- CN104153396A CN104153396A CN201410338843.2A CN201410338843A CN104153396A CN 104153396 A CN104153396 A CN 104153396A CN 201410338843 A CN201410338843 A CN 201410338843A CN 104153396 A CN104153396 A CN 104153396A
- Authority
- CN
- China
- Prior art keywords
- wall
- diaphragm wall
- build
- construction
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Sewage (AREA)
Abstract
The invention discloses an anti-seepage continuous wall construction method. The method includes the following construction steps: A) selecting the diameter of a joint pipe according to the thickness of a continuous wall, and fixedly mounting a sawtooth projection on the outer wall of the joint pipe; B) integrally putting the joint pipe into a concrete construction trench section, and pouring concrete after reinforcement installation; C) after concrete setting, pulling out the joint pipe. The method has the advantages that concrete pouring is facilitated, and construction efficiency is improved; flange embedding and folding are not required, and construction cost is reduced; through changes of the continuous wall crack structure, waterstop effect is realized, and seepage resistance is improved.
Description
Technical field
The present invention relates to a kind of construction techniques, in particular, relate to a kind of construction method of diaphragm wall antiseep.
Background technology
The construction of connection wall be all generally adopt water proofing property higher from close formula concrete, diaphragm wall generally seepage itself is little, seepage generally all comes from joint seam place.Because diaphragm wall adopts section construction, therefore in the time that every section concrete is built, be all to adopt the vertical junction block that diameter conforms to substantially with diaphragm wall thickness that inserts in diaphragm wall segmentation place, as with the connecting sewing of next section of construction of diaphragm wall.After the last period, continuous wall concrete was built, in the time that concrete solidifies, vertically extract joint steel pipe, joint seam after having built presents the semicircle crescent shape that conforms to steel pipe, because the contact surface of semicircle crescent shape is greater than straight line, in the time that next section of diaphragm wall built, what two ends connection wall joint stitched just presents semicircle crater convex form.All generally to adopt this kind of method to improve joint seam contact surface, improve leakage resistance at present.
But semi-circular joint seam is plane contact, therefore still there is continuous wall connector seam seepage.Chinese invention patent application number is: CN201110140576.4, denomination of invention is: articulated joint of diaphragm wall, this patent is in diaphragm wall articulated joint place, be provided with wing plate and flanging part, increase stagnant water effect, but construction of diaphragm wall area is very large, increase wing plate and flanging, can increase Master Cost and affect efficiency of construction.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, and provide one to prevent that diaphragm wall seam from leaking, improve efficiency of construction, reduce the construction method of the diaphragm wall antiseep of construction cost.
The construction method of diaphragm wall antiseep of the present invention, comprises following construction sequence:
A, in box cut inner side, diaphragm wall is set and leads wall, in the middle of diaphragm wall is led wall, build diaphragm wall and build A section 3, select the diameter of junction block according to the thickness of diaphragm wall, lateral wall at junction block fixedly mounts sawtooth projection and is welded and fixed three angle steel, form the three vertical tongue and grooves in road at continuous wall connector seam place by three angle steel, increase the keying strength between body of wall, also formed three seals groove simultaneously;
B, junction block entirety is put into concrete construction groove section, concreting is installed after reinforcing bar;
After C, concrete setting, junction block is extracted;
D, build diaphragm wall and build B section, build A section and diaphragm wall at diaphragm wall and build and between B section, form zigzag joint seam seal groove.
On described junction block outer wall, be provided with rectangular preiection.
Described angle steel width is 50-80mm.
The invention has the beneficial effects as follows: (1) concreting is convenient, improve efficiency of construction; (2), without pre-buried wing plate and flanging, lower construction cost; (3) by changing diaphragm wall crack structure, realize stagnant water effect, improve leakage resistance.
