CN103132465B - Underground box culvert constructing method closely attached to pile foundation bearing platform - Google Patents

Underground box culvert constructing method closely attached to pile foundation bearing platform Download PDF

Info

Publication number
CN103132465B
CN103132465B CN201310096719.5A CN201310096719A CN103132465B CN 103132465 B CN103132465 B CN 103132465B CN 201310096719 A CN201310096719 A CN 201310096719A CN 103132465 B CN103132465 B CN 103132465B
Authority
CN
China
Prior art keywords
protection structure
vertical supporting
pile foundation
underground culvert
cushion cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310096719.5A
Other languages
Chinese (zh)
Other versions
CN103132465A (en
Inventor
薛勇
缪仑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201310096719.5A priority Critical patent/CN103132465B/en
Publication of CN103132465A publication Critical patent/CN103132465A/en
Application granted granted Critical
Publication of CN103132465B publication Critical patent/CN103132465B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The invention discloses an underground box culvert constructing method closely attached to a pile foundation bearing platform. A main structure of an underground box culvert is closely attached to edges of an existing bearing platform. The constructing method comprises the following steps: a boundary invading perpendicular supporting structure is constructed in a width dimension range of the bearing platform; earth excavation and horizontal supporting component erection are performed alternatively up to a designed height so that a foundation pit is formed; a reinforced concrete press plate is poured at the bottom of the foundation pit; the boundary invading perpendicular supporting structure is chiseled in a segmented mode from top to bottom, a soil blocking prefabricating beam is installed in a following mode, meanwhile, piecemeal support exchange is performed to horizontal supporting components and the operation is circulated till the bottom of the foundation pit; after an underground box culvert constructing bottom plate is poured, the horizontal supporting components are detached from bottom to top, side walls of the underground box culvert are poured with the soil blocking prefabricating beam serving as an outer side pattern plate and the two operations are performed alternatively; and a top plate of the underground box culvert is poured finally. The underground box culvert constructing method closely attached to the pile foundation bearing platform has the advantages that the foundation pit is supported effectively under the condition that a requirement for a space of the underground pit is satisfied, meanwhile influences on an existing pile foundation are controlled and normal operating requirements of an existing structure are satisfied.

