CN103981896A - Seamless connecting construction method for basement outer wall and fender piles - Google Patents

Seamless connecting construction method for basement outer wall and fender piles Download PDF

Info

Publication number
CN103981896A
CN103981896A CN201410146379.7A CN201410146379A CN103981896A CN 103981896 A CN103981896 A CN 103981896A CN 201410146379 A CN201410146379 A CN 201410146379A CN 103981896 A CN103981896 A CN 103981896A
Authority
CN
China
Prior art keywords
construction
wall
template
basement
fender post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410146379.7A
Other languages
Chinese (zh)
Other versions
CN103981896B (en
Inventor
程伟
马明国
程群
魏俊松
林贵顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201410146379.7A priority Critical patent/CN103981896B/en
Publication of CN103981896A publication Critical patent/CN103981896A/en
Application granted granted Critical
Publication of CN103981896B publication Critical patent/CN103981896B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a seamless connecting construction method for a basement outer wall and fender piles. The method comprises the following steps: finishing construction of the fender piles; binding reinforcing mesh sheets on the inner-side soil body of a foundation pit; jetting cement slurry to form a wall surface by the inner side soil body of the foundation pit; performing drainage arrangement on the fender piles, and treating the pile bodies; performing water-proofing treatment on an enclosure system; arranging vertical steel bars, horizontal steel bars and stirrups on the basement outer wall; supporting a template on the inner side of the basement outer wall to form a single-side support system with the inner-side soil body of the foundation pit; casting concrete; removing the template when the design strength requirement of the basement outer wall is met. According to the construction method, the inner-side wall surface of the foundation pit is directly taken as one side template of the basement outer wall, and only the inner-side template of the basement outer wall needs to be supported on a construction field to construct the single-side supporting system together with the inner-side wall surface of the foundation pit, so that one construction procedure is eliminated, the manual workload is lowered, the construction time is saved, the construction efficiency is increased, and the consumption of template materials is lowered; seamless construction is adopted for the basement outer wall and the enclosure system, so that heat-preserving treatment between the outer wall and the enclosure system is not needed compared with the prior art.

Description

The seamless link construction method of a kind of outer wall of basement and fender post
Technical field
The present invention relates to the realm of building construction, particularly the seamless link construction method of a kind of outer wall of basement and fender post.
Background technology
Existing outer wall of basement construction method, after normally space enclosing structure having been constructed, setting-out goes out the extension line of outer wall of basement, arrange the reinforcing bar of outer wall of basement, install template, build outer wall of basement concrete, stripping when concrete reaches design strength requirement.This kind of technique waste template, the artificial amount needing is larger, the length consuming time of constructing, the system of going along with sb. to guard him has been wasted a large amount of architectural spaces.
Summary of the invention
The object of the present invention is to provide a kind ofly increases architectural space, reduces template consumption, has reduced by one working procedure, has reduced artificial work amount, saves the engineering time, improves the outer wall of basement of efficiency of construction and the seamless link construction method of fender post.
The technical solution used in the present invention is as follows:
A seamless link construction method for outer wall of basement and fender post, construction sequence comprises:
1) fender post construction
According to the fender post size that construction drawing is given, carry out setting-out, construction fender post;
2) spray anchor
Assembling reinforcement net sheet on the soil body of the inner side of foundation ditch, shotcrete, thus make the soil body inside foundation ditch form metope, the bar diameter that reinforced mesh is used needs >14mm;
3) metope levelling
In follow-up construction, the system of going along with sb. to guard him will be used as a face die plate, therefore will carry out leveling to metope, guarantee planeness;
4) draining setting
According to designing requirement, on fender post, carrying out the construction of drain hole hole, after having constructed, bury draining channel-section steel in drain hole underground, constructs according to design drawing in the angle of inclination of channel-section steel, in outer wall of basement inner side, gutter is set;
5) fender post pile body is processed
Use digging machine to dig out pile body outside fender post, pile body is increased to the construction processing of frictional behaviour;
6) construction of waterproof layer
After metope levelling has been constructed, carry out waterproof construction on metope, waterproof is according to two-layer processing, and one deck is protective coating, and one deck is waterproof roll, does layer protective layer on waterproof layer;
7) arrange lacing wire
Lacing wire is mainly used to the template of fixed outer wall, in this construction method, adopt draining channel-section steel to be used as lacing wire and use, in follow-up construction in order to fixed form;
8) arrange exterior wall reinforcing bar
According to the dimensional requirement of design drawing, arrange vertical reinforcement, horizontal reinforcement, the stirrup of exterior wall, the channel-section steel of draining setting is embedded in outward within the walls as one bearing diagonal;
9) install template
The system of going along with sb. to guard him, as a side template, therefore only need install template one in inner side of outer wall, with the lacing wire of arranging on fender post, fixes template, makes itself and space enclosing structure form a kind of single surface formwork system;
10) concreting
After formwork erection completes, carry out concreting, will go along with sb. to guard him system and exterior wall is linked to be integral body, guarantee exterior wall and the jointless construction of going along with sb. to guard him system;
11) form removable
After outer wall of basement has been built, after concrete reaches design strength requirement, stripping, completes outer wall of basement and the jointless construction of going along with sb. to guard him system.
The construction method of outer wall of basement of the present invention, directly by metope inside foundation ditch directly as a side template of outer wall of basement, job site, only need to install the inner side template of outer wall of basement, make its with foundation ditch inside metope composition single surface formwork system, reduced working procedure one, reduced artificial work amount, save the engineering time, improved efficiency of construction, reduced the use of mould material; Outer wall of basement adopts jointless construction with going along with sb. to guard him system, compares with traditional handicraft, middle without being incubated processing in exterior wall and the system of going along with sb. to guard him.
Accompanying drawing explanation
Fig. 1 is construction schematic diagram of the present invention.
Number in the figure: 1-fender post, 2-metope leveling layer, 3-lacing wire, 4, waterproofing course, 5-vertical reinforcement, 6-horizontal reinforcement, 7-stirrup, 8-template, 9-outer wall of basement concrete.
The specific embodiment
Referring to accompanying drawing, the seamless link construction method of a kind of outer wall of basement and fender post, construction sequence comprises:
1) fender post construction
According to the fender post size that construction drawing is given, carry out setting-out, construction fender post;
2) spray anchor
Assembling reinforcement net sheet on the soil body of the inner side of foundation ditch, shotcrete, thus make the soil body inside foundation ditch form metope, the bar diameter that reinforced mesh is used needs >14mm;
3) metope levelling
In follow-up construction, the system of going along with sb. to guard him will be used as a face die plate, therefore will carry out leveling to metope, guarantee planeness;
4) draining setting
According to designing requirement, on fender post, carrying out the construction of drain hole hole, after having constructed, bury draining channel-section steel in drain hole underground, constructs according to design drawing in the angle of inclination of channel-section steel, in outer wall of basement inner side, gutter is set;
5) fender post pile body is processed
Use digging machine to dig out pile body outside fender post, pile body is increased to the construction processing of frictional behaviour;
6) construction of waterproof layer
After metope levelling has been constructed, carry out waterproof construction on metope, waterproof is according to two-layer processing, and one deck is protective coating, and one deck is waterproof roll, does layer protective layer on waterproof layer;
7) arrange lacing wire
Lacing wire is mainly used to the template of fixed outer wall, in this construction method, adopt draining channel-section steel to be used as lacing wire and use, in follow-up construction in order to fixed form;
8) arrange exterior wall reinforcing bar
According to the dimensional requirement of design drawing, arrange vertical reinforcement, horizontal reinforcement, the stirrup of exterior wall, the channel-section steel of draining setting is embedded in outward within the walls as one bearing diagonal;
9) install template
The system of going along with sb. to guard him, as a side template, therefore only need install template one in inner side of outer wall, with the lacing wire of arranging on fender post, fixes template, makes itself and space enclosing structure form a kind of single surface formwork system;
10) concreting
After formwork erection completes, carry out concreting, will go along with sb. to guard him system and exterior wall is linked to be integral body, guarantee exterior wall and the jointless construction of going along with sb. to guard him system;
11) form removable
After outer wall of basement has been built, after concrete reaches design strength requirement, stripping, completes outer wall of basement and the jointless construction of going along with sb. to guard him system.
The object of the present invention is achieved like this, the construction method of this outer wall of basement, it comprises the steps: first to complete the construction of fender post, then assembling reinforcement net sheet on the soil body of the inner side of foundation ditch, gunite, make the soil body inside foundation ditch form metope, on fender post, carry out draining setting, and pile body is processed, at fender body, fasten and do waterproofing work, arrange the vertical reinforcement of outer wall of basement, horizontal reinforcement, stirrup, install the template of outer wall of basement inner side, make the soil body inside itself and foundation ditch form a single surface formwork system, concreting, stripping when outer wall of basement reaches design strength requirement.
Construction method due to this outer wall of basement, directly by metope inside foundation ditch directly as a side template of outer wall of basement, job site, only need to install the inner side template of outer wall of basement, make its with foundation ditch inside metope composition single surface formwork system, reduced working procedure one, reduced artificial work amount, save the engineering time, improved efficiency of construction, reduced the use of mould material; Outer wall of basement adopts jointless construction with going along with sb. to guard him system, compares with traditional handicraft, middle without being incubated processing in exterior wall and the system of going along with sb. to guard him.

Claims (1)

1. a seamless link construction method for outer wall of basement and fender post, is characterized in that, construction sequence comprises:
1) fender post construction
According to the fender post size that construction drawing is given, carry out setting-out, construction fender post;
2) spray anchor
Assembling reinforcement net sheet on the soil body of the inner side of foundation ditch, shotcrete, thus make the soil body inside foundation ditch form metope, the bar diameter that reinforced mesh is used needs >14mm;
3) metope levelling
In follow-up construction, the system of going along with sb. to guard him will be used as a face die plate, therefore will carry out leveling to metope, guarantee planeness;
4) draining setting
According to designing requirement, on fender post, carrying out the construction of drain hole hole, after having constructed, bury draining channel-section steel in drain hole underground, constructs according to design drawing in the angle of inclination of channel-section steel, in outer wall of basement inner side, gutter is set;
5) fender post pile body is processed
Use digging machine to dig out pile body outside fender post, pile body is increased to the construction processing of frictional behaviour;
6) construction of waterproof layer
After metope levelling has been constructed, carry out waterproof construction on metope, waterproof is according to two-layer processing, and one deck is protective coating, and one deck is waterproof roll, does layer protective layer on waterproof layer;
7) arrange lacing wire
Lacing wire is mainly used to the template of fixed outer wall, in this construction method, adopt draining channel-section steel to be used as lacing wire and use, in follow-up construction in order to fixed form;
8) arrange exterior wall reinforcing bar
According to the dimensional requirement of design drawing, arrange vertical reinforcement, horizontal reinforcement, the stirrup of exterior wall, the channel-section steel of draining setting is embedded in outward within the walls as one bearing diagonal;
9) install template
The system of going along with sb. to guard him, as a side template, therefore only need install template one in inner side of outer wall, with the lacing wire of arranging on fender post, fixes template, makes itself and space enclosing structure form a kind of single surface formwork system;
10) concreting
After formwork erection completes, carry out concreting, will go along with sb. to guard him system and exterior wall is linked to be integral body, guarantee exterior wall and the jointless construction of going along with sb. to guard him system;
11) form removable
After outer wall of basement has been built, after concrete reaches design strength requirement, stripping, completes outer wall of basement and the jointless construction of going along with sb. to guard him system.
CN201410146379.7A 2014-04-11 2014-04-11 The seamless link construction method of a kind of outer wall of basement and fender post Expired - Fee Related CN103981896B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410146379.7A CN103981896B (en) 2014-04-11 2014-04-11 The seamless link construction method of a kind of outer wall of basement and fender post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410146379.7A CN103981896B (en) 2014-04-11 2014-04-11 The seamless link construction method of a kind of outer wall of basement and fender post

Publications (2)

Publication Number Publication Date
CN103981896A true CN103981896A (en) 2014-08-13
CN103981896B CN103981896B (en) 2016-01-20

Family

ID=51274048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410146379.7A Expired - Fee Related CN103981896B (en) 2014-04-11 2014-04-11 The seamless link construction method of a kind of outer wall of basement and fender post

Country Status (1)

Country Link
CN (1) CN103981896B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104480929A (en) * 2014-10-17 2015-04-01 中建四局第六建筑工程有限公司 Pile and wall integrated construction method for applying occlusive pile into permanent basement external wall
CN105569329A (en) * 2016-02-02 2016-05-11 陈君 Unilateral formwork support basement construction method and basement
CN105604099A (en) * 2016-03-11 2016-05-25 中建三局集团有限公司 Waterproof coiled-material base layer
CN105926815A (en) * 2016-05-10 2016-09-07 江苏东晟新诚建设集团有限公司 Integrated construction method for board wall formwork and support formwork in restricted area
CN106759843A (en) * 2016-12-27 2017-05-31 宁波二十冶建设有限公司 A kind of outer wall of basement waterproof construction and its construction method
CN107119695A (en) * 2017-06-27 2017-09-01 中国建筑第二工程局有限公司 Operation frame body for canceling basement exterior wall backfill and construction method
CN107326923A (en) * 2017-07-20 2017-11-07 常州市建筑科学研究院集团股份有限公司 Outer wall of underground structure HCMW engineering methods composite wall and its construction method
CN107975042A (en) * 2017-12-08 2018-05-01 中冶天工集团天津有限公司 A kind of supporting type water-stop curtain and its construction method
CN109083192A (en) * 2018-08-30 2018-12-25 中国十七冶集团有限公司 It is a kind of without fertile slot underground pipe gallery method of construction
CN109518697A (en) * 2018-12-12 2019-03-26 中铁局集团厦门建设工程有限公司 The construction method of form concrete between a kind of subway station fender post
CN111550037A (en) * 2020-05-29 2020-08-18 青岛东建建设有限公司 Building outer wall construction method for foundation pit in narrow site
CN111663540A (en) * 2020-06-29 2020-09-15 河北建设勘察研究院有限公司 Foundation pit supporting structure and wall formwork integrated construction method thereof
CN112482555A (en) * 2020-11-06 2021-03-12 云南建投第六建设有限公司 Shear wall structure and construction method of shear wall

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080001711A (en) * 2006-06-29 2008-01-04 충주대학교 산학협력단 The construction method of retaining wall
KR100976621B1 (en) * 2008-06-03 2010-08-17 주식회사 가인이앤피 Construction method for basement extention
CN201874008U (en) * 2010-11-12 2011-06-22 中国京冶工程技术有限公司 Discontinuous concrete grouting pile and wall structure
KR20110136987A (en) * 2010-06-16 2011-12-22 주식회사 한빛구조엔지니어링 Constructing method for underground external wall using form with concrete placing inlet and vibrator inlet for preventing concrete counterflow
CN103088830A (en) * 2013-02-01 2013-05-08 江苏省江建集团有限公司 Construction method for composite outer wall structure of ultra-deep basement
CN103132690A (en) * 2013-03-13 2013-06-05 江苏南通三建集团有限公司 Basement exterior wall unilateral template and method for supporting template thereof
CN103470026A (en) * 2013-09-04 2013-12-25 中建三局第一建设工程有限责任公司 Basement external wall single-face framework erecting system and construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080001711A (en) * 2006-06-29 2008-01-04 충주대학교 산학협력단 The construction method of retaining wall
KR100976621B1 (en) * 2008-06-03 2010-08-17 주식회사 가인이앤피 Construction method for basement extention
KR20110136987A (en) * 2010-06-16 2011-12-22 주식회사 한빛구조엔지니어링 Constructing method for underground external wall using form with concrete placing inlet and vibrator inlet for preventing concrete counterflow
CN201874008U (en) * 2010-11-12 2011-06-22 中国京冶工程技术有限公司 Discontinuous concrete grouting pile and wall structure
CN103088830A (en) * 2013-02-01 2013-05-08 江苏省江建集团有限公司 Construction method for composite outer wall structure of ultra-deep basement
CN103132690A (en) * 2013-03-13 2013-06-05 江苏南通三建集团有限公司 Basement exterior wall unilateral template and method for supporting template thereof
CN103470026A (en) * 2013-09-04 2013-12-25 中建三局第一建设工程有限责任公司 Basement external wall single-face framework erecting system and construction method

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104480929A (en) * 2014-10-17 2015-04-01 中建四局第六建筑工程有限公司 Pile and wall integrated construction method for applying occlusive pile into permanent basement external wall
CN105569329B (en) * 2016-02-02 2018-08-28 陈君 Single surface formwork basement construction method and basement
CN105569329A (en) * 2016-02-02 2016-05-11 陈君 Unilateral formwork support basement construction method and basement
CN105604099A (en) * 2016-03-11 2016-05-25 中建三局集团有限公司 Waterproof coiled-material base layer
CN105926815A (en) * 2016-05-10 2016-09-07 江苏东晟新诚建设集团有限公司 Integrated construction method for board wall formwork and support formwork in restricted area
CN106759843A (en) * 2016-12-27 2017-05-31 宁波二十冶建设有限公司 A kind of outer wall of basement waterproof construction and its construction method
CN107119695A (en) * 2017-06-27 2017-09-01 中国建筑第二工程局有限公司 Operation frame body for canceling basement exterior wall backfill and construction method
CN107326923A (en) * 2017-07-20 2017-11-07 常州市建筑科学研究院集团股份有限公司 Outer wall of underground structure HCMW engineering methods composite wall and its construction method
CN107975042A (en) * 2017-12-08 2018-05-01 中冶天工集团天津有限公司 A kind of supporting type water-stop curtain and its construction method
CN109083192A (en) * 2018-08-30 2018-12-25 中国十七冶集团有限公司 It is a kind of without fertile slot underground pipe gallery method of construction
CN109518697A (en) * 2018-12-12 2019-03-26 中铁局集团厦门建设工程有限公司 The construction method of form concrete between a kind of subway station fender post
CN111550037A (en) * 2020-05-29 2020-08-18 青岛东建建设有限公司 Building outer wall construction method for foundation pit in narrow site
CN111663540A (en) * 2020-06-29 2020-09-15 河北建设勘察研究院有限公司 Foundation pit supporting structure and wall formwork integrated construction method thereof
CN112482555A (en) * 2020-11-06 2021-03-12 云南建投第六建设有限公司 Shear wall structure and construction method of shear wall

Also Published As

Publication number Publication date
CN103981896B (en) 2016-01-20

Similar Documents

Publication Publication Date Title
CN103981896B (en) The seamless link construction method of a kind of outer wall of basement and fender post
CN109854255B (en) Method for processing tunnel unconverged collapse
CN103015719B (en) Integral casting process for reinforced concrete wastewater tank of pre-drilling engineering
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
CN101672041B (en) Top-down construction method of large underground structure outer wall
CN104805866A (en) Prefabricated comprehensive pipe gallery and construction method
CN205975626U (en) Strut integrated configuration with stagnant water unification in soft soil layer foundation ditch
CN102444143B (en) Construction method for cancelling operation channel for facades of basement
CN104452812A (en) Construction method of basement outer wall
CN101696580A (en) Outboard template construction method of post-pouring belt of outer wall of underground structure
CN107780569A (en) A kind of construction method of the basement shear wall non-dismantling formwork based on BIM
CN107119695A (en) Operation frame body for canceling basement exterior wall backfill and construction method
CN101949226B (en) Cross construction method for large pool body
CN103726508A (en) Prefabricated reinforced concrete board molding bed and construction method
CN203160254U (en) Pit support structure
CN101560766A (en) Grid-like underground continuous wall plate and production method thereof
CN104328790A (en) Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed
CN105862897A (en) Original-groove casting construction method for shallow foundation of sandy mudstone foundation
CN219547838U (en) Frame lattice beam structure without template
CN106193120B (en) Basement is encorbelmented, and bottom plate is inverse to make structure and construction method
CN105019645A (en) Template system for building concrete structure at earth-taking opening in top-down construction method, and construction method
CN108130889B (en) Manufacturing method of stepped construction joint between main bottom plate of pump brake and side wall of runner layer
CN207727603U (en) Big cushion cap deep basal pit formwork supporting system
CN103821149A (en) Large-scale deep foundation pit slope remaining soil digging and pit-in-pit concrete post casting construction method
CN113235645B (en) Tower crane foundation reserved joint bar assembly type forming die construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 230000 building 3, 262 Heping Road, Yaohai District, Hefei City, Anhui Province

Patentee after: No 6 Construction Co.,Ltd. of China Construction Fourth Engineering Bureau

Address before: 230011 science and Technology Department of No.6 company of China Construction Fourth Bureau, Dongfang Building, intersection of Changjiang East Street and Mingguang Road, Yaohai District, Hefei City, Anhui Province

Patentee before: CHINA CONSTRUCTION 4TH ENGINEERING BUREAU, 6TH Co.,Ltd.

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120

CF01 Termination of patent right due to non-payment of annual fee