CN104057081A - Dissoluble metal material for underground construction - Google Patents

Dissoluble metal material for underground construction Download PDF

Info

Publication number
CN104057081A
CN104057081A CN201410330983.5A CN201410330983A CN104057081A CN 104057081 A CN104057081 A CN 104057081A CN 201410330983 A CN201410330983 A CN 201410330983A CN 104057081 A CN104057081 A CN 104057081A
Authority
CN
China
Prior art keywords
metal
nanometer
underground construction
skeleton
metal material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410330983.5A
Other languages
Chinese (zh)
Other versions
CN104057081B (en
Inventor
徐梓辰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410330983.5A priority Critical patent/CN104057081B/en
Publication of CN104057081A publication Critical patent/CN104057081A/en
Application granted granted Critical
Publication of CN104057081B publication Critical patent/CN104057081B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A dissoluble metal material for underground construction comprises a net-shaped metal framework and a filling material. The net-shaped metal framework is of a spatial grid structure composed of metal wires made of nanometer magnesium wires or nanometer magnesium alloy wires or mixtures of nanometer magnesium and nanometer magnesium alloys. The filling material comprises nanometer zinc or nanometer iron or nanometer nickel. The spatial grid structure is filled with the filling material which is in the form of powder or short nanometer metal wires or a combination of the powder and the short nanometer metal wires. A partial assembly made of the metal material and used for underground construction of an oil-gas well can dissolve by itself after playing its roles.

Description

A kind of solubilized metal material of using for underground construction
Technical field
The present invention relates to a kind of soluble Oil/gas Well underground construction material, particularly a kind of mesh skeleton and interstitital texture thereof of utilizing the braiding of nano metal line to form.
Background technology
At present, in petroleum works technical field, the part assembly of Oil/gas Well underground construction not only can become burden but also can in some degree, affect the carrying out of construction after its effect of performance.For example the centralizer of fracturing string plays vital positioning action when construction, after construction, likely by fracturing sand landfill, is caused tubing string to trip out.Therefore be badly in need of a kind of metal material that can dissolve voluntarily at underground construction construction tool later of invention.
Summary of the invention
The object of the invention is in order to address the above problem, designed a kind of solubilized metal material of using for underground construction, this metal material can be used for making in fracturing string centralizer, multistage fracturing metal ball for opening sliding sleeve, packer body, perforating gun etc., and application prospect is extensive.
Realizing above-mentioned purpose technical scheme of the present invention is; the solubilized metal material that should use for underground construction; comprise net metal skeleton, packing material; the space networks trellis structure that the metal line materials that net metal skeleton is made by the mixture of nanometer Mg or nanometer Mg alloy or nanometer Mg and nanometer Mg alloy forms; filler comprises that nanometer Mg powder, nano-graphite particle or other metal actives are less than the metal powder of magnesium, and filler is filled in space networks trellis structure with form or both forms combining of powdery or the short metal wire of nanometer.
Further, should be at isolated air, below the above fusing point of 400 degree during making, die casting forms under 5 conditions more than MPa.Further, the diameter of nanometer Mg alloy wire is less than 5 microns.
Further, packing material can also be nano zinc powder, nanometer iron powder, nano-nickel powder or the manganese powder of receiving.
Further, net metal skeleton relies on the ion in drilling well well liquid can make it slowly dissolve in construction afterwards, or inject high-concentration acidic wastewater electrolyte and accelerate its dissolving, high-concentration acidic wastewater electrolyte chloride ion content 5g/L-20g/L, accelerate the speed of skeleton base metal corrosion, skeleton dissolves gradually, and the chemical equation in course of dissolution is:
Mg+2H 2O=Mg(OH) 2+H 2
Mg+2C1 -=MgCl 2+2e,
Mg(OH) 2+2Cl -=MgCl 2+2OH -
Further, the porosity of net metal skeleton is controlled at 5%-40%, more than permeability is controlled at 10 millidarcies.
Further, net metal skeleton integral body is cylinder, and net metal skeleton permeability is increased to inside gradually by cylinder outside, so that epidermis dissolution velocity is slow, inner dissolution velocity is fast, and metal material can not dissolve when guaranteeing to construct, and construction finish after, the dissolving of this material is more and more faster.
Further, in net metal skeleton, can sneak into high-strength carbon fiber to increase the intensity of material body.
Further, use front must storage by isolated aeroseal.
Magnesium and magnesium alloy have that density is low, intensity is high, bear dynamic load static load ability is strong, elastic modelling quantity is close with other construction materials with Poisson's ratio, the poor chemical stability of while magnesium and magnesium alloy, easily be corroded, especially under chloride environment, there is very strong corrosion performance, therefore can dissolving voluntarily in down-hole of forming with this net metal carcasing.
Accompanying drawing explanation
Fig. 1 is the structural representation of net metal skeleton of the present invention;
Fig. 2 is the partial enlarged drawing of net metal skeleton of the present invention;
In figure, 1, net metal skeleton; 2, metal wire; 3, filler.
The specific embodiment
Below in conjunction with accompanying drawing, the present invention is specifically described, as depicted in figs. 1 and 2, a kind of mesh skeleton that utilizes the braiding of nano metal line to form, comprise net metal skeleton 1, the body of described net metal skeleton is the space network structure forming with 2 braidings of nano metal line, and described space is filled with filler 3 in cancellated space; Described nano metal line 2 is nanometer Mg metal wire or nanometer Mg alloying metal line; Described filler 3 is with powder or short wire-like thing or mixture that the two combines; Described filler 3 is Nano-Zinc, Nanoscale Iron or nano nickel or the manganese of receiving, and utilizes the etching characteristic of himself, can when not needing, eliminate voluntarily.
In the present embodiment, the underground construction instrument that contains this metal parts is lowered in Oil/gas Well and is constructed, after construction, rely on the ion in drilling well well liquid can make metal slowly dissolve, or inject high-concentration acidic wastewater electrolyte and accelerate its dissolving, the acidic electrolysis bath that contains the chloride ion content of 5g/L-20g/L as squeezed into, the speed of accelerating the corrosion of skeleton base metal, skeleton dissolves gradually.
Technique scheme has only embodied the optimal technical scheme of technical solution of the present invention, and those skilled in the art have all embodied principle of the present invention to some changes that wherein some part may be made, within belonging to protection scope of the present invention.

Claims (9)

1. a solubilized metal material of using for underground construction, comprise net metal skeleton, packing material, the space networks trellis structure that described net metal skeleton is comprised of nanometer Mg metal wire, nanometer Mg alloy wire, described filler comprises that nanometer Mg powder and other metal actives are less than the metal powder of magnesium, and described filler is filled in space networks trellis structure with form or both forms combining of powdery or the short metal wire of nanometer.
2. a kind of solubilized metal material of using for underground construction according to claim 1, is characterized in that, should be at isolated air, below the above fusing point of 400 degree during making, die casting forms under 5 conditions more than MPa.
3. a kind of solubilized metal material of using for underground construction according to claim 1, is characterized in that, the diameter of described nanometer Mg alloy wire is less than 5 microns.
4. a kind of solubilized metal material of using for underground construction according to claim 1, is characterized in that, described packing material is the mixture of nano zinc powder, nanometer iron powder, nano-nickel powder.
5. a kind of solubilized metal material of using for underground construction according to claim 1, it is characterized in that, described net metal skeleton relies on the ion in drilling well well liquid can make it slowly dissolve in construction afterwards, or inject high-concentration acidic wastewater electrolyte and accelerate its dissolving, described high-concentration acidic wastewater electrolyte chloride ion content is 5g/L-20g/L, the speed of accelerating the corrosion of skeleton base metal, skeleton dissolves gradually, and the chemical equation in course of dissolution is:
Mg+2H 2O=Mg(OH) 2+H 2
Mg+2Cl -MgCl 2+2e,
Mg(OH) 2+2Cl -=MgCl 2+2OH -
6. a kind of solubilized metal material of using for underground construction according to claim 1, is characterized in that, the porosity of described net metal skeleton is controlled at 5%-40%, more than permeability is controlled at 10 millidarcies.
7. a kind of solubilized metal material of using for underground construction according to claim 3, it is characterized in that, described net metal skeleton integral body is cylinder, described net metal skeleton permeability is increased to inside gradually by cylinder outside, so that epidermis dissolution velocity is slow, inner dissolution velocity is fast, and metal material can not dissolve when guaranteeing to construct, and construction finish after, the dissolving of this material is more and more faster.
8. a kind of solubilized metal material of using for underground construction according to claim 1, is characterized in that, can sneak into high-strength carbon fiber to increase the intensity of material body in described net metal skeleton.
9. a kind of solubilized metal material of using for underground construction according to claim 1, is characterized in that, before using, must store by isolated aeroseal.
CN201410330983.5A 2014-07-09 2014-07-09 Dissoluble metal material for underground construction Active CN104057081B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410330983.5A CN104057081B (en) 2014-07-09 2014-07-09 Dissoluble metal material for underground construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410330983.5A CN104057081B (en) 2014-07-09 2014-07-09 Dissoluble metal material for underground construction

Publications (2)

Publication Number Publication Date
CN104057081A true CN104057081A (en) 2014-09-24
CN104057081B CN104057081B (en) 2017-02-15

Family

ID=51545176

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410330983.5A Active CN104057081B (en) 2014-07-09 2014-07-09 Dissoluble metal material for underground construction

Country Status (1)

Country Link
CN (1) CN104057081B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105298429A (en) * 2015-11-18 2016-02-03 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Drilling packer
CN106121580A (en) * 2016-06-24 2016-11-16 成都维泰油气能源技术有限公司 A kind of High Temperature High Pressure soluble metal sealing drum
CN109441364A (en) * 2018-10-30 2019-03-08 中国科学技术大学 A kind of down-hole casing of soluble aluminum base alloy dissolution pore-forming
CN110671074A (en) * 2018-07-02 2020-01-10 中国石油化工股份有限公司 Well cementation rubber plug rubber part and reinforcing method thereof
CN112012708A (en) * 2019-05-29 2020-12-01 中国石油天然气股份有限公司 Sand jam prevention soluble bridge plug fracturing process pipe column and construction method thereof
CN112324365A (en) * 2020-12-02 2021-02-05 中国石油集团渤海钻探工程有限公司 Degradable hollow edge centralizer

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110132620A1 (en) * 2009-12-08 2011-06-09 Baker Hughes Incorporated Dissolvable Tool and Method
KR20120114117A (en) * 2011-04-06 2012-10-16 주식회사 샤인 Battery having electrode structure with metallic fibers and method of fabricating the electrode structure
CN103008679A (en) * 2012-11-27 2013-04-03 天津大学 Method for preparing nano-silver particle and nano-silver wire mixed conductive ink
CN103343271A (en) * 2013-07-08 2013-10-09 中南大学 Light and pressure-proof fast-decomposed cast magnesium alloy
CN103459770A (en) * 2011-03-29 2013-12-18 贝克休斯公司 High permeability frac proppant
CN103502563A (en) * 2011-04-28 2014-01-08 贝克休斯公司 Method of making and using a functionally gradient composite tool
CN103518032A (en) * 2011-04-28 2014-01-15 贝克休斯公司 Functionally gradient composite article
CN103602866A (en) * 2013-11-01 2014-02-26 尚进 Soluble metal alloy material
CN103898384A (en) * 2014-04-23 2014-07-02 大连海事大学 Soluble magnesium-base alloy material, and preparation method and application thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110132620A1 (en) * 2009-12-08 2011-06-09 Baker Hughes Incorporated Dissolvable Tool and Method
CN103459770A (en) * 2011-03-29 2013-12-18 贝克休斯公司 High permeability frac proppant
KR20120114117A (en) * 2011-04-06 2012-10-16 주식회사 샤인 Battery having electrode structure with metallic fibers and method of fabricating the electrode structure
CN103502563A (en) * 2011-04-28 2014-01-08 贝克休斯公司 Method of making and using a functionally gradient composite tool
CN103518032A (en) * 2011-04-28 2014-01-15 贝克休斯公司 Functionally gradient composite article
CN103008679A (en) * 2012-11-27 2013-04-03 天津大学 Method for preparing nano-silver particle and nano-silver wire mixed conductive ink
CN103343271A (en) * 2013-07-08 2013-10-09 中南大学 Light and pressure-proof fast-decomposed cast magnesium alloy
CN103602866A (en) * 2013-11-01 2014-02-26 尚进 Soluble metal alloy material
CN103898384A (en) * 2014-04-23 2014-07-02 大连海事大学 Soluble magnesium-base alloy material, and preparation method and application thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105298429A (en) * 2015-11-18 2016-02-03 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Drilling packer
CN105298429B (en) * 2015-11-18 2018-09-04 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of lower brill blanking plug
CN106121580A (en) * 2016-06-24 2016-11-16 成都维泰油气能源技术有限公司 A kind of High Temperature High Pressure soluble metal sealing drum
CN106121580B (en) * 2016-06-24 2019-02-26 成都维泰油气能源技术有限公司 A kind of high temperature and pressure soluble metal sealing drum
CN110671074A (en) * 2018-07-02 2020-01-10 中国石油化工股份有限公司 Well cementation rubber plug rubber part and reinforcing method thereof
CN109441364A (en) * 2018-10-30 2019-03-08 中国科学技术大学 A kind of down-hole casing of soluble aluminum base alloy dissolution pore-forming
CN112012708A (en) * 2019-05-29 2020-12-01 中国石油天然气股份有限公司 Sand jam prevention soluble bridge plug fracturing process pipe column and construction method thereof
CN112324365A (en) * 2020-12-02 2021-02-05 中国石油集团渤海钻探工程有限公司 Degradable hollow edge centralizer

Also Published As

Publication number Publication date
CN104057081B (en) 2017-02-15

Similar Documents

Publication Publication Date Title
CN104057081A (en) Dissoluble metal material for underground construction
CN106677745B (en) A kind of gas hydrates decompression exploitation and CO2Bury the process of combination
CN203081397U (en) Grouting bag type hole packer
CN105255467B (en) A kind of composite blockage relieving agent for tight sandstone reservoir
RU2016124638A (en) METHODS FOR EXTRACTION OF HYDROCARBONS FROM THE UNDERGROUND LAYER AND METHODS FOR TREATING HYDROCARBON MATERIAL INSIDE THE UNDERGROUND LAYER
CN104096833B (en) Soluble metal material for underground construction
CN105544508A (en) Cast-in-place pile applicable to karst region having communicating channels
CN204492756U (en) For solvable ball seat and the pressure break ball of pitching sliding sleeve
CN204075197U (en) A kind of solubilized metal structure for underground construction
CN104533346A (en) Method for preparing hole flushing agent through citric acid in in-situ leaching uranium mining process
AU2014255642B2 (en) Method of storing CO2
CN202381013U (en) Composite small junk fishing socket
CN104293332B (en) Unconventional horizontal well multistage bores plug brill plug liquid
CN203655162U (en) Improved drilling head used for pump suction reverse circulation
CN204113173U (en) One partly cuts open formula strong magnetic die
CN103373736B (en) System for extracting deep intercrystalline brine in salt lake mining area
Yinpeng et al. Experimental study on plugging fracturing technology for water-flooded well in low-permeability reservoir
CN104449622B (en) High temperature resistance high pressure organic composite type Oil layer protective solution and preparation method thereof
CN207377529U (en) A kind of continuous oil pipe operation change rail fishing socket
CN203114224U (en) Engineering drill extractor
CN102041970A (en) Protection device for separate stratum fracturing of continuous oil pipe
CN201943673U (en) Spiral sand-proof screen casing
CN205171506U (en) Bored concrete pile in karst area suitable for connectivity passageway has
CN204612623U (en) A kind of sponge plug for borehole
CN103452510B (en) A kind of rope churn drilling tools of scalable hydraulic pressure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant