CN104018871B - A kind of colliery high temperature digging laneway segmentation heat sink and cool-down method - Google Patents

A kind of colliery high temperature digging laneway segmentation heat sink and cool-down method Download PDF

Info

Publication number
CN104018871B
CN104018871B CN201410261346.7A CN201410261346A CN104018871B CN 104018871 B CN104018871 B CN 104018871B CN 201410261346 A CN201410261346 A CN 201410261346A CN 104018871 B CN104018871 B CN 104018871B
Authority
CN
China
Prior art keywords
air
storehouse
high temperature
air inlet
digging laneway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410261346.7A
Other languages
Chinese (zh)
Other versions
CN104018871A (en
Inventor
王成
顾树圣
黄存捍
韩学峰
支光辉
徐汇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi zhongkeside Energy Technology Co., Ltd
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201410261346.7A priority Critical patent/CN104018871B/en
Publication of CN104018871A publication Critical patent/CN104018871A/en
Application granted granted Critical
Publication of CN104018871B publication Critical patent/CN104018871B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of colliery high temperature digging laneway segmentation heat sink, comprise casing, in described casing, be divided into successively from the bottom to top hot gas recovery bin, air inlet storehouse and cold air and discharge storehouse, described air inlet is provided with vortex tube in storehouse, the cold airflow end of vortex tube is discharged storehouse with cold air and is connected, and the thermal current end of vortex tube is connected with hot gas recovery bin; On air inlet storehouse, be provided with air inlet interface, between vortex tube and air inlet interface, be provided with pneumatic tube, described air inlet storehouse is connected with compressed air piping by air inlet interface, on compressed air piping, be provided with pressure-regulating valve, described hot gas recovery bin is connected with hot air discharge pipeline by the steam vent interface arranging on it. Compared with prior art, the present invention has following advantage: there is no moving component, compact conformation, light and handy, cost is low, the life-span is long; Access compressed air do not utilize freon refrigerant also can make in time cold air, refrigerating efficiency fast at a high speed, as long as just can make mining face under mine refrigeration in time.

