CN103939113A - 一种悬轨式施工台车 - Google Patents
一种悬轨式施工台车 Download PDFInfo
- Publication number
- CN103939113A CN103939113A CN201410203084.9A CN201410203084A CN103939113A CN 103939113 A CN103939113 A CN 103939113A CN 201410203084 A CN201410203084 A CN 201410203084A CN 103939113 A CN103939113 A CN 103939113A
- Authority
- CN
- China
- Prior art keywords
- pull bar
- lower edge
- chassis
- edge pull
- web member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 76
- 239000000725 suspension Substances 0.000 title abstract 2
- 230000007246 mechanism Effects 0.000 claims abstract description 23
- 229910000831 Steel Inorganic materials 0.000 claims description 40
- 239000010959 steel Substances 0.000 claims description 40
- 239000000203 mixture Substances 0.000 claims description 5
- 239000004567 concrete Substances 0.000 abstract description 12
- 238000009415 formwork Methods 0.000 abstract description 8
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 62
- 229910052742 iron Inorganic materials 0.000 description 31
- 238000005520 cutting process Methods 0.000 description 15
- 238000000034 method Methods 0.000 description 8
- 230000003014 reinforcing effect Effects 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 238000004062 sedimentation Methods 0.000 description 5
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 3
- 238000000926 separation method Methods 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 238000007728 cost analysis Methods 0.000 description 2
- 238000012407 engineering method Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000002035 prolonged effect Effects 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 241001669679 Eleotris Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009414 blockwork Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000001186 cumulative effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000005183 dynamical system Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410203084.9A CN103939113B (zh) | 2014-05-14 | 2014-05-14 | 一种悬轨式施工台车 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410203084.9A CN103939113B (zh) | 2014-05-14 | 2014-05-14 | 一种悬轨式施工台车 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103939113A true CN103939113A (zh) | 2014-07-23 |
CN103939113B CN103939113B (zh) | 2016-04-20 |
Family
ID=51186959
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410203084.9A Active CN103939113B (zh) | 2014-05-14 | 2014-05-14 | 一种悬轨式施工台车 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103939113B (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106223982A (zh) * | 2016-08-29 | 2016-12-14 | 黄高飞 | 一种隧道施工的无轨道行走台车装置的使用方法 |
CN106246203A (zh) * | 2016-08-03 | 2016-12-21 | 中国十七冶集团有限公司 | 一种用于隧道初期支护的模筑混凝土模板支架 |
CN107269298A (zh) * | 2017-07-24 | 2017-10-20 | 国家电网公司 | 一种隧道施工台车 |
CN109139049A (zh) * | 2018-09-10 | 2019-01-04 | 中铁局集团第二工程有限公司 | 一种地铁暗挖车站二衬扣拱施工方法 |
CN109538242A (zh) * | 2018-10-23 | 2019-03-29 | 中建局集团第建筑有限公司 | 一种隧道施工模板支架的搭建方法 |
CN112709162A (zh) * | 2020-12-30 | 2021-04-27 | 中铁六局集团北京铁路建设有限公司 | 大跨度薄壁混凝土声屏障浇筑台车 |
CN112726442A (zh) * | 2020-12-30 | 2021-04-30 | 中铁六局集团北京铁路建设有限公司 | 大跨度薄壁混凝土声屏障浇筑台车的施工方法 |
CN113914897A (zh) * | 2021-09-27 | 2022-01-11 | 中铁十四局集团建筑工程有限公司 | 可移动拱顶二次衬砌模板台架及联络洞室台架移动结构 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020066835A (ko) * | 2001-02-14 | 2002-08-21 | 선산철강공업(주) | 터널 구축용 슬라이딩 스틸 폼의 구조 |
JP3750470B2 (ja) * | 2000-03-03 | 2006-03-01 | 株式会社大林組 | トンネル覆工コンクリートの自動散水設備 |
CN102146798A (zh) * | 2011-03-02 | 2011-08-10 | 中国土木工程集团有限公司 | 电气化铁路营业线增建明洞拱圈衬砌台车及构筑方法 |
CN202628116U (zh) * | 2012-04-24 | 2012-12-26 | 中国水利水电第十四工程局有限公司 | 一种用于轻型移动式钢模台车的拱架 |
CN203321538U (zh) * | 2013-06-25 | 2013-12-04 | 中铁十六局集团地铁工程有限公司 | 一种变断面隧道衬砌模具 |
CN203867587U (zh) * | 2014-05-14 | 2014-10-08 | 中铁二局股份有限公司 | 一种悬轨式施工台车 |
-
2014
- 2014-05-14 CN CN201410203084.9A patent/CN103939113B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3750470B2 (ja) * | 2000-03-03 | 2006-03-01 | 株式会社大林組 | トンネル覆工コンクリートの自動散水設備 |
KR20020066835A (ko) * | 2001-02-14 | 2002-08-21 | 선산철강공업(주) | 터널 구축용 슬라이딩 스틸 폼의 구조 |
CN102146798A (zh) * | 2011-03-02 | 2011-08-10 | 中国土木工程集团有限公司 | 电气化铁路营业线增建明洞拱圈衬砌台车及构筑方法 |
CN202628116U (zh) * | 2012-04-24 | 2012-12-26 | 中国水利水电第十四工程局有限公司 | 一种用于轻型移动式钢模台车的拱架 |
CN203321538U (zh) * | 2013-06-25 | 2013-12-04 | 中铁十六局集团地铁工程有限公司 | 一种变断面隧道衬砌模具 |
CN203867587U (zh) * | 2014-05-14 | 2014-10-08 | 中铁二局股份有限公司 | 一种悬轨式施工台车 |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106246203A (zh) * | 2016-08-03 | 2016-12-21 | 中国十七冶集团有限公司 | 一种用于隧道初期支护的模筑混凝土模板支架 |
CN106223982A (zh) * | 2016-08-29 | 2016-12-14 | 黄高飞 | 一种隧道施工的无轨道行走台车装置的使用方法 |
CN107269298A (zh) * | 2017-07-24 | 2017-10-20 | 国家电网公司 | 一种隧道施工台车 |
CN109139049A (zh) * | 2018-09-10 | 2019-01-04 | 中铁局集团第二工程有限公司 | 一种地铁暗挖车站二衬扣拱施工方法 |
CN109139049B (zh) * | 2018-09-10 | 2020-05-08 | 中铁一局集团第二工程有限公司 | 一种地铁暗挖车站二衬扣拱施工方法 |
CN109538242A (zh) * | 2018-10-23 | 2019-03-29 | 中建局集团第建筑有限公司 | 一种隧道施工模板支架的搭建方法 |
CN109538242B (zh) * | 2018-10-23 | 2020-09-29 | 中建一局集团第一建筑有限公司 | 一种隧道施工模板支架的搭建方法 |
CN112709162A (zh) * | 2020-12-30 | 2021-04-27 | 中铁六局集团北京铁路建设有限公司 | 大跨度薄壁混凝土声屏障浇筑台车 |
CN112726442A (zh) * | 2020-12-30 | 2021-04-30 | 中铁六局集团北京铁路建设有限公司 | 大跨度薄壁混凝土声屏障浇筑台车的施工方法 |
CN113914897A (zh) * | 2021-09-27 | 2022-01-11 | 中铁十四局集团建筑工程有限公司 | 可移动拱顶二次衬砌模板台架及联络洞室台架移动结构 |
Also Published As
Publication number | Publication date |
---|---|
CN103939113B (zh) | 2016-04-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103939113B (zh) | 一种悬轨式施工台车 | |
CN101230785B (zh) | 大断面、多断面隧道衬砌施工方法 | |
CN103939114B (zh) | 一种悬轨式台车衬砌施工方法 | |
CN103614970B (zh) | 钢桁梁拼装架设施工用纵向拖拉及横向顶推滑移*** | |
CN103614969B (zh) | 一种钢桁梁拼装架设施工工艺 | |
CN103485288B (zh) | 一种穿越既有线的双层顶进涵施工工艺 | |
CN106702910A (zh) | 一种双塔双索面矮塔斜拉桥的主梁施工工艺 | |
CN105064397A (zh) | 一种在地铁区间盾构隧道基础上扩挖车站的明挖施工方法 | |
CN108561156B (zh) | 分离式隧道换拱支护结构及其施工方法 | |
CN202596743U (zh) | 地下隧道无拉杆侧墙施工用模板台车 | |
CN106522112A (zh) | 斜拉桥边跨梁段架设***及其方法 | |
CN104481546A (zh) | 一种软岩隧道斜井进入正洞的双曲拱的施工方法 | |
CN113062354A (zh) | 明挖桩撑体系预制装配式地铁车站拼装方法 | |
CN205806684U (zh) | 一种横跨基坑工程管线悬吊结构 | |
CN204715366U (zh) | 一种大面积深基坑分区顺逆工况下的支撑体系 | |
CN202991063U (zh) | 一种大断面隧道液压台车 | |
CN206860179U (zh) | 一种隧道建设用中隔墙 | |
CN106246190A (zh) | 一种隧道双侧壁九部导坑施工方法 | |
CN205135661U (zh) | 隧道二次浇筑支撑架 | |
CN103089298B (zh) | 一种构筑侧向多列沿空留巷充填墙体的结构及方法 | |
CN110645022A (zh) | 一种联络通道自锚式模板支架***及施工方法 | |
CN206956744U (zh) | 一种路肩复合支挡结构 | |
CN106087996B (zh) | 基于自我调平反压装置的人工挖孔桩施工方法 | |
CN103924981B (zh) | 单拱大跨浅埋暗挖隧道加固体系及其施工方法 | |
CN203035204U (zh) | 一种大断面隧道二衬分组模板台车 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160301 Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Applicant after: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. Address before: 610041, No. nine, No. 156, building B, high building, Xing Xing Road, Chengdu hi tech Zone, Sichuan Applicant before: China Railway Erju Co., Ltd. Applicant before: China Railway Erju 1st Engineering Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20140723 Assignee: China Railway Second Bureau Decoration Engineering Co., Ltd. Assignor: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. Contract record no.: 2017510000024 Denomination of invention: Suspension rail type construction trolley Granted publication date: 20160420 License type: Exclusive License Record date: 20170824 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170919 Address after: Nanming District 550007 of Guizhou province Guiyang city four street 3 Jinpeng building Co-patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. Patentee after: China Railway Erju 1st Engineering Co., Ltd. Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. |
|
TR01 | Transfer of patent right | ||
CP03 | Change of name, title or address |
Address after: 550002 Jinpeng Building, No. 3, Sitong Street, Nanming District, Guiyang City, Guizhou Province Co-patentee after: China Railway No. 2 Engineering Group Co., Ltd. Patentee after: China Railway Erju 1st Engineering Co., Ltd. Address before: 550007 Jinpeng Building, No. 3, Sitong Street, Nanming District, Guiyang City, Guizhou Province Co-patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. Patentee before: China Railway Erju 1st Engineering Co., Ltd. |
|
CP03 | Change of name, title or address |