Brief description of the drawings
Fig. 1 is structural representation of the present invention;
In figure: box cut 1, diaphragm wall are led wall 2, diaphragm wall and built A section 3, junction block 4, diaphragm wall and build B section 5, joint seam 6, joint seam seal groove 7.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
In the drawings, the construction method of diaphragm wall antiseep of the present invention, comprises following construction sequence:
A, in box cut 1 inner side, diaphragm wall is set and leads wall 2, in the middle of diaphragm wall is led wall 2, build diaphragm wall and build A section 3, select the diameter of junction block 4 according to the thickness of diaphragm wall, fixedly mounting sawtooth projection and be welded and fixed three width at the lateral wall of junction block 4 is 60mm angle steel, stitch 6 places by three angle steel at continuous wall connector and form the three vertical tongue and grooves in road, increase the keying strength between body of wall, also formed three seals groove simultaneously, the seepage that has prevented continuous wall connector seam of maximum possible;
B, junction block 4 entirety are put into concrete construction groove section, concreting is installed after reinforcing bar;
After C, concrete setting, junction block 4 is extracted;
D, build diaphragm wall and build B section 5, build A section 3 and diaphragm wall at diaphragm wall and build between B section 5 and form zigzag joint seam seal groove 7, utilize the interlock of watering between walling can realize waterproof object, do not need to increase any supporting facility.
On described junction block 4 outer walls, be provided with rectangular preiection.
The present invention, by 4 structural changes of docking head tube, increases the contact surface of diaphragm wall, has also increased the snap-in force of two ends bodies of wall, and sealing notch has improved the anti-permeability of continuous wall connector seam, simple, with low cost, safe and reliable, successful greatly.
Claims (3)
1. a construction method for diaphragm wall antiseep, is characterized in that, comprises following construction sequence:
A, in box cut (1) inner side, diaphragm wall is set and leads wall (2), in the middle of diaphragm wall is led wall (2), build diaphragm wall and build A section (3), select the diameter of junction block (4) according to the thickness of diaphragm wall, lateral wall at junction block (4) fixedly mounts sawtooth projection and is welded and fixed three angle steel, locate to form the three vertical tongue and grooves in road by three angle steel at continuous wall connector seam (6), increase the keying strength between body of wall, also formed three seals groove simultaneously;
B, junction block (4) entirety is put into concrete construction groove section, concreting is installed after reinforcing bar;
After C, concrete setting, junction block (4) is extracted;
D, build diaphragm wall and build B section (5), build A section (3) and diaphragm wall at diaphragm wall and build and between B section (5), form zigzag joint seam seal groove (7).
2. the construction method of diaphragm wall antiseep according to claim 1, is characterized in that, on described junction block (4) outer wall, is provided with rectangular preiection.
3. the construction method of diaphragm wall antiseep according to claim 1, is characterized in that, described angle steel width is 50-80mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410338843.2A CN104153396A (en) | 2014-07-17 | 2014-07-17 | Anti-seepage continuous wall construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410338843.2A CN104153396A (en) | 2014-07-17 | 2014-07-17 | Anti-seepage continuous wall construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104153396A true CN104153396A (en) | 2014-11-19 |
Family
ID=51879010
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410338843.2A Pending CN104153396A (en) | 2014-07-17 | 2014-07-17 | Anti-seepage continuous wall construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104153396A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105887936A (en) * | 2016-05-13 | 2016-08-24 | 中国矿业大学 | Freezing pipe embedding type water sealing method of trench wall connector |
CN110409511A (en) * | 2019-07-24 | 2019-11-05 | 中铁二十局集团第四工程有限公司 | A kind of interlocking pile and ground-connecting-wall seam crossing water-stopping method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60246916A (en) * | 1984-05-21 | 1985-12-06 | Takenaka Doboku Co Ltd | Method of constructing wall type underground continuous wall using delay-cured cement |
JP3681314B2 (en) * | 2000-01-18 | 2005-08-10 | エス・バイ・エル株式会社 | Water stop device used for small-scale continuous wall construction |
CN101041962A (en) * | 2007-04-13 | 2007-09-26 | 中铁一局集团有限公司 | Underground continuous wall milling joint and construction technique thereof |
CN102011410A (en) * | 2010-10-29 | 2011-04-13 | 广东省基础工程公司 | Prefabricated prestressed underground continuous wall and construction method thereof |
CN102080379A (en) * | 2009-11-26 | 2011-06-01 | 上海市基础工程有限公司 | V-shaped steel plate pulling device for ultra-deep ground wall construction |
CN102352623A (en) * | 2011-08-03 | 2012-02-15 | 天津深基工程有限公司 | Diaphragm wall reinforcing cage dovetail type sealing head structure |
CN103306312A (en) * | 2013-06-20 | 2013-09-18 | 江苏城市职业学院 | Underground diaphragm wall plate-type rigid joint and construction method thereof |
CN103924622A (en) * | 2014-04-16 | 2014-07-16 | 黄河勘测规划设计有限公司 | Parting water-stop design method of concrete cast-in-situ diaphragm wall of deep overburden layer dam foundation |
-
2014
- 2014-07-17 CN CN201410338843.2A patent/CN104153396A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60246916A (en) * | 1984-05-21 | 1985-12-06 | Takenaka Doboku Co Ltd | Method of constructing wall type underground continuous wall using delay-cured cement |
JP3681314B2 (en) * | 2000-01-18 | 2005-08-10 | エス・バイ・エル株式会社 | Water stop device used for small-scale continuous wall construction |
CN101041962A (en) * | 2007-04-13 | 2007-09-26 | 中铁一局集团有限公司 | Underground continuous wall milling joint and construction technique thereof |
CN102080379A (en) * | 2009-11-26 | 2011-06-01 | 上海市基础工程有限公司 | V-shaped steel plate pulling device for ultra-deep ground wall construction |
CN102011410A (en) * | 2010-10-29 | 2011-04-13 | 广东省基础工程公司 | Prefabricated prestressed underground continuous wall and construction method thereof |
CN102352623A (en) * | 2011-08-03 | 2012-02-15 | 天津深基工程有限公司 | Diaphragm wall reinforcing cage dovetail type sealing head structure |
CN103306312A (en) * | 2013-06-20 | 2013-09-18 | 江苏城市职业学院 | Underground diaphragm wall plate-type rigid joint and construction method thereof |
CN103924622A (en) * | 2014-04-16 | 2014-07-16 | 黄河勘测规划设计有限公司 | Parting water-stop design method of concrete cast-in-situ diaphragm wall of deep overburden layer dam foundation |
Non-Patent Citations (1)
Title |
---|
叶向阳: ""锁口管在连续墙施工中的应用"", 《城市建设理论研究(电子版) 》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105887936A (en) * | 2016-05-13 | 2016-08-24 | 中国矿业大学 | Freezing pipe embedding type water sealing method of trench wall connector |
CN110409511A (en) * | 2019-07-24 | 2019-11-05 | 中铁二十局集团第四工程有限公司 | A kind of interlocking pile and ground-connecting-wall seam crossing water-stopping method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107859064B (en) | Waterproof structure for connection of prefabricated pipe gallery and cast-in-situ pipe gallery and construction method | |
CN205205875U (en) | Underground continuous wall rubber tape water joint case | |
CN204040062U (en) | Prefabricated wedge shape flexible interface assembling piping lane | |
CN104153396A (en) | Anti-seepage continuous wall construction method | |
CN103835316A (en) | Connector structure of precast underground continuous wall and construction method | |
CN206768864U (en) | A kind of rubber fastening band for piping lane movement joint | |
CN203855990U (en) | Big pipe shaft block structure that falls | |
CN203145542U (en) | Ordinary reinforced concrete crack-resistant no-seepage pool with large volume | |
CN105971016A (en) | Utility tunnel internode connection structure | |
CN110486538A (en) | A kind of service sleeve connect plugging structure and method for blocking with pipeline | |
CN202175961U (en) | Swallow-tailed seal head structure of diaphragm wall steel reinforcement cage | |
CN106051316B (en) | A kind of pipeline wears the construction method in pond | |
CN204356915U (en) | The self waterproof structure that steel pipe column is crossing with concrete of basement exterior wall | |
CN104912057B (en) | Construction method of underground continuous wall | |
CN204510223U (en) | The two-way Grouting Pipe of vacuum-pumping | |
CN204691255U (en) | Diaphragm wall | |
CN203960813U (en) | Anchorage part for earth work membrane | |
CN104790380B (en) | Underground diaphragm wall framework | |
CN204343250U (en) | Concrete cut-off wall connection structure beneficial to stress release | |
CN203879548U (en) | Sealing wall for water plugging of mine roadway | |
CN204343251U (en) | Horizontal connection structure between concrete cut-off wall and concrete structure | |
CN203022131U (en) | L-shaped wall internal corner integral horizontal connection node | |
CN204475355U (en) | Plugging structure | |
CN208309615U (en) | A kind of hole top row ditch of foundation pit | |
CN202755381U (en) | Joint box for underground continuous wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |