CN103883273A - 利用饱和潜水支持船上的双吊机安装立管的方法 - Google Patents

利用饱和潜水支持船上的双吊机安装立管的方法 Download PDF

Info

Publication number
CN103883273A
CN103883273A CN201410055865.8A CN201410055865A CN103883273A CN 103883273 A CN103883273 A CN 103883273A CN 201410055865 A CN201410055865 A CN 201410055865A CN 103883273 A CN103883273 A CN 103883273A
Authority
CN
China
Prior art keywords
standpipe
ship
hypomere
saturation diving
diving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410055865.8A
Other languages
English (en)
Other versions
CN103883273B (zh
Inventor
马超
苗春生
张印桐
林守强
高原
宋春娜
刘宝昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cnooc Shenzhen Ocean Engineering Technology Service Co ltd
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Original Assignee
SHENZHEN SEA OIL ENGINEERING UNDERWATER TECHNOLOGY CO LTD
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN SEA OIL ENGINEERING UNDERWATER TECHNOLOGY CO LTD, China National Offshore Oil Corp CNOOC, Offshore Oil Engineering Co Ltd filed Critical SHENZHEN SEA OIL ENGINEERING UNDERWATER TECHNOLOGY CO LTD
Priority to CN201410055865.8A priority Critical patent/CN103883273B/zh
Publication of CN103883273A publication Critical patent/CN103883273A/zh
Application granted granted Critical
Publication of CN103883273B publication Critical patent/CN103883273B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

一种利用饱和潜水支持船上的双吊机安装立管的方法,其特征在于:采用以下安装步骤:一,传递操作人员至驳船;二,安装下段立管索具;三,由两吊机试吊立管下段;四,将操作人员传回;五,由两吊机将立管下段吊起,船移出;六,两吊机将立管下段固定到船舷上;七,下放立管下段入水,并使立管下段在水中保持垂直;八,主吊机解脱;九,水下机器人潜水;十,将下段立管嵌入立管卡子内固定;十一,重复上述步骤直至将整个立管安装完毕。本发明只需要饱和潜水支持船+自航驳船就能够进行深水立管的安装,不仅大大降低了对船舶资源得要求,而且,还提高了工作效率及经济效益。

Description

利用饱和潜水支持船上的双吊机安装立管的方法
技术领域
本发明涉及安装立管的方法,尤其涉及一种利用饱和潜水支持船上的两个吊机在自航驳船的配合下顺利完成立管的起吊、扶正、传递和安装工作的双吊机安装立管的方法。属于海洋石油工程领域。
背景技术
近年来,为节约海上油气田的开发成本,依托已建油田设施开发周边油田的项目越来越多。例如:在南海,这样的项目大多是依托大型具有油气处理能力的综合平台,在附近建设一些小型井架平台或水下井口设施。而把小型井架平台或水下井口所生产的油气资源输送到综合处理平台,除新建连接的海底管道外,通常,还要在原有旧平台上安装新的立管,以连接新建管道。
对于立管的安装,长期以来,一直依靠着“大型起重施工船+饱和潜水支持船”或者动力定位船(DP)+饱和潜水支持船(DSV)”,比如:海洋石油工程公司的“蓝疆”以及广州打捞局的“华天龙”等等。通过船舶上的吊机,将装运在甲板上的立管直接吊起,并将其平放入在水中,且通过固定在立管上浮袋的浮力,使立管漂浮在水面上;然后,摘除吊钩并将其连接在立管端头的吊点上,开动吊机将立管直立起来,再慢慢将其吊至指定位置,由潜水员在水下将立管卡子合上将其固定。
目前,随着我国海洋石油工业的迅速发展,大型石油平台结构物制造安装的任务越来越重,而这些大型结构物的海上运输及安装都必须由大型起重施工船舶来完成,然而,由于我国现有的大型起重施工船舶资源却是非常紧张,同时,在海上施工期间,因大型起重施工船或动力定位船故障,而导致饱和潜水支持船待机的可能性极大,施工进度不宜控制,因而,造成成本上的增加,利润上的降低。
发明内容
本发明的主要目的在于克服现有技术存在的上述缺点,而提供一种利用饱和潜水支持船上双吊机安装立管的方法,其利用较为经济的饱和潜水支持船上的两台吊机,就能够完成立管的起吊、扶正、传递和安装;实现了以小船代替大船,并将施工船舶的搭配模式由大型起重施工船+饱和潜水支持船或动力定位船+饱和潜水支持船的变成饱和潜水支持船+自航驳船的模式,不仅降低了整体船舶租赁费用,而且,降低了由于大型起重施工船或者动力定位船故障,而产生饱和潜水支持船待机的可能性,同时,使整体故障待机率低,大大提高了工作效率及经济效益。
本发明的目的是由以下技术方案实现的:
一种利用饱和潜水支持船上的双吊机安装立管的方法,其特征在于:采用以下安装步骤:
第一步,将操作人员由饱和潜水支持船传递至驳船;
第二步,由操作人员安装下段立管索具,并与饱和潜水支持船上的吊机相连,然后,拆除固定立管下段用的绑扎带和固定设施;
第三步,由饱和潜水支持船的两个吊机试吊立管下段;
第四步,待试吊成功后,再将操作人员传递回饱和潜水支持船;
第五步,由饱和潜水支持船的两吊机司机,将立管下段缓缓吊起,在达到设定高度后,解开两船艏艉的缆绳,饱和潜水支持船开始移出;
第六步,饱和潜水支持船移离驳船后,由两吊机将立管下段固定到船舷上,潜水支持船移船至平台;
第七步,饱和潜水支持船到达平台后,利用推进器推进靠***台,做好立管下段的传递准备;
第八步,饱和潜水支持船上的两吊机,开始下放立管下段入水,两吊机缓慢下放,从而,缓慢扶正立管下段,并使立管下段在水中保持垂直;再将平台绞车钢丝绳传递至饱和潜水支持船的甲板上,并将钢丝绳与立管下段上部的拖拉盲板相连;
第九步,饱和潜水支持船两吊机继续下放立管下段,待平台绞车全部受力后,由水下机器人观察主吊机索具受力状态,待主吊机完全不受力时,潜水监督操控声控卸扣控制器,打开声控卸扣,主吊机解脱完毕;
第十步,通过水下机器人全程监控,平台绞车与饱和潜水支持船两吊机协同下放立管下段,待立管下段下放至安装位置时,准备开始潜水;
第十一步,将潜水钟下水,饱和潜水员出钟后,将下段立管嵌入立管卡子内,合并卡子,并安装螺栓;
第十二步,饱和潜水支持船重复步骤1-10,传递下放立管中部至水下安装位置;
第十三步,饱和潜水员将立管中部嵌入立管卡子内,并组对立管中部与立管下部间的法兰;
第十四步,当立管中部全部嵌入立管卡子内后,安装立管卡子螺栓;
第十五步,饱和潜水支持船重复步骤1-10,再传递立管上部至平台绞车;
第十六步,空气潜水员将上部立管嵌入立管卡子内,并组对立管上部与立管中部之间的法兰;
第十七步,当立管中部全部嵌入立管卡子内,安装立管卡子螺栓;
第十八步,回收所有的索具,由水下机器人进行完工后调查。
所述第十一步,利用配重块调整下部立管的角度,并利用手扳葫芦将下段立管嵌入立管卡子内,合并卡子,安装螺栓,再用液压扳手对支撑卡子螺栓加力锁紧。
所述第十四步、第十七步中,安装立管卡子螺栓后,再安装法兰垫圈,利用液压拉伸器对法兰螺栓进行加力,然后,再用液压扳手对支撑卡子螺栓加力锁紧。
本发明的有益效果:
(1)只需要饱和潜水支持船+自航驳船就能够进行深水立管的安装,降低了整体船舶租赁费用,节约大量的生产成本。
(2)利用饱和潜水支持船双吊机安装深水立管,大大降低了对船舶资源得要求,减少了立管安装对大型浮吊和动力定位船的依赖。
(3)降低了由于大型起重施工船或者动力定位船故障而产生饱和潜水支持船待机的可能性,大大提高了工作效率及经济效益。
(4)充分的防台风应急措施,将施工风险减小到可控范围,极大程度地保障了施工的有序进行。
附图说明
图1为本发明立管吊装索具布置示意图。
图2为本发明饱和潜水支持船起吊立管示意图。
图3为本发明立管由饱和潜水支持船传递至平台绞车示意图。
图4为本发明饱和潜水支持船二吊机继续下放立管下段示意图。
图5为本发明立管下段水下安装示意图。
图6为本发明立管水下法兰对接示意图。
图7为本发明立管中段水下安装示意图。
图中主要标号说明:
1.立管索具、2.立管、3、饱和潜水支持船、4.吊机、5.绞车、6.饱和潜水员、7.水下机器人。
具体实施方式
本发明立管安装前,需在平台上按设计要求安装绞车5,并采用焊接方式安装数处吊点,通过吊点改变绞车5钢丝绳的方向,从而,在立管2传递时可以按需改变立管2的方向;由于立管2传递对海况要求也很高,因此,只有在较好的海况条件下,才能保证饱和潜水支持船3和驳船安全相靠,完成立管2起吊和传递。
本发明立管海上安装工作采用以下安装步骤:
第一步,将操作人员由饱和潜水支持船3传递至驳船
运输立管2的驳船选择好地点抛锚,并调整好艏向;饱和潜水支持船3通过推进器的推进慢慢靠向驳船左舷,两船艏艉带缆完毕后,从饱和潜水支持船3上传递操作人员至驳船;
第二步,如图1所示,由操作人员安装下段立管索具1,并与饱和潜水支持船3上的吊机相连,然后,拆除固定立管2下段用的绑扎带和其他固定设施;
第三步,清理固定立管2下段设施后,由饱和潜水支持船3的两个吊机试吊立管2下段;
第四步,待试吊成功后,再将操作人员传递回饱和潜水支持船3;
第五步,如图2所示,由饱和潜水支持船3的甲板长指挥两吊机4的司机,将立管2下段缓缓吊起,在达到设定高度后,解开两船艏艉的缆绳,饱和潜水支持船3开始移出;
第六步,饱和潜水支持船3移离驳船后,由两吊机4,将立管2下段固定到船舷上,潜水支持船3移船至WC8-3A平台;
第七步,饱和潜水支持船3到达WC8-3A平台后,利用推进器推进靠***台,做好立管2下段的传递准备;
第八步,如图3所示,饱和潜水支持船3上的两吊机4,开始下放立管2下段入水,两吊机4缓慢下放,从而,缓慢扶正立管2下段,并使立管2下段在水中保持垂直;再将平台绞车5钢丝绳传递至饱和潜水支持船3的甲板上,并将钢丝绳与立管2下段上部的拖拉盲板相连,检查确保连接正常;
第九步,如图4所示,饱和潜水支持船3两吊机4继续下放立管2下段,待平台绞车5全部受力后,由水下机器人7观察主吊机索具受力状态,待主吊机完全不受力时,潜水监督操控声控卸扣控制器,打开声控卸扣,主吊机解脱完毕;
第十步,通过水下机器人7全程监控,平台绞车5与饱和潜水支持船3两吊机4协同下放立管2下段,待立管2下段下放至安装位置时,准备开始潜水;
第十一步,如图5所示,将潜水钟下水,饱和潜水员6出钟后,利用5吨配重块调整下部立管的角度,并利用手扳葫芦等工具将下段立管嵌入立管卡子内,合并卡子,并安装螺栓,安装螺栓时,用液压扳手对立管卡子螺栓加力锁紧;
第十二步,饱和潜水支持船3重复步骤1-10,传递下放立管2中部至水下安装位置;
第十三步,如图6所示,饱和潜水员6将立管2中部嵌入立管卡子内,并组对立管2中部与立管2下部间的法兰;
第十四步,如图7所示,当立管2中部全部嵌入立管卡子内后,安装立管卡子螺栓后,再安装立管2中部与立管2下部间法兰垫圈,用液压拉伸器对法兰螺栓进行加力,然后,再用液压扳手对立管卡子螺栓加力锁紧;
第十五步,饱和潜水支持船3重复步骤1-10再传递立管2上部至平台绞车5;
第十六步,空气潜水员将上部立管嵌入卡子内,并组对立管2上部与立管2中部之间的法兰;
第十七步,当立管2中部全部嵌入卡子内,安装立管卡子螺栓后,再安装立管2上部与立管2中部间法兰垫圈,用液压拉伸器对法兰螺栓进行加力锁紧。用液压扳手对所有需要加力的立管卡子螺栓进行加力锁紧;
第十八步,回收所有的索具,由水下机器人7进行完工后调查。
上述饱和潜水支持船、吊机、绞车、水下机器人为现有技术,未作说明的技术为现有技术。
以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。

Claims (3)

1.一种利用饱和潜水支持船上的双吊机安装立管的方法,其特征在于:采用以下安装步骤:
第一步,将操作人员由饱和潜水支持船传递至驳船;
第二步,由操作人员安装下段立管索具,并与饱和潜水支持船上的吊机相连,然后,拆除固定立管下段用的绑扎带和固定设施;
第三步,由饱和潜水支持船的两个吊机试吊立管下段;
第四步,待试吊成功后,再将操作人员传递回饱和潜水支持船;
第五步,由饱和潜水支持船的两吊机司机,将立管下段缓缓吊起,在达到设定高度后,解开两船艏艉的缆绳,饱和潜水支持船开始移出;
第六步,饱和潜水支持船移离驳船后,由两吊机将立管下段固定到船舷上,潜水支持船移船至平台;
第七步,饱和潜水支持船到达平台后,利用推进器推进靠***台,做好立管下段的传递准备;
第八步,饱和潜水支持船上的两吊机,开始下放立管下段入水,两吊机缓慢下放,从而,缓慢扶正立管下段,并使立管下段在水中保持垂直;再将平台绞车钢丝绳传递至饱和潜水支持船的甲板上,并将钢丝绳与立管下段上部的拖拉盲板相连;
第九步,饱和潜水支持船两吊机继续下放立管下段,待平台绞车全部受力后,由水下机器人观察主吊机索具受力状态,待主吊机完全不受力时,潜水监督操控声控卸扣控制器,打开声控卸扣,主吊机解脱完毕;
第十步,通过水下机器人全程监控,平台绞车与饱和潜水支持船两吊机协同下放立管下段,待立管下段下放至安装位置时,准备开始潜水;
第十一步,将潜水钟下水,饱和潜水员出钟后,将下段立管嵌入立管卡子内,合并卡子,并安装螺栓;
第十二步,饱和潜水支持船重复步骤1-10,传递下放立管中部至水下安装位置;
第十三步,饱和潜水员将立管中部嵌入立管卡子内,并组对立管中部与立管下部间的法兰;
第十四步,当立管中部全部嵌入立管卡子内后,安装立管卡子螺栓;
第十五步,饱和潜水支持船重复步骤1-10,再传递立管上部至平台绞车;
第十六步,空气潜水员将上部立管嵌入立管卡子内,并组对立管上部与立管中部之间的法兰;
第十七步,当立管中部全部嵌入立管卡子内,安装立管卡子螺栓;
第十八步,回收所有的索具,由水下机器人进行完工后调查。
2.根据权利要求1所述的利用饱和潜水支持船上的双吊机安装立管的方法,其特征在于:所述第十一步,利用配重块调整下部立管的角度,并利用手扳葫芦将下段立管嵌入立管卡子内,合并卡子,安装螺栓,再用液压扳手对支撑卡子螺栓加力锁紧。
3.根据权利要求1所述的利用饱和潜水支持船上的双吊机安装立管的方法,其特征在于:所述第十四步、第十七步中,安装立管卡子螺栓后,再安装法兰垫圈,利用液压拉伸器对法兰螺栓进行加力,然后,再用液压扳手对支撑卡子螺栓加力锁紧。
CN201410055865.8A 2014-02-19 2014-02-19 利用饱和潜水支持船上的双吊机安装立管的方法 Active CN103883273B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410055865.8A CN103883273B (zh) 2014-02-19 2014-02-19 利用饱和潜水支持船上的双吊机安装立管的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410055865.8A CN103883273B (zh) 2014-02-19 2014-02-19 利用饱和潜水支持船上的双吊机安装立管的方法

Publications (2)

Publication Number Publication Date
CN103883273A true CN103883273A (zh) 2014-06-25
CN103883273B CN103883273B (zh) 2016-05-11

Family

ID=50952368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410055865.8A Active CN103883273B (zh) 2014-02-19 2014-02-19 利用饱和潜水支持船上的双吊机安装立管的方法

Country Status (1)

Country Link
CN (1) CN103883273B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104849075A (zh) * 2015-03-24 2015-08-19 深圳海油工程水下技术有限公司 陆上模拟rov对海洋油气水下设备的检测方法
CN105782568A (zh) * 2016-03-29 2016-07-20 中国海洋石油总公司 立管、护管的安装方法
CN108202215A (zh) * 2016-12-20 2018-06-26 上海船厂船舶有限公司 钻井船的隔水管张紧器的安装方法
CN108590547A (zh) * 2018-03-01 2018-09-28 深圳海油工程水下技术有限公司 立管安装方法
CN112339936A (zh) * 2020-09-17 2021-02-09 海洋石油工程股份有限公司 一种浮式生产储卸油装置立管监测***的舱内安装方法
CN112943131A (zh) * 2021-02-02 2021-06-11 海洋石油工程股份有限公司 一种海洋立管拆除方法
CN113981966A (zh) * 2021-10-29 2022-01-28 中国海洋石油集团有限公司 大尺寸锚桩水下安装方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3877583A (en) * 1974-01-18 1975-04-15 Dolphin International Pipe racking system
US20060225891A1 (en) * 2000-06-02 2006-10-12 Adams Burt A Apparatus for, and method of, landing items at a well location
CN101203657A (zh) * 2005-06-30 2008-06-18 瑞士单浮筒系泊公司 近海采油装置中立管的安装方法
CN101363218A (zh) * 2007-08-06 2009-02-11 中国海洋石油总公司 导管架的立管卡子的安装方法
CN102213085A (zh) * 2010-04-09 2011-10-12 中国海洋石油总公司 导管架立管的安装方法
CN102235154A (zh) * 2010-05-07 2011-11-09 中国海洋石油总公司 立管固定装置
CN102235548A (zh) * 2010-05-07 2011-11-09 中国海洋石油总公司 深水立管及水下设施安装装置
CN103154424A (zh) * 2010-10-12 2013-06-12 Bp北美公司 海底自由站立式立管***和方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3877583A (en) * 1974-01-18 1975-04-15 Dolphin International Pipe racking system
US20060225891A1 (en) * 2000-06-02 2006-10-12 Adams Burt A Apparatus for, and method of, landing items at a well location
CN101203657A (zh) * 2005-06-30 2008-06-18 瑞士单浮筒系泊公司 近海采油装置中立管的安装方法
CN101363218A (zh) * 2007-08-06 2009-02-11 中国海洋石油总公司 导管架的立管卡子的安装方法
CN102213085A (zh) * 2010-04-09 2011-10-12 中国海洋石油总公司 导管架立管的安装方法
CN102235154A (zh) * 2010-05-07 2011-11-09 中国海洋石油总公司 立管固定装置
CN102235548A (zh) * 2010-05-07 2011-11-09 中国海洋石油总公司 深水立管及水下设施安装装置
CN103154424A (zh) * 2010-10-12 2013-06-12 Bp北美公司 海底自由站立式立管***和方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
夏宝莹等: "动力定位船立管安装技术", 《中国造船》, vol. 50, 30 November 2009 (2009-11-30) *
王懿等: "深水立管安装技术进展", 《石油矿场机械》, vol. 38, no. 6, 30 June 2009 (2009-06-30) *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104849075A (zh) * 2015-03-24 2015-08-19 深圳海油工程水下技术有限公司 陆上模拟rov对海洋油气水下设备的检测方法
CN104849075B (zh) * 2015-03-24 2017-12-01 深圳海油工程水下技术有限公司 陆上模拟rov对海洋油气水下设备的检测方法
CN105782568A (zh) * 2016-03-29 2016-07-20 中国海洋石油总公司 立管、护管的安装方法
CN105782568B (zh) * 2016-03-29 2017-10-24 中国海洋石油总公司 立管、护管的安装方法
CN108202215A (zh) * 2016-12-20 2018-06-26 上海船厂船舶有限公司 钻井船的隔水管张紧器的安装方法
CN108590547A (zh) * 2018-03-01 2018-09-28 深圳海油工程水下技术有限公司 立管安装方法
CN108590547B (zh) * 2018-03-01 2019-09-17 深圳海油工程水下技术有限公司 立管安装方法
CN112339936A (zh) * 2020-09-17 2021-02-09 海洋石油工程股份有限公司 一种浮式生产储卸油装置立管监测***的舱内安装方法
CN112339936B (zh) * 2020-09-17 2022-07-01 海洋石油工程股份有限公司 一种浮式生产储卸油装置立管监测***的舱内安装方法
CN112943131A (zh) * 2021-02-02 2021-06-11 海洋石油工程股份有限公司 一种海洋立管拆除方法
CN112943131B (zh) * 2021-02-02 2022-07-01 海洋石油工程股份有限公司 一种海洋立管拆除方法
CN113981966A (zh) * 2021-10-29 2022-01-28 中国海洋石油集团有限公司 大尺寸锚桩水下安装方法

Also Published As

Publication number Publication date
CN103883273B (zh) 2016-05-11

Similar Documents

Publication Publication Date Title
CN103883273B (zh) 利用饱和潜水支持船上的双吊机安装立管的方法
CN107697238B (zh) 一种深水浮式多功能干树半潜平台及其海上安装方法
RU2519456C2 (ru) Система швартовки с отделенными якорными оттяжками и/или системой водоотделяющих колонн
CN103395476B (zh) 一种潜没浮筒在超深水中的安装方法
CN202828023U (zh) 设置有插拔桩装置的浅滩海区抢险作业船
CN103738477B (zh) 系泊锚腿上锚缆的更换方法
CN102852147B (zh) 导管架单扒杆双钩扶正方法
CN101850831A (zh) 一种大型远洋海工平台生活区总段吊装方法
CN1932160A (zh) 水工工程中构件安装施工的辅助装置及其使用方法
CN101475046B (zh) 基于l型漂浮平台的大型推进器水下安装工艺
CN103422483A (zh) 浅水导管架浮托安装的方法
WO2003074353A1 (en) A method for underwater transportation and installation or removal of objects at sea
CN110761315B (zh) 一种利用钻探船施工吸力锚的方法
Wang et al. Latest progress in deepwater installation technologies
CN102140789A (zh) 一种新的浅水导管架设计及安装方法
CN110155262A (zh) 一种具有自安装功能的干树半潜式平台
CN102213085A (zh) 导管架立管的安装方法
CN103373446A (zh) 导管架拆除船及拆除方法
CN106321028A (zh) 一种水下采油树的安装方法和***
CN104973225B (zh) 一种浮式生产平台
CN103963931B (zh) 大型构件半潜式水上出运安装***及施工方法
CN103552655B (zh) 一种400吨起重铺管船托管架水上安装方法
CN102661444B (zh) 海洋石油平台深水双管系的安装方法
CN101362008B (zh) 海上平台的消防泵护管的浮袋安装法
CN207631439U (zh) 大吨位同步提升***

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee after: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee after: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee after: COOEC SUBSEA TECHNOLOGY Co.,Ltd.

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee before: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee before: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee before: COOEC SUBSEA TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100010 No. 25 North Main Street, Dongcheng District, Beijing, Chaoyangmen

Patentee after: CHINA NATIONAL OFFSHORE OIL Corp.

Patentee after: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee after: CNOOC Shenzhen Ocean Engineering Technology Service Co.,Ltd.

Address before: 100010 No. 25 North Main Street, Dongcheng District, Beijing, Chaoyangmen

Patentee before: CHINA NATIONAL OFFSHORE OIL Corp.

Patentee before: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee before: COOEC SUBSEA TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder