ示す複数の実績値を含む電力管理情報を作成する(ステップS202)。   Next, the power management server 101 performs aggregation processing. More specifically, the information processing unit 24 in the power management server 101 receives the actual value information from each customer apparatus 202 via the communication unit 21, and receives a plurality of actual values respectively indicated by the received plural actual value information. Including power management information is created (step S202).

次に、電力管理サーバ101における表示処理部22は、情報処理部24により作成された電力管理情報に基づく画面を表示装置に表示する表示処理を行う(ステップS203)。   Next, the display processing unit 22 in the power management server 101 performs display processing for displaying a screen based on the power management information created by the information processing unit 24 on the display device (step S203).

図9は、図8に示す表示処理における動作の流れを示すフローチャートの一例を示す図である。   FIG. 9 is a diagram showing an example of a flowchart showing the flow of operations in the display process shown in FIG.

図9を参照して、表示処理において、まず、電力管理サーバ101における情報処理部24は、オペレータによる日付の入力を受け付ける(ステップS401)。   Referring to FIG. 9, in the display process, first, information processing unit 24 in power management server 101 accepts an input of a date by an operator (step S401).

次に、オペレータが、たとえば端末装置171を介して日付の入力を行うと、情報処理部24は、入力された日付の0時〜24時の期間にDR期間が含まれるか否かを確認し、確認結果を表示処理部22に通知する(ステップS402)。   Next, when the operator inputs a date via, for example, the terminal device 171, the information processing unit 24 checks whether or not the DR period is included in the period from 0:00 to 24:00 of the input date. The confirmation result is notified to the display processing unit 22 (step S402).

そして、表示処理部22は、入力された日付の0時〜24時の期間にDR期間が含まれない場合(ステップS402において「NO」)、たとえば、当該日付の期間における実績受電量の合計の時系列変化を示す画面を、表示装置に表示する処理を行う(ステップ403)。   If the DR period is not included in the period from 0 o'clock to 24 o'clock of the input date ("NO" in step S402), for example, the display processing unit 22 displays the total amount of actual power received during the period of the date. A process of displaying a screen showing a time series change on the display device is performed (step 403).

一方、表示処理部22はは、入力された日付の0時〜24時の期間にDR期間が含まれる場合(ステップS402において「YES」)、当該日付の期間に含まれる1または複数のDR期間を示すイベント画面Sc1を表示する表示処理を行う。すなわち、表示処理部22は、たとえば図3に示すイベント画面Sc1を表示する表示処理を行う(ステップS404)。   On the other hand, when the period from 0 o'clock to 24 o'clock of the input date includes the DR period ("YES" in step S402), the display processing unit 22 includes one or more DR periods included in the period of the date A display process for displaying the event screen Sc1 is displayed. That is, the display processing unit 22 performs display processing for displaying the event screen Sc1 shown in FIG. 3, for example (step S404).

次に、情報処理部24は、オペレータによるDR期間の選択操作を受け付ける(ステップS405)。   Next, the information processing unit 24 receives a DR period selection operation by the operator (step S405).

次に、オペレータが、端末装置171を介してDR期間の選択結操作を行ったとすると、情報処理部24は、選択されたDR期間を表示処理部22に通知し、表示処理部22は、通知されたDR期間に対応する全体実績画面Sc2を表示する表示処理を行う。   Next, if the operator performs a DR period selection operation via the terminal device 171, the information processing unit 24 notifies the display processing unit 22 of the selected DR period, and the display processing unit 22 A display process for displaying the entire result screen Sc2 corresponding to the DR period thus performed is performed.

すなわち、表示処理部22は、たとえば図4に示す、全体調整量、複数の需要家へのインセンティブの合計、予測受電量の合計の時系列変化、実績受電量の合計の時系列変化、予測料金の合計の時系列変化、および実績料金の合計の時系列変化を示す全体実績画面Sc2を表示する表示処理を行う(ステップS406)。   That is, the display processing unit 22, for example, as shown in FIG. 4, the total adjustment amount, the total incentive to a plurality of consumers, the time series change of the total predicted power reception amount, the time series change of the total amount of actual power reception, the prediction fee Display processing for displaying the total result screen Sc2 showing the total time-series change and the total time-series change of the actual charges (step S406).

次に、情報処理部24は、オペレータによる個別実績ボタンB1または制御内容ボタンB2の選択操作を受け付ける(ステップS407)。   Next, the information processing section 24 receives an operation for selecting the individual result button B1 or the control content button B2 by the operator (step S407).

そして、オペレータが、端末装置171を介して個別実績ボタンB1の選択操作を行ったとすると、情報処理部24は、オペレータにより個別実績ボタンB1が選択されたことを表示処理部22に通知する。そして、表示処理部22は、たとえば図5に示す個別実績画面Sc3、すなわち需要家ごとのDRに対する実績を示す個別実績画面Sc3を表示する表示処理を行う。   If the operator performs an operation for selecting the individual achievement button B1 via the terminal device 171, the information processing unit 24 notifies the display processing unit 22 that the individual achievement button B1 has been selected by the operator. And the display process part 22 performs the display process which displays the separate performance screen Sc3 shown, for example in FIG. 5, ie, the separate performance screen Sc3 which shows the performance with respect to DR for every consumer.

また、オペレータが、端末装置171を介して制御内容ボタンB2の選択操作を行ったとすると、情報処理部24は、オペレータにより制御内容ボタンB2が選択されたことを表示処理部22に通知する。そして、表示処理部22は、たとえば図6に示す制御内容画面Sc4、すなわち負荷205ごとの制御内容を示す制御内容画面Sc4を表示する表示処理を行う(ステップS408)。   If the operator performs a selection operation of the control content button B2 via the terminal device 171, the information processing unit 24 notifies the display processing unit 22 that the control content button B2 has been selected by the operator. Then, the display processing unit 22 performs display processing for displaying, for example, the control content screen Sc4 shown in FIG. 6, that is, the control content screen Sc4 showing the control content for each load 205 (step S408).

次に、情報処理部24は、個別実績画面Sc3または制御内容画面Sc4が表示されている状況において、オペレータによる需要家IDの選択操作を受け付ける(ステップS409)。   Next, the information processing unit 24 accepts an operation for selecting a customer ID by the operator in a situation where the individual result screen Sc3 or the control content screen Sc4 is displayed (step S409).

次に、オペレータが、端末装置171を介して需要家IDの選択操作を行ったとすると、情報処理部24は、オペレータにより選択された需要家IDを表示処理部22に通知する。そして、表示処理部22は、たとえば図7に示す詳細画面Sc5、すなわち選択された需要家IDに対応する需要家施設に関する詳細を示す詳細画面Sc5を表示する処理を行う(ステップS410)。   Next, if the operator performs an operation for selecting a customer ID via the terminal device 171, the information processing unit 24 notifies the display processing unit 22 of the customer ID selected by the operator. And the display process part 22 performs the process which displays the detail screen Sc5 which shows the detail regarding the customer facility corresponding to the detail screen Sc5 shown in FIG. 7, for example, selected customer ID, for example (step S410).

再び図8を参照して、次に、電力管理サーバ101における情報処理部24は、電力管理情報を通信部21経由で系統側サーバ121へ送信する(ステップS204)。   Referring to FIG. 8 again, next, the information processing unit 24 in the power management server 101 transmits power management information to the system side server 121 via the communication unit 21 (step S204).

次に、系統側サーバ121は、電力管理サーバ101から電力管理情報を受信すると、受信した電力管理情報の示す需要家ごとの受電量を登録する登録処理を行う(ステップS205)。   Next, when receiving power management information from the power management server 101, the grid-side server 121 performs a registration process for registering the amount of power received for each consumer indicated by the received power management information (step S205).

(DR実行後)
DR実行後において、まず、各需要家装置202は、自己のDRの実績を示す実績値情報を電力管理サーバ101へ送信する(ステップS301)。
(After DR execution)
After the DR execution, first, each customer device 202 transmits performance value information indicating its own DR performance to the power management server 101 (step S301).

次に、電力管理サーバ101は、上述したステップS202と同様に、集計処理を行う(ステップS302)。   Next, the power management server 101 performs a totaling process in the same manner as in step S202 described above (step S302).

次に、電力管理サーバ101は、上述したステップS203と同様に、作成した電力管理情報に基づく画面を表示装置に表示する表示処理を行う(ステップS303)。   Next, similarly to step S203 described above, the power management server 101 performs display processing for displaying a screen based on the created power management information on the display device (step S303).

次に、電力管理サーバ101は、電力管理情報を系統側サーバ121へ送信する(ステップS304)。   Next, the power management server 101 transmits power management information to the system side server 121 (step S304).

次に、系統側サーバ121は、電力管理サーバ101から電力管理情報を受信すると、受信した電力管理情報の示す需要家ごとの受電量を登録する登録処理を行う(ステップS305)。   Next, when receiving power management information from the power management server 101, the grid-side server 121 performs a registration process for registering the amount of power received for each consumer indicated by the received power management information (step S305).

次に、系統側サーバ121は、たとえば、登録した需要家ごとの受電量に基づいて、各需要家に支払うべき対価を算出する(ステップS306)。そして、系統側サーバ121を運用する送配電事業者または電力小売事業者は、系統側サーバ121により算出された需要家ごとの対価を、対応する複数の需要家へそれぞれ付与する。   Next, the system side server 121 calculates a consideration to be paid to each consumer based on, for example, the registered power reception amount for each consumer (step S306). Then, the power transmission / distribution business operator or the power retail business operator that operates the grid-side server 121 gives the consideration for each customer calculated by the grid-side server 121 to each of a plurality of corresponding customers.

ところで、送配電事業者および電力小売り事業者は、多くの電力需要施設にxEMSが導入されることにより、全体的な電力需要を広範囲に調整することが容易となる。   By the way, transmission / distribution operators and power retailers can easily adjust the overall power demand in a wide range by introducing xEMS in many power demand facilities.

たとえば、送配電事業者および電力小売り事業者は、電力需給の逼迫が予測される場合に、アグリゲータに対して予め節電依頼を行う。そして、アグリゲータは、節電依頼に従って、電力需要施設における機器の運転状態を管理する。   For example, a power transmission / distribution company and a power retailer make a power-saving request in advance to the aggregator when power supply and demand are expected to be tight. Then, the aggregator manages the operation state of the device in the power demand facility according to the power saving request.

しかしながら、依頼先における機器の管理内容が適切でない場合、電力需給が逼迫したり、電力の供給が需要を上回ったりし、系統における電力の需給バランスが崩れるため、好ましくない。このため、電力消費の調整の依頼先をより適切に管理することのできる技術が望まれる。   However, when the management content of the device at the request destination is not appropriate, the power supply and demand is tight, the power supply exceeds the demand, and the power supply and demand balance in the system is disrupted. For this reason, a technique capable of more appropriately managing a request destination for adjustment of power consumption is desired.

これに対して、本発明の実施の形態に係る電力管理サーバ101では、情報処理部24が、需要家施設における負荷205の制御内容を示す制御情報、ならびに系統から需要家施設への受電量、および従量料金の少なくともいずれか一方を示す電力管理情報を作成する。そして、表示処理部22が、情報処理部24により作成された制御情報および電力管理情報に基づいて、負荷205の制御内容の時系列変化と、受電量の時系列変化および従量料金の時系列変化の少なくともいずれか一方とを対応付けて表示する処理を行う。   On the other hand, in the power management server 101 according to the embodiment of the present invention, the information processing unit 24 controls the control information indicating the control content of the load 205 in the customer facility, and the amount of power received from the system to the customer facility, And power management information indicating at least one of the metered rate is created. Then, based on the control information and the power management information created by the information processing unit 24, the display processing unit 22 performs a time-series change in the control content of the load 205, a time-series change in the amount of received power, and a time-series change in the usage fee. The process which matches and displays at least any one of these is performed.

このような構成により、負荷205が制御されることによる効果、すなわち受電量の変化および従量料金の変化のうちの少なくともいずれか一方を、視覚的に容易に把握することができる。したがって、電力消費の調整に関する依頼先のより適切な管理を可能とすることができる。   With such a configuration, it is possible to visually easily grasp at least one of the effect of controlling the load 205, that is, the change in the amount of received power and the change in the metered charge. Accordingly, it is possible to more appropriately manage the request destination regarding adjustment of power consumption.

また、本発明の実施の形態に係る電力管理サーバ101では、表示処理部22が、系統から要請されるDR期間をさらに対応付けて表示する処理を行う。   Moreover, in the power management server 101 according to the embodiment of the present invention, the display processing unit 22 performs a process of further displaying the DR periods requested from the system in association with each other.

