CN103982199B - Tunnel Second Lining formwork jumbo locking plug template, plug node and method for blocking - Google Patents

Tunnel Second Lining formwork jumbo locking plug template, plug node and method for blocking Download PDF

Info

Publication number
CN103982199B
CN103982199B CN201410208544.7A CN201410208544A CN103982199B CN 103982199 B CN103982199 B CN 103982199B CN 201410208544 A CN201410208544 A CN 201410208544A CN 103982199 B CN103982199 B CN 103982199B
Authority
CN
China
Prior art keywords
punching block
couplet
template
line
locking plug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410208544.7A
Other languages
Chinese (zh)
Other versions
CN103982199A (en
Inventor
万利
李振江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Provincial Communications Planning and Design Institute Group Co Ltd
Original Assignee
Shandong Provincial Communications Planning and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Provincial Communications Planning and Design Institute Co Ltd filed Critical Shandong Provincial Communications Planning and Design Institute Co Ltd
Priority to CN201410208544.7A priority Critical patent/CN103982199B/en
Publication of CN103982199A publication Critical patent/CN103982199A/en
Application granted granted Critical
Publication of CN103982199B publication Critical patent/CN103982199B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of Tunnel Second Lining formwork jumbo locking plug template, plug node and method for blocking, wherein template part comprises the punching block part be made up of the arc punching block first line of a couplet of concentric structure and the arc punching block second line of a couplet, in up and down connecting rod, be provided with strip hole; The punching block first line of a couplet and the punching block second line of a couplet are respectively by be bolted on up and down connecting rod and to form an arc shaped slits of passing for manner water-band between two punching blocks, arc wood based panel side being carried out to shutoff is made up of multistage, can be fitted in the outside of the punching block first line of a couplet under the state of building.Also disclose node structure and method for blocking.Punching block part of the present invention arranges waterstop draw-in groove, overcomes many defects that splicing wooden model exists, and significantly improves efficiency and the waterproof effect of constuction joint place waterproofing work, reduces construction costs; Wooden model part is spliced by lath, and controllability is strong, can the rough basal plane of suitable for surrounding rock, and it highly also can regulate with the difference of lining thickness.

Description

Tunnel Second Lining formwork jumbo locking plug template, plug node and method for blocking
Technical field
The program belongs to the template field needing concrete casting in tunnel construction of tunnel, specifically a kind of Tunnel Second Lining formwork jumbo locking plug template, plug node and method for blocking.
Background technology
Adopt in the construction of tunnel of composite lining at drill bursting construction, need the mould coordinating steel formwork jumbo to carry out secondary lining to build.At present, the tunnel of drill bursting construction is adopted mostly to adopt composite lining, the secondary lining that the preliminary bracing be namely made up of bolt-spary supports and form concrete form both at home and abroad.Wherein, secondary lining many employings steel formwork jumbo carries out mould and builds, and in two lining concrete placements, the side at chassis two ends contacts with the concrete be shaped, and do not need shutoff, sky is faced in side in addition, need arrange locking plug template.Because the thickness of Tunnel Second Lining changes with Grades of Surrounding Rock, and drilling and blasting method to excavate the country rock basal plane caused uneven, locking plug template cannot make the punching block of sizing.The basic wooden model adopting interim spelling system in current constructing tunnel, hoop fixes narrow batten different in size as locking plug template, and middle buried water stop (bar) then adopts reinforcing bar to fasten in the middle part of lining cutting (hoop layout).
The template system of this structure by the impact of existing construction technology, the wooden assembled formwork of employing due to seam too much, often occur local spillage phenomenon in work progress, cause basal plane coarse, expansion sealing strip waterproof effect is had a greatly reduced quality; And for middle buried water stop, because locking plug template is wooden structures, fixed card slot cannot be reserved, can only position by arranging reinforcing bar card and (adopt the paragraph of plain concrete secondary lining, still need and hoop spacer bars is set), virtually add engineering cost, and complicated construction technique, difficult quality guarantee.That is, waterstop (bar) erection procedure is comparatively complicated on the one hand, constuction joint contact basal plane is comparatively coarse on the one hand, waterproof effect is caused to be deteriorated, constuction joint water leakage defect (according to incompletely statistics, constuction joint water leakage defect has all appearred in the tunnel of domestic 90%) is often there is in operation process.
Summary of the invention
In order to solve buried water stop in prior art (bar), difficult, installation base surface problem of rough is installed, the invention provides a kind of Tunnel Second Lining formwork jumbo steel and wood composite locking plug template, for improving seam quality and waterproof effect, and provide the plug node and method for blocking that use this template.
The technical solution adopted for the present invention to solve the technical problems is: Tunnel Second Lining formwork jumbo locking plug template, is characterized in that, comprise
The punching block part be made up of the arc punching block first line of a couplet and the arc punching block second line of a couplet of concentric structure, wherein, described punching block first line of a couplet section is Z-shaped, and punching block second line of a couplet section is I shape;
Up and down connecting rod, and strip hole is provided with in described up and down connecting rod;
The described punching block first line of a couplet and the punching block second line of a couplet, respectively by be bolted on up and down connecting rod and to form an arc shaped slits of passing for manner water-band between two punching blocks, are provided with packing ring between the described punching block second line of a couplet and up and down connecting rod;
Wood based panel, arc wood based panel side being carried out to shutoff is made up of multistage, can be fitted in the outside of the punching block first line of a couplet under the state of building.
Further, the described punching block second line of a couplet has for surveying with chassis the preformed hole that rib is fixed.
Further, described up and down connecting rod is a strip steel plate stamping parts.
A kind of Tunnel Second Lining plug node, is characterized in that, comprise
The jetting cement basal plane of sclerosis, described jetting cement basal plane and tunnel basement rock are solidified into one;
Form concrete layer, described form concrete layer is wet matter state,
And to the hoop template that form concrete layer end face supports, described hoop template is directly connected on chassis,
And form concrete layer side is carried out to the locking plug template of shutoff, described locking plug template is above-mentioned Tunnel Second Lining formwork jumbo locking plug template, and the punching block second line of a couplet in described locking plug template is fixed on the chassis side rib for providing support to locking plug template by securing member;
And pre-filled waterstop, the outer end of described waterstop extends to outside through behind the gap on described locking plug template, and the pivot joint position of waterstop is positioned at outside,
And hoop fixes muscle, fix both sides inside and outside wood based panel that muscle is separately fixed in described locking plug template with the described hoop that chassis is directly connected, and described wood based panel is fixed muscle and top is withstood on described jetting cement basal plane through hoop.
Further, described wood based panel is MULTILAYER COMPOSITE plank.
Further, described locking plug template is that a unit length combinationally uses with 2 meters.
Use above-mentioned locking plug template to carry out a method for blocking for operation, it is characterized in that, comprise the following steps:
Step one, the side rib of the described punching block second line of a couplet and formwork jumbo is carried out bolt fix, then buried water stop in installing, the both sides of waterstop are made to be placed in the both sides in gap respectively, and the pivot joint position of waterstop is positioned at outside, the steel template first line of a couplet is installed after installing waterstop again, and by up and down connecting rod, punching block up and down is fixed as an entirety, and clamp waterstop;
Step 2, wood based panel is fixed muscle through hoop and made the top of wood based panel hold out against on jetting cement basal plane from bottom to top, and described hoop is fixed muscle and is fixed on chassis;
Step 3, repeats step 2, seeks secondary progressive, carries out conventional pumps and send concrete to do industry, concrete is injected the space between locking plug template and hoop template, after maintenance after a while after completing the installation of whole section template.
The invention has the beneficial effects as follows: the present invention have developed the template form of steel and wood composite, punching block part arranges waterstop (bar) draw-in groove, overcome many defects that splicing wooden model exists, significantly improve efficiency and the waterproof effect of constuction joint place waterproofing work, reduce construction costs; Wooden model part is spliced by lath, and controllability is strong, can the rough basal plane of suitable for surrounding rock, and it highly also can regulate with the difference of lining thickness.In addition, this template is Lay Importance on Practical very, significantly can improve the construction quality of Tunnel Second Lining and constuction joint waterproof and perform efficiency.
Accompanying drawing explanation
Fig. 1 is the stereogram of template.
Fig. 2 is the front view of template.
Fig. 3 is in Fig. 2 I--I profile.
Fig. 4 is in Fig. 2 II--II profile.
Fig. 5 is node schematic diagram.
Fig. 6 is the annular plugging effect schematic diagram using this locking plug template to be formed.
Fig. 7 is the constuction joint schematic diagram using this template secondary lining to be formed.
In figure: the 1 punching block first line of a couplet, the 2 punching block second lines of a couplet, 3 up and down connecting rods, 31 strip holes, 4 bolts, 41 packing rings, 5 waterstops, 51 gaps, 52 dodge space, 6 wood based panels, 7 preformed holes, 8 side ribs, and 9 hoops fix muscle, 91 hoop templates.
Detailed description of the invention
As shown in Figures 1 to 4,
Tunnel Second Lining formwork jumbo steel and wood composite locking plug template, forms by with lower part.
The punching block part be made up of the arc punching block first line of a couplet 1 and the arc punching block second line of a couplet 2 of concentric structure, wherein, two punching blocks are all shaping, are Z-shaped at the punching block first line of a couplet 1 section, and the punching block second line of a couplet 2 section is I shape, with reference to the pattern in figure 1 and Fig. 3.Two punching blocks have similar radian, and are concentric circles distribution pattern.
Up and down connecting rod 3, and strip hole 31 is provided with in described up and down connecting rod, above-mentioned up and down connecting rod is a strip steel plate stamping parts, and having is a connector.The punching block first line of a couplet and the punching block second line of a couplet are fixed on up and down connecting rod respectively by bolt 4, and between two punching blocks, form the gap 51 passed for manner water-band 5 of an arc, wherein the punching block first line of a couplet and up and down connecting rod are directly fastenedly connected, and packing ring 41 is provided with between the punching block second line of a couplet and up and down connecting rod, what form an indent dodges space 52, for dodging waterstop, for waterstop provides space.The described punching block second line of a couplet has for surveying the preformed hole 7 that rib is fixed, for being reasonably fastenedly connected with chassis side rib with chassis.
Wood based panel 6, arc wood based panel side being carried out to shutoff is made up of multistage, uses with punching block part combination, can be fitted in the outside of the punching block first line of a couplet under the state of building.
A kind of Tunnel Second Lining plug node, is described in detail the composition structure of node below.
As Fig. 5 and Fig. 6, the jetting cement basal plane of sclerosis, described jetting cement basal plane and tunnel basement rock are solidified into one, and its surface has rough shape, also be the face that in locking plug template, wood based panel upper edge directly contacts, the contact surface place that ensure herein closely cooperates not spillage material.
For ease of the dismounting in work progress and transport, it is a unit (for ease of description architecture composition, giving a kind of simple schematic diagram in Fig. 6) that above-mentioned locking plug template is intended with 2 meters.
Before two lining pouring concretes, first the punching block second line of a couplet 2 of steel template is carried out bolt with the side rib 8 of formwork jumbo to fix, then buried water stop 5 in installing, the steel template first line of a couplet 1 is installed after installing waterstop 5 again, and by up and down connecting rod 3, punching block up and down is combined into entirety, and clamp waterstop, wherein waterstop part should leak outside one section of surplus, pivot joint position with dodge in space, and to fold downwards.Then wood based panel 6 fixed muscle 9 through hoop and made the top of wood based panel 6 hold out against on jetting cement basal plane from bottom to top, namely completing the blackout work of a unit.Seek secondary progressive, carrying out conventional pumps after completing the installation of whole section template send concrete to do industry, concrete is injected the space between locking plug template and hoop template, after maintenance after a while, after form removal, the constuction joint that secondary lining is formed forms pattern as shown in Figure 7.
In this node, form concrete layer is wet matter state, can immobilization after maintenance after a while.
Above-mentioned hoop template 91 is directly connected on chassis, uses chassis to support.
Above-mentioned locking plug template carries out shutoff to form concrete layer side and the punching block second line of a couplet in described locking plug template is fixed on the chassis side rib for providing support to locking plug template by securing member, is connected with chassis, uses chassis to support.
Hoop is fixed muscle 9 and is directly connected with chassis, its essence is the arch steel of a stiffness, form an external support, hoop fixes the inside and outside both sides that muscle is separately fixed at the wood based panel in described locking plug template, it is the steel component of brace scutum, in inside and outside both sides, wood based panel provided support and clamp wood based panel, making wood based panel 6 fix muscle through hoop and top is withstood on described jetting cement basal plane.
Embodiment recited above is only be described the preferred embodiment of the present invention; not scope of the present invention is limited; under not departing from the present invention and designing the prerequisite of spirit; relevant technical staff in the field, to various distortion of the present invention and improvement, all should expand in protection domain as determined in claims of the present invention.

Claims (7)

1. a Tunnel Second Lining formwork jumbo locking plug template, is characterized in that, comprises
The punching block part be made up of the arc punching block first line of a couplet and the arc punching block second line of a couplet of concentric structure, wherein, described punching block first line of a couplet section is Z-shaped, and punching block second line of a couplet section is I shape;
Up and down connecting rod, and strip hole is provided with in described up and down connecting rod;
The described punching block first line of a couplet and the punching block second line of a couplet respectively by be bolted on up and down connecting rod and to form an arc shaped slits of passing for manner water-band between two punching blocks, and are provided with packing ring between the described punching block second line of a couplet and up and down connecting rod;
And wood based panel, arc wood based panel side being carried out to shutoff is made up of multistage, can be fitted in the outside of the punching block first line of a couplet under the state of building.
2. Tunnel Second Lining formwork jumbo locking plug template according to claim 1, is characterized in that, the described punching block second line of a couplet has for surveying with chassis the preformed hole that rib is fixed.
3. Tunnel Second Lining formwork jumbo locking plug template according to claim 1, is characterized in that, described up and down connecting rod is a strip steel plate stamping parts.
4. a Tunnel Second Lining plug node, is characterized in that, comprises
The jetting cement basal plane of sclerosis, described jetting cement basal plane and tunnel basement rock are solidified into one;
Form concrete layer, described form concrete layer is wet matter state,
And to the hoop template that form concrete layer end face supports, described hoop template is directly connected on chassis,
And form concrete layer side is carried out to the locking plug template of shutoff, described locking plug template is the Tunnel Second Lining formwork jumbo locking plug template in claims 1 to 3 described in any one, and the punching block second line of a couplet in described locking plug template is fixed on the chassis side rib for providing support to locking plug template by securing member;
And pre-filled waterstop, the outer end of described waterstop extends to outside through behind the gap on described locking plug template, and the pivot joint position of waterstop is positioned at outside,
And hoop fixes muscle, fix both sides inside and outside wood based panel that muscle is separately fixed in described locking plug template with the described hoop that chassis is directly connected, and described wood based panel is fixed muscle and top is withstood on described jetting cement basal plane through hoop.
5. Tunnel Second Lining plug node according to claim 4, is characterized in that, described wood based panel is MULTILAYER COMPOSITE plank.
6. Tunnel Second Lining plug node according to claim 4, described locking plug template is that a unit length combinationally uses with 2 meters.
7. use the locking plug template in claim 1 to 3 described in any one to carry out a method for blocking for operation, it is characterized in that, comprise the following steps:
Step one, carries out bolt by the side rib of the described punching block second line of a couplet and formwork jumbo and fixes, and buried water stop in then installing, makes the both sides of waterstop be placed in the both sides in gap respectively, and the pivot joint position of waterstop is positioned at outside; The steel template first line of a couplet is installed after installing waterstop again, and by up and down connecting rod, punching block up and down is fixed as an entirety, and clamp waterstop;
Step 2, wood based panel is fixed muscle through hoop and made the top of wood based panel hold out against on jetting cement basal plane from bottom to top, and described hoop is fixed muscle and is fixed on chassis;
Step 3, repeats step 2, seeks secondary progressive, carries out conventional pumps and send concrete to do industry, concrete is injected the space between locking plug template and hoop template, after maintenance after a while after completing the installation of whole section template.
CN201410208544.7A 2014-05-16 2014-05-16 Tunnel Second Lining formwork jumbo locking plug template, plug node and method for blocking Active CN103982199B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410208544.7A CN103982199B (en) 2014-05-16 2014-05-16 Tunnel Second Lining formwork jumbo locking plug template, plug node and method for blocking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410208544.7A CN103982199B (en) 2014-05-16 2014-05-16 Tunnel Second Lining formwork jumbo locking plug template, plug node and method for blocking

Publications (2)

Publication Number Publication Date
CN103982199A CN103982199A (en) 2014-08-13
CN103982199B true CN103982199B (en) 2016-03-30

Family

ID=51274341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410208544.7A Active CN103982199B (en) 2014-05-16 2014-05-16 Tunnel Second Lining formwork jumbo locking plug template, plug node and method for blocking

Country Status (1)

Country Link
CN (1) CN103982199B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372862A (en) * 2014-11-17 2015-02-25 中国葛洲坝集团第三工程有限公司 Z type water and grout stopping sheet and application method thereof
CN105781578B (en) * 2016-03-08 2018-02-06 中铁隧道集团三处有限公司 The quick blocking formwork jumbo and method for blocking of a kind of tunnel water bursting factor
CN106837385A (en) * 2017-04-07 2017-06-13 中国水利水电第五工程局有限公司 A kind of seamless stopend for Tunnel Second Lining
CN107060829B (en) * 2017-05-24 2023-04-07 福州大学 Assembled lining structure for tunnel model test and manufacturing method thereof
CN107975381B (en) * 2017-09-19 2024-05-10 中铁隧道集团二处有限公司 Trolley filling template
CN108194107B (en) * 2018-03-05 2023-10-24 四川皓德斯新材料科技有限公司 Composite rubber vertical rod telescopic plug plate mechanism and application method thereof
US20210238844A1 (en) * 2018-05-03 2021-08-05 Sika Technology Ag A method for installing of a sealing element for a concrete joint
CN110017154B (en) * 2019-03-29 2021-07-30 陕西铁路工程职业技术学院 Combined positioning clamp for construction of construction joint based on tunnel secondary lining end
CN111441798A (en) * 2019-06-22 2020-07-24 李光见 Construction technology design for section plug of tunnel secondary lining trolley
CN110486050A (en) * 2019-08-29 2019-11-22 中国建筑土木建设有限公司 Clamp the Tunnel Second Lining trolley faces end head plugging template and construction method of waterstop
CN113217032A (en) * 2021-05-31 2021-08-06 中电建路桥集团有限公司 Multifunctional movable template for open cut tunnel construction and tunnel construction method
CN113898383A (en) * 2021-10-09 2022-01-07 中铁二十三局集团第四工程有限公司 Secondary lining pouring method with rubber waterstop
CN118030126B (en) * 2024-04-12 2024-06-14 山西省公路局晋中分局试验室 Tunnel lining maintenance device and application method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3545699B2 (en) * 2000-12-04 2004-07-21 五洋建設株式会社 Secondary lining method for steel segments
CN202441391U (en) * 2012-02-28 2012-09-19 中铁十二局集团有限公司 End template device for mounting waterstop in tunnel secondary lining concrete
CN103147763A (en) * 2013-01-04 2013-06-12 中铁二十二局集团有限公司 Tunnel inverted arch end combined steel mould
CN103147764A (en) * 2013-01-04 2013-06-12 中铁二十二局集团有限公司 Sizing end mould plate for second lining of tunnel arch wall
CN203847132U (en) * 2014-05-16 2014-09-24 山东省交通规划设计院 Plug formwork for formwork trolley and plug junction for secondary lining of tunnel

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001329795A (en) * 2000-05-20 2001-11-30 Kanazawa Seisakusho:Kk Tunnel lining construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3545699B2 (en) * 2000-12-04 2004-07-21 五洋建設株式会社 Secondary lining method for steel segments
CN202441391U (en) * 2012-02-28 2012-09-19 中铁十二局集团有限公司 End template device for mounting waterstop in tunnel secondary lining concrete
CN103147763A (en) * 2013-01-04 2013-06-12 中铁二十二局集团有限公司 Tunnel inverted arch end combined steel mould
CN103147764A (en) * 2013-01-04 2013-06-12 中铁二十二局集团有限公司 Sizing end mould plate for second lining of tunnel arch wall
CN203847132U (en) * 2014-05-16 2014-09-24 山东省交通规划设计院 Plug formwork for formwork trolley and plug junction for secondary lining of tunnel

Also Published As

Publication number Publication date
CN103982199A (en) 2014-08-13

Similar Documents

Publication Publication Date Title
CN103982199B (en) Tunnel Second Lining formwork jumbo locking plug template, plug node and method for blocking
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN103437791B (en) The mounting method of buried water stop in a kind of tunnel lining trolley termination
CN103912011A (en) Open excavation prefabricated underground structure
CN109356183B (en) Open caisson reserved hole plugging structure and construction method thereof
CN203847132U (en) Plug formwork for formwork trolley and plug junction for secondary lining of tunnel
CN105201530A (en) Repairing and strengthening method for large cracks on rock tunnel lining
CN105350581A (en) Advanced sealing structure for basement top slab settlement post-cast strips
CN104947944A (en) Embedding method for embedding box iron in concrete component
CN204023628U (en) A kind of water-stopping structure
CN110029753A (en) A kind of crack resistence exempts from float strips board wall body and construction method
CN106284999A (en) Assembled architecture haydite concrete batten of internal partition mounting process
CN102691301A (en) Synchronous construction method for envelope enclosure supporting breast beam and main structure wall
CN106481347B (en) A kind of anti-internal water pressure composite shield section of jurisdiction
CN104294771A (en) Square prefabricated reinforced concrete culvert
CN103556820A (en) Suspension mold for enlarging and reinforcing concrete beam and construction method of suspension mold
CN103132465B (en) Underground box culvert constructing method closely attached to pile foundation bearing platform
CN211817040U (en) Slurry leakage prevention structure at splicing part of assembled laminated slab
CN204097891U (en) Reinforced concrete prefabricated square culvert
CN203247838U (en) Fully-buried basement side wall post-pouring belt advance water stop formwork
CN105863135A (en) Mounting node for external wall panel
CN203654760U (en) Device for treating seam between vertical structure and horizontal structure
CN204826626U (en) But reuse's concatenation formula typical forms
CN215979401U (en) Rubber air bag plug template for tunnel secondary lining construction
CN210288159U (en) Split type precast concrete culvert's concatenation structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 250031 Shandong Province Flyover District of Ji'nan city Shanxi Road No. 576.

Patentee after: Shandong transportation planning and Design Institute Co.,Ltd.

Address before: 250031 Shandong Province Flyover District of Ji'nan city Shanxi Road No. 576.

Patentee before: SHANDONG PROVINCIAL COMMUNICATIONS PLANNING AND DESIGN INSTITUTE

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 250031 No. 576 Wushanxi Road, Tianqiao District, Jinan City, Shandong Province

Patentee after: Shandong transportation planning and Design Institute Group Co.,Ltd.

Address before: 250031 No. 576 Wushanxi Road, Tianqiao District, Jinan City, Shandong Province

Patentee before: Shandong transportation planning and Design Institute Co.,Ltd.

CP01 Change in the name or title of a patent holder