CN104005775A - Integrated formwork for tunnel inverted arch backfill construction, and constructing process of integrated formwork - Google Patents

Integrated formwork for tunnel inverted arch backfill construction, and constructing process of integrated formwork Download PDF

Info

Publication number
CN104005775A
CN104005775A CN201410271884.4A CN201410271884A CN104005775A CN 104005775 A CN104005775 A CN 104005775A CN 201410271884 A CN201410271884 A CN 201410271884A CN 104005775 A CN104005775 A CN 104005775A
Authority
CN
China
Prior art keywords
template
turn
sidewall
over form
governor motion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410271884.4A
Other languages
Chinese (zh)
Other versions
CN104005775B (en
Inventor
余波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Colitt Machinery Manufacturing Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=51366647&utm_source=***_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN104005775(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Individual filed Critical Individual
Priority to CN201410271884.4A priority Critical patent/CN104005775B/en
Publication of CN104005775A publication Critical patent/CN104005775A/en
Application granted granted Critical
Publication of CN104005775B publication Critical patent/CN104005775B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses an integrated formwork for tunnel inverted arch backfill construction, and a constructing process of the integrated formwork. In the integrated formwork, a side wall formwork body and a turning formwork body are symmetrically arranged on the two sides of an end beam, the side wall formwork body is connected with the end beam in a rigid mode, the side wall formwork body is hinged to the turning formwork body, and a formwork through beam is connected with the turning formwork body in a rigid mode. One end of the side wall formwork body is provided with a supporting walking mechanism which is used for being connected in a side groove in a lap joint mode, wherein the side groove has been formed through lining. The other end of the side wall formwork body is provided with a transverse supporting and adjusting mechanism, and a vertical supporting and adjusting mechanism is arranged below the end beam. A turning formwork body supporting and adjusting mechanism is connected to the turning formwork body. One end of the turning formwork body supporting and adjusting mechanism is connected with the formwork through beam, and the other end of the turning formwork body supporting and adjusting mechanism is connected with the side wall formwork body. A limiting mechanism is arranged on the side wall formwork body. A turning mechanism is used for folding the turning formwork body and fixing the turning formwork body to the limiting mechanism. When the integrated formwork is moved and moved in position, the side groove which has been formed through lining serves as a guide rail and a positioning datum, and therefore the integrated formwork is convenient to move and can be rapidly moved in position.

Description

Integrated template and construction technology thereof for tunnel invert backfill construction
technical field
The present invention relates to a kind of constructing tunnel template, relate in particular to a kind of tunnel invert backfill construction integrated template and construction technology thereof.
Background technology
Modern tunnel structure complexity, the duration is short, quality is high, and the innovation of construction technology has been proposed to higher requirement.Constructing tunnel mainly by: excavation, lining cutting, finishing three process form.The principal element that affects tunnel application life and tunnel construction cycle is by excavating and lining cutting two procedures determines.This two procedures is carried out in tunnel narrow space simultaneously, when requiring construction quality, can not interfere with each other, and this has proposed high requirement to construction method and execution control.
Current construction method is: first excavate operation in front, tunnel; Then carry out in the wings lining cutting operation.Excavation operation is selected digging mode and coordinates corresponding lining cutting mode by country rock situation.Each construction operation is alternate, sequentially carries out.The job requirements of each link guarantee plan time that will strictly closely cooperate, controls not excess budget of construction investment.
Tunnel invert and secondary lining concrete form a sealing force structure after excavation completes by tunnel, bear pressure from surrounding rock, prevent tunnel collapse, and its quality has determined the application life in tunnel.Inverted arch fill concrete plays cushioning effect, and its quality influence is to safety and the comfortableness of Vehicle Driving Cycle; Can the attached structure such as ditch and cable channel quality influence tunnel normally use.Thereby quality, the working procedure time, most important to tunnel construction of the attached structures such as inverted arch, inverted arch filling and ditch are also difficult point and the emphasis of current constructing tunnel.
In the modal bench excavation mode of current constructing tunnel as example, in constructing tunnel, inverted arch and inverted arch are filled construction process and are: waterproofing course → reinforcing bar binding is laid in the base treatment → preliminary bracing of preparation of construction → inverted arch excavation, the installation invert form → inverted arch filling concrete → inverted arch demoulding → Central drain is measured setting-out → Central drain formwork erection → inverted arch fill concrete perfusion → maintenance to intensity and met machine-walking → end.The wide approximately 6 meters of scope internal cause gradients in inverted arch middle part are less, available Manual mode, and both sides adopt form concrete.When both sides invert forms be installed installed on steel mesh reinforcement welded reinforcement support bar, less punching block is welded to invert form is installed on support bar; After inverted arch pouring concrete is complete, pull down invert form after cutting off solder joint with burning torch again when the demoulding.Above operation is complete, and with manually carrying out, workload is large, and template installation quality is restive, and every linear meter(lin.m.) need consume 40-50 kilogram of bearing bar, causes larger waste.
For solving an above-mentioned difficult problem, prior art is explored and has been tested and permitted several different methods, but all has so far various defects, is difficult to promote.For example 201310315424.2 disclosed a kind of convertible tunnel overhead arch mould plate trolley and construction methods thereof of hanging, open day is 2013.10.16, it adopts two groups independently on symmetrical travelling car, to install turnover invert form additional, carries out inverted arch and filling operation.On travelling car, be equiped with road wheel, when mobile, is just propping up on concrete surface one end, and the other end is walked on inverted arch filling face.When the demoulding, the rotation of hinge that invert form arranges on dolly, fills construction after departing from lining and exceeding filling face.From said structure and mode of occupation: 1,, because having increased dolly outside template, construction weight is larger.2, dolly template in both sides is absolute construction, when walking, walk respectively, and easy sideslip, thereby all difficulties mobile and in place, if set up guide rail, increase again workload, and dismounting inconvenience, cost is high.3, have one end road wheel to be positioned at and just prop up on concrete surface, after must moving into place before inverted arch steel mesh reinforcement is installed, personnel carry out steel mesh reinforcement installation exercise below invert form, and installing space is narrow and small and dangerous.4, soakaway trench reserved opening is easily stopped up, and inconvenience cleaning.Therefore existing invert form, owing to there are these defects, makes it be difficult to promote.
Summary of the invention
The problems referred to above that the object of the invention is to overcome constructing tunnel integrated template and construction technology existence thereof, provide a kind of tunnel invert backfill construction integrated template and construction technology thereof.The present invention is in mobile and in place, serve as guide rail and positioning datum with the gutter that lining cutting forms, thereby conveniently moving, in place rapid, solve the prior art easy sideslip of walking on a first concrete surface, increase again the problem of workload and construction cost if set up guide rail.
For achieving the above object, the technical solution used in the present invention is as follows:
A kind of tunnel invert backfill construction integrated template, it is characterized in that: comprise two groups of sidewall templates, a butt beam, two groups of turn-over forms, the two logical beams of template, cross binding governor motion, vertical supporting governor motion and switching mechanisms, sidewall template and turn-over form are symmetricly set on end carriage both sides, sidewall template and end carriage are rigidly connected, sidewall template and turn-over form are hinged, and the logical beam of template and turn-over form are rigidly connected; Sidewall template one end is provided with the support walking mechanism in the gutter for being overlapped on the formation of lining cutting, and the other end arranges cross binding governor motion, and vertical supporting governor motion is arranged on end carriage below; On turn-over form, be also connected with turn-over form support adjustment mechanism, turn-over form support adjustment mechanism one end is connected with the logical beam of template, and the other end is connected with sidewall template; On sidewall template, be provided with position-limit mechanism, switching mechanism is fixed to position-limit mechanism for turn-over form is received to mould.
When described integrated template is during in inverted arch concrete construction state, sidewall template one end is overlapped on by supporting walking mechanism on the gutter of the formation of lining cutting, the other end is supported in tunnel by cross binding governor motion and just props up on sidewall, vertical supporting governor motion is supported in tunnel and just props up on base plate, adjusts turn-over form to needs angle by turn-over form support adjustment mechanism.
When described integrated template is in the time receiving mould state, switching mechanism one end is connected with sidewall template, and the other end is connected with the logical beam of template, drives turn-over form to turn on position-limit mechanism.
When described integrated template is during in walking states, support walking mechanism and be arranged in the gutter that lining cutting forms, gutter forms guide rail.
Described support walking mechanism comprises two groups of roller structures, and every group of roller structure comprises three rollers, and roller is connected with sidewall template by telescopic screw rod, and three rollers form and the support walking structure of the gutter shape adaptation that lining cutting forms.
Described position-limit mechanism is limiting bracket, and limiting bracket is four groups, and every group of sidewall template middle part arranges two groups of limiting brackets.
Described cross binding governor motion comprises that two cross binding are very heavy, two very heavy being symmetricly set on sidewall template of cross binding.
Two vertical supportings of described vertical supporting governor motion are very heavy, two very heavy end carriage belows that are arranged on of vertical supporting, and end carriage top is provided with suspension hook, and end carriage both sides are provided with the connection seat connecting with sidewall template.
Described switching mechanism comprises four upset cucurbits, and when in the time receiving mould state, upset cucurbit one end is articulated on the gourd hook of sidewall template setting, and the other end is articulated on the hinge ear of the logical beam of template.
It is very heavy that described turn-over form support adjustment mechanism comprises that four turn-over forms support, and every group of turn-over form correspondence arranges two turn-over forms and support very heavyly, and turn-over form supports very heavy one end and leads to beam with template and be connected, and the other end is connected with the hinge ear on position-limit mechanism.
A construction technology for integrated template for tunnel invert backfill construction, is characterized in that, comprises following operation:
A, inverted arch concrete construction: sidewall template one end is overlapped on the gutter of the formation of lining cutting, the other end is supported in tunnel by cross binding governor motion and just props up on sidewall, vertical supporting governor motion is supported in tunnel and just props up on base plate fixingly, installs after locking plug template, carries out inverted arch concrete construction;
B, fill concrete construction: inverted arch reaches after demoulding requirement, remove turn-over form support adjustment mechanism, switching mechanism one end is articulated on sidewall template, the other end is articulated on the logical beam of template, pack up turn-over form to limiting bracket, pack up vertical supporting governor motion, ditch template, soakaway trench, bulkhead are installed, start to carry out fill concrete construction;
C, run to next station: after fill concrete reaches driving and requires, now next circulation reinforcing bar installs, packs up cross binding governor motion, then sidewall template one end is departed to the concrete of having poured into a mould; Utilize walking machine by mentioning end carriage, also mentioned the sidewall template and the turn-over form that are connected with end carriage, put down the steel mesh reinforcement top that runs to next circulation simultaneously;
D, repeat above step, can carry out inverted arch and filling operation.
In described a operation, regulate center line and high-rise position by cross binding governor motion and vertical supporting governor motion, adjust turn-over form to needs angle by turn-over form support adjustment mechanism.
Employing the invention has the advantages that:
One, the present invention is made up of two groups of sidewall templates, a butt beam, two groups of turn-over forms, the two logical beams of template, cross binding governor motion, vertical supporting governor motion and switching mechanisms, from forming, obviously simple than prior art, save equipment cost; Sidewall template and turn-over form are symmetricly set on end carriage both sides, and sidewall template and end carriage are rigidly connected, and sidewall template and turn-over form are hinged, and the logical beam of template and turn-over form are rigidly connected; Sidewall template one end is provided with the support walking mechanism in the gutter for being overlapped on the formation of lining cutting, and the other end arranges cross binding governor motion, and vertical supporting governor motion is arranged on end carriage below; On turn-over form, be also connected with turn-over form support adjustment mechanism, turn-over form support adjustment mechanism one end is connected with the logical beam of template, and the other end is connected with sidewall template; On sidewall template, be provided with position-limit mechanism, switching mechanism is fixed to position-limit mechanism for turn-over form is received to mould, adopt this structure, in mobile and in place, serve as guide rail and positioning datum with the gutter that lining cutting forms, thereby conveniently moving, in place rapid, solve the prior art easy sideslip of walking on a first concrete surface, increase again the problem of workload and construction cost if set up guide rail.
Two, in the present invention, when described integrated template is during in inverted arch concrete construction state, sidewall template one end is overlapped on by supporting walking mechanism on the gutter of the formation of lining cutting, the other end is supported in tunnel by cross binding governor motion and just props up on sidewall, vertical supporting governor motion is supported in tunnel and just props up on base plate, adjust turn-over form to needs angle by turn-over form support adjustment mechanism, adopt this structure, there are three braced structuress, excellent stability, and the angle of turn-over form can realize the adjustment that becomes more meticulous, construction precision is obviously better than prior art.
Three,, in the present invention, when described integrated template is in the time receiving mould state, switching mechanism one end is connected with sidewall template, the other end is connected with the logical beam of template, drives turn-over form to turn on position-limit mechanism, when turn-over form upset, is easy to drive, and after upset, can reliably fix, keep receiving mould state.
Four, in the present invention, when described integrated template is during in walking states, support walking mechanism and be arranged in the gutter that lining cutting forms, gutter forms guide rail, and gutter serves as guide rail and positioning datum in construction always, there will not be the situation of sideslip.
Five, in the present invention, described support walking mechanism comprises two groups of roller structures, every group of roller structure comprises three rollers, roller is connected with sidewall template by telescopic screw rod, and three rollers form the support walking structure with the gutter shape adaptation that lining cutting forms, roller structure forms three-point fix in gutter, has ensured the reliability of walking.
Six, in the present invention, described position-limit mechanism is limiting bracket, and limiting bracket is four groups, and every group of sidewall template middle part arranges two groups of limiting brackets, adopts the mode of limiting bracket, can mate with turn-over form, effectively fixing to turn-over form.
Seven,, in the present invention, described cross binding governor motion comprises that two cross binding are very heavy, two very heavy being symmetricly set on sidewall template of cross binding, and cross binding governor motion is simple in structure, and reliability is high, and can realize becomes more meticulous regulates center line and high-rise position.
Eight, in the present invention, two vertical supportings of described vertical supporting governor motion are very heavy, two very heavy end carriage belows that are arranged on of vertical supporting, end carriage top is provided with suspension hook, end carriage both sides are provided with the connection seat connecting with sidewall template, vertical supporting governor motion is simple in structure, and reliability is high, and can realize becomes more meticulous regulates center line and high-rise position.
Nine, in the present invention, described switching mechanism comprises four upset cucurbits, when in the time receiving mould state, upset cucurbit one end is articulated on the gourd hook of sidewall template setting, the other end is articulated on the hinge ear of the logical beam of template, and switching mechanism relatively and prior art, simpler in result, easy to operate, reliability is high.
Ten, in the present invention, it is very heavy that described turn-over form support adjustment mechanism comprises that four turn-over forms support, every group of turn-over form correspondence arranges two turn-over forms and supports very heavy, turn-over form supports very heavy one end and is connected with the logical beam of template, the other end is connected with the hinge ear on position-limit mechanism, turn-over form support adjustment mechanism is simple in structure, and not only has the support function to turn-over form, and can also realize becomes more meticulous regulates turn-over form angle.
11, adopt the construction technology in the present invention, in mobile and in place, integrated template serves as guide rail and positioning datum with gutter, not only conveniently moving, in place rapid, and adopt after this construction technology completion, change soakaway trench reserved opening into horizontal positioned, be difficult for stopping up, be easy to cleaning; The gutter that serves as guide rail effect not only can serve as interim ditch, improve operating environment in tunnel, also provide support a little for follow-up ditch, both sides and cable channel construction and installation template, the concrete after the construction of ditch, both sides and cable channel in gutter has formed inverted arch carving head and can prevent that ditch cable trench dislocation and cracking from seeping water between filling with inverted arch.
To sum up, the present invention not only structurally, on working procedure unlike the prior art, and also there is larger difference with prior art in inverted arch and backfill construction completion situation, solved the problem that prior art is described in background technology.
Brief description of the drawings
Fig. 1 be in the time of inverted arch concrete construction the present invention left side A to the right B to structural representation
Fig. 2 be in the time that fill concrete is constructed the present invention left side A to the right B to structural representation
Fig. 3 is the A portion structure for amplifying schematic diagram in Fig. 1
Fig. 4 is the B portion structure for amplifying schematic diagram in Fig. 2
Fig. 5 is plan structure schematic diagram of the present invention
Fig. 6 is inverted arch of the present invention and backfill completion situation schematic diagram
Fig. 7 is prior art inverted arch and backfill completion situation schematic diagram
In figure, be labeled as: 1, sidewall template, 2, end carriage, 3, turn-over form, 4, the logical beam of template, 5, gutter, 6, roller, 7, limiting bracket, 8, cross binding is very heavy, and 9, vertical supporting is very heavy, 10, suspension hook, 11, upset cucurbit, 12, gourd hook, 13, turn-over form supports very heavy, 14, soakaway trench, 15, template rotating shaft, 16, inverted arch, 17, inverted arch is filled, and 18, locking plug template, 19, centre drain; 20, inverted arch backfill layer; 21, abutment wall.
Detailed description of the invention
Embodiment 1
As shown in Fig. 1-4, a kind of tunnel invert backfill construction integrated template, comprise two groups of sidewall templates 1,, a butt beam 2, two groups of turn-over forms 3, the two logical beams 4 of template, cross binding governor motion, vertical supporting governor motion and switching mechanisms, sidewall template 1 and turn-over form 3 are symmetricly set on end carriage 2 both sides, sidewall template 1 is rigidly connected with end carriage 2, sidewall template 1 is hinged with turn-over form 3, can be hinged by template rotating shaft 15, and the logical beam 4 of template is rigidly connected with turn-over form 3; Sidewall template 1 one end is provided with the support walking mechanism in the gutter 5 for being overlapped on the formation of lining cutting, and the other end arranges cross binding governor motion, and vertical supporting governor motion is arranged on end carriage 2 belows; On turn-over form 3, be also connected with turn-over form support adjustment mechanism, turn-over form support adjustment mechanism one end is connected with the logical beam 4 of template, and the other end is connected with sidewall template 1; On sidewall template 1, be provided with position-limit mechanism, switching mechanism is fixed to position-limit mechanism for turn-over form 3 is received to mould.
When described integrated template is during in inverted arch concrete construction state, sidewall template 1 one end is overlapped on by supporting walking mechanism on the gutter 5 of the formation of lining cutting, the other end is supported in tunnel by cross binding governor motion and just props up on sidewall, vertical supporting governor motion is supported in tunnel and just props up on base plate, adjusts turn-over form 3 to needs angle by turn-over form support adjustment mechanism.
When described integrated template is in the time receiving mould state, switching mechanism one end is connected with sidewall template 1, and the other end is connected with the logical beam 4 of template, drives turn-over form 3 to turn on position-limit mechanism.
When described integrated template is during in walking states, support walking mechanism and be arranged in the gutter 5 that lining cutting forms, gutter 5 forms guide rail.
In the present invention, described support walking mechanism comprises two groups of roller structures, and every group of roller structure comprises three rollers, and roller 6 is connected with sidewall template 1 by telescopic screw rod, and three rollers form and the support walking structure of the gutter 5 shape adaptations that lining cutting forms.
In the present invention, described position-limit mechanism is limiting bracket 7, and limiting bracket 7 is four groups, and every group of sidewall template 1 middle part arranges two groups of limiting brackets 7.
In the present invention, described cross binding governor motion comprises that two very heavy 8, two cross binding very heavy 8 of cross binding are symmetricly set on sidewall template 1.
In the present invention, very heavy 9, two vertical supportings very heavy 9 of two vertical supportings of described vertical supporting governor motion are arranged on end carriage 2 belows, and end carriage 2 tops are provided with suspension hook 10, and end carriage 2 both sides are provided with the connection seat connecting with sidewall template 1.
In the present invention, described switching mechanism comprises four upset cucurbits 11, and when in the time receiving mould state, upset cucurbit 11 one end are articulated on the gourd hook 12 that sidewall template 1 arranges, and the other end is articulated on the hinge ear of the logical beam 4 of template.
In the present invention, described turn-over form support adjustment mechanism comprises that four turn-over forms support very heavy 13, every group of turn-over form 3 correspondence arrange two turn-over forms and support very heavyly 13, and turn-over form supports very heavy 13 one end and is connected with the logical beam 4 of template, and the other end is connected with the hinge ear on position-limit mechanism.
A construction technology for integrated template for tunnel invert backfill construction, comprises following operation:
A, inverted arch concrete construction: sidewall template one end is overlapped on the gutter of the formation of lining cutting, the other end is supported in tunnel by cross binding governor motion and just props up on sidewall, vertical supporting governor motion is supported in tunnel and just props up on base plate fixing, install after locking plug template 18, carry out inverted arch concrete construction;
B, fill concrete construction: inverted arch reaches after demoulding requirement, remove turn-over form support adjustment mechanism, switching mechanism one end is articulated on sidewall template, the other end is articulated on the logical beam of template, pack up turn-over form to limiting bracket, pack up vertical supporting governor motion, ditch template, soakaway trench, bulkhead are installed, start to carry out fill concrete construction; As shown in Figure 2 and Figure 4, the correlation of inverted arch 16, inverted arch filling 17 and integrated template;
C, run to next station: after fill concrete reaches driving and requires, now next circulation reinforcing bar installs, packs up cross binding governor motion, then sidewall template one end is departed to the concrete of having poured into a mould; Utilize walking machine by mentioning end carriage, also mentioned the sidewall template and the turn-over form that are connected with end carriage, put down the steel mesh reinforcement top that runs to next circulation simultaneously;
D, repeat above step, can carry out inverted arch and filling operation.
In described a operation, regulate center line and high-rise position by cross binding governor motion and vertical supporting governor motion, adjust turn-over form to needs angle by turn-over form support adjustment mechanism.
Embodiment 2
The present invention is very heavy by two groups of symmetrical sidewall templates, sidewall template end carriage, two groups of turn-over forms, eight supports, two template Tong Liang, four 3t upset cucurbits form.
Sidewall template middle part is provided with four groups of limiting brackets and four gourd hooks; On limiting bracket, there is very heavy hinge ear; Be provided with three rollers in sidewall template one end, roller can stretch by screw mandrel; The connection seat that the other end is provided with two cross binding and connects with end carriage; Sidewall template below is also provided with the hinge ear hinged with turn-over form.
End carriage both sides are provided with the connection seat connecting with sidewall template, and it is very heavy that below is provided with two vertical supportings.Top is provided with suspension hook.
Turn-over form top is provided with the hinge ear hinged with sidewall template; Below is provided with the connection seat connecting with the logical beam of template.
Template Tong Liang side is provided with and very heavy hinged hinge ear; Below is provided with the connection seat connecting with turn-over form.
Sidewall template symmetrical each one group respectively with end carriage bolt rigid connection, sidewall template below is hinged with turn-over form; The logical beam of turn-over form and template is by bolt rigid connection.
Sidewall template one side is overlapped on the gutter of the formation of lining cutting, the other end just props up on sidewall by the very heavy tunnel that is supported in of cross binding, end carriage vertical supporting is very heavy be supported in tunnel just prop up on base plate fixing, and can be by cross binding very heavy and the very heavy adjusting center line of vertical supporting and high-rise position.Support very heavy adjustment turn-over form to needs angle by turn-over form.Install after locking plug template, start to carry out inverted arch concrete construction.
Reach after demoulding requirement Deng inverted arch, remove turn-over form and support very heavyly, hang over sidewall template gourd hook with upset cucurbit one end, the other end hangs over the logical beam of template and cuts with scissors on ear, packs up turn-over form to limiting bracket, packs up end carriage vertical supporting very heavy.Ditch template, soakaway trench, bulkhead are installed, are started to carry out fill concrete construction.
Reach after driving requirement Deng fill concrete, now next circulation reinforcing bar installs.Pack up end carriage cross binding very heavy, the very heavy concrete of having poured into a mould that sidewall template one end is departed from of swing roller spiral.Other lifting walking machines on the simple and easy trestle that utilizes automatic trestle or set up, as digging machine etc., mention end carriage by suspension hook, also mention the sidewall template and the turn-over form that are connected with end carriage simultaneously.Put down the steel mesh reinforcement top that runs to next circulation.
Repeat above step, can carry out inverted arch and filling operation.
Embodiment 3
As shown in Figure 5, left side A is to illustrate centre drain 19, inverted arch backfill layer 20, gutter 5, abutment wall 21 for inverted arch and backfill completion part, and right side B is to for adopting the present invention to be in Construction State.
As shown in Figure 6, the present invention changes soakaway trench 14 reserved opening into horizontal positioned, is difficult for stopping up, and is easy to cleaning, and inverted arch and backfill completion situation exists the gutter for making guide rail and positioning datum all the time.
As shown in Figure 7, prior art inverted arch and backfill completion situation soakaway trench 14 reserved opening have a kink, and soakaway trench reserved opening is easily stopped up, inconvenience cleaning, and there is no gutter.
Obviously; those of ordinary skill in the art is according to grasped technological know-how and customary means; according to above said content; can also make the various ways that does not depart from fundamental technics thought of the present invention; the change of for example support adjustment mechanism, these pro forma conversion are all within protection scope of the present invention.

Claims (10)

1. a tunnel invert backfill construction integrated template, it is characterized in that: comprise two groups of sidewall templates (1), a butt beam (2), two groups of turn-over forms (3), the two logical beams (4) of template, cross binding governor motion, vertical supporting governor motion and switching mechanisms, sidewall template (1) and turn-over form (3) are symmetricly set on end carriage (2) both sides, sidewall template (1) is rigidly connected with end carriage (2), sidewall template (1) is hinged with turn-over form (3), and template is led to beam (4) and is rigidly connected with turn-over form (3); Sidewall template (1) one end is provided with the interior support walking mechanism of gutter (5) forming for being overlapped on lining cutting, and the other end arranges cross binding governor motion, and vertical supporting governor motion is arranged on end carriage (2) below; Turn-over form is also connected with turn-over form support adjustment mechanism on (3), and turn-over form support adjustment mechanism one end is connected with the logical beam (4) of template, and the other end is connected with sidewall template (1); Sidewall template is provided with position-limit mechanism on (1), and switching mechanism is fixed to position-limit mechanism for turn-over form (3) is received to mould.
2. tunnel invert backfill construction integrated template according to claim 1, it is characterized in that: when described integrated template is during in inverted arch concrete construction state, sidewall template (1) one end is overlapped on by supporting walking mechanism on the gutter (5) of the formation of lining cutting, the other end is supported in tunnel by cross binding governor motion and just props up on sidewall, vertical supporting governor motion is supported in tunnel and just props up on base plate, adjusts turn-over form (3) to needs angle by turn-over form support adjustment mechanism.
3. tunnel invert backfill construction integrated template according to claim 1 and 2, it is characterized in that: when described integrated template is in the time receiving mould state, switching mechanism one end is connected with sidewall template (1), the other end is connected with the logical beam (4) of template, drives turn-over form (3) to turn on position-limit mechanism.
4. tunnel invert backfill construction integrated template according to claim 3, is characterized in that: when described integrated template is during in walking states, support walking mechanism and be arranged in the gutter (5) that lining cutting forms, gutter (5) forms guide rail.
5. according to the tunnel invert backfill construction integrated template described in claim 1,2 or 4, it is characterized in that: described support walking mechanism comprises two groups of roller structures, every group of roller structure comprises three rollers (6), roller (6) is connected with sidewall template (1) by telescopic screw rod, and three rollers form and the support walking structure of gutter (5) the shape adaptation that lining cutting forms.
6. tunnel invert backfill construction integrated template according to claim 5, is characterized in that: described position-limit mechanism is limiting bracket (7), and limiting bracket (7) is four groups, and every group of sidewall template (1) middle part arranges two groups of limiting brackets (7).
7. according to the tunnel invert backfill construction integrated template described in claim 1,2,4 or 6, it is characterized in that: described cross binding governor motion comprises two cross binding very heavy (8), two cross binding very heavy (8) are symmetricly set on sidewall template (1).
8. tunnel invert backfill construction integrated template according to claim 7, it is characterized in that: described turn-over form support adjustment mechanism comprises that four turn-over forms support very heavy (13), every group of turn-over form (3) correspondence arranges two turn-over forms and supports very heavy (13), turn-over form supports very heavy (13) one end and is connected with the logical beam (4) of template, and the other end is connected with the hinge ear on position-limit mechanism.
9. the construction technology of integrated template for a kind of tunnel invert backfill construction as claimed in claim 1, is characterized in that, comprises following operation:
A, inverted arch concrete construction: sidewall template one end is overlapped on the gutter of the formation of lining cutting, the other end is supported in tunnel by cross binding governor motion and just props up on sidewall, vertical supporting governor motion is supported in tunnel and just props up on base plate fixingly, installs after locking plug template, carries out inverted arch concrete construction;
B, fill concrete construction: inverted arch reaches after demoulding requirement, remove turn-over form support adjustment mechanism, switching mechanism one end is articulated on sidewall template, the other end is articulated on the logical beam of template, pack up turn-over form to limiting bracket, pack up vertical supporting governor motion, ditch template, soakaway trench, bulkhead are installed, start to carry out fill concrete construction;
C, run to next station: after fill concrete reaches driving and requires, now next circulation reinforcing bar installs, packs up cross binding governor motion, then sidewall template one end is departed to the concrete of having poured into a mould; Utilize walking machine by mentioning end carriage, also mentioned the sidewall template and the turn-over form that are connected with end carriage, put down the steel mesh reinforcement top that runs to next circulation simultaneously;
D, repeat above step, can carry out inverted arch and filling operation.
10. the construction technology of integrated template for tunnel invert backfill construction according to claim 9, it is characterized in that: in described a operation, regulate center line and high-rise position by cross binding governor motion and vertical supporting governor motion, adjust turn-over form to needs angle by turn-over form support adjustment mechanism.
CN201410271884.4A 2014-06-18 2014-06-18 Tunnel invert backfill construction integrated template and construction technology thereof Active CN104005775B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410271884.4A CN104005775B (en) 2014-06-18 2014-06-18 Tunnel invert backfill construction integrated template and construction technology thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410271884.4A CN104005775B (en) 2014-06-18 2014-06-18 Tunnel invert backfill construction integrated template and construction technology thereof

Publications (2)

Publication Number Publication Date
CN104005775A true CN104005775A (en) 2014-08-27
CN104005775B CN104005775B (en) 2016-02-03

Family

ID=51366647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410271884.4A Active CN104005775B (en) 2014-06-18 2014-06-18 Tunnel invert backfill construction integrated template and construction technology thereof

Country Status (1)

Country Link
CN (1) CN104005775B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884664A (en) * 2017-02-27 2017-06-23 中铁十九局集团有限公司 Tunnel inverted arch template and tunnel inverted arch filling rapid construction method
CN108150197A (en) * 2018-02-05 2018-06-12 中铁隧道集团处有限公司 Radially overturning inverted arch trestle and its installation position method for demoulding to arc formwork
CN110905554A (en) * 2019-12-10 2020-03-24 成都科利特机械制造有限公司 Tunnel inverted arch and filled concrete paver and construction process
CN112065454A (en) * 2020-09-30 2020-12-11 湖南五新模板有限公司 Inverted arch formwork and construction method thereof
CN112177633A (en) * 2020-09-30 2021-01-05 湖南五新模板有限公司 Template for inverted arch construction and construction method thereof
CN112228108A (en) * 2020-09-30 2021-01-15 湖南五新模板有限公司 Slidable inverted arch formwork and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201133253Y (en) * 2008-01-02 2008-10-15 中铁五局(集团)有限公司 Tunnel inverting operation trolley
JP2012229546A (en) * 2011-04-26 2012-11-22 Gifu Kogyo Co Ltd Form for secondary lining concrete of tunnel
CN202970732U (en) * 2012-12-17 2013-06-05 山东铁鹰建设工程有限公司 Subway tunnel inverted arch concrete lining trolley
CN203081466U (en) * 2013-03-01 2013-07-24 中铁十七局集团第四工程有限公司 Integrated moving framework for inverted arch of tunnel
CN203905969U (en) * 2014-06-18 2014-10-29 余波 Integrated formwork for backfill construction of tunnel invert

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201133253Y (en) * 2008-01-02 2008-10-15 中铁五局(集团)有限公司 Tunnel inverting operation trolley
JP2012229546A (en) * 2011-04-26 2012-11-22 Gifu Kogyo Co Ltd Form for secondary lining concrete of tunnel
CN202970732U (en) * 2012-12-17 2013-06-05 山东铁鹰建设工程有限公司 Subway tunnel inverted arch concrete lining trolley
CN203081466U (en) * 2013-03-01 2013-07-24 中铁十七局集团第四工程有限公司 Integrated moving framework for inverted arch of tunnel
CN203905969U (en) * 2014-06-18 2014-10-29 余波 Integrated formwork for backfill construction of tunnel invert

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884664A (en) * 2017-02-27 2017-06-23 中铁十九局集团有限公司 Tunnel inverted arch template and tunnel inverted arch filling rapid construction method
CN108150197A (en) * 2018-02-05 2018-06-12 中铁隧道集团处有限公司 Radially overturning inverted arch trestle and its installation position method for demoulding to arc formwork
CN108150197B (en) * 2018-02-05 2024-04-05 中铁隧道集团一处有限公司 Radial overturning inverted arch trestle of arc-shaped template and mounting, positioning and demolding method thereof
CN110905554A (en) * 2019-12-10 2020-03-24 成都科利特机械制造有限公司 Tunnel inverted arch and filled concrete paver and construction process
CN112065454A (en) * 2020-09-30 2020-12-11 湖南五新模板有限公司 Inverted arch formwork and construction method thereof
CN112177633A (en) * 2020-09-30 2021-01-05 湖南五新模板有限公司 Template for inverted arch construction and construction method thereof
CN112228108A (en) * 2020-09-30 2021-01-15 湖南五新模板有限公司 Slidable inverted arch formwork and construction method thereof

Also Published As

Publication number Publication date
CN104005775B (en) 2016-02-03

Similar Documents

Publication Publication Date Title
CN104005775B (en) Tunnel invert backfill construction integrated template and construction technology thereof
CN109505630B (en) Full-hydraulic crawler-type self-propelled trestle and construction method
CN101929341B (en) Construction method for TBM synchronization lining
CN105952482B (en) Self-propelled tunnel inverted arch lining trolley
CN102146796B (en) Construction technology for inverted arch of two-track tunnel of high-speed railway
CN102146799B (en) Construction equipment for inverted arch of two-track tunnel of high-speed railway
CN109538238A (en) Tunnel arch prefabricated segment construction device and control method
CN103967050A (en) Construction system of subway station
CN201196094Y (en) Hydraulic template trolley for rail tunnel liner concrete
CN103470272B (en) A kind of chassis for the multiple section concrete construction of Mining Method and construction method thereof
CN203066990U (en) Fully-hydraulic and self-walking inverted arch formworking trolley for tunnel
CN102022123B (en) Integral lining method for tunnel with altered diameter by model board trolley
CN103541744A (en) Tire walking full-hydraulic lining trolley
CN102704949A (en) No-pull rod side wall construction method for underground tunnel and formwork trolley for construction
CN104564102B (en) A kind of tunnel lining concrete grouting device
CN103352710A (en) Suspension overturn type tunnel inverted arch formwork trolley and construction method thereof
CN103982200B (en) Slide rail Mobile steel mould trolley in tunneling boring
CN106223983A (en) A kind of diversion tunnel inclined shaft, flat section tunneling boring primary steel mould trolley
CN105736012B (en) A kind of tunnel lining concrete grouting device
CN102268858B (en) Cradle for suspension pouring of arch-type bridge
CN203499697U (en) Trolley used for concrete construction of various cross sections through mining method
CN203905969U (en) Integrated formwork for backfill construction of tunnel invert
CN104110002A (en) Method for replacing bridge deck slabs of steel truss girder bridge
CN202017493U (en) Construction equipment for inverted arch of high-speed railway double-track tunnel
CN203603928U (en) Rubber-tyred walking full-hydraulic lining trolley

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180817

Address after: 610000 No. 60 North Section of Xingye Road, Jinyuan Town, Dayi County, Chengdu, Sichuan.

Patentee after: CHENGDU COLITT MACHINERY MANUFACTURING CO., LTD.

Address before: 610031 Sichuan Jiaotong Road, Jinniu District, Chengdu 7 Jiaotong University Intelligent District S10-1-5A

Patentee before: Yu Bo

TR01 Transfer of patent right