このような構成により、たとえば、DR期間における受電量と、DR期間以外の期間における受電量とを比較したり、DR期間における従量料金と、DR期間以外の期間における従量料金とを比較したりすることが可能となる。これにより、DR期間において負荷205が制御されることによる効果を明確に把握することができる。   With such a configuration, for example, the amount of power received in the DR period is compared with the amount of power received in a period other than the DR period, or the metered charge in the DR period is compared with the metered charge in the period other than the DR period. It becomes possible. Thereby, the effect by controlling the load 205 in the DR period can be clearly grasped.

また、本発明の実施の形態に係る電力管理サーバ101では、表示処理部22が、受電量の時系列変化の予測および従量料金の時系列変化の予測の少なくともいずれか一方を、さらに対応付けて表示する処理を行う。   Further, in the power management server 101 according to the embodiment of the present invention, the display processing unit 22 further associates at least one of the prediction of the time-series change of the received power amount and the prediction of the time-series change of the metered charge. Process to display.

このような構成により、たとえば負荷205が制御されない場合における予測内容を把握することにより、負荷205が制御されることによる効果をより一層明確に把握することができる。   With such a configuration, for example, by grasping the predicted contents when the load 205 is not controlled, it is possible to grasp the effect of controlling the load 205 more clearly.

また、本発明の実施の形態に係る電力管理サーバ101では、表示処理部22が、受電量の時系列変化および従量料金の時系列変化の両方を表示する処理を行う。   Further, in the power management server 101 according to the embodiment of the present invention, the display processing unit 22 performs a process of displaying both the time-series change of the received power amount and the time-series change of the metered charge.

このような構成により、たとえば、従量料金の時系列変化を、負荷205が制御されることによる変化であるのか、または時間帯に応じた電気料金の単価の推移による変化であるのかを区別することができるため、負荷205が制御されることによる効果をより正確に把握することができる。   With such a configuration, for example, it is distinguished whether the time-series change of the metered charge is a change due to the load 205 being controlled or a change due to a change in the unit price of the electricity charge according to the time zone. Therefore, the effect by controlling the load 205 can be grasped more accurately.

本発明の実施の形態に係る電力管理システム301は、電力管理サーバ101における表示処理部22が実績画面を表示する処理を行う構成であるとしたが、これに限定するものではない。電力管理システム301は、電力管理サーバ101から電力管理情報等を取得し、電力管理情報等に基づいてイベント画面Sc1、全体実績画面Sc2、個別実績画面Sc3、制御内容画面Sc4および詳細画面Sc5を表示する処理を行う表示処理装置を備える構成であってもよい。この表示処理装置は、たとえば図1に示す端末装置171であってもよいし、端末装置171とは異なる装置であってもよい。   In the power management system 301 according to the embodiment of the present invention, the display processing unit 22 in the power management server 101 is configured to perform the process of displaying the result screen. However, the present invention is not limited to this. The power management system 301 acquires power management information and the like from the power management server 101, and displays an event screen Sc1, an overall results screen Sc2, an individual results screen Sc3, a control details screen Sc4, and a details screen Sc5 based on the power management information and the like. The display processing apparatus which performs the process to perform may be provided. This display processing device may be, for example, the terminal device 171 shown in FIG. 1 or a device different from the terminal device 171.

また、本発明の実施の形態に係るサーバの機能の一部または全部が、クラウドコンピューティングによって提供されてもよい。すなわち、本発明の実施の形態に係るサーバが、複数のクラウドサーバ等によって構成されてもよい。   In addition, part or all of the functions of the server according to the embodiment of the present invention may be provided by cloud computing. That is, the server according to the embodiment of the present invention may be configured by a plurality of cloud servers and the like.

上記実施の形態は、すべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は、上記説明ではなく特許請求の範囲によって示され、特許請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。   The above embodiment should be considered as illustrative in all points and not restrictive. The scope of the present invention is defined by the terms of the claims, rather than the description above, and is intended to include any modifications within the scope and meaning equivalent to the terms of the claims.

以上の説明は、以下に付記する特徴を含む。   The above description includes the following features.

[付記1]
施設における機器の制御内容を示す制御情報、ならびに系統から前記施設への電力供給量、および電気料金の少なくともいずれか一方を示す電力管理情報を取得する取得部と、
前記取得部により取得された前記制御情報および前記電力管理情報に基づいて、前記制御内容の時系列変化と、前記電力供給量の時系列変化および前記電気料金の時系列変化の少なくともいずれか一方とを対応付けて表示する処理を行う表示処理部とを備え、
前記表示処理部は、さらに、複数の前記施設の各々への電力供給量の合計、前記複数の施設の各々の電気料金の合計、前記複数の施設のリスト、および前記機器ごとの前記制御内容のうちの少なくともいずれか1つを表示する処理を行うことが可能であり、
前記機器は、エコキュート、二次電池式電気自動車、プラグインハイブリッドカー、照明、テレビ、蓄電池または空調装置であり、
前記機器がエコキュートである場合、前記表示処理部は、さらに、前記機器の設けられた前記施設における湯の利用パターンおよび前記機器により沸かされた湯の貯湯量を表示する処理を行うことが可能である、表示処理装置。
[Appendix 1]
An acquisition unit that acquires power management information indicating at least one of control information indicating the control content of the equipment in the facility, a power supply amount from the system to the facility, and an electricity charge;
Based on the control information and the power management information acquired by the acquisition unit, at least one of a time-series change of the control content, a time-series change of the power supply amount, and a time-series change of the electricity rate And a display processing unit that performs processing to display in association with each other,
The display processing unit further includes a total power supply amount to each of the plurality of facilities, a total of electricity charges for each of the plurality of facilities, a list of the plurality of facilities, and the control content for each device. Can display at least one of them,
The equipment is eco-cute, secondary battery electric vehicle, plug-in hybrid car, lighting, TV, storage battery or air conditioner,
When the device is eco-cute, the display processing unit can further perform a process of displaying a hot water usage pattern in the facility where the device is provided and the amount of hot water boiled by the device. A display processing device.

21 通信部
22 表示処理部
23 記憶部
24 情報処理部
101 電力管理サーバ(表示処理装置)
111 卸電力取引所サーバ
121 系統側サーバ
171 端末装置
202 需要家装置
205 負荷
301 電力管理システム


21 Communication Unit 22 Display Processing Unit 23 Storage Unit 24 Information Processing Unit 101 Power Management Server (Display Processing Device)
111 Wholesale Power Exchange Server 121 System Side Server 171 Terminal Device 202 Customer Device 205 Load 301 Power Management System


Claims (6)

施設における機器の制御内容を示す制御情報、ならびに系統から前記施設への電力供給量、および電気料金の少なくともいずれか一方を示す電力管理情報を取得する取得部と、
前記取得部により取得された前記制御情報および前記電力管理情報に基づいて、前記制御内容の時系列変化と、前記電力供給量の時系列変化および前記電気料金の時系列変化の少なくともいずれか一方とを対応付けて表示する処理を行う表示処理部とを備える、表示処理装置。
An acquisition unit that acquires power management information indicating at least one of control information indicating the control content of the equipment in the facility, a power supply amount from the system to the facility, and an electricity charge;
Based on the control information and the power management information acquired by the acquisition unit, at least one of a time-series change of the control content, a time-series change of the power supply amount, and a time-series change of the electricity rate A display processing device comprising: a display processing unit that performs a process of displaying in association with each other.
前記表示処理部は、前記系統から要請される電力消費の抑制期間をさらに対応付けて表示する処理を行う、請求項1に記載の表示処理装置。   The display processing apparatus according to claim 1, wherein the display processing unit performs a process of further displaying a power consumption suppression period requested from the system in association with each other. 前記表示処理部は、前記電力供給量の時系列変化の予測および前記電気料金の時系列変化の予測の少なくともいずれか一方を、さらに対応付けて表示する処理を行う、請求項1または請求項2に記載の表示処理装置。   The said display process part performs the process which further displays in correlation at least any one of the prediction of the time series change of the said electric power supply amount, and the prediction of the time series change of the said electricity bill. The display processing device according to 1. 前記表示処理部は、前記電力供給量の時系列変化および前記電気料金の時系列変化の両方を表示する処理を行う、請求項1から請求項3のいずれか1項に記載の表示処理装置。   The display processing device according to any one of claims 1 to 3, wherein the display processing unit performs a process of displaying both a time-series change in the power supply amount and a time-series change in the electricity bill. 表示処理装置における表示処理方法であって、
施設における機器の制御内容を示す制御情報、ならびに系統から前記施設への電力供給量、および電気料金の少なくともいずれか一方を示す電力管理情報を取得するステップと、
取得した前記制御情報および前記電力管理情報に基づいて、前記制御内容の時系列変化と、前記電力供給量の時系列変化および前記電気料金の時系列変化の少なくともいずれか一方とを対応付けて表示する処理を行うステップとを含む、表示処理方法。
A display processing method in a display processing device,
Obtaining power management information indicating at least one of control information indicating the control content of the equipment in the facility, power supply amount from the system to the facility, and electricity charge; and
Based on the acquired control information and the power management information, a time-series change in the control content and at least one of a time-series change in the power supply amount and a time-series change in the electricity rate are displayed in association with each other. A display processing method including the step of performing the processing to be performed.
表示処理装置において用いられる表示処理プログラムであって、
コンピュータを、
施設における機器の制御内容を示す制御情報、ならびに系統から前記施設への電力供給量、および電気料金の少なくともいずれか一方を示す電力管理情報を取得する取得部と、
前記取得部により取得された前記制御情報および前記電力管理情報に基づいて、前記制御内容の時系列変化と、前記電力供給量の時系列変化および前記電気料金の時系列変化の少なくともいずれか一方とを対応付けて表示する処理を行う表示処理部、
として機能させるための、表示処理プログラム。
A display processing program used in a display processing device,
Computer
An acquisition unit that acquires power management information indicating at least one of control information indicating the control content of the equipment in the facility, a power supply amount from the system to the facility, and an electricity charge;
Based on the control information and the power management information acquired by the acquisition unit, at least one of a time-series change of the control content, a time-series change of the power supply amount, and a time-series change of the electricity rate A display processing unit for performing a process of displaying in association with each other,
Display processing program to function as
JP2017112641A 2017-06-07 2017-06-07 Display processor, display processing method and display processing program Pending JP2018207709A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017112641A JP2018207709A (en) 2017-06-07 2017-06-07 Display processor, display processing method and display processing program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017112641A JP2018207709A (en) 2017-06-07 2017-06-07 Display processor, display processing method and display processing program

Publications (1)

Publication Number Publication Date
JP2018207709A true JP2018207709A (en) 2018-12-27

Family

ID=64958504

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017112641A Pending JP2018207709A (en) 2017-06-07 2017-06-07 Display processor, display processing method and display processing program

Country Status (1)

Country Link
JP (1) JP2018207709A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111983957A (en) * 2020-09-03 2020-11-24 中国兵器工业集团第二一四研究所苏州研发中心 Combined power supply and power-on time sequence control method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111983957A (en) * 2020-09-03 2020-11-24 中国兵器工业集团第二一四研究所苏州研发中心 Combined power supply and power-on time sequence control method thereof

Similar Documents

Publication Publication Date Title
JP5999148B2 (en) Server apparatus and program
Yu et al. A statistical demand-price model with its application in optimal real-time price
US11435772B2 (en) Systems and methods for optimizing energy usage using energy disaggregation data and time of use information
US10345766B2 (en) Energy management server, energy management method, and medium
EP2933774A1 (en) Energy-management server, energy-management method, and program
JP6610059B2 (en) Electric power demand induction device
JP6646112B2 (en) Demand response management system including scheduling function
JP2018109809A (en) Power transaction system
US20180212427A1 (en) Device control apparatus
JP6289759B2 (en) Control device, control system, control method, and program
KR20120076659A (en) Load control method for load contol apparatus
WO2017033282A1 (en) Control device, event information display method and program
WO2016084313A1 (en) Power demand adjustment system, demand adjustment device, group generation device, and group generation method
US10268171B2 (en) Demand response control result presentation apparatus
JP2017163630A (en) Controller, power generator, control method and program
WO2015064024A1 (en) Rewards information determining device and rewards information determining system
JP2018207709A (en) Display processor, display processing method and display processing program
JP2016015850A (en) Power consumption management device, power consumption management system, power consumption management method and power consumption management program
JP2015192518A (en) Power purchase reducing method and power purchase reducing system
Kou et al. Distributed demand-side management for microgrids in modern power system
JP2014039422A (en) System for selecting power saving request user and suppressing user power use amount
JP7165874B2 (en) Power control method, program, power control system, aggregation system, and communication terminal
JP6919347B2 (en) Display processing device, display processing method and display processing program
JP2017191521A (en) Display method, program, and display system
JP2017103862A (en) Power estimating apparatus, power estimating method, and power estimating program