CN103993888B - Improved shield tunneling machine structure for tunnel face reinforcement construction in shield tunneling machine cabin - Google Patents

Improved shield tunneling machine structure for tunnel face reinforcement construction in shield tunneling machine cabin Download PDF

Info

Publication number
CN103993888B
CN103993888B CN201410259234.8A CN201410259234A CN103993888B CN 103993888 B CN103993888 B CN 103993888B CN 201410259234 A CN201410259234 A CN 201410259234A CN 103993888 B CN103993888 B CN 103993888B
Authority
CN
China
Prior art keywords
shield machine
cabin
grouting
mortar
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410259234.8A
Other languages
Chinese (zh)
Other versions
CN103993888A (en
Inventor
陈赞
邓能伟
顾剑刚
李仲峰
冯海珍
杨仲杰
王英珺
向坤
崔振东
张思梅
杨高传
梁新权
吴波
洪源
韩永刚
王坤为
刘汉龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201410259234.8A priority Critical patent/CN103993888B/en
Publication of CN103993888A publication Critical patent/CN103993888A/en
Application granted granted Critical
Publication of CN103993888B publication Critical patent/CN103993888B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses an improved structure of a shield machine for tunnel face reinforcement construction in a shield machine cabin, which is characterized in that: set up the shield and construct machine and improve the structure: the method is characterized in that a synchronous grouting pipeline is connected in a preformed hole of the earth cabin wall of the shield machine, a front grouting steel pipe is inserted into a front grouting hole of the shield machine, and the front grouting steel pipe is lengthened, so that the front end of the front grouting steel pipe can extend into the position above the tunnel face in front of the shield machine. The tunnel face reinforcing structure in the shield machine cabin constructed by the equipment has good safety performance, and operators can enter the cabin to carefully check the abrasion condition of the cutter and change the cutter.

Description

A kind of shield machine modified node method for solidifying of the working face construction in shield machine cabin
The application is application number: 2011104428151, the applying date is: within 2011, December 26, denomination of invention are: the divisional application of the application for a patent for invention of solidifying of the working face structure, its construction method and equipment in shield machine cabin.
Technical field
The present invention relates to a kind of shield machine modified node method for solidifying of the working face construction in shield machine cabin.
Background technology
In China, the underground granite ubiquity in some areas, when adopting shield machine to carry out tunneling shield construction, shield machine front end cutter very easily weares and teares, and changes cutter frequent.
For the replacing of shield machine front end cutter in work progress, need first to reinforce facies palmaris in the cabin of job site, in prior art, have ground strengthening vertical and process with pressure two kinds of modes for solidifying of the working face in cabin.Adopting strengthening vertical stratum, ground to require is location broader on construction ground, comes into operation so that construction equipment is marched into the arena.But in Shield Construction Method Used, shield machine is by railroad crossing, river, high stored building group etc. sometimes, provide condition cannot to ground strengthening vertical.Process with pressure enters in cabin by operating personnel tool changing of opening the cabin, and under air pressure conditions, carry out operation, personnel are short in the underdeck operation time, and air pressure is easier than soil pressure runs off, and safety of opening the cabin with pressure is not high.
Situation is frequently changed for granite area shield machine cutter, open the cabin check and change increasing of number of times considerably increase potential safety hazard, meanwhile, based on the many factors such as economy and duration, existing ground strengthening vertical stratum method and method of opening the cabin with pressure all can not engineering demands.
Summary of the invention
The present invention is the weak point for avoiding existing for above-mentioned prior art, provides solidifying of the working face structure in a kind of shield machine cabin, its construction method and equipment.For tool changing in cabin provides safety, economically and reasonably construction environment.
The present invention is that technical solution problem adopts following technical scheme:
In shield machine cabin of the present invention, the feature of solidifying of the working face structure is: arranging one reinforcing wall as solidifying of the working face structure along shield machine front face.
Described reinforcing wall is thickness is 0.1-0.2m, area is 40-45m 2cement mortar body of wall.
In shield machine cabin of the present invention, the feature of the construction method of solidifying of the working face structure is that following steps are carried out:
A, outfit grouting mortar, empty shield machine soil cabin, continues next-step operation when shield machine soil cabin soil pressure remains zero;
B, synchronous grouting pipeline is connected to shield machine soil bulkhead preformed hole, in shield machine soil cabin, injects mortar by synchronous grouting pipeline, until mortar fills shield machine soil cabin and forms mortar body of wall at face place, shield machine front;
C, pre-grouting steel pipe to be inserted in shield machine pre-grouting hole, to make described pre-grouting pipe stretch into above the face of shield machine front; Utilize secondary injection pulp grinder to inject cement slurry by pre-grouting steel pipe, reach after setting value until grouting pressure, shrink the hinged shield machine that makes of shield machine and retreat, form reinforcing wall;
D, when the mortar injected and cement slurry reach initial set state, empty the mortar in shield machine soil cabin and cement slurry, when the reinforcing wall formed by the mortar injected and cement slurry completes initial set, operating personnel can open the cabin tool changing.
In shield machine cabin of the present invention, the feature of the construction method of facies palmaris ruggedized construction is also:
The batching of described mortar is: cement 300-350kg, flyash 320kg, swell soil 200kg, sand 770kg, water 570kg;
Described cement slurry proportioning is by weight: water: cement=0.8: 1.
In shield machine cabin of the present invention, the feature of the shield machine modified node method of solidifying of the working face construction connects synchronous grouting pipeline in described shield machine soil bulkhead preformed hole, pre-grouting steel pipe is inserted in described shield machine pre-grouting hole, described pre-grouting steel pipe is arranged for lengthening, and the front end of described pre-grouting steel pipe can be stretched into above the face of shield machine front.
Compared with the prior art, beneficial effect of the present invention is embodied in:
1, the present invention makes shield machine front face soil stabilization intensity high, after hatch door is opened, can place ice cube, arranges ventilation etc. in cabin, personnel can in cabin long working, drastically increase tool changing operating efficiency;
2, the present invention is not by construction plant environmental constraints, the less investments such as its manpower, financial resources, thing force-summing device;
3, through repeatedly using this method to open the cabin tool changing, ground monitoring measures sedimentation hardly;
4, can effective guarantee underdeck operation personal security.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Number in the figure: 1 shield machine; 2 pre-grouting steel pipes; 3 shield machines are hinged; 4 pre-grouting holes; 5 synchronous grouting pipelines; 6 native bulkhead preformed holes; 7 reinforcing walls.
Detailed description of the invention
See Fig. 1, in the present embodiment, in shield machine cabin, solidifying of the working face structure is arranging one reinforcing wall 7 as solidifying of the working face structure along shield machine front face, and reinforcing wall 7 is thickness is 0.1-0.2m, area is 40-45m 2cement mortar body of wall.
The shield machine modified node method of constructing for solidifying of the working face in shield machine cabin in the present embodiment connects synchronous grouting pipeline 5 in the native bulkhead preformed hole 6 of shield machine, pre-grouting steel pipe 2 is inserted in shield machine pre-grouting hole 4, pre-grouting steel pipe 2 is arranged for lengthening, and the front end of pre-grouting steel pipe 2 can be stretched into above the face of shield machine front.
In the present embodiment, in shield machine cabin, the feature of the construction method of solidifying of the working face structure is carried out as follows:
1, be equipped with grouting mortar, empty shield machine soil cabin, continue next-step operation when shield machine soil cabin soil pressure remains zero; If shield machine soil cabin soil pressure has the trend constantly risen, then must stop the operation of following steps.
2, synchronous grouting pipeline 5 is connected to shield machine soil bulkhead preformed hole 6, in shield machine soil cabin, injects mortar by synchronous grouting pipeline 5, until mortar fills shield machine soil cabin and forms mortar body of wall at face place, shield machine front;
The batching of mortar is: cement 300-350kg, flyash 320kg, swell soil 200kg, sand 770kg, water 570kg; Need the continuity keeping slip casting, within 3 ~ 4 hours, complete the injection of mortar; After slip casting completes, need the excavation device conveying worm on timing rotation shield machine, prevent mortar from solidifying conveying worm.
3, the pre-grouting steel pipe 2 got ready is inserted in shield machine pre-grouting hole 4, makes pre-grouting pipe 2 to be stretched into above the face of shield machine front; Utilize secondary injection pulp grinder to inject cement slurry by pre-grouting steel pipe 2, reach after setting value until grouting pressure, shrink shield machine hinged 3 and shield machine is retreated, form reinforcing wall 7.
Usual grouting pressure setting value is 0.1-0.2MPa; Cement slurry proportioning is by weight: water: cement=0.8: 1.
4, when the mortar injected and cement slurry reach initial set state, empty the mortar in shield machine soil cabin and cement slurry, when the reinforcing wall 7 formed by the mortar injected and cement slurry completes initial set, operating personnel can open the cabin tool changing.

Claims (1)

1., for a shield machine modified node method for solidifying of the working face construction in shield machine cabin, it is characterized in that:
Arranging solidifying of the working face structure in shield machine cabin is: arrange one reinforcing wall (7) as solidifying of the working face structure along shield machine front face, in described shield machine cabin, solidifying of the working face structure is constructed as follows:
A, outfit grouting mortar, empty shield machine soil cabin, continues next-step operation soil pressure remains zero in shield machine soil cabin;
B, synchronous grouting pipeline (5) is connected to shield machine soil bulkhead preformed hole (6), in shield machine soil cabin, mortar is injected, until mortar fills shield machine soil cabin and forms mortar body of wall at face place, shield machine front by synchronous grouting pipeline (5);
C, pre-grouting steel pipe (2) to be inserted in shield machine pre-grouting hole (4), make described pre-grouting steel pipe (2) stretch into above the face of shield machine front; Utilize secondary injection pulp grinder to inject cement slurry by pre-grouting steel pipe (2), reach after setting value until grouting pressure, shrink shield machine hinged (3) and shield machine is retreated, form reinforcing wall (7);
D, when the mortar injected and cement slurry reach initial set state, empty the mortar in shield machine soil cabin and cement slurry, when the reinforcing wall formed by the mortar injected and cement slurry (7) completes initial set, operating personnel can open the cabin tool changing;
Described reinforcing wall (7) is thickness is 0.1-0.2m, area is 40-45m 2cement mortar body of wall;
The batching of described mortar is: cement 300-350kg, flyash 320kg, swell soil 200kg, sand 770kg, water 570kg;
Described cement slurry proportioning is by weight: water: cement=0.8: 1;
Shield machine modified node method is set: in shield machine soil bulkhead preformed hole (6), connect synchronous grouting pipeline (5), pre-grouting steel pipe (2) is inserted in shield machine pre-grouting hole (4), described pre-grouting steel pipe (2) is arranged for lengthening, and the front end of described pre-grouting steel pipe (2) can be stretched into above the face of shield machine front.
CN201410259234.8A 2011-12-26 2011-12-26 Improved shield tunneling machine structure for tunnel face reinforcement construction in shield tunneling machine cabin Expired - Fee Related CN103993888B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410259234.8A CN103993888B (en) 2011-12-26 2011-12-26 Improved shield tunneling machine structure for tunnel face reinforcement construction in shield tunneling machine cabin

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201410259234.8A CN103993888B (en) 2011-12-26 2011-12-26 Improved shield tunneling machine structure for tunnel face reinforcement construction in shield tunneling machine cabin
CN201110442815.1A CN102425425B (en) 2011-12-26 2011-12-26 Tunnel face reinforcing structure in shield machine cabin, construction method and equipment thereof

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201110442815.1A Division CN102425425B (en) 2011-12-26 2011-12-26 Tunnel face reinforcing structure in shield machine cabin, construction method and equipment thereof

Publications (2)

Publication Number Publication Date
CN103993888A CN103993888A (en) 2014-08-20
CN103993888B true CN103993888B (en) 2016-02-10

Family

ID=45959450

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201410259234.8A Expired - Fee Related CN103993888B (en) 2011-12-26 2011-12-26 Improved shield tunneling machine structure for tunnel face reinforcement construction in shield tunneling machine cabin
CN201110442815.1A Expired - Fee Related CN102425425B (en) 2011-12-26 2011-12-26 Tunnel face reinforcing structure in shield machine cabin, construction method and equipment thereof

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201110442815.1A Expired - Fee Related CN102425425B (en) 2011-12-26 2011-12-26 Tunnel face reinforcing structure in shield machine cabin, construction method and equipment thereof

Country Status (1)

Country Link
CN (2) CN103993888B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104481548B (en) * 2014-11-01 2016-05-11 中铁一局集团有限公司 A kind of shield tunnel construction face void handling method
CN105569665B (en) * 2015-10-30 2018-06-29 中铁十六局集团北京轨道交通工程建设有限公司 Balancing earth-pressure shielding machine soil mass consolidation tool changing construction method outside the native storehouse in layer of sand
CN105649655B (en) * 2016-03-25 2020-06-19 粤水电轨道交通建设有限公司 Be used for following shield structure built-in toward peripheral stratum slip casting reinforcing apparatus
CN106050130B (en) * 2016-06-30 2018-05-01 浙江海聚科技有限公司 A kind of advance borehole method
CN106907157B (en) * 2017-02-09 2019-01-04 广东水电二局股份有限公司 A kind of shield machine normal pressure opens the cabin operation construction method
CN107288644A (en) * 2017-08-04 2017-10-24 中船重型装备有限公司 Radial type for shield machine soil improvement and Advance Drilling injects pore structure
CN108706921A (en) * 2018-06-05 2018-10-26 中铁十四局集团大盾构工程有限公司 A kind of plastic concrete and preparation method thereof reinforced for shield end
CN109707402A (en) * 2018-11-30 2019-05-03 中铁建南方建设投资有限公司 A kind of device, frame head apparatus and the implementation method of TBM passing fault pre-grouting
CN109877088B (en) * 2019-01-15 2020-07-28 中铁工程装备集团技术服务有限公司 Method for wrapping shield shell of shield machine by concretion mortar
CN110439577B (en) * 2019-08-21 2021-02-12 河海大学 SCAP type under-pressure cabin opening method based on earth pressure balance shield machine
CN111946297A (en) * 2020-08-19 2020-11-17 新地能源工程技术有限公司 Filling and curing slurry and horizontal directional drilling grouting collapse prevention process
CN112343606B (en) * 2020-11-12 2023-10-13 上海隧道工程有限公司 Pipe jacking machine advanced grouting device capable of performing inclined grouting and grouting method
CN113074000B (en) * 2021-04-16 2022-03-22 吉林大学 Y-shaped tunnel grouting structure and matched grouting method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3218642A1 (en) * 1982-05-18 1983-11-24 Philipp Holzmann AG, Hauptniederlassung Düsseldorf, 4000 Düsseldorf Underground tunnel structure
CN102052079A (en) * 2010-11-19 2011-05-11 中铁一局集团有限公司 Method for exchanging tool of shield machine for tunnel construction
CN102168565A (en) * 2011-03-21 2011-08-31 广东水电二局股份有限公司 Soil reinforcing method for realizing normal-pressure cabin opening of shield machine

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3516192B2 (en) * 1996-03-25 2004-04-05 清水建設株式会社 Construction method of large section tunnel and shield machine
JP2001020676A (en) * 1999-07-09 2001-01-23 Kajima Corp Void filling method in excavating ground by excavator
CN101566063B (en) * 2009-06-04 2011-02-09 上海交通大学 Method of reinforcing soil body for inlet and outlet cave mouths of tunnel shield
CN101769157B (en) * 2010-01-21 2012-01-04 广东省长大公路工程有限公司 Construction method for tunnel working face counterpressure treatment during tunnel excavation
CN202381098U (en) * 2011-12-26 2012-08-15 中铁四局集团有限公司 Improved structure of shield machine for tunnel face reinforcing construction in shield machine cabin
CN202370529U (en) * 2011-12-26 2012-08-08 中铁四局集团有限公司 Tunnel face reinforcing structure in shield machine cabin

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3218642A1 (en) * 1982-05-18 1983-11-24 Philipp Holzmann AG, Hauptniederlassung Düsseldorf, 4000 Düsseldorf Underground tunnel structure
CN102052079A (en) * 2010-11-19 2011-05-11 中铁一局集团有限公司 Method for exchanging tool of shield machine for tunnel construction
CN102168565A (en) * 2011-03-21 2011-08-31 广东水电二局股份有限公司 Soil reinforcing method for realizing normal-pressure cabin opening of shield machine

Also Published As

Publication number Publication date
CN102425425B (en) 2014-07-23
CN103993888A (en) 2014-08-20
CN102425425A (en) 2012-04-25

Similar Documents

Publication Publication Date Title
CN103993888B (en) Improved shield tunneling machine structure for tunnel face reinforcement construction in shield tunneling machine cabin
CN101666234B (en) Fracture rock no-slurry-blocking wall compound grouting construction method
CN103321653B (en) Method of treating lining after collapse of underground cavern crown
CN105201448A (en) Method for water-stopping grouting plugging in high-pressure high-flow water gush channel
CN102278130A (en) Process method for reinforcing and grouting of high-pressure water-rich solution cavity of tunnel
CN202090930U (en) Convenient-to-clean grouting pipeline system for shield machine
CN204253056U (en) A kind of shield machine export & import reinforcing structure
CN103835729A (en) Ground pre-grouting strengthening technology for deep long-distance roadway surrounding rock
CN108756898A (en) Using the front pre-grouting construction method of HSC grouting materials
CN112502720B (en) Method for passing open TBM through fault fracture zone
CN105888673A (en) Deep-hole plastic pipe high-pressure grouting anti-explosion device in soft water-rich surrounding rock and operation method
CN102400694A (en) Reinforcement method for combined part of shield tunnel and mining-method tunnel
CN103089276A (en) Deep-shallow hole and high-low pressure coupling grouting technology
CN208965598U (en) The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN105257309B (en) In a kind of layer of sand in balancing earth-pressure shielding machine storehouse slip casting tool changing construction method
CN202370529U (en) Tunnel face reinforcing structure in shield machine cabin
CN106930289A (en) A kind of noiseless broken pile device and broken pile method
CN207406345U (en) Rich water sand-pebble layer shield tunnel end horizontal grouting ruggedized construction
CN109458214A (en) A kind of low air permeability coal seam static blasting permeability-increasing gas pumping method
CN105257306B (en) A kind of tool changing construction method of filling in barn reinforced in shield cabin
CN107152286A (en) A kind of cutterhead frequency-conversion control cabinet electricity for shield machine drives moment of torsion and got rid of poverty system and method
CN202381098U (en) Improved structure of shield machine for tunnel face reinforcing construction in shield machine cabin
CN203114232U (en) Horizontal drilling lossless distance-adjustable type safety blowout preventing device
Zhang et al. Construction applicability of mechanical methods for connecting aisle in the bohai mudstone stratum with high water pressure
CN210975737U (en) Reservoir dam body culvert pipe transformation structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160210

CF01 Termination of patent right due to non-payment of annual fee