Description

A kind of Underground Culvert construction method being close to pile foundation support table
Technical field
The invention belongs to underground construction technical field, be specifically related to a kind of Underground Culvert construction method being close to pile foundation support table.
Background technology
Certain airport rapid transit passage is Underground Culvert structure, due to restrictions such as ambient conditionss, this Underground Culvert structure and existing built on stilts airport gallery intersect vertically, and be close to gallery pile foundation support table, and owing to being close in Underground Culvert agent structure and cushion cap limit, the space of vertical supporting structure system enforcement is not carried out within the scope of cushion cap width dimensions, thus must consider that other supporting method is to the weak soil soil layer in cushion cap width range, basic component (pile foundation and cushion cap) is protected with the top gallery be connected, use to guarantee that the safety of top gallery is normal, stability of foundation pit under excavation state.
The technical scheme that cushion cap is underpined can be selected for above-mentioned operating mode, but cushion cap underpins scheme to be existed and needs to widen cushion cap, takies the underground space and widen due to cushion cap and make Underground Culvert implement the shortcoming such as more difficult, therefore this kind of scheme be not suitable for using in this engineering.
Summary of the invention
The object of the invention is according to above-mentioned the deficiencies in the prior art part, a kind of Underground Culvert construction method being close to pile foundation support table is provided, this construction method invades the vertical supporting and protection structure in boundary by construction within the scope of cushion cap width dimensions, and laterally set up horizontal support elements invading between the vertical supporting and protection structure in boundary, wait to cut invade the vertical supporting and protection structure in boundary after the native prefabricated crossbeam of gear is longitudinally set again, to reach, effective support is carried out to foundation ditch, control the impact on existing pile foundation simultaneously.
The object of the invention realizes being completed by following technical scheme:
A kind of Underground Culvert construction method being close to pile foundation support table, relate to existing pile foundation cushion cap, agent structure and the described cushion cap limit of described Underground Culvert are close to, it is characterized in that described Underground Culvert construction method at least comprises the steps: that A. along the described Underground Culvert preset longitudinally, construct in described cushion cap both sides vertical supporting and protection structure, within the scope of described cushion cap width dimensions, the vertical supporting and protection structure in boundary is invaded in construction; B. excavate the earthwork in the space of described vertical supporting and protection structure formation, laterally set up horizontal support elements described invading between the vertical supporting and protection structure in boundary, alternately construction is until design height, to form foundation ditch simultaneously; C. bottom described foundation ditch construction and pouring reinforcement concrete pressing plate, and by the reinforcing bar in described steel concrete pressing plate with described invade in the vertical supporting and protection structure in boundary main muscle weld together; D., within the scope of described Underground Culvert design height, segmentation cuts and invades the vertical supporting and protection structure in boundary from top to bottom, and keeps off native prefabricated crossbeam near the pile foundation sidewall installation of described cushion cap; Support replacement is piecemeal carried out to described horizontal support elements, to make the two end supports of described horizontal support elements on the native prefabricated crossbeam of described gear simultaneously; Cycle operation like this is until steel concrete pressing plate place bottom described foundation ditch; E. build the base plate of described Underground Culvert, in described foundation ditch, remove described horizontal support elements from bottom to up afterwards, and with the native prefabricated crossbeam of described gear for outboard template builds the side wall of described Underground Culvert, both hocket; Top board is built to complete the agent structure of described Underground Culvert at the design height place of described Underground Culvert; Last earthing backfill above described top board.
Connecting reinforcement or band steel is embedded with near described cushion cap two sides place in described vertical supporting and protection structure, when the pile foundation sidewall installation of described cushion cap keeps off native prefabricated crossbeam, first the Surface layer's concrete of the vertical supporting and protection structure near described cushion cap two sides place is cut, pull out pre-buried described connecting reinforcement or band steel, described gear native prefabricated crossbeam two ends and described connecting reinforcement or band steel are welded and fixed.
Described vertical supporting and protection structure supporting and protection structure vertical with invading boundary adopts bored pile or diaphragm wall.
The native prefabricated crossbeam of described gear is one or more in lattice girder steel, shaped steel or precast concrete beam.
The native prefabricated crossbeam of described gear is lattice girder steel, and the two sides of described lattice girder steel are laid with panel.
Advantage of the present invention is, under the condition meeting Underground Culvert space requirement, carry out effective support to foundation ditch, and control existing pile foundation impact, meet the instructions for use of existing structure thing normal operation, construction sequence is simple, and technical economic benefit is remarkable simultaneously.
Accompanying drawing explanation
Fig. 1 is the plane relation schematic diagram in the present invention between Underground Culvert and cushion cap;
Fig. 2 is construction foundation pit schematic diagram in the present invention;
Fig. 3 cuts in the present invention to invade the vertical supporting and protection structure in boundary and the native prefabricated crossbeam schematic diagram of welding gear piecemeal;
Fig. 4 cuts in the present invention to invade the vertical supporting and protection structure in boundary and the native prefabricated crossbeam schematic diagram of welding gear piecemeal;
Fig. 5 is the schematic diagram completing the native prefabricated crossbeam of welding gear in the present invention;
Fig. 6 is the schematic cross section of foundation ditch in the present invention;
Fig. 7 be in the present invention Underground Culvert constructed after structural representation;
Fig. 8 is near the connection diagram I of the vertical supporting and protection structure of cushion cap two end faces with the native prefabricated crossbeam of gear in the present invention;
Fig. 9 is near the connection diagram II of the vertical supporting and protection structure of cushion cap two end faces with the native prefabricated crossbeam of gear in the present invention;
Figure 10 is the plane relation schematic diagram in the present invention between cushion cap with vertical supporting and protection structure.
Detailed description of the invention
Feature of the present invention and other correlated characteristic are described in further detail by embodiment below in conjunction with accompanying drawing, so that the understanding of technician of the same trade:
Be respectively as marked 1-12 in Fig. 1-10, figure: vertical supporting and protection structure 1, foundation ditch 2, invade the vertical supporting and protection structure in boundary 3, keep off native prefabricated crossbeam 4, existing pile foundation 5, cushion cap 6, vertical supporting and protection structure 7, horizontal support elements 8, plain concrete layer 9, steel concrete pressing plate 10, Underground Culvert 11, connecting reinforcement 12.
Embodiment: as shown in figs 1-9, the present embodiment is specifically related to a kind of Underground Culvert construction method being close to pile foundation support table, certain airport rapid transit passage yet to be built is Underground Culvert structure, due to the restriction of ambient conditions, this rapid transit passage yet to be built and existing built on stilts airport gallery intersect vertically, the width of Underground Culvert 11 is equal with the distance of being separated by between two existing cushion caps 6, therefore the Underground Culvert 11 of rapid transit passage needs to be close to existing pile foundation 5 and cushion cap 6 is constructed, because construction space is narrow, difficulty of construction is larger.Below for being close to the Specific construction step of the Underground Culvert construction method of pile foundation support table:
A. as shown in Fig. 1,2,8,10, a narrow space is accompanied between the existing pile foundation 5 of both sides, first vertical supporting and protection structure 7 is squeezed in the two sides construction near cushion cap 6, connecting reinforcement 12 is embedded with in vertical supporting and protection structure 7, connecting reinforcement 12 is for connecting the gear soil prefabricated crossbeam of subsequent installation, and connecting reinforcement 12 also can adopt band steel; And longitudinally squeeze into vertical supporting and protection structure 1 successively along the Underground Culvert preset, vertical supporting and protection structure 1 arranges near rapid transit channel profile yet to be built; Within the scope of the width dimensions of cushion cap 6, the vertical supporting and protection structure 3 in boundary is invaded in construction afterwards, namely refers in the side ranges that cushion cap 6 contacts with foundation ditch 2 within the scope of so-called width dimensions; Wherein vertical supporting and protection structure 1, invade the vertical supporting and protection structure in boundary 3 and all adopt drill-pouring pilework with vertical supporting and protection structure 7;
B. as shown in Figure 2, limit excavation invades the earthwork in space that the vertical supporting and protection structure in boundary 3 and vertical supporting and protection structure 1 forms, limit is erection horizontal support elements 8 laterally, the two ends supporting and protection structure 3 vertical with invading boundary of horizontal support elements 8 fixes, excavation and erection hockets until foundation ditch 2 design height, to form foundation ditch 2;
C. as shown in Figure 2, construct in the bottom of foundation ditch 2 and build plain concrete layer 9, pouring reinforcement concrete pressing plate 10 again on plain concrete layer 9 afterwards, the main muscle in the supporting and protection structure 3 vertical with invading boundary of the reinforcing bar in steel concrete pressing plate 10 welds together, to improve the stability of foundation ditch 2;
D. as shown in Fig. 1,3,4,5,6, within the scope of the design height of Underground Culvert 11, segmentation cuts and invades the vertical supporting and protection structure 3 in boundary from top to bottom, and cut the Surface layer's concrete of the vertical supporting and protection structure 7 near cushion cap 6 two sides place, pull out the connecting reinforcement 12 be embedded in advance wherein, mounting block soil prefabricated crossbeam 4, makes the two ends of gear soil prefabricated crossbeam 4 and connecting reinforcement 12 weld together; Support replacement is piecemeal carried out to horizontal support elements 8, to make its two end supports on the native prefabricated crossbeam 4 of gear simultaneously; Alternate cycles operation like this is until on steel concrete pressing plate 10 bottom foundation ditch 2; Wherein keep off native prefabricated crossbeam 4 and can adopt lattice girder steel, shaped steel or precast concrete beam, according to lattice girder steel, panel should be laid on two lateral surfaces of lattice girder steel, it meets native panel in order to stable stop water and soil, and its foundation ditch panel can be used as the side wall template of building Underground Culvert 11 agent structure;
E. as shown in Fig. 5,6,7, build the base plate of Underground Culvert, in foundation ditch 2, remove horizontal support elements 8 from bottom to up afterwards, and with the gear of both sides soil prefabricated crossbeam 4 for outboard template builds Underground Culvert side wall, both hocket, to form the side wall of Underground Culvert 11; Thereafter top board is built to complete the agent structure of Underground Culvert 11 at the design height place of Underground Culvert 11; Last earthing backfill above top board.
As shown in Figure 8,9, the vertical supporting and protection structure being used for mounting block soil prefabricated crossbeam 4 near cushion cap 6 two sides can be close to foundation ditch 2 avris layout (see figure 9), also can abdicate the width keeping off native prefabricated crossbeam 4 and arrange (see figure 8), if be close to foundation ditch 2 avris to arrange, the workload that part invades the vertical supporting and protection structure 3 in boundary can be saved, but larger with the native prefabricated crossbeam 4 connection construction difficulty of gear; The width keeping off native prefabricated crossbeam 4 if abdicate is arranged, more convenient with the connection construction of the native prefabricated crossbeam 4 of gear.
In the present embodiment, first the vertical supporting and protection structure in boundary 3 is invaded in construction, vertical supporting and protection structure 1 is with the object of vertical supporting and protection structure 7, controls follow-uply to deep-cut soil disturbance in the process of foundation ditch 2 and cause impact for existing pile foundation 5 and cushion cap 6; Cut the object of invading the vertical supporting and protection structure 3 in boundary to be afterwards, invade the design width that the vertical supporting and protection structure 3 in boundary is positioned at Underground Culvert 11, therefore must be cut, and the native prefabricated crossbeam 4 of gear is set near the sidewall of vertical supporting and protection structure 7 and existing pile foundation 5, keep off native prefabricated crossbeam 4 and not only can carry out effective support to foundation ditch 2, control the impact on existing pile foundation 5, also because its width is less, sufficient space can be sold to apply the agent structure of Underground Culvert 11.

Claims (5)

1. be close to the Underground Culvert construction method of pile foundation support table for one kind, relate to existing pile foundation cushion cap, agent structure and the described cushion cap limit of described Underground Culvert are close to, it is characterized in that described Underground Culvert construction method at least comprises the steps: that A. along the described Underground Culvert preset longitudinally, to construct in described cushion cap both sides vertical supporting and protection structure, within the scope of described cushion cap width dimensions, the vertical supporting and protection structure in boundary is invaded in construction, namely refers in the side ranges that described cushion cap contacts with foundation ditch within the scope of so-called width dimensions; B. excavate the earthwork in the space of described vertical supporting and protection structure formation, laterally set up horizontal support elements described invading between the vertical supporting and protection structure in boundary, alternately construction is until design height, to form foundation ditch simultaneously; C. bottom described foundation ditch construction and pouring reinforcement concrete pressing plate, and by the reinforcing bar in described steel concrete pressing plate with described invade in the vertical supporting and protection structure in boundary main muscle weld together; D., within the scope of described Underground Culvert design height, segmentation cuts and invades the vertical supporting and protection structure in boundary from top to bottom, and keeps off native prefabricated crossbeam near the pile foundation sidewall installation of described cushion cap; Support replacement is piecemeal carried out to described horizontal support elements, to make the two end supports of described horizontal support elements on the native prefabricated crossbeam of described gear simultaneously; Cycle operation like this is until steel concrete pressing plate place bottom described foundation ditch; E. build the base plate of described Underground Culvert, in described foundation ditch, remove described horizontal support elements from bottom to up afterwards, and with the native prefabricated crossbeam of described gear for outboard template builds the side wall of described Underground Culvert, both hocket; Top board is built to complete the agent structure of described Underground Culvert at the design height place of described Underground Culvert; Last earthing backfill above described top board.
2. a kind of Underground Culvert construction method being close to pile foundation support table according to claim 1, it is characterized in that being embedded with connecting reinforcement or band steel in described vertical supporting and protection structure near described cushion cap two sides place, when the pile foundation sidewall installation of described cushion cap keeps off native prefabricated crossbeam, first the Surface layer's concrete of the vertical supporting and protection structure near described cushion cap two sides place is cut, pull out pre-buried described connecting reinforcement or band steel, described gear native prefabricated crossbeam two ends and described connecting reinforcement or band steel are welded and fixed.
3. a kind of Underground Culvert construction method being close to pile foundation support table according to claim 1, is characterized in that described vertical supporting and protection structure supporting and protection structure vertical with invading boundary adopts bored pile or diaphragm wall.
4. a kind of Underground Culvert construction method being close to pile foundation support table according to claim 1, is characterized in that the native prefabricated crossbeam of described gear is one or more in lattice girder steel or precast concrete beam.
5. a kind of Underground Culvert construction method being close to pile foundation support table according to claim 4, is characterized in that the native prefabricated crossbeam of described gear is lattice girder steel, the two sides of described lattice girder steel is laid with panel.
CN201310096719.5A 2013-03-25 2013-03-25 Underground box culvert constructing method closely attached to pile foundation bearing platform Active CN103132465B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310096719.5A CN103132465B (en) 2013-03-25 2013-03-25 Underground box culvert constructing method closely attached to pile foundation bearing platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310096719.5A CN103132465B (en) 2013-03-25 2013-03-25 Underground box culvert constructing method closely attached to pile foundation bearing platform

Publications (2)

Publication Number Publication Date
CN103132465A CN103132465A (en) 2013-06-05
CN103132465B true CN103132465B (en) 2014-12-31

Family

ID=48492874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310096719.5A Active CN103132465B (en) 2013-03-25 2013-03-25 Underground box culvert constructing method closely attached to pile foundation bearing platform

Country Status (1)

Country Link
CN (1) CN103132465B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758890B (en) * 2016-11-11 2017-11-17 厦门市市政工程设计院有限公司 Campshed box culvert structure and its construction method
CN107034918A (en) * 2017-06-23 2017-08-11 北京城乡建设集团有限责任公司 A kind of integral structure and amputation method for improving amputation efficiency
CN110158614B (en) * 2019-06-14 2021-03-16 广西大学 Foundation pit support structure penetration limiting residual pile chiseling and pile filling combined support method
CN111519634B (en) * 2020-04-30 2022-05-10 中国一冶集团有限公司 Support removing and replacing construction method of temporary support replacing structure
CN114033214B (en) * 2021-12-15 2023-03-28 山西五建集团有限公司 Method for treating strut-changing type space pile foundation of existing fractured ancient urn city gate by using top-turning reconstruction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030071986A (en) * 2002-03-05 2003-09-13 한국건설기술연구원 Culvert and culvert method by segmental block
JP2004150033A (en) * 2002-10-28 2004-05-27 Taisei Corp Strut replacing tool and strut replacing method
CN102444142A (en) * 2011-09-20 2012-05-09 新世纪建设集团有限公司 Pile group column replacement expanded basement and construction method of same
CN102444132A (en) * 2011-09-15 2012-05-09 中国建筑第六工程局有限公司 Support structure of relay double-row steel sheet pile underwater deep foundation pit and construction method
CN102720201A (en) * 2012-07-02 2012-10-10 中建三局第二建设工程有限责任公司 Support change construction building method implemented by using main structure of building

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030071986A (en) * 2002-03-05 2003-09-13 한국건설기술연구원 Culvert and culvert method by segmental block
JP2004150033A (en) * 2002-10-28 2004-05-27 Taisei Corp Strut replacing tool and strut replacing method
CN102444132A (en) * 2011-09-15 2012-05-09 中国建筑第六工程局有限公司 Support structure of relay double-row steel sheet pile underwater deep foundation pit and construction method
CN102444142A (en) * 2011-09-20 2012-05-09 新世纪建设集团有限公司 Pile group column replacement expanded basement and construction method of same
CN102720201A (en) * 2012-07-02 2012-10-10 中建三局第二建设工程有限责任公司 Support change construction building method implemented by using main structure of building

Also Published As

Publication number Publication date
CN103132465A (en) 2013-06-05

Similar Documents

Publication Publication Date Title
CN107313431B (en) Close on not contour foundation pit method for synchronously constructing
JP2018162655A (en) Final joint of immersed tunnel as well as prefabrication method and installation method
CN103590404B (en) A kind of foundation ditch method for supporting being close to built underground structure
CN103132465B (en) Underground box culvert constructing method closely attached to pile foundation bearing platform
KR101179770B1 (en) Soil protection against build structure and the method
CN108678751B (en) Assembly type construction method of shield cutter head manhole by jacking and excavating firstly
CN111236241B (en) Weak water-rich stratum subway foundation pit reinforcing excavation method based on half-cover excavation method
CN111794254A (en) Railway slope prefabricated assembled post-cast framework slope protection structure and construction method thereof
CN103711056A (en) Steel tool type temporary construction road and construction method thereof
CN108035379B (en) Comprehensive pipe gallery and construction method thereof
CN104894926B (en) Retaining structure and its construction method on the high embankment of existing railway
CN106968692B (en) Tunnel excavation supporting structure and construction method thereof
CN103643681A (en) Subway station foundation ditch inverse constructed supporting structure and construction method thereof
CN111827349B (en) Method for quickly constructing underground structure of subway station by adopting combined structure technology
CN111809662B (en) Subway station underground structure combination construction method
CN105298147A (en) Ultra-deep foundation pit spiral descending quick material transportation passage and construction method thereof
KR101249660B1 (en) Earth pressure supporting method of walls trench applying construction of none- excavation underground structure
CN205224014U (en) Precast underground continuous wall of pre -buried steel sheet
CN211498975U (en) Anti structure of floating of shallow earthing underground structure
CN211900603U (en) Face combination shield structure hole of hoist enclosed construction forever
CN105780938A (en) Vertical construction seam construction method of core tube bottom board for super high-rise
CN205224015U (en) Precast underground continuous wall of pre -buried I -steel
CN205063369U (en) Quick transport corridor of super deep basal pit spiral decline material
CN211287711U (en) Device for resisting large deformation of soil body in shield construction of soft soil stratum
CN214738121U (en) Remove node means of open cut foundation ditch temporary stand in advance

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant