CN103833164B - Sewage precipitative filter tank - Google Patents

Sewage precipitative filter tank Download PDF

Info

Publication number
CN103833164B
CN103833164B CN201410097336.4A CN201410097336A CN103833164B CN 103833164 B CN103833164 B CN 103833164B CN 201410097336 A CN201410097336 A CN 201410097336A CN 103833164 B CN103833164 B CN 103833164B
Authority
CN
China
Prior art keywords
district
sedimentation
sewage
flocculation zone
region
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410097336.4A
Other languages
Chinese (zh)
Other versions
CN103833164A (en
Inventor
顾建嗣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ENVIRONMENTAL PROTECTION ENGINEERING Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410097336.4A priority Critical patent/CN103833164B/en
Publication of CN103833164A publication Critical patent/CN103833164A/en
Application granted granted Critical
Publication of CN103833164B publication Critical patent/CN103833164B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Separation Of Suspended Particles By Flocculating Agents (AREA)

Abstract

The invention discloses a sewage precipitative filter tank which comprises a tank body, wherein a coagu-flocculation reaction region, a flocculation region and a precipitative filter region are sequentially arranged outward from the center of the tank body. The coagu-flocculation reaction region and the precipitative filter region are circular unit treatment regions with sealed bottom faces. The flocculation region is a circular unit treatment region with an opened bottom face and is arranged on the peripheral side of the coagu-flocculation reaction region in a sleeving manner, the precipitative filter region is arranged on the peripheral side of the flocculation region in a sleeving manner, a water inlet pipe for introducing sewage to be treated is arranged on the lower part of the coagu-flocculation reaction region in a through manner, the upper part of the coagu-flocculation reaction region is communicated and connected with the upper part of the flocculation region, the lower part of the flocculation region is communicated and connected with the precipitative filter region, and a circular fiber filter tank is arranged around the upper part of the precipitative filter region. The filter tank disclosed by the invention realizes the purpose that the whole precipitative filter system is reasonable in arrangement, small in occupied area, small in head loss, high in effective treatment volume of the water pool, convenient for operation and management and economic and effective.

Description

Settlement of sewage filtering basin
Technical field
The technical field of the sewage disposal of the present invention involved by civil engineering work and environmental engineering, particularly relates to a kind of settlement of sewage filtering basin of sewage work's advanced treatment.
Background technology
Along with country is to the raising of sewage work's discharge standard-required, most newly-built sewage work all will reach the emission standard of one-level A, many built sewage works also want upgrading, reach the emission standard of one-level A, therefore in design and construction process, advanced treatment of wastewater facility is all related to, at present, advanced treatment of wastewater adopts usually to the water outlet of secondary sedimentation basins through dosing coagulating sedimentation and after filtering, the pollutent such as suspended substance, phosphorus in further removal sewage, discharges after reaching one-level emission standard A.
Advanced treatment of wastewater coagulating sedimentation filtering system of the prior art is primarily of the composition such as coagulative precipitation tank and filter tank.Wherein, coagulative precipitation tank has dosing mixing zone, flocculation zone, settling region, mud scraper, sludge recirculation system etc. usually, be by dosing coagulant and the organic pollution materials in sewage fully mix contact and and then by the place of its mud-water separation.The effect of dosing mixing zone, flocculation zone coagulating agent and organic pollution materials is fully mixed contact, and forms cotton-shaped particle; The effect of settling region makes mud-water separation, and after process, sewage is discharged by effluent weir; The effect of mud scraper is that the mud of precipitation is effectively discharged; The effect of sludge recirculation system be part is discharged sludge reflux to reaction zone, improve mud mixing contact effect.Filter tank is conventional is filtering cloth filtering pool and sand filter, because filtering cloth filtering pool floor space is little, head loss is few, applies more.Filtering cloth filtering pool is made up of filter cloth dish and back-purge system, and the effect of filter cloth dish is filtered sewage, and the residue on filter cloth is removed in the effect of back-purge system, keeps the clean of filter cloth.After the process of dosing coagulating sedimentation filtering system, in sewage, the pollution substance such as SS, P all can reach one-level emission standard A.
In traditional wastewater coagulating sedimentation filtering system, coagulating sedimentation and to filter be in 2 different structures, each pond inner and between pipe duct or aperture connect the head loss produced generally can more than 2 meters, sewage work's gross head loss is made to increase a lot, in the project of upgrading and rebuilding of particularly existing sewage work, because original Tail water reuse reserves head seldom, often need to promote for 2 times.
In the wastewater coagulating sedimentation pond of routine, to need the partial sludge of discharging through pump reflux to flocculation zone, to improve sludge concentration in pond, ensure sludge settling effect, effluent weir will have certain free-electron model height, prevents subsequent disposal or discharge from affecting sedimentation effect.
In the filtering cloth filtering pool of routine, filter type goes out in exceptionally entering and enters to go out 2 kinds with interior, the corresponding employing vacuum take-off of filter cloth back flushing and hydrodynamic cleaning two kinds, vacuum take-off due to the sealing of suction nozzle outer rim and filter cloth more difficult, cause back flushing water loss larger, hydrodynamic cleaning requires to suspend the filtration being rinsed part when rinsing, and reduces filtration useful area.
Several situation can cause cost of sewage disposal to increase above, need certain floor space, special in existing sewage work upgrading, Tail water reuse nervous to some lands used reserves the few project of head, traditional more difficult adaptation of wastewater coagulating sedimentation filtering system.
Therefore, those skilled in the art is devoted to develop a kind of settlement of sewage filtering basin, realizes that floor space is little, head loss is little, the effective processing volume in pond is high and be convenient to the object of operational management.
Summary of the invention
Because the above-mentioned deficiency of prior art, the present invention proposes a kind of settlement of sewage filtering basin, realizes that floor space is little, head loss is little, the effective processing volume in pond is high and be convenient to the object of operational management.
For achieving the above object, the invention provides a kind of settlement of sewage filtering basin, comprise pond body, outwards coagulating district is furnished with successively at the center of described pond body, flocculation zone and sedimentation and filtration district, described coagulating district and described sedimentation and filtration district are the annular unit treatment zone of sealing bottom surface, described flocculation zone is uncovered annular unit treatment zone, bottom surface, described flocculation zone is set in outside the surrounding in described coagulating district, described sedimentation and filtration district is set in outside the surrounding of described flocculation zone, the bottom conducting in described coagulating district is provided with one for importing the water inlet pipe for the treatment of sewage, the top in described coagulating district and the upper guide of described flocculation zone are led to and are connect, the bottom of described flocculation zone is connected with described sedimentation and filtration district conducting, the top in described sedimentation and filtration district is arranged with the circular fiber filter vat for filtering the water outlet in described sedimentation and filtration district, described settlement of sewage filtering basin also comprise collect for pool bottom sludge, water surface scum silica frost is removed, the mud scraper of the back flushing of circular fiber filter vat and sludge reflux.
As a further improvement on the present invention, described mud scraper comprises rotation axis, cleaning shoe, skimming plate, vacuum pump, filter cloth back flushing suction nozzle and mud air lift return line, described rotation axis is plugged in the center of described pond body, described cleaning shoe is connected to the bottom of described rotation axis, described skimming plate is connected to the top of described rotation axis, described mud air lift return line and described vacuum pump are all arranged on described rotation axis, described mud air lift return line one end conducting is connected to the bottom in described sedimentation and filtration district, the other end conducting is connected on described flocculation zone, described mud air lift return line is connected with described vacuum pump, for the sludge lifting bottom described sedimentation and filtration district is back in described flocculation zone, described filter cloth back flushing suction nozzle is arranged towards described circular fiber filter vat, described filter cloth back flushing suction nozzle is connected with described vacuum pump, for carrying out vacuum take-off back flushing to described circular fiber filter vat, described cleaning shoe, skimming plate, mud air lift return line, vacuum pump and filter cloth back flushing suction nozzle all move in a circle with described rotation axis.
As a further improvement on the present invention, be formed with cloth tank inwardly on the top of described flocculation zone, described mud air lift return line is derived in mud to described cloth tank.
As a further improvement on the present invention, the upper periphery side of described pond body is arranged with the effluent trough of an annular, and the water conducting after filtration is connected in described effluent trough by pipeline by described circular fiber filter vat.
As a further improvement on the present invention, the orifice plate formed side by side by many inclined tubes is furnished with in the middle part of described sedimentation and filtration district.
As a further improvement on the present invention, described pond body is circular pond body, and described coagulating district, flocculation zone and sedimentation and filtration district are circular cell processing district, and described pond body, coagulating district, flocculation zone and sedimentation and filtration district are arranged concentric.
As a further improvement on the present invention, described circular fiber filter vat is annular, and described circular fiber filter vat surrounding inner side-wall is coated with fiber filter cloth, and sewage is undertaken filtering rear discharge by entering in groove through described fiber filter cloth outside groove.
As a further improvement on the present invention, the arranged outside of described pond body has a blowoff chamber, and the bottom in described sedimentation and filtration district is provided with sludge pipe, and described sludge pipe is derived in mud to described blowoff chamber.
As a further improvement on the present invention, the bottom surface of described flocculation zone is extended in the bottom in described coagulating district, and the part of extending bottom surface, described flocculation zone in described coagulating district is arranged with water distribution baffle plate.
Settlement of sewage filtering basin of the present invention solve traditional wastewater sedimentation and filtration system due to the problem that land used is many, working cost is high that process structures are many, head loss causes greatly, realize whole sedimentation and filtration system reasonable Arrangement, floor space is little, head loss is little, the effective processing volume in pond is high, be convenient to operational management and cost-effective goal of the invention, concrete beneficial effect is as follows:
(1) the present invention embodies pond type and arranges the technical characterstic combined with sewage disposal waterpower flow process.Volume, flow velocity etc. that coagulating sedimentation filters each processing unit require different, and by filtering position and the shape of each processing unit according to waterpower flow process reasonable Arrangement coagulating sedimentation, make pool inner water power smooth, water distribution is even, improves the effective processing volume in pond.
(2) the present invention embodies the technical characterstic of Sewage treatment systems integration.By circular fiber filter vat being arranged in the clear water floor on top, sedimentation and filtration district, muddy water gravity separation and filter-cloth filtering are combined, change precipitation and filter the sewage disposal traditional way divided in tripe systems building, both the problem that filtering cloth filtering pool needs bottom spoil disposal had been solved, farthest reduce head loss again, save land used.
(3) the present invention embodies the technical characterstic that sewage treatment process will be convenient to operational management.Have employed vacuum take-off backwash mode, avoid the impact of flushing process on precipitation, achieve the operation of circular fiber filter vat continuous high-efficient.Mud air lift return line is set in pond, improves sludge reflux method, realize mud at pond internal reflux.
(4) the present invention embodies the technical characterstic that Modern sewage treatment process combines with equipment and technology progress.The process characteristic of coagulating sedimentation filtering basin can utilize mud scraper to be easy to realize the required function that mud collection, filter cloth back flushing, sludge reflux etc. ensure Sewage treatment systems safety, reliability service.
(5) present invention reduces head loss and saved land used, water outlet SS ﹤ 10mg/l, efficiently solving the problem of second lift and the land used anxiety often occurred in sewage upgrading, reduce working cost and construction investment.
Be described further below with reference to the technique effect of accompanying drawing to design of the present invention, concrete structure and generation, to understand object of the present invention, characteristic sum effect fully.
Accompanying drawing explanation
Fig. 1 is that the facade of the present embodiment settlement of sewage filtering basin arranges schematic diagram.
Fig. 2 is the floor plan schematic diagram of the present embodiment settlement of sewage filtering basin.
Embodiment
As depicted in figs. 1 and 2, the present embodiment proposes a kind of settlement of sewage filtering basin, comprise pond body 1, outwards coagulating district 2 is furnished with successively at the center of pond body 1, flocculation zone 3 and sedimentation and filtration district 4, coagulating district 2 and sedimentation and filtration district 4 are the annular unit treatment zone of sealing bottom surface, flocculation zone 3 is uncovered annular unit treatment zone, bottom surface, flocculation zone 3 is set in outside the surrounding in coagulating district 2, sedimentation and filtration district 4 is set in outside the surrounding of flocculation zone 3, the bottom conducting in coagulating district 2 is provided with one for importing the water inlet pipe 5 for the treatment of sewage, the top in coagulating district 2 and the upper guide of flocculation zone 3 are led to and are connect, the bottom of flocculation zone 3 is connected with sedimentation and filtration district 4 conducting, the top in sedimentation and filtration district 4 is arranged with the circular fiber filter vat 6 for filtering the water outlet in sedimentation and filtration district 4.
Concrete, as shown in the figure, the settlement of sewage filtering basin of the present embodiment also comprise collect for pool bottom sludge, water surface scum silica frost is removed, the mud scraper 7 of the back flushing of circular fiber filter vat and sludge reflux.Mud scraper 7 comprises rotation axis 8, cleaning shoe 9, skimming plate 10, vacuum pump (not shown), filter cloth back flushing suction nozzle 12 and mud air lift return line 13, rotation axis 8 is plugged in the center of pond body 1, cleaning shoe 9 is connected to the bottom of rotation axis 8, skimming plate 10 is connected to the top of rotation axis 8, mud air lift return line 13 and vacuum pump are all arranged on rotation axis 8, one end conducting of mud air lift return line 13 is connected to the bottom in sedimentation and filtration district 4, the other end conducting is connected on flocculation zone 3, mud air lift return line 13 is connected with vacuum pump (not shown), for the sludge lifting bottom sedimentation and filtration district 4 is back in flocculation zone 3, filter cloth back flushing suction nozzle 12 is arranged towards circular fiber filter vat 6, filter cloth back flushing suction nozzle 12 is connected with described vacuum pump, for carrying out vacuum take-off back flushing to circular fiber filter vat 6, cleaning shoe 9, skimming plate 10, mud air lift return line 13, no matter vacuum pump and filter cloth back flushing suction nozzle 12 be direct or indirect be arranged on rotation axis 8, all move in a circle with rotation axis 8.
Exemplary, the present embodiment is formed with cloth tank 14 inwardly on the top of flocculation zone 3, and mud air lift return line 13 derives mud in cloth tank 14.The effluent trough 15 of an annular is arranged with in the upper periphery side of pond body 1, water conducting after filtration is connected in effluent trough 15 by pipeline 16 by circular fiber filter vat 6, circular fiber filter vat 6 is in annular, circular fiber filter vat 6 surrounding inner side-wall is coated with fiber filter cloth, as illustrated by the arrows in fig. 1, sewage is undertaken filtering rear discharge by entering in groove through described fiber filter cloth outside groove.The present embodiment sets up filter vat bracing frame 17 in the clear water floor on top, sedimentation and filtration district 4, circular fiber filter vat 6 is three, as shown in the figure, be arranged on filter vat bracing frame 17, circular fiber filter vat 6 is spaced a distance and arranges the conducting of a pipeline 16 to effluent trough 15.
As shown in Figure 1, the present embodiment is furnished with the orifice plate 18 formed side by side by many inclined tubes in the middle part of sedimentation and filtration district 4, and sedimentation and filtration district 4 bottom sewage is upwardly flow through orifice plate 18.
As shown in the figure, the pond body 1 of the present embodiment is circular pond body, and coagulating district 2, flocculation zone 3 and sedimentation and filtration district 4 are circular cell processing district, and pond body 1, coagulating district 2, flocculation zone 3 and sedimentation and filtration district 4 are arranged concentric.The bottom surface of flocculation zone 3 is extended in the bottom in coagulating district 2, and the part of extending bottom surface, flocculation zone 3 in coagulating district 2 is arranged with water distribution baffle plate 19.
Also be provided with a blowoff chamber 20 outside the pond body 1 of the present embodiment, the bottom in sedimentation and filtration district 4 is provided with sludge pipe 21, and sludge pipe 21 derives mud in blowoff chamber 20, is discharged by blowoff chamber 20.
The present embodiment is in conjunction with the sewage treatment process feature of coagulative precipitation tank and filtering cloth filtering pool, be expelled to by effluent weir the traditional arrangement mode that fiber filter cloth in filter tank carries out filtering through precipitation according to sewage, change coagulating sedimentation and filter completely isolated pattern, directly circular fiber filter vat is replaced effluent weir, settlement of sewage is filtered complete in 1 structures, greatly reduce head loss, reduce sewage treatment structure, solve traditional wastewater coagulating sedimentation filtering system structures more, the problem that head loss is larger.Change the mode of traditional sludge pond in external reflux simultaneously, by arranging the mud air lift return line in the body of pond, directly by the sludge reflux at the bottom of pond to flocculation zone, reduce lift height, saved power consumption.The circular fiber filter vat being arranged in exhalant region goes out filtered model in adopting and entering outward, adopts the method for vacuum take-off back flushing.And 1 multi-functional mud scraper is set in pond, bear pool bottom sludge collection, the back flushing of filter cloth and the removing of water surface scum silica frost by it.Exemplary, embody rule is as follows:
1, the intensive development trend of sewage disposal complied with by the settlement of sewage filtering basin of the present embodiment, is novel integrated sewage water further treatment technique.From Fig. 1 and Fig. 2, the mixed flocculation-precipitation-filtration process flow process commonly used in sewage disposal completes by the present embodiment in 1 pond.The pond body 1 of the present embodiment is a circular pond body, these 3 annular unit treatment zones of coagulating district 2, flocculation zone 3 and sedimentation and filtration district 4 are divided in pond body 1, sewage enters from pond body 1 central lower, discharges after coagulation, precipitation, filtration from the effluent trough 15 outside pond body 1.Bottom the sedimentation and filtration district 4 of the present embodiment, (i.e. the bottom of pond body 1) is mud district, and after precipitation, mud is entered in blowoff chamber 20 by sludge pipe 21 after collecting.Needed for 3 annular unit treatment zones, volume is from small to large, reasonably to be formed between each cellular zone waterpower by technical process and required flow rate from pool center be up/down perforation nature to surrounding diffusion, discharge after top, sedimentation and filtration district 4 is filtered.
2, one of the advantage of the sedimentation and filtration ditch of the present embodiment instead of conventional effluent weir with circular fiber filter vat 6, from Fig. 1 and Fig. 2, circular fiber filter vat 6 is in circular, be arranged in the clear water floor on top, sedimentation and filtration district 4, make direct filtration after settlement of sewage, sedimentation and filtration two kinds of functions are united two into one, completes simultaneously.Circular fiber filter vat 6 is fixed in pond body 1, and its number of turns can be determined, as the present embodiment is just provided with 3 ring shape fiber filter grooves according to the process water yield.The mode gone out in entering outside circular fiber filter vat 6 adopts, water outlet discharge after the effluent trough 15 of pond body 1 is collected.
3, the present embodiment is in order to ensure the filtration efficiency of circular fiber filter vat 6 and normally work, have employed vacuum pump and filter cloth back flushing suction nozzle 12 carries out vacuum take-off back flushing, vacuum pump and filter cloth back flushing suction nozzle 12 are arranged on the rotation axis 8 of mud scraper 7 by the present embodiment, filter cloth back flushing suction nozzle 12 is arranged towards circular fiber filter vat 6, and move in a circle with rotation axis 8, realize circling along circular fiber filter vat 6, and according to the stopping state of fiber filter cloth, carry out back flushing.Siphoned away by suspended substance outside circular fiber filter vat 6 by suction, avoid the impact of back flushing on fluidised form, ensure that settling stability, make filtration and rinse in continuity, the mixed solution of back flushing suction directly drains into flocculation zone 3.The quantity of filter cloth back flushing suction nozzle 12, can determine as required.
4, the middle part in the sedimentation and filtration district 4 of the present embodiment arranges orifice plate 18, in pond body 1, be provided with mud air lift return line 13, see Fig. 1, by direct for the pool bottom sludge in sedimentation and filtration district 4 internal reflux to flocculation zone 3, change the mode of traditional sludge in pond external reflux, reduce power consumption.The quantity of mud air lift return line 13 can be arranged as required, and as the present embodiment is just provided with 2 mud air lift return lines 13, mud air lift return line 13 is arranged on rotation axis 8, circles with rotation axis 8.As shown in Figure 1, be formed with cloth tank 14 inwardly on the top of flocculation zone 3, mud air lift return line 13 derives mud in cloth tank 14, makes the mud of backflow evenly enter flocculation zone 3.
1 multi-functional mud scraper 7 is established in the pond body 1 of 5, the present embodiment, this equipment adopts peripheral-traction mode, drive rotation axis 8 to rotate, cleaning shoe 9, skimming plate 10, mud air lift return line 13, vacuum pump and filter cloth back flushing suction nozzle 12 move in a circle under the effect of rotation axis 8.
Shown in the arrow (right part effluent stream is to not shown) of the left part 6, in composition graphs 1, the sewage of the present embodiment enters from the water inlet pipe 5 of bottom, coagulating district 2, flocculation zone 3 is ploughed under on top, coagulating district 2, then sedimentation and filtration district 4 is flowed into from bottom, flocculation zone 3, sewage after precipitation, filters rear discharge by the circular fiber filter vat 6 being located at clear water zone, top, sedimentation and filtration district 4 from bottom to top.
More than describe preferred embodiment of the present invention in detail.Should be appreciated that those of ordinary skill in the art just design according to the present invention can make many modifications and variations without the need to creative work.Therefore, all technician in the art, all should by the determined protection domain of claims under this invention's idea on the basis of existing technology by the available technical scheme of logical analysis, reasoning, or a limited experiment.

Claims (9)

1. settlement of sewage filtering basin, comprise pond body, it is characterized in that: be outwards furnished with coagulating district successively at the center of described pond body, flocculation zone and sedimentation and filtration district, described coagulating district and described sedimentation and filtration district are the annular unit treatment zone of sealing bottom surface, described flocculation zone is uncovered annular unit treatment zone, bottom surface, described flocculation zone is set in outside the surrounding in described coagulating district, described sedimentation and filtration district is set in outside the surrounding of described flocculation zone, the bottom conducting in described coagulating district is provided with one for importing the water inlet pipe for the treatment of sewage, the top in described coagulating district and the upper guide of described flocculation zone are led to and are connect, the bottom of described flocculation zone is connected with described sedimentation and filtration district conducting, the top in described sedimentation and filtration district is arranged with the circular fiber filter vat for filtering the water outlet in described sedimentation and filtration district, described settlement of sewage filtering basin also comprise collect for pool bottom sludge, water surface scum silica frost is removed, the mud scraper of the back flushing of circular fiber filter vat and sludge reflux.
2. settlement of sewage filtering basin as claimed in claim 1, it is characterized in that: described mud scraper comprises rotation axis, cleaning shoe, skimming plate, vacuum pump, filter cloth back flushing suction nozzle and mud air lift return line, described rotation axis is plugged in the center of described pond body, described cleaning shoe is connected to the bottom of described rotation axis, described skimming plate is connected to the top of described rotation axis, described mud air lift return line and described vacuum pump are all arranged on described rotation axis, described mud air lift return line one end conducting is connected to the bottom in described sedimentation and filtration district, the other end conducting is connected on described flocculation zone, described mud air lift return line is connected with described vacuum pump, for the sludge lifting bottom described sedimentation and filtration district is back in described flocculation zone, described filter cloth back flushing suction nozzle is arranged towards described circular fiber filter vat, described filter cloth back flushing suction nozzle is connected with described vacuum pump, for carrying out vacuum take-off back flushing to described circular fiber filter vat, described cleaning shoe, skimming plate, mud air lift return line, vacuum pump and filter cloth back flushing suction nozzle all move in a circle with described rotation axis.
3. settlement of sewage filtering basin as claimed in claim 2, is characterized in that: be formed with cloth tank inwardly on the top of described flocculation zone, and described mud air lift return line is derived in mud to described cloth tank.
4. settlement of sewage filtering basin as claimed in claim 1 or 2, is characterized in that: the upper periphery side of described pond body is arranged with the effluent trough of an annular, and the water conducting after filtration is connected in described effluent trough by pipeline by described circular fiber filter vat.
5. settlement of sewage filtering basin as claimed in claim 1 or 2, is characterized in that: be furnished with the orifice plate formed side by side by many inclined tubes in the middle part of described sedimentation and filtration district.
6. settlement of sewage filtering basin as claimed in claim 1 or 2, it is characterized in that: described pond body is circular pond body, described coagulating district, flocculation zone and sedimentation and filtration district are circular cell processing district, and described pond body, coagulating district, flocculation zone and sedimentation and filtration district are arranged concentric.
7. settlement of sewage filtering basin as claimed in claim 6, it is characterized in that: described circular fiber filter vat is annular, described circular fiber filter vat surrounding inner side-wall is coated with fiber filter cloth, and sewage is undertaken filtering rear discharge by entering in groove through described fiber filter cloth outside groove.
8. settlement of sewage filtering basin as claimed in claim 1 or 2, it is characterized in that: the arranged outside of described pond body has a blowoff chamber, the bottom in described sedimentation and filtration district is provided with sludge pipe, and described sludge pipe is derived in mud to described blowoff chamber.
9. settlement of sewage filtering basin as claimed in claim 1 or 2, it is characterized in that: the bottom surface of described flocculation zone is extended in the bottom in described coagulating district, and the part of extending bottom surface, described flocculation zone in described coagulating district are arranged with water distribution baffle plate.
CN201410097336.4A 2014-03-17 2014-03-17 Sewage precipitative filter tank Expired - Fee Related CN103833164B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410097336.4A CN103833164B (en) 2014-03-17 2014-03-17 Sewage precipitative filter tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410097336.4A CN103833164B (en) 2014-03-17 2014-03-17 Sewage precipitative filter tank

Publications (2)

Publication Number Publication Date
CN103833164A CN103833164A (en) 2014-06-04
CN103833164B true CN103833164B (en) 2015-04-22

Family

ID=50797110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410097336.4A Expired - Fee Related CN103833164B (en) 2014-03-17 2014-03-17 Sewage precipitative filter tank

Country Status (1)

Country Link
CN (1) CN103833164B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106698623A (en) * 2017-03-01 2017-05-24 合肥智慧龙图腾知识产权股份有限公司 Flocculation and sedimentation device for sewage
CN106884474B (en) * 2017-04-02 2018-01-12 双峰县九峰农机制造科技有限公司 A kind of sewage precipitation device
CN109336234A (en) * 2018-11-30 2019-02-15 贵州楚天两江环境股份有限公司 A kind of efficient dephosphorization technique

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2376248C1 (en) * 2008-07-08 2009-12-20 Государственное образовательное учреждение высшего профессионального образования Казанский государственный технический университет им. А.Н. Туполева Method of removing suspended particles from liquids and device for removing suspended particles from liquids
CN102010043A (en) * 2010-11-01 2011-04-13 江苏新纪元环保有限公司 Combined type water clarifying device
CN202297252U (en) * 2011-09-01 2012-07-04 上海润德环境工程有限公司 Low-energy-consumption integrated nitrogen and phosphorus recycling device
CN103232099A (en) * 2013-04-23 2013-08-07 中国市政工程西北设计研究院有限公司 Integrated water purifying facility for centralized water supply to villages and towns
CN203715419U (en) * 2014-03-17 2014-07-16 顾建嗣 Sewage sedimentation filtration tank

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2376248C1 (en) * 2008-07-08 2009-12-20 Государственное образовательное учреждение высшего профессионального образования Казанский государственный технический университет им. А.Н. Туполева Method of removing suspended particles from liquids and device for removing suspended particles from liquids
CN102010043A (en) * 2010-11-01 2011-04-13 江苏新纪元环保有限公司 Combined type water clarifying device
CN202297252U (en) * 2011-09-01 2012-07-04 上海润德环境工程有限公司 Low-energy-consumption integrated nitrogen and phosphorus recycling device
CN103232099A (en) * 2013-04-23 2013-08-07 中国市政工程西北设计研究院有限公司 Integrated water purifying facility for centralized water supply to villages and towns
CN203715419U (en) * 2014-03-17 2014-07-16 顾建嗣 Sewage sedimentation filtration tank

Also Published As

Publication number Publication date
CN103833164A (en) 2014-06-04

Similar Documents

Publication Publication Date Title
CN103922506B (en) Integrated complete equipment for water quality purification treatment
CN109534553A (en) A kind of processing system and method for high suspended matter mine water
CN103833164B (en) Sewage precipitative filter tank
CN201890788U (en) Double-layered pressure type oil remover
CN111450616A (en) Efficient activated sludge interception type secondary sedimentation tank process system with coupling depth filtering function
CN104841200A (en) Swirling flow type solid-liquid separation device
CN203625180U (en) Mechanical flocculation sewage treatment sediment filter tank
CN204659688U (en) A kind of washing system for construction site vehicle
CN202785864U (en) Two-way water intake high-density clarification tank
CN110204103B (en) Suspension medium layer filtering system based on hydraulic fluidization layering
CN204159086U (en) A kind of Continuous Flow sand filter
CN103922541B (en) For the full suspended active sludge integrated treatment unit of urban wastewater treatment
CN105329994A (en) Water treatment clarification
CN201890787U (en) Double-layered pressure type integrated deoiler
CN203715419U (en) Sewage sedimentation filtration tank
CN203794750U (en) Complete-suspension activated sludge process integrated treatment device used for town sewage treatment
CN203593679U (en) Magnetized degreaser
CN101891263B (en) Continuously washing sand filtering device with flow-stabilizing and sand-settling functions
CN209668931U (en) A kind of multistage intermediate water reuse system
CN204865133U (en) Sewage treatment sand filter system
CN205516881U (en) Strengthen superposed layer spiral vertical flow settling pond
CN203355389U (en) Underflow type clarifying pond
CN203890153U (en) Complete set of water quality purification treatment all-in-one equipment
CN107485922A (en) A kind of sedimentation and filtration ditch
CN105457374A (en) Fiber rotary disk filter and sewage treatment method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI ZEXI ENVIRONMENTAL PROTECTION ENGINEERING

Free format text: FORMER OWNER: GU JIANSI

Effective date: 20150902

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150902

Address after: 200060, Shanghai, Putuo District, No. 13, building 97, room E, Changshou Road

Patentee after: Shanghai Environmental Protection Engineering Co., Ltd.

Address before: 200060, room 10, No. 662, Lane 802, Anyuan Road, Shanghai, Putuo District

Patentee before: Gu Jiansi

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150422

Termination date: 20190317

CF01 Termination of patent right due to non-payment of annual fee