CN103821381B - A kind ofly make the molten building renovation technique be integrated of new and old concrete - Google Patents
A kind ofly make the molten building renovation technique be integrated of new and old concrete Download PDFInfo
- Publication number
- CN103821381B CN103821381B CN201410013060.7A CN201410013060A CN103821381B CN 103821381 B CN103821381 B CN 103821381B CN 201410013060 A CN201410013060 A CN 201410013060A CN 103821381 B CN103821381 B CN 103821381B
- Authority
- CN
- China
- Prior art keywords
- concrete
- old concrete
- template
- new
- integrated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The present invention relates to and a kind ofly make the molten building renovation technique be integrated of new and old concrete, its processing step is, first carries out intensity detection, destroys damage or the concrete that burns out of fire, measure the old concrete strength of residue with Schmidt hammer, residue concrete strength >=1OO# (C1O) namely can be used as to strengthen mending repairs foundation admittedly; Then carry out calcium carbide detection, then carry out doing template, carry out template by size, one side will be created smooth in order to the demoulding inwards, and ensure the quality of products for convenience of operation, column template should be divided into two to three joints; Carry out pickling again, wipe the concrete surface of staggering with wet rag clear, dip in pickle with bamboo band handle hairbrush after dry and be evenly applied to old concrete surface; Again smash pouring concrete, first installation form can be smash and water, and sulfuric acid concrete is wanted to smash while insert real, smashes and tamps from charging above to during capital; Finally carry out form removal, concrete can remove template after smashing and watering 2 days, need not showering curing.In sum, pickling technical economic benefit, social benefit and ecological benefits are remarkable, and technology maturation is practical, the feature that DEVELOPMENT PROSPECT is wide.
Description
Technical field
The invention belongs to concrete structure reforming technology technical field, relate to and a kind ofly make the molten building renovation technique be integrated of new and old concrete.
Background technology
Modern building be unable to do without concrete.Concrete invention and use existing more than 100 year history, brings splendidness to modern architecture industry.But the technical barrier that long-standing problem new-old concrete can not moltenly be integrated, fails effectively to be solved all the time.To maintenance and renovation old building, generally all can make following construction processing: 1. suitably improve concrete strength, to increase adhesion stress; 2. by old concrete surface turk, to increase adhesive power; 3. old concrete is cleaned in cleaning, new-old concrete is contacted as far as possible tightr.
Above-mentioned measure has certain booster action, but fundamentally can not solve new-old concrete and to combine closely problem, will unclamp through new and old concrete after a while, peel off, come off.Trace it to its cause, be concrete ramming after three months, its inside will carbonize, and generates calcium carbide.Calcium carbide does not affect concrete intensity, but it can form separation layer at new-old concrete interface, has a strong impact on both combining closely, brings potential potential safety hazard to maintenance and renovation engineering.
Summary of the invention
For overcoming above-mentioned technical disadvantages, the invention provides one to repair most of obsolete building, the calcium carbide of old concrete interface can be removed, make that new-old concrete is molten to be integrated, what fundamentally can solve that new-old concrete combines closely problem makes the molten pickle that is integrated of new and old concrete and using method thereof simultaneously
.
The present invention solves the technical method that its technical problem adopts: a kind ofly make the molten building renovation technique be integrated of new and old concrete, and its processing step is:
The first step: intensity detection, destroys damage or the concrete that burns out of fire, measures the old concrete strength of residue with Schmidt hammer, and residue concrete strength >=1OO# (C1O) namely can be used as to strengthen mending repairs foundation admittedly;
Second step: calcium carbide detects, the old concrete of the part that staggers or destroy the old concrete of damage, dips in upper phenolphthalein liquid with cotton fibre and is applied to the old concrete of residue on the surface, show the old concrete of pink expression and carbonize, should carry out pickling after 1 minute;
3rd step: do template, carry out template by size, one side will be created smooth in order to the demoulding inwards, and ensure the quality of products for convenience of operation, column template should be divided into two to three joints;
4th step: pickling, wipes the concrete surface (not rinsing with water) of staggering clear with wet rag, dips in pickle and is evenly applied to old concrete surface, require once to complete, do not repeat after dry with bamboo band handle hairbrush;
5th step: smash pouring concrete, first installation form can be smash and water, sulfuric acid concrete wants on-the-spot artificial hand to fry, and now fries existing use, how many and how much fries, smash while insert real, namely install second section template and smash after having smash first segment and water, the one side of Section of three template will stay a breach (the top board place of post), finally fills up from breach charging, or from boring a hole upstairs, smashing and tamping from charging above to during capital;
6th step: form removal, concrete can remove template after smashing and watering 2 days, need not showering curing.
Its component of pickle and the weight ratio of described 4th step are: 27% commercial sulphuric acid 1.15 ~ 1.5, clean water 100.
Described 5th step sulfuric acid concrete 1m
3materials: 400 grade cement with 402 kilograms, the cobble smashed or granite stones (particle diameter 10mm) 0.82m
3, medium sand 0.63m
3, clean water 200 kilograms, 27% commercial sulphuric acid 2.21 kilograms.
Described sulfuric acid should load compared with heavy sheet glass bottle or solid plastic ware, and can not use ironware, operating personnel should be with safety goggles, mouth mask, Rubber gloves, wear anti-skidding rubber overshoes, in order to avoid burn.
Sulfuric acid, when preparing, should be poured into water by described pickle and sulfuric acid concrete slowly, with falling with stirring, water can not be poured in sulfuric acid, in order to avoid set off an explosion.
Rubble in described sulfuric acid concrete with the cobble smashed or granite, must forbid limestone.
Described pickle and can not disorderly falling everywhere for the surplus waste water of above-mentioned technique, care should be used to pours sewer into.
During the residual building of described first step detection of fires, for safety, should successively prick to shore in advance and prop up, make provision against emergencies.
Described first step intensity detection, successively should divide flooring, wall, post subregion multi-site determination, ensures that data are representative.
The invention has the beneficial effects as follows: 1, use this technique can repair the building of most of obsolete building, particularly concrete on fire; 2, can significantly reduce costs, the shortening time; 3, applying after the form removal of this technology need not trickle maintenance, can saving water resource and the energy, for the region that freshwater resources lack, has great meaning; In sum, pickling technical economic benefit, social benefit and ecological benefits are remarkable, and technology maturation is practical, the feature that DEVELOPMENT PROSPECT is wide.
Detailed description of the invention
Below in conjunction with embodiment, the present invention is further described.
Make the molten building renovation technique be integrated of new and old concrete, its processing step is:
The first step: intensity detection, destroys damage or the concrete that burns out of fire, measures the old concrete strength of residue with Schmidt hammer, and residue concrete strength >=1OO# (C1O) namely can be used as to strengthen mending repairs foundation admittedly;
Second step: calcium carbide detects, the old concrete of the part that staggers or destroy the old concrete of damage, dips in upper phenolphthalein liquid with cotton fibre and is applied to the old concrete of residue on the surface, show the old concrete of pink expression and carbonize, should carry out pickling after 1 minute;
3rd step: do template, carry out template by size, one side will be created smooth in order to the demoulding inwards, and ensure the quality of products for convenience of operation, column template should be divided into two to three joints;
4th step: pickling, wipes the concrete surface (not rinsing with water) of staggering clear with wet rag, dips in pickle and is evenly applied to old concrete surface, require once to complete, do not repeat after dry with bamboo band handle hairbrush;
5th step: smash pouring concrete, first installation form can be smash and water, sulfuric acid concrete wants on-the-spot artificial hand to fry, and now fries existing use, how many and how much fries, smash while insert real, namely install second section template and smash after having smash first segment and water, the one side of Section of three template will stay a breach (the top board place of post), finally fills up from breach charging, or from boring a hole upstairs, smashing and tamping from charging above to during capital;
6th step: form removal, concrete can remove template after smashing and watering 2 days, need not showering curing.
Its component of pickle and the weight ratio of described 4th step are: 27% commercial sulphuric acid 1.15 ~ 1.5, clean water 100.
Described 5th step sulfuric acid concrete 1m
3materials: 400 grade cement with 402 kilograms, the cobble smashed or granite stones (particle diameter 10mm) 0.82m
3, medium sand 0.63m
3, clean water 200 kilograms, 27% commercial sulphuric acid 2.21 kilograms.
Described sulfuric acid should load compared with heavy sheet glass bottle or solid plastic ware, and can not use ironware, operating personnel should be with safety goggles, mouth mask, Rubber gloves, wear anti-skidding rubber overshoes, in order to avoid burn.
Sulfuric acid, when preparing, should be poured into water by described pickle and sulfuric acid concrete slowly, with falling with stirring, water can not be poured in sulfuric acid, in order to avoid set off an explosion.
Rubble in described sulfuric acid concrete with the cobble smashed or granite, must forbid limestone.
Described pickle and can not disorderly falling everywhere for the surplus waste water of above-mentioned technique, care should be used to pours sewer into.
During the residual building of described first step detection of fires, for safety, should successively prick to shore in advance and prop up, make provision against emergencies.
Described first step intensity detection, successively should divide flooring, wall, post subregion multi-site determination, ensures that data are representative.
Embodiment 1:1991 applies this technology January, repairs the roof truss that in former Shaoguan valve plant, butterfly workshop three Pin damages, only uses fund about 50,000 yuan, 29 days used times, rebuild if dismantle and about need fund 400,000 yuan, about half a year consuming time, contrast economizes on the use of funds 350,000 yuan, time shorten 5 months.
Embodiment 2:1991 applies the Red Star department store, Shaoguan, fire residual building of this technology reparation May, test through 22 years (1991-2013), still as excellent as before, not occurring any problem, is exactly fabulous illustration, whole maintenance cost about 500,000 yuan, the only 105 days used time (time has packed and repaiied air-conditioning, water power, counter interior), if push over reconstruction four layers about need fund 6,630,000 yuan, need to build more than 2 years, contrast economizes on the use of funds 6,130,000 yuan, shortens 24 months time.
Embodiment 3: 70 years last century Shanghai Machinery Import and Export Corporation, buy one and be built in the nineteen twenty-two high three floor half area 3500m in building
2aging blocks, amassed 6000m for reconstructing into six aspects
2new building, earnestly find building constructor 8 years in Shanghai City unmanned ready to work, my company applied this technology after entering and carried out strengthening reconstruction afterwards, became six floor modern architectures.After completion, Shanghai Machinery Import and Export Corporation and Shanghai City capital construction commission very satisfied.Shanghai City capital construction commission has specially met my company cadres and technical personnel, and Shanghai Machinery Import and Export Corporation also sent special messenger afterwards, comes Shaoguan from afar and gives silk banner, express thanks.
The present invention possesses 1, uses this technique can repair the building of most of obsolete building, particularly concrete on fire; 2, can significantly reduce costs, the shortening time; 3, applying after the form removal of this technology need not trickle maintenance, can saving water resource and the energy, for the region that freshwater resources lack, has great meaning; In sum, pickling technical economic benefit, social benefit and ecological benefits are remarkable, and technology maturation is practical, the feature that DEVELOPMENT PROSPECT is wide.
Claims (7)
1. make the molten building renovation technique be integrated of new and old concrete, it is characterized in that processing step is:
The first step: intensity detection, destroys damage or the concrete that burns out of fire, measures the old concrete strength of residue with Schmidt hammer, and residue concrete strength >=1OO# (C1O) namely can be used as to strengthen mending repairs foundation admittedly;
Second step: calcium carbide detects, the old concrete of the part that staggers or destroy the old concrete of damage, dips in upper phenolphthalein liquid with cotton fibre and is applied to the old concrete of residue on the surface, show the old concrete of pink expression and carbonize, should carry out pickling after 1 minute;
3rd step: do template, carry out template by size, one side will be created smooth in order to the demoulding inwards, and ensure the quality of products for convenience of operation, column template should be divided into two to three joints;
4th step: pickling, wipes the concrete surface of staggering clear with wet rag, do not rinse concrete surface with water, dips in pickle and is evenly applied to old concrete surface, require once to complete, do not repeat after dry with bamboo band handle hairbrush;
5th step: smash pouring concrete, first installation form can be smash and water, sulfuric acid concrete wants on-the-spot artificial hand to fry, now fry existing using, want how many how much to fry, smash while insert real, namely install second section template and smash after having smash first segment and water, the one side of Section of three template will stay a breach, and breach is positioned at the top board place of post, finally fill up from breach charging, or from boring hole upstairs, smashing and tamping from charging above to during capital, the rubble in sulfuric acid concrete must with the cobble smashed or granite, forbidding limestone, wherein sulfuric acid concrete 1m
3materials: 400 grade cement with 402 kilograms, the cobble of the particle diameter 10mm smashed or granite stones 0.82m
3, medium sand 0.63m
3, clean water 200 kilograms, 27% commercial sulphuric acid 2.21 kilograms;
6th step: form removal, concrete can remove template after smashing and watering 2 days, need not showering curing.
2. make the molten building renovation technique be integrated of new and old concrete as claimed in claim 1, it is characterized in that: its component of pickle and the weight ratio of described 4th step are: 27% commercial sulphuric acid 1.15 ~ 1.5, clean water 100.
3. make the molten building renovation technique be integrated of new and old concrete as claimed in claim 1, it is characterized in that: described sulfuric acid should load compared with heavy sheet glass bottle or solid plastic ware, can not use ironware, operating personnel should be with safety goggles, mouth mask, Rubber gloves, wear anti-skidding rubber overshoes, in order to avoid burn.
4. make the molten building renovation technique be integrated of new and old concrete as claimed in claim 1, it is characterized in that: sulfuric acid, when preparing, should be poured into water by described pickle and sulfuric acid concrete slowly, with falling with stirring, water can not be poured in sulfuric acid, in order to avoid set off an explosion.
5. make the molten building renovation technique be integrated of new and old concrete as claimed in claim 1, it is characterized in that: described pickle and can not disorderly falling everywhere for the surplus waste water of above-mentioned technique, care should be used to pours sewer into.
6. make the molten building renovation technique be integrated of new and old concrete as claimed in claim 1, it is characterized in that: during the residual building of described first step detection of fires, for safety, should successively prick to shore in advance and prop up, make provision against emergencies.
7. make the molten building renovation technique be integrated of new and old concrete as claimed in claim 1, it is characterized in that: described first step intensity detection, successively should divide flooring, wall, post subregion multi-site determination, ensure that data are representative.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410013060.7A CN103821381B (en) | 2014-01-13 | 2014-01-13 | A kind ofly make the molten building renovation technique be integrated of new and old concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410013060.7A CN103821381B (en) | 2014-01-13 | 2014-01-13 | A kind ofly make the molten building renovation technique be integrated of new and old concrete |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103821381A CN103821381A (en) | 2014-05-28 |
CN103821381B true CN103821381B (en) | 2016-03-02 |
Family
ID=50756646
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410013060.7A Expired - Fee Related CN103821381B (en) | 2014-01-13 | 2014-01-13 | A kind ofly make the molten building renovation technique be integrated of new and old concrete |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103821381B (en) |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3983002B2 (en) * | 2001-03-07 | 2007-09-26 | トピー工業株式会社 | Method and structure for repairing and reinforcing steel structural members of existing construction structures |
KR100432318B1 (en) * | 2001-08-24 | 2004-05-22 | 김기태 | use a carbon point the existing structure of repair & reinforcement method or construction |
CN102070317B (en) * | 2010-11-26 | 2012-07-25 | 北京新奥混凝土集团有限公司 | Mineral admixture concrete |
-
2014
- 2014-01-13 CN CN201410013060.7A patent/CN103821381B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN103821381A (en) | 2014-05-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105421254B (en) | In-situ repairing method of upper pinner of rail transit bridge support and pinner formwork | |
CN107059536B (en) | A kind of new-to-old concrete interface bar planting adhesive method | |
CN108032424A (en) | A kind of production technology of prefabricated component stair | |
CN102839824A (en) | Steel-bonded reinforcement method for steel structure | |
CN102678136B (en) | Dual-reduction turnover construction process for sprayed concrete | |
CN105756365B (en) | A kind of method of rapid reinforcement beams of concrete | |
CN101871267B (en) | Composite strengthening technology of aged reinforced concrete beam | |
CN104389439A (en) | Strengthening method for reinforced concrete column | |
CN106316325A (en) | High-strength repairing material for concrete cracks and construction method of high-strength repairing material | |
CN104060760A (en) | Layered construction method for oversized concrete beam of structural transfer floor of high-rise building | |
CN103526953B (en) | The roof panel processing method that bearing capacity is inadequate | |
CN103821381B (en) | A kind ofly make the molten building renovation technique be integrated of new and old concrete | |
CN102676181B (en) | Coke oven door lining brick repairing process | |
CN203546602U (en) | Prestressed corrugated-pipe protecting device used in concrete-pouring process of beam | |
CN104453235B (en) | Current conversion station fire wall construction technology | |
CN110863670A (en) | Method for repairing corrosion of tower foot of transmission steel tower | |
CN101551049B (en) | A method for reinforcing overhead concrete pipeline | |
CN208777143U (en) | A kind of oblique prestressing force cement concrete cracks repairing structure | |
CN106337566A (en) | High-strength repairing method for hole of cement prefabricated component | |
CN205857636U (en) | A kind of Mortar spraying machine with elevating function | |
CN211621264U (en) | Glue injection device for treating concrete cracks | |
CN208056611U (en) | A kind of wall-connecting piece being used in turn | |
CN209429284U (en) | A kind of overlength reinforced concrete water pond expansion joint processing mechanism | |
CN202482897U (en) | Concrete structure | |
CN202787098U (en) | Maintenance and reinforcement structure for aged concrete construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160302 Termination date: 20190113 |