CN103835518A - Shaped splicable protective shed - Google Patents

Shaped splicable protective shed Download PDF

Info

Publication number
CN103835518A
CN103835518A CN201410072336.9A CN201410072336A CN103835518A CN 103835518 A CN103835518 A CN 103835518A CN 201410072336 A CN201410072336 A CN 201410072336A CN 103835518 A CN103835518 A CN 103835518A
Authority
CN
China
Prior art keywords
secondary beam
girder
load
beams
tie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410072336.9A
Other languages
Chinese (zh)
Inventor
李聪
方涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201410072336.9A priority Critical patent/CN103835518A/en
Publication of CN103835518A publication Critical patent/CN103835518A/en
Pending legal-status Critical Current

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention discloses a shaped splicable protective shed. The shaped splicable protective shed comprises at least four load-bearing columns, girders are erected at the upper ends of the load-bearing columns, connection beams are arranged between the upper portions of the load-bearing columns and end portions of the girders, a plurality of bottom-layer beams are erected among the girders, a plurality of stand columns are arranged on the girders and the connection beams, a plurality of middle-layer beams and a plurality of upper-layer beams are erected on the middle sections and the upper ends of the stand columns, and color steel plates, wooden formworks and protective plates are paved on the bottom-layer beams, the middle-layer beams and the upper-layer beams respectively. The shaped splicable protective shed has the advantages of simplicity in splicing, short construction period, good protecting effect, safety and reliability.

Description

Regularization assemble type protection canopy
Technical field
The present invention relates to a kind of regularization assemble type protection canopy.
Technical background
Building site conventionally need to be set up a large amount of interim lightly constructed and simply equipped buildings and be stayed and have a rest or deposit constructional materials for chore boy, but that common lightly constructed and simply equipped building is built speed is slow, a large amount of manpower and materials are expended, also caused the waste of material, and protection effect is not good, cannot tackle the drop impact of thing of building site high level.
Summary of the invention
Technical problem to be solved by this invention is just to provide a kind of regularization assemble type protection canopy, and assembled simple and convenient, the speed of building is fast, has three-layer protection structure, and protection effect is well safer.
For solving the problems of the technologies described above, the present invention adopts following technical scheme:
Regularization assemble type protection canopy, comprise at least four load-bearing pillars, girder is set up in described load-bearing pillar upper end, described load-bearing pillar top and end of main beam are provided with tie-beam, between described girder, set up some foundation level beams, on described girder and tie-beam, be respectively equipped with some root posts, some middle level secondary beams and upper strata secondary beam are set up respectively in each interlude of described column and upper end, on described bottom secondary beam, middle level secondary beam and upper strata secondary beam, are equipped with respectively color steel, wooden form and protected apron.
Preferably, to be respectively equipped with anchor ear fastening in connection with locating to be connected described girder and bottom secondary beam and column and the junction of middle level secondary beam, upper strata secondary beam.
Preferably, described load-bearing pillar and girder, tie-beam, girder is connected by right-angle coupler respectively with column with tie-beam and bottom secondary beam.
Preferably, described color steel is provided with some middle standing pillars, and described middle standing pillar is connected with middle level secondary beam and upper strata secondary beam is connected.
Preferably, described protected apron is color-steel composite board.
The present invention adopts technique scheme, by setting up on load-bearing pillar on girder and load-bearing pillar and girder, tie-beam is set, thereby formation supporting frame, on girder and column, set up respectively bottom secondary beam, middle level secondary beam and upper strata secondary beam, assembled simple, can greatly shorten construction period, form three-layer protection structure and be equipped with respectively color steel, wooden form and protected apron on bottom secondary beam, middle level secondary beam and upper strata secondary beam, can effectively tackle the drop impact of thing of building site high level, make protection canopy better protecting effect, more safe and reliable.
Brief description of the drawings
Below in conjunction with the drawings and specific embodiments, the present invention is described further:
Fig. 1 is structural representation of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is elaborated.
As shown in Figure 1, the present invention includes at least four load-bearing pillars 1, girder 2 is set up in described load-bearing pillar upper end, described load-bearing pillar top and end of main beam are provided with tie-beam 3, between described girder, set up some foundation level beams 4, on described girder and tie-beam, be respectively equipped with some root posts 6, some middle level secondary beams 7 and upper strata secondary beam 8 are set up respectively in each interlude of described column and upper end, are equipped with respectively color steel 5, wooden form 9 and protected apron 10 on described bottom secondary beam, middle level secondary beam and upper strata secondary beam.It is fastening in connection with locating to be connected that described girder 2 and bottom secondary beam 4 and column 6 and the junction of middle level secondary beam 7, upper strata secondary beam 8 are respectively equipped with anchor ear.Described load-bearing pillar 1 and girder 2, tie-beam 3, girder is connected by right-angle coupler respectively with column 6 with tie-beam 3 and bottom secondary beam 4.Described protected apron 10 is color-steel composite board.Described color steel 5 is provided with some middle standing pillars 11, and described middle standing pillar is connected with middle level secondary beam 7 and upper end is connected with upper strata secondary beam 8.
A kind of embodiment of the present invention: adopt 1, two girder 2 of four load-bearing pillars and four tie-beams 3, its concrete installation steps are:
1) first use the screw of M12 × 30 to connect load-bearing pillar 1 and girder 2;
2) use the screw of M12 × 70 that four tie-beams 3 are connected with girder with load-bearing pillar respectively;
3) on girder, set up the bottom secondary beam 4 of some 6 meters long, then use the screw of anchor ear and M10 × 100 that bottom secondary beam 4 and girder 2 are fixed;
4) on bottom secondary beam, lay color steel 5, adopt the laying of parallel long edge direction and every color steel to overlap, coincidence length is not less than 3cm, bears down on one with the lumps of wood in color steel top;
5) by 2 meters of spacing, column 6 is installed respectively on girder and tie-beam, and column 6 lower ends and girder, tie-beam is fixed with right-angle coupler;
6) set up the middle level secondary beam 7 of some 6 meters long apart from 600mm place, bottom at column, and secondary beam two ends, middle level and column are fixed with right-angle coupler;
7) by spacing 2 meter ampere dress middle standing pillars, middle standing pillar bottom pad is located on color steel, and with right-angle coupler, middle standing pillar and middle level secondary beam 7 intersections is fixed, and completely spreads wooden form 9 on middle level secondary beam 7;
8) the upper strata secondary beam 8 of some 6 meters long is installed in column and middle standing pillar upper end, and secondary beam two ends, upper strata and column and middle standing pillar is fixed with right-angle coupler to the backplate 10 of setting up defences on secondary beam upper berth, upper strata.
Just preferred embodiment of the present invention is described above, but can not be interpreted as it is limitations on claims.The present invention is not only confined to above embodiment, and its concrete structure allows to change, and those skilled in the art can make according to the present invention various changes and distortion, only otherwise depart from spirit of the present invention, all belongs to the defined scope of claims of the present invention.

Claims (5)

1. regularization assemble type protection canopy, it is characterized in that: comprise at least four load-bearing pillars (1), girder (2) is set up in described load-bearing pillar upper end, described load-bearing pillar top and end of main beam are provided with tie-beam (3), between described girder, set up some foundation level beams (4), on described girder and tie-beam, be respectively equipped with some root posts (6), some middle level secondary beams (7) and upper strata secondary beam (8) are set up respectively in each interlude of described column and upper end, described bottom secondary beam, on middle level secondary beam and upper strata secondary beam, be equipped with respectively color steel (5), wooden form (9) and protected apron (10).
2. regularization assemble type protection canopy according to claim 1, is characterized in that: it is fastening in connection with locating to be connected that described girder (2) and bottom secondary beam (4) and column (6) and the junction of middle level secondary beam (7), upper strata secondary beam (8) are respectively equipped with anchor ear.
3. regularization assemble type protection canopy according to claim 1, it is characterized in that: described load-bearing pillar (1) and girder (2), tie-beam (3), girder is connected by right-angle coupler respectively with column (6) with tie-beam (3) and bottom secondary beam (4).
4. regularization assemble type protection canopy according to claim 1, is characterized in that: described color steel (5) is provided with some middle standing pillars (11), and described middle standing pillar is connected with middle level secondary beam (7) and upper strata secondary beam (8) is connected.
5. regularization assemble type protection canopy according to claim 1, is characterized in that: described protected apron (10) is color-steel composite board.
CN201410072336.9A 2014-02-28 2014-02-28 Shaped splicable protective shed Pending CN103835518A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410072336.9A CN103835518A (en) 2014-02-28 2014-02-28 Shaped splicable protective shed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410072336.9A CN103835518A (en) 2014-02-28 2014-02-28 Shaped splicable protective shed

Publications (1)

Publication Number Publication Date
CN103835518A true CN103835518A (en) 2014-06-04

Family

ID=50799378

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410072336.9A Pending CN103835518A (en) 2014-02-28 2014-02-28 Shaped splicable protective shed

Country Status (1)

Country Link
CN (1) CN103835518A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025336A (en) * 2018-08-09 2018-12-18 李竑靓 A kind of safety protection device for building construction and its construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0216261A (en) * 1988-07-05 1990-01-19 Sekisui House Ltd Falling-down-proof temporary handrail at opening section of stair hall or the like
DE20108086U1 (en) * 2001-05-13 2001-08-09 Probst, Bernd, 96317 Kronach Covered walkway
DE10108086A1 (en) * 2000-02-22 2001-09-13 Yamamoto Kogaku safety goggles
CN102174856A (en) * 2011-03-23 2011-09-07 中天建设集团有限公司 Finalized rebar machining shed
CN202431011U (en) * 2012-01-16 2012-09-12 中国建筑一局(集团)有限公司 Reusable tool type bolting reinforcing steel bar processing shed for construction site
CN202755678U (en) * 2012-08-07 2013-02-27 中建三局建设工程股份有限公司 Shape steel secure channel with temporary storage yard function
CN203257118U (en) * 2013-06-05 2013-10-30 江苏省苏中建设集团股份有限公司 Constructional engineering safety protection rebar protective shed
CN203701627U (en) * 2014-02-28 2014-07-09 中天建设集团有限公司 Shaped spliceable protective shed

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0216261A (en) * 1988-07-05 1990-01-19 Sekisui House Ltd Falling-down-proof temporary handrail at opening section of stair hall or the like
DE10108086A1 (en) * 2000-02-22 2001-09-13 Yamamoto Kogaku safety goggles
DE20108086U1 (en) * 2001-05-13 2001-08-09 Probst, Bernd, 96317 Kronach Covered walkway
CN102174856A (en) * 2011-03-23 2011-09-07 中天建设集团有限公司 Finalized rebar machining shed
CN202431011U (en) * 2012-01-16 2012-09-12 中国建筑一局(集团)有限公司 Reusable tool type bolting reinforcing steel bar processing shed for construction site
CN202755678U (en) * 2012-08-07 2013-02-27 中建三局建设工程股份有限公司 Shape steel secure channel with temporary storage yard function
CN203257118U (en) * 2013-06-05 2013-10-30 江苏省苏中建设集团股份有限公司 Constructional engineering safety protection rebar protective shed
CN203701627U (en) * 2014-02-28 2014-07-09 中天建设集团有限公司 Shaped spliceable protective shed

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025336A (en) * 2018-08-09 2018-12-18 李竑靓 A kind of safety protection device for building construction and its construction method
CN109025336B (en) * 2018-08-09 2020-12-01 江苏杰辰五金制品有限公司 Building construction safety protection device and construction method thereof

Similar Documents

Publication Publication Date Title
CN102146731B (en) Supporting structure for floor formwork of steel structure building and construction method
CN104213717B (en) Multi-storey building integration transformation method of construction
CN104818772A (en) Large-span long-cantilever connection structure and construction technique
CN204551491U (en) A kind of side slope protection greening structure
CN103578346B (en) A kind of simply supported girder bridge teaching simulation structure
CN203701627U (en) Shaped spliceable protective shed
CN205000463U (en) Long cantilever disjunctor structure of large -span
CN202369930U (en) Door opening type bearing framed bent device for multiplayer concrete box girder
CN103835518A (en) Shaped splicable protective shed
CN204059420U (en) Late poured band support structure
CN102418414A (en) Long-slab-span prefabricated beam floor formwork system
CN103835512B (en) Regularization assemble type protection canopy mounting method
CN203684102U (en) Supporting system for precast beam formed by connecting span erection of ramp bridge and main line bridge
CN105971117A (en) Pseudo-classic architecture steel-frame structure with box type cross-section girders
CN203755165U (en) Bracket structure for steel pipe pile
CN205445125U (en) Execute i -shaped assembled enclosure fast
CN210658013U (en) Hanging basket structure for construction of wet joints of prefabricated erected small box girder cross-line bridge
CN204326556U (en) A kind of large-span truss for both wired upper bridge constructions is safe guarding shed
CN203429557U (en) Anchor pole back beam applied to underpass bridge jacking construction
CN203531349U (en) Novel high-bearing easily-dismantled overhanging type scaffold
CN204298993U (en) A kind of large floor height frame-shear-wall structure system
CN204959794U (en) Field word roof beam pile cap and flat slab floor structure system
CN205243069U (en) Simply connect bridge
CN203174490U (en) Collision and dropping object prevention constructed facility
CN204983711U (en) Standardized escape way

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140604