Description

A kind of colliery high temperature digging laneway segmentation heat sink and cool-down method
Technical field
The present invention relates to a kind of heat sink, be specifically related to a kind of colliery high temperature digging laneway segmentation heat sink and coolingMethod.
Background technology
In recent years, along with the pit mining degree of depth continues to increase, ventilation distance constantly extends, ventilation section is little etc. many because ofElement, can not meet the requirement of down-hole required airflow, causes down-hole temperature to raise, and produces high warm evil, to a great extentThe contradiction that is unfavorable for safety in production with mining sequence, work situation etc. is particularly outstanding. In hot environment, people's central nervous systemSystem is imbalance easily, thus feel absent-minded, tired, all over the body unable, have dizzy spells, etc. This state of mind becomes brings outThe reason of accident. In the time that the air themperature of operating location in ore deposit reaches 30 DEG C, start to occur heatstroke death by accident. At high-temperature mineIn, general productivity ratio is all lower, and its relative efficiency of some mines is only 30 one 40%. " safety regulations in coal mine " regulation: " rawThe air themperature of producing coal mine excavation working face must not exceed 26 DEG C " " air themperature of getting working face exceedes 30 DEG C and must takeCooling measure. " for the problem of the high warm evil of down-hole, successively taked optimization ventilating system, strengthen face air volume, changedAscensional ventilation is the measures such as descentional ventilation, coal-bed flooding precooling coal body, ice cube dissolving cooling, but effect is all not too remarkable.
By field investigation and reading relative literature, draw following existing mine cooling measure:
1. pair existing ventilating system is adjusted. The problem existing: in the time that air quantity is increased to a certain degree, the cooling of increasing windEffect will weaken. Increase the restriction that wind cooling is also subject to the many factors such as mine section and ventilation blower ability, range of application simultaneouslyReduce. Certain ore deposit downhole temperature exceedes 28 degrees Celsius of " safety regulations in coal mine " defined, and aeration-coolingly can not solve essenceProblem.
2. take provision for thermal insulation. The problem existing: expense is higher, and timeliness is poor, As time goes on, spraying heat insulationThe heat-blocking action of layer can reduce greatly. Also can produce the unsafe factors such as fire, toxic gas release simultaneously.
3. pair air intake is lowered the temperature in advance. The problem existing: can increase the humidity of air intake, can cause moist operating environment.Summer, ambient temperature was higher, was difficult to reach the required refrigerating capacity of mine, so cooling-down effect is not obvious.
4. descentional ventilation. The problem existing: descentional ventilation mode is unfavorable for gas management and the fire period in working faceCatastrophe processing; In addition, transport electromechanical equipment is all in return, has brought unsafe factor to production. Therefore, adoptWhile using descentional ventilation, must adopt corresponding safety measure, have certain limitation.
5. individual protection. The problem existing: workman job site disperses relatively, and conventional cold accumulation cooling-down takes workman is enteredRow protection, cold accumulation cooling-down takes due to needs agent for storage of coldness and freezing, and heat exchange is very fast, and the seeervice cycle is shorter. There is the cycle in agent for storage of coldness, manyAfter inferior use, will lose efficacy. Being difficult to meet high-frequency uses.
Find by analysis, above existing mine cooling measure, can not effectively lower the temperature to down-hole. CauseThis, the method and apparatus that is necessary to invent a kind of effective down-hole cooling is realized mine cooling, especially to workspaceBetween cooling.
Summary of the invention
For problems of the prior art, the invention provides a kind of colliery high temperature digging laneway segmentation heat sink andCool-down method, utilizes compressed air to realize down-hole working face cooling, and mode by intelligent control module control is to manyDuan Jiangwen unit lowers the temperature, thereby realizes personnel's operation interval cooling in the high temperature digging laneway of whole colliery, can allow down-holeStaff is in the air ambient of relative low temperature.
For achieving the above object, the present invention is by the following technical solutions:
A kind of colliery high temperature digging laneway segmentation heat sink, comprises casing, in described casing, is divided into successively from the bottom to topHot gas recovery bin, air inlet storehouse and cold air are discharged storehouse, and described air inlet is provided with vortex tube in storehouse, the cold airflow end of vortex tube and cold air rowDeliver from godown connected, the thermal current end of vortex tube is connected with hot gas recovery bin; On air inlet storehouse, be provided with air inlet interface, vortex tube withBetween air inlet interface, connect by pneumatic tube, described air inlet storehouse is connected with compressed air piping by air inlet interface, is pressingContracting air duct is provided with pressure-regulating valve, on described hot gas recovery bin, is provided with steam vent interface, and hot gas recovery bin is by rowPore interface is connected with hot air discharge pipeline.
According to the needs of concrete refrigerating capacity, described vortex tube is arranged in air inlet storehouse with connected mode in parallel or series connection.
For convenience of the direction of the cold airflow end cold airflow of introduction of eddy currents pipe, and in time by isolated cold airflow to tunnel skyGas is lowered the temperature, and described cold air is discharged storehouse outer rim and is provided with wind deflector.
Described casing is made by metal material or other non-combustible materials, and casing is divided into internal layer and skin, internal layer and skinThe middle fireproof heat-insulating material of filling forms heat-insulation layer, hot gas collecting bin and cold air is discharged storehouse and played the work of insulationWith.
Apply a cool-down method for colliery high temperature digging laneway segmentation heat sink, described colliery high temperature digging laneway dividesSection heat sink and intelligent control module are connected to form intelligent cooling system, and described intelligent control module comprises and is arranged on compression skyMagnetic valve in feed channel, this magnetic valve is connected with delay controller, and described delay controller is connected with infrared sensor of the human bodyConnect, this infrared sensor of the human body is connected to combine by low voltage mine cable and protects on power supply.
The cool-down method of application colliery high temperature digging laneway segmentation heat sink, comprises the following steps: 1. by colliery high temperatureDigging laneway overall space is divided into some coolings unit, and described intelligent cooling system divides in parallel along tunneling direction ABe not arranged in each cooling unit, along with the propelling of boring head, intelligence be installed again apart from boring head 50m-100m placeCooling system; After touching signal, infrared sensor of the human body is triggered, intelligent control module unlatching work in this cooling unit,Delay controller closure, magnetic valve is switched on and is opened; 2. the compressed air that mine air compressor produces is delivered to through pressure ventilation pipeCompressed air piping, is then connected with pneumatic tube through air inlet interface, and pneumatic tube is connected with vortex tube; 3. compressed air delivery arrivesEnergy separation occurs after vortex tube in vortex tube, and vortex tube one end produces low temperature cold air-flow, and the other end produces high temperature hot gas stream;4. cold airflow is discharged storehouse and wind deflector discharge by cold air, and cold air is discharged in the high temperature digging laneway of colliery, realizes in tunnel and fallingTemperature also plays alimentation to the wind supply quantity in tunnel, has increased the wind supply quantity in tunnel simultaneously; Thermal current enters hot gas and reclaimsStorehouse, is then connected with hot air discharge pipeline by steam vent interface, reclaims closed tube be discharged into outside working face through hot gas; 5. work as time delayWhen delaying time of controller finishes, delay controller recovers normally open, and magnetic valve dead electricity is closed, now, and colliery high temperature digging lanewaySegmentation heat sink quits work; 6. in the next one is lowered the temperature unit, infrared sensor of the human body touches after signal, this cooling listInfrared sensor of the human body in unit is triggered, intelligent control module unlatching work in this cooling unit, delay controller closure, electricityMagnet valve obtains electric and opens, and the colliery high temperature digging laneway segmentation heat sink in this cooling unit starts and realizes this cooling unitCooling, in the time that the delay controller time delay of this cooling unit finishes, delay controller recover normally open, magnetic valve dead electricity closeClose, now, colliery high temperature digging laneway segmentation heat sink quits work; Mode by intelligent control module control is to multistageCooling unit lowers the temperature, thereby realizes the concentrated cooling of whole colliery high temperature digging laneway; 7. when no signal triggering human body is redWhen outer sensor, described delay controller is in normally open, and magnetic valve is in closed condition, colliery high temperature digging laneway segmentationHeat sink is not worked.
Infrared sensor of the human body described in the present invention, delay controller and magnetic valve, be explosion-proof electric apparatus, all meets " coalOre deposit safety code " requirement of explosion proof of defined.
Compared with prior art, the present invention has following advantage: 1. the present invention does not have moving component, compact, light and handy, low one-tenthBasis, non-maintaining, the life-span is long; 2. the present invention does not utilize freon refrigerant and can make in time cold air, environment friendly and pollution-free and notBe subject to mine ventilation section and ventilation blower ability restriction, be not subject to that subsurface environment affects, refrigerating efficiency is fast at a high speed, as long as access compressionAir, just can make mining face under mine refrigeration in time; 3. the thermal current that vortex tube produces adopts concentrates discharge, not with underground workFace air produces second heat exchange; 4. colliery high temperature digging laneway segmentation heat sink and intelligent control module are connected to form intelligenceCooling system, by high temperature digging laneway overall space is converted into localized hyperthermia space, with the side of intelligent control module controlMethod is lowered the temperature to multistage cooling unit, thereby realizes the concentrated cooling of whole colliery high temperature digging laneway; 5. colliery high temperature pickThe cold airflow that enters the generation of tunnel segmentation heat sink plays alimentation to tunnel wind supply quantity, has increased the air feed in tunnel simultaneouslyAmount, finally realizes personnel's operation interval cooling in high temperature tunnel, can allow underground work personnel be in the air ring of relative low temperatureIn border; 6. adopt infrared sensor of the human body, delay controller, magnetic valve, forms intelligent control module, when staff triggers peopleWhen body infrared sensor, heat sink is just worked, and has saved compressed air consumption, has reduced to a great extent downhole cooling one-tenthThis, improved cooling-down effect.
Brief description of the drawings
Fig. 1 is the structural representation of colliery high temperature digging laneway segmentation heat sink in the present invention.
Fig. 2 is that the A of Fig. 1 is to view.
Fig. 3 is the structure distribution figure that high temperature digging laneway segmentation heat sink in colliery of the present invention is applied in cool-down method.
Fig. 4 is the circuit theory diagrams of intelligent control module in the present invention.
In figure: 1-casing, 2-wind deflector, 3-cold air is discharged storehouse, 4-vortex tube, 5-pneumatic tube, 6-intake interface, 7-air inletStorehouse, 8-steam vent interface, 9-hot gas recovery bin, 10-heat-insulation layer, 11-pressure-regulating valve 12-compressed air piping, 13-hot gas rowPut pipeline, 14-magnetic valve, 15-infrared sensor of the human body, 16-delay controller, 17-low voltage mine cable, 19-combines and protects power supply,20-hot gas recovery tube, 21-pressure ventilation pipe, 22-boring head, 23-power cable.
Detailed description of the invention
Embodiment 1
As depicted in figs. 1 and 2, the present embodiment mining face under mine heat sink, comprises casing 1, in described casing by down toOn be provided with successively hot gas recovery bin 9, air inlet storehouse 7 and cold air is discharged storehouse 3, described air inlet is provided with vortex tube 4 in storehouse, vortex tube is with alsoThe connected mode of connection is arranged in air inlet storehouse, and the cold airflow end of vortex tube is discharged storehouse with cold air and is connected, and cold air is discharged storehouse outer rim and establishedThere is wind deflector 2, guide in time the mobile direction of cold airflow; The thermal current end of vortex tube is connected with hot gas recovery bin; In air inletStorehouse is provided with air inlet interface 6, between vortex tube and air inlet interface, is connected by pneumatic tube 5, and described air inlet storehouse is by arrangingPressure-regulating valve 11 on air inlet interface is connected with compressed air piping 12, and described hot gas recovery bin passes through to arrange on itSteam vent interface 8 is connected with hot air discharge pipeline 13.
The present embodiment casing is made by stainless steel, foam glass, rock cotton board or other non-combustible materials; Casing is divided into internal layerAnd skin, internal layer and the outer middle fireproof heat-insulating material of filling form heat-insulation layer 10, and hot gas collecting bin and cold air are dischargedThe effect of insulation is played in storehouse.
Apply a cool-down method for the present embodiment colliery high temperature digging laneway segmentation heat sink, the pick of described colliery high temperatureEnter tunnel segmentation heat sink and intelligent control module and be connected to form intelligent cooling system, described intelligent control module comprises settingMagnetic valve 14 on compressed air piping, this magnetic valve is connected with delay controller 16, and described delay controller and human body are redOuter sensor 15 is connected, and this infrared sensor of the human body is connected to combine by low voltage mine cable 17 and protects on power supply 19.
The cool-down method of application the present embodiment colliery high temperature digging laneway segmentation heat sink, its spy comprises the following steps:1. colliery high temperature digging laneway overall space is divided into some coolings unit, described intelligent cooling system along tunneling direction A withMode in parallel is arranged on respectively in each cooling unit, along with the propelling of boring head 22, apart from boring head 50m place againIntelligent cooling system is installed; After touching signal, infrared sensor of the human body is triggered, intelligent control module in this cooling unitUnlatching work, delay controller closure, magnetic valve is switched on and is opened; 2. the compressed air that mine air compressor produces is through pressing windPipe 21 is delivered to compressed air piping, is then connected with pneumatic tube through air inlet interface, and pneumatic tube is connected with vortex tube; 3. compressionThere is energy separation after being transported to vortex tube in air, vortex tube one end produces low temperature cold air-flow in vortex tube, and the other end producesHigh temperature hot gas stream; 4. cold airflow is discharged storehouse and wind deflector discharge by cold air, and cold air is discharged in the high temperature digging laneway of colliery, realIn existing tunnel, lower the temperature and the wind supply quantity in tunnel is played to alimentation, having increased the wind supply quantity in tunnel simultaneously; Hot gas flows toEnter hot gas recovery bin, be then connected with hot air discharge pipeline by steam vent interface, be discharged into working face through hot gas recovery tube 20Outward; 5. in the time that delay controller time delay finishes, delay controller recovers normally open, and magnetic valve dead electricity is closed, and now, colliery is highTemperature digging laneway segmentation heat sink quits work; 6. when infrared sensor of the human body in next cooling unit touches signalAfter, the infrared sensor of the human body in this cooling unit is triggered, intelligent control module unlatching work in this cooling unit, time delay controlDevice closure processed, magnetic valve is switched on and is opened, and the colliery high temperature digging laneway segmentation heat sink in this cooling unit starts and is realThe cooling of now this cooling unit, in the time that the delay controller time delay of this cooling unit finishes, delay controller recovers normally open,Magnetic valve dead electricity is closed, and now, colliery high temperature digging laneway segmentation heat sink quits work; By intelligent control module controlMode multistage cooling unit is lowered the temperature, thereby realize the concentrated cooling of whole colliery high temperature digging laneway; 7. when nothing letterNumber trigger when infrared sensor of the human body, described delay controller is in normally open, and magnetic valve is in closed condition, colliery high temperatureDigging laneway segmentation heat sink is not worked.
In the present embodiment, magnetic valve is that intrinsic safety type magnetic valve, delay controller are intrinsic safety type delay controller, combine and protect power supplyBe connected for 127V and with 660V power cable 23.
Embodiment 2
The present embodiment mining face under mine heat sink, comprises casing, is provided with successively from the bottom to top hot gas and returns in described casingReceive storehouse, air inlet storehouse and cold air and discharge storehouse, described air inlet is provided with vortex tube in storehouse, vortex tube with the connected mode of series connection be arranged on intoIn gas storehouse, the cold airflow end of vortex tube is discharged storehouse with cold air and is connected, and cold air is discharged storehouse outer rim and is provided with wind deflector, guides in time cold airFlow mobile direction; The thermal current end of vortex tube is connected with hot gas recovery bin; On air inlet storehouse, be provided with air inlet interface, eddy currentBetween pipe and air inlet interface, be provided with pneumatic tube, described air inlet storehouse is by being arranged on pressure-regulating valve and the pressure on air inlet interfaceContracting air duct is connected, and described hot gas recovery bin is connected with hot air discharge pipeline by the steam vent interface arranging on it.
The present embodiment casing is made by metal material; Casing is divided into internal layer and skin, and internal layer and outer middle filling are fire-retardantHeat preserving and insulating material forms heat-insulation layer, hot gas collecting bin and cold air is discharged storehouse and played the effect of insulation.
Apply a cool-down method for the present embodiment colliery high temperature digging laneway segmentation heat sink, the pick of described colliery high temperatureEnter tunnel segmentation heat sink and intelligent control module and be connected to form intelligent cooling system, described intelligent control module comprises settingMagnetic valve 14 on compressed air piping, this magnetic valve is connected with delay controller 16, and described delay controller and human body are redOuter sensor 15 is connected, and this infrared sensor of the human body is connected to combine by low voltage mine cable 17 and protects on power supply 19.
The cool-down method of application the present embodiment colliery high temperature digging laneway segmentation heat sink, its spy comprises the following steps:1. colliery high temperature digging laneway overall space is divided into some coolings unit, described intelligent cooling system along tunneling direction A withMode in parallel is arranged on respectively in each cooling unit, along with the propelling of boring head, apart from boring head 100m place againIntelligent cooling system is installed; After touching signal, infrared sensor of the human body is triggered, intelligent control module in this cooling unitUnlatching work, delay controller closure, magnetic valve is switched on and is opened; 2. the compressed air that mine air compressor produces is through pressing windPipe 21 is delivered to compressed air piping, is then connected with pneumatic tube through air inlet interface, and pneumatic tube is connected with vortex tube; 3. compressionThere is energy separation after being transported to vortex tube in air, vortex tube one end produces low temperature cold air-flow in vortex tube, and the other end producesHigh temperature hot gas stream; 4. cold airflow is discharged storehouse and wind deflector discharge by cold air, and cold air is discharged in the high temperature digging laneway of colliery, realIn existing tunnel, lower the temperature and the wind supply quantity in tunnel is played to alimentation, having increased the wind supply quantity in tunnel simultaneously; Hot gas flows toEnter hot gas recovery bin, be then connected with hot air discharge pipeline by steam vent interface, be discharged into working face through hot gas recovery tube 20Outward; 5. in the time that delay controller time delay finishes, delay controller recovers normally open, and magnetic valve dead electricity is closed, and now, colliery is highTemperature digging laneway segmentation heat sink quits work; 6. when infrared sensor of the human body in next cooling unit touches signalAfter, the infrared sensor of the human body in this cooling unit is triggered, intelligent control module unlatching work in this cooling unit, time delay controlDevice closure processed, magnetic valve is switched on and is opened, and the colliery high temperature digging laneway segmentation heat sink in this cooling unit starts and is realThe cooling of now this cooling unit, in the time that the delay controller time delay of this cooling unit finishes, delay controller recovers normally open,Magnetic valve dead electricity is closed, and now, colliery high temperature digging laneway segmentation heat sink quits work; By intelligent control module controlMode multistage cooling unit is lowered the temperature, thereby realize the concentrated cooling of whole colliery high temperature digging laneway; 7. when nothing letterNumber trigger when infrared sensor of the human body, described delay controller is in normally open, and magnetic valve is in closed condition, colliery high temperatureDigging laneway segmentation heat sink is not worked.
In the present embodiment, magnetic valve is that intrinsic safety type magnetic valve, delay controller are intrinsic safety type delay controller, combine and protect power supplyBe connected for 127V and with 660V power cable.
In the present invention, the colliery high temperature digging laneway segmentation heat sink course of work is as follows:
The compressed air that mine air compressor produces is delivered to compressed air piping through pressure ventilation pipe 21, then through air inletInterface is connected with pneumatic tube, and pneumatic tube is connected with vortex tube; 3. there is energy in compressed air delivery after vortex tube in vortex tubeAmount separates, and vortex tube one end produces low temperature cold air-flow, and the other end produces high temperature hot gas stream; 4. cold airflow by cold air discharge storehouse andWind deflector is discharged, and cold air is discharged in the high temperature digging laneway of colliery, realizes and in tunnel, lowers the temperature and the wind supply quantity in tunnel is playedAlimentation has increased the wind supply quantity in tunnel simultaneously; Thermal current enters hot gas recovery bin, then by steam vent interface and heatGas discharge tube connects, and is discharged into outside working face through hot gas recovery tube 20, prevents that in high temperature digging laneway, air produces second heatExchange.
In the present invention, colliery high temperature digging laneway segmentation heat sink operation principle is as follows:
The compressed air of down-hole is input to vortex tube by compressed air piping pressure-regulating valve intake interface pneumatic tubeIn, when the compressed air with certain pressure enters vortex tube, compressed air is in the inner energy separation that occurs of vortex tube. Vortex tubeCompressed air is separated into one cold flow and blast of hot air stream. Cold airflow flows out from cold air end, and thermal current flows out from hot gas end. ThisInvention utilizes compressed air by the isolated cold airflow of vortex tube, the working face of mine to be lowered the temperature, and vortex tube is produced simultaneouslyRaw thermal current is collected by hot gas collecting bin, and the thermal current of collection, by hot air discharge pipeline, is discharged into underground workOutside face. Avoid working face air to go the contact of the thermal current of vortex tube generation, realized working face cooling.

Claims (3)

1. apply a cool-down method for colliery high temperature digging laneway segmentation heat sink, the high temperature digging laneway segmentation of described collieryHeat sink and intelligent control module are connected to form intelligent cooling system, wherein, and colliery high temperature digging laneway segmentation heat sink,Comprise casing (1), casing is divided into internal layer and skin, forms heat-insulation layer at internal layer and the outer middle fireproof heat-insulating material of filling(10), in described casing, be divided into successively from the bottom to top hot gas recovery bin (9), air inlet storehouse (7) and cold air and discharge storehouse (3), described in enterIn gas storehouse, be provided with vortex tube (4), the cold airflow end of vortex tube is discharged storehouse with cold air and is connected, and thermal current end and the hot gas of vortex tube returnReceipts storehouse is connected; On air inlet storehouse, be provided with air inlet interface (6), between vortex tube and air inlet interface, connect by pneumatic tube (5)Connect, described air inlet storehouse is connected with compressed air piping (12) by air inlet interface, is provided with pressure and adjusts on compressed air pipingJoint valve (11), is provided with steam vent interface (8) on described hot gas recovery bin, hot gas recovery bin is by steam vent interface and hot gas rowPutting pipeline (13) is connected; Described intelligent control module comprises the magnetic valve (14) being arranged on compressed air piping, this electromagnetismValve is connected with delay controller (16), and described delay controller is connected with infrared sensor of the human body (15), and this human body infrared passesSensor is connected to combine by low voltage mine cable (17) and protects on power supply (19); It is characterized in that comprising the following steps: 1. by collieryHigh temperature digging laneway overall space is divided into some coolings unit, described intelligent cooling system along tunneling direction A with side in parallelFormula is arranged on respectively in each cooling unit, along with the propelling of boring head (22), intelligent cooling system is installed again; Work as human bodyInfrared sensor is triggered after touching signal, intelligent control module unlatching work in this cooling unit, and delay controller closure,Magnetic valve is switched on and is opened; 2. the compressed air that mine air compressor produces is delivered to compressed air hose through pressure ventilation pipe (21)Road, is then connected with pneumatic tube through air inlet interface, and pneumatic tube is connected with vortex tube; 3. compressed air delivery to after vortex tubeEnergy separation occurs in vortex tube, and vortex tube one end produces low temperature cold air-flow, and the other end produces high temperature hot gas stream; 4. cold air circulationCross cold air and discharge storehouse and wind deflector and discharge, cold air is discharged in the high temperature digging laneway of colliery, realizes, lowering the temperature and to tunnel in the tunnel inInterior wind supply quantity plays alimentation, has increased the wind supply quantity in tunnel simultaneously; Thermal current enters hot gas recovery bin, then passes throughSteam vent interface is connected with hot air discharge pipeline, is discharged into outside tunnel through hot gas recovery tube (20); 5. when delay controller time delayWhen end, delay controller recovers normally open, and magnetic valve dead electricity is closed, now, and colliery high temperature digging laneway segmentation cooling dressPut and quit work; 6. in the next one is lowered the temperature unit, infrared sensor of the human body touches after signal, the human body in this cooling unitInfrared sensor is triggered, intelligent control module unlatching work in this cooling unit, and delay controller closure, magnetic valve obtains also electricOpen, the colliery high temperature digging laneway segmentation heat sink in this cooling unit starts and realizes the cooling of this cooling unit, whenWhen the delay controller time delay of this cooling unit finishes, delay controller recovers normally open, and magnetic valve dead electricity is closed, now,Colliery high temperature digging laneway segmentation heat sink quits work; Mode by intelligent control module control is to the multistage unit that lowers the temperatureLower the temperature, thereby realize personnel's operation interval cooling in the high temperature digging laneway of whole colliery, can allow underground work personnel locateIn the air ambient of relative low temperature; 7. in the time that no signal triggers infrared sensor of the human body, described delay controller is in often openingState, magnetic valve is in closed condition, and colliery high temperature digging laneway segmentation heat sink is not worked.
2. the cool-down method of application according to claim 1 colliery high temperature digging laneway segmentation heat sink, its feature existsIn: described vortex tube is arranged in air inlet storehouse with connected mode in parallel or series connection.
3. the cool-down method of application according to claim 1 colliery high temperature digging laneway segmentation heat sink, its feature existsIn: described cold air is discharged storehouse outer rim and is provided with wind deflector (2).
CN201410261346.7A 2014-06-13 2014-06-13 A kind of colliery high temperature digging laneway segmentation heat sink and cool-down method Active CN104018871B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410261346.7A CN104018871B (en) 2014-06-13 2014-06-13 A kind of colliery high temperature digging laneway segmentation heat sink and cool-down method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410261346.7A CN104018871B (en) 2014-06-13 2014-06-13 A kind of colliery high temperature digging laneway segmentation heat sink and cool-down method

Publications (2)

Publication Number Publication Date
CN104018871A CN104018871A (en) 2014-09-03
CN104018871B true CN104018871B (en) 2016-05-11

Family

ID=51435830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410261346.7A Active CN104018871B (en) 2014-06-13 2014-06-13 A kind of colliery high temperature digging laneway segmentation heat sink and cool-down method

Country Status (1)

Country Link
CN (1) CN104018871B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105066497B (en) * 2015-07-17 2017-06-06 浙江大学 A kind of both cooling and heating room temperature regulation system of wind drive
CN107313796A (en) * 2017-08-23 2017-11-03 黑龙江工业学院 A kind of coal mine heat evil prevention and controls
CN109667612A (en) * 2018-12-27 2019-04-23 常州工学院 The separate system and method aeration-cooling for U-shaped long range stope
KR20210028842A (en) * 2019-09-05 2021-03-15 (주)뉴영시스템 Cooling system for Rapid Thermal Processing
CN115342599B (en) * 2022-08-18 2024-04-19 中国矿业大学 Low-temperature heat drying and freeze drying combined system and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2941357A1 (en) * 1979-10-12 1981-04-23 Wende & Malter GmbH, 5810 Witten Underground mine air cooling system - has additional solely underground cold circuit between those leading upward and on site
CN2144714Y (en) * 1992-11-24 1993-10-27 徐州矿务局 Air cooling device
CN202451197U (en) * 2011-09-29 2012-09-26 陈业武 Mine underground temperature regulator
CN202938429U (en) * 2012-08-23 2013-05-15 山东名世矿业机械有限公司 Mine pneumatic air conditioner
CN203374298U (en) * 2013-06-28 2014-01-01 湖南科技大学 Efficient heat-exchange air cooler for mine
CN203925562U (en) * 2014-06-13 2014-11-05 河南理工大学 A kind of colliery high temperature digging laneway segmentation heat sink

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2941357A1 (en) * 1979-10-12 1981-04-23 Wende & Malter GmbH, 5810 Witten Underground mine air cooling system - has additional solely underground cold circuit between those leading upward and on site
CN2144714Y (en) * 1992-11-24 1993-10-27 徐州矿务局 Air cooling device
CN202451197U (en) * 2011-09-29 2012-09-26 陈业武 Mine underground temperature regulator
CN202938429U (en) * 2012-08-23 2013-05-15 山东名世矿业机械有限公司 Mine pneumatic air conditioner
CN203374298U (en) * 2013-06-28 2014-01-01 湖南科技大学 Efficient heat-exchange air cooler for mine
CN203925562U (en) * 2014-06-13 2014-11-05 河南理工大学 A kind of colliery high temperature digging laneway segmentation heat sink

Also Published As

Publication number Publication date
CN104018871A (en) 2014-09-03

Similar Documents

Publication Publication Date Title
CN104018871B (en) A kind of colliery high temperature digging laneway segmentation heat sink and cool-down method
CN203925562U (en) A kind of colliery high temperature digging laneway segmentation heat sink
CN102767387B (en) Excavation tunnel heat-insulation flow-dividing heat discharge cooling method
CN103216255B (en) Compressed air cold conveying cooling system for mine and cooling method thereof
CN102900452A (en) Technique for cooling deep mining area by using ground temperature of shallow goaf and waste roadway
CN110905581B (en) Movable type excavation roadway cooling equipment
CN102269008B (en) System for reducing mine temperature by use of constant-temperature water bearing formation
CN201865689U (en) Temperature reduction and dehumidification device for underground sanctuary
CN204238970U (en) A kind of type pit cooling system based on vortex tube refrigeration
CN102061919A (en) Co-mining tunneling method of seam roadway gas
CN103362530B (en) To working face cooling and the apparatus and method for utilizing heat energy in a kind of mining process
CN103670497A (en) Gas treatment method used when tunneled underground coal mine roadway is communicated with abandoned roadway
CN202194678U (en) System for cooling mine by utilizing constant-temperature water bearing stratum
CN207527290U (en) A kind of safe extraction supercharging gathering system in goaf coal bed gas ground
CN201786374U (en) Ventilating device for driving face
CN109028754A (en) For underground fire extinguishing/cooling liquid CO2Real-time preparation system and application method
CN204002897U (en) Mining swirl control cold water dust-proof temp-lowering atomization mechanism
CN202017520U (en) Air purifying, cooling and dehumidifying integrated device for mining rescue capsule
CN202690106U (en) Insulated shunt heat-removing and cooling system of excavation roadway
CN203770142U (en) Waste heat utilization device of air compressor
CN110410130B (en) Small explosion-proof compressed air driven coal mine underground air conditioner and refrigeration method
CN206837271U (en) A kind of steam smoothering car of steam annihilator and its composition
CN102287215A (en) Electroless carbon dioxide refrigerating and desiccant air conditioner
CN102979548B (en) Constant-temperature cold conveying system of underground movable-type escape capsule and refuge chamber
CN106285762A (en) high-temperature high-humidity mine local refrigeration system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201026

Address after: No. a11, 10 / F, qingkong innovation base, No. 191, Chengbei West Street, Luzhou District, Changzhi City, Shanxi Province 046000

Patentee after: Shanxi zhongkeside Energy Technology Co., Ltd

Address before: 454000 School of energy science and engineering, 2001 Century Avenue, Jiaozuo hi tech Zone, Henan

Patentee before: HENAN POLYTECHNIC University