CN104047296A - 三角基础陆地风电塔架基础环 - Google Patents

三角基础陆地风电塔架基础环 Download PDF

Info

Publication number
CN104047296A
CN104047296A CN201410289253.5A CN201410289253A CN104047296A CN 104047296 A CN104047296 A CN 104047296A CN 201410289253 A CN201410289253 A CN 201410289253A CN 104047296 A CN104047296 A CN 104047296A
Authority
CN
China
Prior art keywords
welded
flange
tubing string
foundation
foundation ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410289253.5A
Other languages
English (en)
Inventor
崔志忠
杨洋
冯照周
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIAONING DAJIN HEAVY INDUSTRY Co Ltd
Original Assignee
LIAONING DAJIN HEAVY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAONING DAJIN HEAVY INDUSTRY Co Ltd filed Critical LIAONING DAJIN HEAVY INDUSTRY Co Ltd
Priority to CN201410289253.5A priority Critical patent/CN104047296A/zh
Publication of CN104047296A publication Critical patent/CN104047296A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Wind Motors (AREA)

Abstract

本发明属于风力发电装备,特别涉及一种三角基础陆地风电塔架基础环,基础环主体(5)的上面焊接连接基础环上法兰(4),基础环主体(5)外圆周上120度均布分别焊接三个连接臂(3),连接臂(3)的外端头分别焊接连接管柱(2),管柱(2)的下端头焊接连接管柱底法兰(1),管柱底法兰(1)上设有多个管柱底法兰孔(1-1),管柱底法兰(1)分别装在预制小基础(8)上,预制小基础(8)上分别植入多个锚栓(6),锚栓(6)分别穿装在对应的管柱底法兰孔(1-1)中并用紧固螺母(7)锁固,三角基础陆地风电塔架基础环不用在现场挖掘大型的基础坑,分立式的预制小基础将塔架底部的承力面积加大,有利于承受更大的弯矩,改善了独立的管式基础受力情况。

Description

三角基础陆地风电塔架基础环
技术领域
   本发明属于风力发电装备,特别涉及一种三角基础陆地风电塔架基础环。
背景技术
风力发电是新能源中最具实用性潜力的再生能源,风电塔架是风力发电装备主要组成部分之一,管塔式风电塔架一般由基础环及三段筒节组成,施工时将基础环部分安装调试合格后用混凝土浇注到基础上,上部安装其它筒节,而基础环采用与塔架一样的管式,管式的基础环基础较大,受力不好。
发明内容
本发明的目的在于克服上述技术不足,提供一种改善受力,能够降低制造成本,适合更高风电塔架的三角基础陆地风电塔架基础环。
本发明解决技术问题采用的技术方案是:三角基础陆地风电塔架基础环包括基础环主体、基础环上法兰、连接臂,其特点是基础环主体的上面焊接连接基础环上法兰,基础环主体外圆周上120度均布分别焊接三个连接臂,连接臂的外端头分别焊接连接管柱,管柱的下端头焊接连接管柱底法兰,管柱底法兰上设有多个管柱底法兰孔, 管柱底法兰分别装在预制小基础上,预制小基础上分别植入多个锚栓,锚栓分别穿装在对应的管柱底法兰孔中并用紧固螺母锁固。
本发明的有益效果是:三角基础陆地风电塔架基础环不用在现场挖掘大型的基础坑,分立式的预制小基础将塔架底部的承力面积加大,有利于承受更大的弯矩,改善了独立的管式基础受力情况。
附图说明
以下结合附图以实施例具体说明。
图1是三角基础陆地风电塔架基础环结构主视图。
图2是图1的俯视图。
图中,1-管柱底法兰;1-1-管柱底法兰孔;2-管柱;3-连接臂;4-基础环上法兰;5-基础环主体;6-锚栓;7-紧固螺母;8-预制小基础。
具体实施方式
实施例,参照附图1~2,三角基础陆地风电塔架基础环的基础环主体5上面焊接连接基础环上法兰4,基础主体5外圆周上120度均布分别焊接连接三个连接臂3,连接臂3的外端头分别焊接连接管柱2,管柱2的下端头焊接连接管柱底法兰1,管柱底法兰1上设有多个管柱底法兰孔1-1。管柱底法兰1分别装在预制小基础8上,预制小基础8上分别植入多个锚栓6,锚栓6分别穿装在对应的管柱底法兰孔1-1中并用紧固螺母7锁固。
三角基础陆地风电塔架基础环的施工过程是:在工厂内将基础环上法兰4焊接到基础环主体5上,再将三个连接臂3分别120度均布焊接在基础环主体5的外圆周上,在每个连接臂 3的外端头焊接管柱2,在管柱2的下端头焊接管柱底法兰1后运到施工现场。将基础环上法兰4、基础环主体5、连接臂3、管柱2、管柱底法兰1的组合体用吊车吊装在预制小基础8上,锚栓6分别穿装在相对应的管柱底法兰孔1-1中,然后用紧固螺母7锁紧固定。

Claims (1)

1.一种三角基础陆地风电塔架基础环,包括基础环主体(5)、基础环上法兰(4)、连接臂(3),其特征在于基础环主体(5)的上面焊接连接基础环上法兰(4),基础环主体(5)外圆周上120度均布分别焊接三个连接臂(3),连接臂(3)的外端头分别焊接连接管柱(2),管柱(2)的下端头焊接连接管柱底法兰(1),管柱底法兰(1)上设有多个管柱底法兰孔(1-1), 管柱底法兰(1)分别装在预制小基础(8)上,预制小基础(8)上分别植入多个锚栓(6),锚栓(6)分别穿装在对应的管柱底法兰孔(1-1)中并用紧固螺母(7)锁固。
CN201410289253.5A 2014-06-26 2014-06-26 三角基础陆地风电塔架基础环 Pending CN104047296A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410289253.5A CN104047296A (zh) 2014-06-26 2014-06-26 三角基础陆地风电塔架基础环

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410289253.5A CN104047296A (zh) 2014-06-26 2014-06-26 三角基础陆地风电塔架基础环

Publications (1)

Publication Number Publication Date
CN104047296A true CN104047296A (zh) 2014-09-17

Family

ID=51500667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410289253.5A Pending CN104047296A (zh) 2014-06-26 2014-06-26 三角基础陆地风电塔架基础环

Country Status (1)

Country Link
CN (1) CN104047296A (zh)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1876093A1 (de) * 2006-07-07 2008-01-09 Arcadis Consult GmbH Schwimmendes Offshore-Fundament und Verfahren zu dessen Herstellung
DE202012100448U1 (de) * 2012-02-09 2012-02-17 Kgw Schweriner Maschinen- Und Anlagenbau Gmbh Stahlturm für Windkraftanlagen
CN202247928U (zh) * 2011-08-31 2012-05-30 中国水电顾问集团华东勘测设计研究院 多桩门架式海上风力发电机组基础结构
CN102562490A (zh) * 2010-12-07 2012-07-11 通用电气公司 风力涡轮机塔架组件及其组装方法
JP2013040566A (ja) * 2011-08-11 2013-02-28 Enedream Co Ltd 応力分散型の風力発電機用の支柱タワー
EP2036815B1 (de) * 2007-09-12 2013-05-01 WeserWind GmbH Verfahren zur Installation und Deinstallation einer Gründungsstruktur sowie Gründungsstruktur und Auftriebskörper
CN203977444U (zh) * 2014-06-26 2014-12-03 辽宁大金重工股份有限公司 三角基础陆地风电塔架基础环

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1876093A1 (de) * 2006-07-07 2008-01-09 Arcadis Consult GmbH Schwimmendes Offshore-Fundament und Verfahren zu dessen Herstellung
EP2036815B1 (de) * 2007-09-12 2013-05-01 WeserWind GmbH Verfahren zur Installation und Deinstallation einer Gründungsstruktur sowie Gründungsstruktur und Auftriebskörper
CN102562490A (zh) * 2010-12-07 2012-07-11 通用电气公司 风力涡轮机塔架组件及其组装方法
JP2013040566A (ja) * 2011-08-11 2013-02-28 Enedream Co Ltd 応力分散型の風力発電機用の支柱タワー
CN202247928U (zh) * 2011-08-31 2012-05-30 中国水电顾问集团华东勘测设计研究院 多桩门架式海上风力发电机组基础结构
DE202012100448U1 (de) * 2012-02-09 2012-02-17 Kgw Schweriner Maschinen- Und Anlagenbau Gmbh Stahlturm für Windkraftanlagen
CN203977444U (zh) * 2014-06-26 2014-12-03 辽宁大金重工股份有限公司 三角基础陆地风电塔架基础环

Similar Documents

Publication Publication Date Title
CN204024928U (zh) 一种可装配自立式风力发电机组预应力混凝土钢组合塔架
CN202132187U (zh) 风力发电机组拉索式塔架结构
US9410340B2 (en) Plated transition piece
CN104121155A (zh) 一种可装配自立式风力发电机组预应力混凝土钢组合塔架及其锚固方法
CN102322172B (zh) 锥形中空夹层钢管混凝土格构式结构电力设施塔架
CN104314776B (zh) 一种用于海上和陆上风电机组的装配式预应力塔筒
JPWO2012025985A1 (ja) 風力発電装置及び風車用タワー施工方法
CN202047421U (zh) 一种海上风电塔架基础过渡段
WO2021184746A1 (zh) 一种组合式圆筒结构风机基础
CN105201010A (zh) 海上风机装配式斜桩基础
CN102102643A (zh) 风力发电机组用格构式空心钢管混凝土塔架
GB2507248A (en) Conical transition piece between the tower and jacket of a wind turbine
CN201962693U (zh) 预应力混凝土钢结构复合风电塔架
CN201443476U (zh) 风力发电用塔筒
CN212336069U (zh) 深海风力发电导管架式单桩复合结构
CN202402220U (zh) 一种减震风力发电塔
CN202596242U (zh) 一种混凝土塔架
CN203977444U (zh) 三角基础陆地风电塔架基础环
CN204401628U (zh) 大跨度钢支撑多向连接件
CN202031370U (zh) 一种混凝土-钢结构复合风电塔架
CN101725475A (zh) 具有预制钢筋混凝土基柱的风力发电塔筒
CN104047296A (zh) 三角基础陆地风电塔架基础环
CN205062831U (zh) 一种组合式塔吊塔基及其施工方法
CN205895508U (zh) 塔筒的底部固定装置及风力发电装置
CN104153630A (zh) 混合式风电塔架的过渡连接方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140917